Home / Suncorp Group / Determination 956541

Determination 956541

Cash settlement amount for roof rectification, internal repairs and mould remediation after faulty insurer repairs

FirmSuncorp Group
Decided2024-03-12
ProductGeneral Insurance · Home building and contents
OutcomeFor the complainant in part
Amount awarded$33,755
Non-financial loss$2,000
Amount claimed—
SourceAFCA PDF

Summary

Complainants disputed the insurer's cash settlement for faulty roof repairs, internal damage and mould after a hail claim. AFCA partly upheld the complaint, requiring payment of half the roof retiling cost with 20% contingency, increased internal contingencies, mould remediation and $2,000 non-financial loss.

The insurer's faulty repairs caused further damage and its assessment was inadequate, so fair settlement required half the retiling cost, 20% contingencies and mould cover, but not full roof replacement or painting.

Issues

Subjects and remedies

home or building damagenatural disasterpay claimpay compensationpay non financial loss

Related

All Suncorp Group determinations · Find similar determinations

Text of the determination

Determination Case number 956541 Financial firm AAI Limited Determination | Case number: 956541 Page 1 of 29 Case number: 956541 6 February 2024 1 Determination overview 1.1 Complaint On 31 October 2018 the complainants lodged a claim for hail damage to the property with the financial firm (insurer). The insurer accepted the claim and repaired the roof. In October 2021 the complainants notified the insurer of issues with its roof repairs. In October 2022, the insurer authorised its builder to complete the roof remediation works and cash settled the complainants for additional internal damage. On 11 November 2022 the insurer’s builder notified the insurer it could not complete the repairs because it could not warrant the work due to the undamaged roof tiles being painted previously. The insurer advised the complainants and made a cash settlement offer for the roof rectification works. The complainants agree to be cash settled for the repairs, however they are dissatisfied with the insurer ’s proposed amount. They want the insurer to cover the costs of retiling the entire roof, pay a 40% increase on cash settlements received, and cash settle the mould remediation. Further, they say the insurer misled them and mishandled the claim. 1.2 Issues and key findings Has the insurer correctly assessed the roof rectification works? No. The insurer must cover half the complainant’s quote for roof retiling and include a 20% uplift, but not including sarking for the reasons provided in this determination. The insurer is to cash settle the claim as set out in section 2.1. Is the insurer required to increase its offer for internal damages? Yes. The insurer must increase the cash settlement offer for the outstanding internal repairs by 20%. The insurer must obtain a quote for the mould remediation and cash settle the complainants with a 20% contingency applied for the transfer of risks to the complainants. The insurer is to pay the complainants as set out in section 2.2. Did the insurer misled the complainants? The insurer’s decision to cash settle the roof repairs after having authorised the repairs can be seen has misleading. However, the loss suffered by the complainants as a result is adequately covered by the additional settlement awarded by this determination. Accordingly, it is not fair to award compensation for this. Are the complainants entitled to compensation for non-financial loss? The complainants experienced delays with their claim, causing them and their family undue stress and inconvenience. Accordingly, it is fair to award the complainant’s $2,000 non - financial loss compensation. Determination | Case number: 956541 Page 2 of 29 1.3 Determination The determination is partially in favour of the complainants. The insurer must settle the complainants $22,980 for the roof, a further $10,774.79 as contingency towards outstanding internal repairs. The insurer must obtain an actionable quote for mould remediation and cash settle that amount plus a twenty percent uplift. The insurer is to pay $2,000 non-financial loss compensation. Determination | Case number: 956541 Page 3 of 29 2 Reasons for determination 2.1 Has the insurer correctly assessed the roof rectification works? Complainants maintain roof damage is extensive Before lodging the complaint with AFCA, the complainants wanted the insurer to complete the rectification works to the roof. However, the complainants have now accepted the insurer’s decision to cash settle the repairs as they have lost trust in the insurer. I am satisfied a cash settlement in circumstances where works cannot be warranted, and the relationship has broken down, is fair. The complainants say the insurer should be liable to cover the costs of retiling the entire roof. The complainants say there are well over 100 broken tiles. They say broken tiles cannot be identified unless each roof tile is lifted individually and inspected because they are overlapping. The complainants rely on their expert CGB ’s’ observations that ‘many cracked water courses are not obvious until the overlapping til e is removed’. The complainant s also rely on photographs depicting cracked tiles underneath the overlapping tiles which were removed. The complainants have provided their own photographs of the different sections of the roof and marked and counted approximately 112 tiles visibly damaged tiles on those photographs. The complainants say the number of broken tiles is far greater than this. This is in line with the complainant ’ s roof report from A6, which says it observed too many broken tiles to count during its inspection of the roof. It attributes the cause of damage to foot traffic. The complainants also rely on their own photographs of the tiles taken from the roof cavity during wet weather which shows water seeping into the roof cavity along the tiles. Complainants want roof retiled The complainants provided a further opinion from CGB which recommends the removal and disposal of the existing tiled roof and instalment of a new roof and a quote from MG for the same for $36,300 (excluding sarking). The complainants want the insurer to cover these costs and say they will bear the costs of installing sarking. The complainants also submit that if the insurer does not cover the costs of retiling the entire roof, it should be liable to cover the costs of painting all the roof tiles to create a uniform look and put the roof in the condition it was in before the damage. Insurer says it assessed works correctly The insurer accepted liability for poor roof repairs, and acknowledges it is likely there is further unforeseen damage. Its cash settlement offer for the roof is $11,066.84, being $7,066.84 for the replacement of 100 tiles, with a further $4,000 as contingency to be applied towards painting the replacement tiles. This offer is based on its builder, R’s q uote submitted on 15 August 2022. The insurer says the offer is fair because the roof report from its expert SCR dated 11 November 2022 found approximately 50 damaged tiles and the offer allows for those plus an additional 50 tiles for unforeseen damage. Determination | Case number: 956541 Page 4 of 29 The insurer says it is not liable to cover the costs associated with painting the tiles. Information shows insurer’s assessment is not accurate In view of the available information and given the insurer acknowledges it is likely there is further, unforeseen damage, I accept the complainants ’ submission that some cracked tiles cannot be seen unless the overlapping tile above is removed. However, I am not persuaded the insurer should be liable to re-tile the entire roof. While the three roof reports obtained by the insurer all found in the vicinity of 50 tiles requiring replacement I am not persuaded these reports are accurate. This is because the photographs provided by the complainants show there are a lot more than 50 tiles requiring replacement. The insurer says A6 findings that there were to many broken tiles to count is not supported by any photographic evidence. The insurer’s assessor suggests the discrepancy between the insurer’s latest roof report dated November 2022 and the complainants could be due to people/ trades the complainants have engaged to access the roof since November 2022. On balance, I consider this speculative and am not persuaded the insurer can establish this with any degree of certainty. Rather on balance I am satisfied the number of broken tiles on the roof is greater than 100 and due to faulty repairs completed by the insurer and missed damaged tiles caused by foot traffic on the roof as a result of SES staff attendance. This is because the information available does not show all the tiles on the roof are damaged and require replacement. There is no expert evidence or other information demonstrating, on the balance of probabilities, the damage is so extensive the entire roof needs to be replaced. Accordingly, I am satisfied it is fair and reasonable the insurer cover half of the costs of retiling the entire roof. This is because, on balance, I am satisfied the number of damage tiles is far greater than 100 tiles but not enough to warrant a full roof replacement. Further, given the transfer or risks and life warranty to the complainants I am satisfied it is fair and reasonable a further 20% contingency should apply. I am satisfied this is the fairest approach given the exact extent of damage is uncertain. Insurer not required to cover painting costs I accept painting all the roof tiles would create a uniform look. However, under the policy the insurer is only liable to cover the costs of replacing the damaged tiles. Therefore, it would not be fair to require the insurer to cover the costs of repainting all the roof tiles. Accordingly, on balance, I am satisfied the insurer is not liable to cover these costs. Insurer liable to cover half of the roof retiling costs The complainant provided a quote from A6 for full roof repairs for $36,300 (not including sarking) and a quote for $1,200 for the removal and refit of the complainants’ solar panels . In line with this determination’s findings, the insurer must cash settle the complainant $18,150 towards the roof repairs with a further 20% contingency of $3,630. Accordingly, the insurer must pay the complainants $21,780 and a further $1,200 for the removal and re-installation of the solar panels. Determination | Case number: 956541 Page 5 of 29 2.2 Is the insurer required to increase its payments for outstanding internal damages? Outcome complainants seek is excessive Five payments totalling $84,158.32 were made for:  $18,013.84 for internal repairs  $31,134 for outstanding bathroom repairs  $1,100 for complainants ’ costs for his expert report  $11,170.75 for temporary accommodation  $22,739.93 for outstanding internal repairs. The complainants seek a 40% increase on the total amount of cash settlement payments received. The complainants submitted costs of labour and materials increase every month but have not provided information to support this. I accept there is an ongoing increase in costs of materials and trades in the current economic climate. However, I am not persuaded the increase warrants a 40% uplift. This is well in excess of what AFCA usually considers a reasonable uplift to account for transfer of risk and loss of warranty. Further I am not satisfied it is fair to apply and uplift to all payments to date. This is because:  the payment for $18,013.84 relates to repairs already completed  the $1,100 was a reimbursement of the complainants ’ report fees  the $11,170.75 payment was for temporary accommodation costs sourced from Airbnb. Nevertheless, I am persuaded the insurer must increase its settlement liability. Insurer must include adequate contingency for internal repairs The insurer submits no contingency should be applied to the bathroom payment because the figure is based on the complainants ’ quote which was approximately 20% higher than the insurer ’s quote. I am not persuaded by the insurer’s submission. This is becau se the complainants still bear the transfer or risks and lifetime warranty. The bathroom and the outstanding internal repairs have not been completed because the roof remediation works have not been attended to, due to the ongoing dispute, neither the roof repairs or outstanding internal repairs have been completed. Further, the insurer has not provided any information to show the complainant’s quote is excessive. Conversely, the insurer’s quote is based on its preferred repairers quote. There is no information to show this is the established market rate for the repairs. Therefore, in view of the above, I am satisfied it is fair a contingency should be applied to allow for the transfer of warranty and risk to the complainants. The insurer acknowledged no contingency was allowed for the other outstanding internal repairs and that 15% was appropriate. I am not persuaded 15% is fair. Rather I am satisfied 20% is more appropriate to allow for the likely increase in costs of materials and trades, transfer of other risks and loss of warranty. Accordingly, the insurer must pay the complainants the previously offered cash settlement plus:  $6,226.80 as 20% contingency for the bathroom repairs  $4,547.99 as 20% contingency for outstanding internal repairs. Determination | Case number: 956541 Page 6 of 29 Insurer liable for mould remediation The insurer obtained a mould assessment report from MCCP. The report found the roof cavity was affected by mould and included recommendations for remediation. Relevantly the insurer says this is not a causation report. The insurer has declined to cover the remediation costs. It relies on its assessor’s reports of 15 September 2023 which found that the cause of the mould is not attributable to the original hail event. The assessor found that the moisture ingress observed on th e complainant’s photographs of the tiles is due to paint/ debris blocking the water channel on the tile and therefore should not be covered. The proximate cause of damage is the effective or dominant cause of the claimed damage. It is neither the first, last or sole cause of such damage. It is what had the most significant impact in bringing about the claimed loss. It must be determined on the balance of probabilities and requires a common-sense evaluation of the applicable facts and circumstances. Even if I accept the assessor’s analysis , I am not persuaded that moisture ingress is likely to be the proximate cause of mould in the roof cavity. There is limited information about the extent and duration of this issue. Conversely, there is no dispute the in surer’s faulty roof repairs clearly allowed further water ingress and caused internal damage. This is supported by the complainant’s information, including photographs showing water seeping into the roof cavity from the damaged tiles during wet weather. On balance, I am persuaded this is more likely to be the dominant cause of mould in the given circumstances. Therefore, I am satisfied the insurer should cover the mould remediation in the roof cavity. The insurer must obtain an actionable quote for the mould remediation and cash settle the complainants with a 20% contingency applied for the transfer of risks to the complainants. 2.3 Did the insurer misled the complainants? Insurer did not mislead complainants The complainants say the insurer engaged in misconduct. However, the complainants have not provided any evidence to support this allegation. The complainants say the insurer misled them because the insurer authorised the roof repairs and reversed its decision based on SCR’s findings abo ut the paint on the tiles. The complainants say SCR’s report is at odd s with the other roof reports. SCR’s report is the only one which raises the issue of the tiles being painted. I accept this was the first time the issue was raised and none of the othe r insurer’s appointed builders raised any concerns about their ability to do the roof repairs and warrant their work. Relevantly, the insurer did the initial roof repairs which turned out to be faulty. However, from the images provided it is clear the roof tiles have been painted. I accept the insurer changing its position from repair to cash settle during the course of a complaint is misleading. However, even if I accept the insurer misled the complainants by changing its decision to complete the repairs, I am not persuaded the complainants suffered any additional loss requiring compensation. Determination | Case number: 956541 Page 7 of 29 This is because the complainants are no longer seeking that the insurer completes the repairs and the insurer is liable to cash settle them for the roof repairs and to pay a further 20% contingency on outstanding internal repairs and roof repairs. For the reasons provided in this determination, I am satisfied this will address the complainant’s concerns and restore their claimable loss. Ultimately, it is regrettable the insurer did not go ahead with the roof rectification works. This demonstrates poor claim handling on its part. Accordingly, it will be addressed under compensation for non-financial loss below. 2.4 The complainants are entitled to compensation for non- financial loss The complainants are entitled to compensation for non-financial loss. The complainants experienced delays with their claim causing them undue stress and inconvenience. AFCA can award compensation in certain circumstances AFCA’s rules enab le it to award compensation to a complainant for non-financial loss outside of the policy terms (capped at $5,400). Compensation for non-financial loss is limited. AFCA may decide an insurer should compensate a complainant for such a loss only where there has been:  an unusual amount of physical inconvenience,  time taken to resolve a situation, or  interference with the complainant’s expectation or enjoyment or peace of mind. AFCA takes a conservative approach to compensation for non-financial loss and expects a complainant to be moderately robust and bear the usual degree of inconvenience when managing a claim. Complainants entitled to compensation for claim handling experience The insurer’s decision not to go ahead with the roof repairs had a significant impact on the complainant. The complainants had lined up trades to commence the internal repairs in January 2023 and was compelled to cancel them. To date no repairs have been done because the roof must be remediated before the internal repairs can occur. The complainants continue to live in a damaged home which is subject to ongoing water ingress. The complainants have suffered a significant amount of stress and inconvenience as a result. Further, in view of this determination’s findings, I a m satisfied the insurer’s handling of the claim was less than ideal, and its final position and offer for roof repairs is inadequate and not reasonably formed. Given this, I find the complainants are entitled to non-financial loss compensation. The insurer has offered a $1,000 ex-gratia payment in recognition of the complainant s’ overall claim experience. In view of the above I am not persuaded this is sufficient Rather, I am satisfied it is fair in the circumstances that the insurer compensates the complainants $2,000 for non-financial loss. This is because the complainants have been living in a home subject to water ingress and with internal damages for a significant amount of time. Determination | Case number: 956541 Page 8 of 29 2.5 Why the outcome is fair The outcome is fair in all the circumstances because the insurer failed to reasonably assess its liability and did not handle the claim properly. Determination | Case number: 956541 Page 9 of 29 3 Supporting information 3.1 The AFCA process AFCA’s approach is based on fairness AFCA has determined this complaint based on what is fair in all the circumstances, having regard to:  the legal principles  applicable industry codes or guidance  good industry practice  previous decisions of AFCA or its predecessor schemes (which are not binding). The respective parties have completed a full exchange of the relevant information, and each party has had the opportunity to address any issues raised. We have reviewed and considered all of the information the parties have provided. While the parties have raised a number of issues in their submissions, we have restricted this determination to the issues that are relevant to the outcome. We assess complaints on available information and circumstances AFCA is not a court of law. We do not have the power to take or test evidence on oath, or to require third parties to give evidence. When we assess complaints, we consider:  available documents  the recollections of the parties  all relevant circumstances. We give more weight to documents created at the time the events occurred. If there are no relevant documents, we will decide what most likely occurred based on the available information. If there are conflicting recollections and these are evenly weighted, we may find that a claim cannot be established. 3.2 Relevant supporting information Relevant expert reports extracts CGB report dated 29 December 2023 CGB Accredited with Master Builders Association of NSW Inspection and report by: CS (Licensed Builder) ‘Roof (page 3) a. The roof has Monier cement tiles laid at an approximate pitch of 21 degrees. Tiles have been spray painted with replaced tile patches have been added with failed paint. See photos 1, 2 and 3. Determination | Case number: 956541 Page 10 of 29 CGB report dated 29 December 2023 CSH (Licensed Builder / Supervisor ) Building Consultant accredited with Master Builders Assoc (NSW) b. The roof is hip and ridge construction with Dutch gables at 3 ends. See plan marked in red. c. Roof trusses and battens are of Pine timber. d. No sarking is evident. e. A number of cracked and defective tiles have been left in water courses that are cracked through allowing ingress onto the new bathroom ceiling, living, and garage/rumpus rooms. See photos 4,5,6,7,8 and 9, showing typical throughout the roof. Note, many cracked water courses are not obvious until the overlapping tile is removed. It is likely many of these tiles were cracked with SES temporary “make safe” works and were not identified or repaired. f. Attempts were made to seal tile joints as water courses were cracked beneath. See photo 10 where sealant has been applied. These tiles sho uld have been replaced. Roof space a. The roof has Monier cement tiles laid at an approximate pitch of 21 degrees. Tiles have been spray painted with replaced tile patches have been added with failed paint. See photos 1, 2 and 3. b. The roof is hip and r idge construction with Dutch gables at 3 ends. See plan marked in red. c. Roof trusses and battens are of Pine timber. d. No sarking is evident. e. A number of cracked and defective tiles have been left in water courses that are cracked through allowing ingress onto the new bathroom ceiling, living, and garage/rumpus rooms. See photos 4,5,6,7,8 and 9, showing typical throughout the roof. Note, many cracked water courses are not Determination | Case number: 956541 Page 11 of 29 CGB report dated 29 December 2023 obvious until the overlapping tile is removed. It is likely many of these til es were cracked with SES temporary “make safe” works and were not identified or repaired. f. Attempts were made to seal tile joints as water courses were cracked beneath. See photo 10 where sealant has been applied. These tiles should have been replaced.‟ CONCLUSION (page.4) a. All damage identified in this report is most likely from water ingress from the storm event and subsequent ongoing ingress due to defective repairs. RECOMMENDATIONS (page 5) a. The roof and tiles require a thorough inspection. Defective tiles with damaged water courses to be replaced with new, and undertake repairs as required including flashings. Inspection and repairs to be undertaken by a licensed roof tiling contractor to meet AS2050. CGB additional comments - email of 28 June 2023 CGB Consultants Accredited with Master Builders Association of NSW CSH „I note with interest that your insurance claim is broken down into separate issues with only the roof tiles left as a matter with AFCA. It was proven that ongoing ingress into your bathroom, after roof tiles and ceiling had been replaced by the insurance company, caused the bathroom to further dilapidate Determination | Case number: 956541 Page 12 of 29 CGB additional comments - email of 28 June 2023 with ongoing ingress from cracked tiles directly above and not visible until re moved. The false and misleading reports commissioned by the insurance company as to cause, were refuted and you have had your bathroom issue settled. I not e the assessment made by B H made mention of the same storm event that passed through Berowra with numerous claim s made under this event. S Group received a lot of call backs 1 - 2 years after the event with customers finding cracks. I do not agree with his explanation of the cause of tiles cracking. I inspected many houses in Berowra immediately after th at storm event and after insurance companies had carried out repairs, when I was approached by many home owners who had cracked roof tiles not identified and replaced. I undertook inspections and found in most cases that complete roof replacement was neces sary. Most of these cases were settled and roofs were replaced. Some owners however could not continue with the ongoing defective works being done, and excuses of wear and tear, lack of maintenance etc. There are a number of ongoing disputes I am still inv olved with where insurance companies have gone all out to not replace roofs. I will not provide a quote to replace say 100 tiles or quote to re - paint same. I stand by my Report in regard to the extent of hail damage. I recommend that the existing tiled roof be removed and disposed of, and a new tiled roof installed with heavy duty sarking to meet all relevant Australian Standards. It is my opinion that the insurance company should bear the cost of the hail/storm event damaged roof, and you cover the cost of sarking and any additional repairs not related to hail damage. I can provide quotes for same, and provide the mandatory HBCF insurance required, something most insurance company contractors do not do.‟ Determination | Case number: 956541 Page 13 of 29 SCF - Roof report dated 11 November 2022 SCF „ Comments: I‟ve been to the above address and inspected the roof. I have found 19 broken tiles only on inspection whilst on the roof. No inspection of tiles was done inside roof cavity as this is not something we carry out usually. One of the 19 tiles is under the top ridge. All top ridges are missing weep holes. We have found tiny chips in approximately 30 tiles that we don‟t believe is storm related. The roof has been painted and it appears this has caused the tiles to become porous as the paint is peel ing from the tiles. Water issues are also apparent on bottom of tiles where paint is piling up and not allowing water to run away freely. Two skylights on the back part of the roof need to be re flashed and tiles cut in properly as they are kicking up on b oth sides and will cause water to enter. Front bellcast is dropping down due to not being installed correctly. Any repairs to the job will not be warranted by us due to the poor quality of the tiles.‟ RNF Specialist Report dated 28 March 2022 R NF Assessment completed b y RNF Specialist ‘Please provide a conclusion with related damages and recommendations (page 2) As requested by RNF, Plumbing Services have attended the above - mentioned property on the 28/03 at 3.30pm at a pre - arranged meeting to i nspect and report on damages due to storm. At the time of the roof assessment, Mr. Insured advised that as a result of a previous hail event that passed through the area in 2019, subsequent hail related damage had occurred to the tiled roof line. During this period, multiple persons varying Determination | Case number: 956541 Page 14 of 29 RNF Specialist Report dated 28 March 2022 from th e SES to trade personnel have gain access to the main roof line to either install protection coverings or replace hail damaged material. Nb; Mr. Insured believes that this foot traffic has resulted in a large number of roof tiles sustaining fractures to th e under - tile water course, some of which have resulted in additional internal damage. Roof Inspection noted the following: The main roof was found to be cladded in a Monier „Centurion‟ profiled concrete roof tile with a recorded pitch reading of 20.3°. (co mpliant). For the purpose of the roof inspection each roof line was thoroughly inspected 3x times. Each tile viewed to have either a missing or fractured tile water course was marked out with white chalk. In total, approx. 46x concrete roof tiles were note d to have either missing or partially fractured water courses. Nb; When on site, the insured requested that I inspect each tile individually from within the roof cavity. In my opinion, the external assessment was thorough enough. In my professional opinion , damaged watercourses viewed and marked out on the main roof line would be attributed to a number of issues some of which are listed below. 1. Water courses sustaining hair line fractures during the manufacturing, packaging, and transportation process and being installed by trades when the main roof was cladded. The water courses then fail over time due to the general expansion & contraction process. 2. Water courses sustaining fractures due to foot traffic. Nb; The attached photo marked out with white dot s, does clearly Determination | Case number: 956541 Page 15 of 29 RNF Specialist Report dated 28 March 2022 show a line of traffic where others have used to inspect or to install tarps at the time of the storm event.‟ EMR – Roof Inspection Report dated 8 July 2022 E MR ‘Strom Works Identified During the inspection the following findings were identified as storm issues. It is recommended that these works be attended to in the near future to ensure the property remains watertight: I recommend all the cracked tiles be replaced with the exact same sized tiles – minimum 50 tiles Re point any cracks on ridge cappings Re fit any loose tiles and make them sit correctly‟ . ARR – Roof report dated 23 September 2023 ARR WH (R oof Tiler) I inspected the above roof on Wednesday 20th of September 2023 at the request of the residential owner. I was provided with and read the report of BH dated 15 September 2023. I disag ree with the report of Mr H in particular his opinion that when the roof was painted, the paint sealed the gaps between adjoining tiles causing leakage. I utilized a torch to see the underside of the tiles and could see no blockages from paint debris. On my inspection, I could find no evidence of any such issue. In my opinion as a licensed roof tiler, when a roof is painted, the paint seals the individual tile, which acts Determination | Case number: 956541 Page 16 of 29 ARR – Roof report dated 23 September 2023 as a coloured membrane for each individual tile, not as a tile to tile adhesive or seal the gaps. The paint thickness is estimated at 120 microns. Furthermor e, on my inspection of the roof many of the water courses, being the tile lip under each linking tile, were broken a number to which I felt were too many to count. In my opinion, the cause of the leaks is most likely related to damage caused by foot traffi c. Upon my investigation with the owner of the property, I was advised that on or around 2018 the property sustained substantial hail damage and to rectify such damage, emergency services followed by repatriation workman walked on the roof for the purposes of repair. I have concluded that it is such extensive foot traffic that has led to the broken, slipped, and loose tiles and consequential leaks. The tradesmen who repaired the roof previously, due to hail damage, used incorrect tiles and silicone to temp orary fix out of place tiles. The roof showed minimal roof paint peeling, with less than 2% of the whole roof being subject to paint peel. I reviewed the images supplied by the owner and believe that the damage to the tiles and subsequent water damage to the inside of the residence was from the hail event and subsequent repair work performed on or around 2018 and not the paint restoration of the roof. Insurer internal assessor report dated 14 June 2023 AAMI BH Page 3 – 5 CRACKING OF ROOF TILES. The insured has stated that his repairer recommends each roof tile is lifted individually and inspected for cracking. I do not believe this is required for the following reasons. Determination | Case number: 956541 Page 17 of 29 Insurer internal assessor report dated 14 June 2023 The second claim, Hxxxxx 9028, is for hail damage that is the same storm that passed through Berowra. Berowra is approx 40km North, North East of Chipping Norton. I assessed numerous claims in Berow ra under this event. The S Group received a lot of calls back approx 1 - 2 years afte r the event with customers advising they were finding cracked tiles on their roof. When reinspection's were carried out it was found that many of the tiles had hairline cracks that weren‟t visible immediately after the event (during initial assessments or repairs) but had become visible. The roof tiles are made from cement. With the changes in seasons, the tiles will expand in summer when they are hot and contract in winter when its colder. When the cement tile is heated during the summer months it will exp and. During the winter/colder months, the tile will contract in size. Any cracks that are present will remain open when the tile contracts, thus the cracking becomes visible. Given the panel repairer repaired the roof in 2019 I believe that if any tiles di d sustain hairline cracking it would have been visible by now as we have been through 3 - 4 years of seasonal changes. Also, as above, there is no sarking under the tiles so any cracks would likely have visible water stains to the underside of the tiles wher e the rainwater has passed through the crack. This expansion and contraction that occurs is less than millimetres and over the course of a few years, a crack that is present may only be 1mm wide, but visible. As there has been various assessment carried ou t on the roof, foot traffic is more likely to be the cause of any additional cracked tiles. Assessor agrees that an allowance should be included in the settlement for the replacement of additional tiles. An allowance of 50 tiles has been requested. Assesso r recommends 100 tiles are allowed to ensure there is sufficient coverage. While it is unlikely there will be this amount present, this amount will also Determination | Case number: 956541 Page 18 of 29 Insurer internal assessor report dated 14 June 2023 allow for any additional damages to the tiles during future repairs. PAINTING OF TILES. Based on the in formation present, it appears the tiles that were replaced have been painted. This not common practice under a repair as painting of roof tiles cannot be warranted by a repairer. As roof tiles are exposed to the elements, paint failure is almost guaranteed , with roof painting specialists generally only warranting roof restorations for 10 - 12 years. As the S Group include a lifetime warranty to repairs, this is not a risk that is usually undertaken. As above, a high volume of claims was lodged under this even t and many repairs were completed under a make safe, i.e., instead of tarping a roof to stop water ingress damages occurring, tiles were replaced to ensure the dwellings were watertight. Many tiles were replaced that were different colours but the same pro file. If a tile is of a differing profile to the existing is installed, the watercourses on the tiles do not match and the tile will not be seated correctly, this will allow water ingress. I cannot state why the tiles were painted. What should have occurre d, and usually does, is the allowance for painting of the damaged tiles only is cash settled to the insured. The insured can then use these funds as a contribution to have the entire roo f painted, as above, the S Group cannot warrant this as part of a repa ir. It is also common practice to remove undamaged tiles from the least visible elevation of the dwelling and use these to replace the damaged tiles with the new (potentially) different coloured tiles used to replace the undamaged tiles from the least visi ble elevation. This is usually to the bottom course of tiles on the side of the dwelling or over a pergola. This will aide in providing a more uniform appearance to the roof. One of the submitted reports states the paint is failing across the entire roof. By the insure ds own admission on claim Hxxxxx 3892, he had roof maintenance Determination | Case number: 956541 Page 19 of 29 Insurer internal assessor report dated 14 June 2023 completed approx 2 years earlier. Images contained in the initial Home Repair roof report show close - up photos of the roof tiles and it is visible in these photos that the paint tha t has been applied to the tiles is thin and has worn due to exposure to the elements. These images were taken 8/11/2018, over 4 years ago. It would be expected that the condition of the paint has worsened in the time that has passed since the initial Home Repair report. As stated above in this report, painting of roof tiles cannot be guaranteed for an extended period. Given the insured had the roof painted approx 8 years ago, possibly longer as the insured has only stated he had maintenance completed 2 year s prior nd does not specify the roof was painted, the paint that has been applied would be approaching the end of its serviceable life and would require a new application. As the entire roof does not form part of the claim, this would not be covered under either of the claims. Based on the above I believe the allowance provided for painting of the tiles that have been replaced is sufficient. The allowance for painting should be increased to cover the 100 additional tiles only as a gesture of good will to th e insured. Assessor recommends the above information is used to settle the claim. Insurer internal assessor report dated 15 September 2023 AAMI BH Assessor has reviewed the hygienist report regarding the possibility of mould contamination in the ro of space at the insured site and spoken with M from BB regarding his attendance. Assessor has also reviewed the emails submitted by the insured showing the condition of the underside of the roof tiles. The hygien ist report submitted by BB was carried out by hygienist Mr AN . Determination | Case number: 956541 Page 20 of 29 Insurer internal assessor report dated 15 September 2023 The report outlines that inspection that was undertaken at the site and the results of the inspection. The report states - "Based on the information presented in this report, it i s the opinion of MP that: • Visible mould was observed w ithin the roof space on timber joists • No damp or musty odours were perceived throughout the subject area during the inspection • Mould surface sample MSS1 collected from the timber joist in the roof space returned mould spore concentrations which were c onsidered „Very High‟ and showed high levels of intact fungal hyphae. • The dominant genus within sample MSS1 was Cladosporium which is associated with water damage in buildings. The presence of high levels of intact hyphal structures indicates recently active mould growth; • No elevated moisture readings were observed throughout the roof space • Due to the levels of mould identified wit hin this report, MP recommends remediation works are undertaken to reduce these levels". MP have provided the followi ng remediation plan based on the report. "• Any moisture ingress issues should be addressed prior to remediation works commencing; Roofing should be assessed prior to undertaking any internal remediation works; • The following building materials should be removed as a part of remediation works: Roof space, yellow insulation batts, throughout; • The following building materials should be cleaned and remediated: Roof space, timber joists and framework, throughout; Determination | Case number: 956541 Page 21 of 29 Insurer internal assessor report dated 15 September 2023 Roof space, top side of gyprock ceilin g linings, throughout". This was discussed with BB. He has advised the remediation based on the findings would be to remove the insulation batts and carry out a Hepa vacuum of the ceiling space. This report was based on the findings that were evident at the time of the inspection, the report does not provide a causation. The MP inspection was carried out on 25/8/2023. Mr insured has submitted two emails on 14/9/2023. These emails contain images Mr insured has advised he took on 30/8/2023, 5 days after the MP assessment. Mr insured has advised he took these images as it was raining at the time, and he was showing various points of water ingress through the roof. The images supplied by the insured show the underside of the roof tiles with what appears to be moisture coming through. It was noted that all the images showing this show moisture along the joints of the tiles, not coming through the tiles. This would suggest the tiles are not broken/ cracked from impacts, rather that the watercourse or water ch annel in the roof tile is blocked not allowing rainwater that has entered the joint between the roof tiles to escape as per the design of the roof tile. It is noted on the claim that the insured had completed a roof restoration shortly before the event o ccurred. It is this assessor‟s opinion that the moisture ingress noted by the insured can be related to paint/debris blocking the water channel on the tile. This is not related to the claimed event, Determination | Case number: 956541 Page 22 of 29 Insurer internal assessor report dated 15 September 2023 rather the restoration of the roof. When a roof is paint ed, the paint will seal the gap between the adjoining tiles and the water channel on the nose of the tile prohibiting water that enters into the joint from escaping. Given the time since the restoration was completed by the insured, exposure to the element s, and the foot traffic that has passed over the roof, it is likely movement of the tiles would have occurred causing the paint covering the joints to crack. Based on the insureds submitted images, the ingress shown is not claim related, therefore assesso r does not recommend the remediation outlined by the hygienist is covered under the claim. As above, the hygienist report is not a causation report and only outlines the findings at the time of the inspection. The images supplied by the insured do not sho w any evidence of cracking to the tiles, only moisture uptake along the edges of the tiles suggesting the ingress is occurring through the joints, not through cracking. The remaining reserve of $5,000.00 does not require amending at this stage of the cla im. Insurer internal assessor’s report dated 6 October 2023 B AAMI Page 6 The insured has submitted a quot e from MR for the sum of $38,610.00 to remove and replace all roof tiles and battens and install sark ing. It should be not ed there is no sark ing under the roof tiles at present and has not been since the time of construction. This quote provides a total cost for t he work but does not provide a break down of costs with quantities. Based on this, I am unable to Determination | Case number: 956541 Page 23 of 29 Insurer internal assessor’s report dated 6 October 2023 determine if the quote is fair and reasonable. I do not believe the damages sustained during the hail event were substantial enough to warrant a full roof rep lac ement. The images submitted by the insured show moisture ingress around the perimeter of the tiles and no crack ing is visible from the underside of the tiles. This is what led me to believe the watercourse or water channel in the roof tiles are block ed , not allowing rainwater that has entered the joint bet ween the roof tiles to escape as per the design of the roof tile. This is discussed in greater detail in my report submitted on 15/9/2023. The SCF report also discusses the issues and contains images to show what the author notes as issues with the tiles. The report by hygienist of MP was reviewed and discussed fully in the report submitted on 15/9/2023. The repo rt by MP does include a remediation plan for mould that was found in the roof. The testing found Cladosporium which is associated with water damage. The presence of high levels of intact hyphal structures indicates recently active mould growth. As noted in the hygienist report, there was no evidence of elevated moisture levels in th e roof space at the time of the inspection. Mr insured submitted images from inside the roof space tak en 5 days after the MP inspection was complet ed and advised it was raining at the time he took the images. As I have previously discussed, the moisture noted in the roof space, shown in the insureds submitted images, was noted to be entering around the perimeter of the tiles. The cause of this was discussed in the S CF report. Based on these t wo reports I have recommended the hygienists remediation recomm endations were not carried out under Determination | Case number: 956541 Page 24 of 29 Insurer internal assessor’s report dated 6 October 2023 the claim as the cause of the mould has not been related to the hail event. When noting the condition of the roof in their report, SCF state - “Any repairs to the job will not be warranted by us due to the poor quality of the tiles.” Mould assessment report dated 4 September 2023 AN Page 5 Recommendations Based on the information presented within the body of this report, Mc C P recommends the following remediation works. All remediation and removal works should comply with IICRC S520 standards: • During works personnel accessing the subject area must wear appropriate PPE and a facial fit test is recommend for any personnel undertaking remediation works; • Any moisture ingress issues should be addressed prior to r emediation works commencing; o Roofing should be assessed prior to undertaking any internal remediation works; • The following building materials should be removed as a part of remediation works: o Roof space, yellow insulation batts, throughout; • The fol lowing building materials should be cleaned and remediated: o Roof space, timber joists and framework, throughout; o Roof space, top side of gyprock ceiling linings, throughout; Determination | Case number: 956541 Page 25 of 29 Mould assessment report dated 4 September 2023 • Air filtration devices fitted with High Efficiency Particulate Air (HEPA) fi lters should be installed throughout the subject area for the duration of remediation works; • Any additional visible mould observed or uncovered during works should be remediated or removed at the remediators discretion; • Ensure all air filtration device s are switched off 24 hours prior to undertaking the clearance or PRV inspection; and • Remove containment measures after receiving a mould clearance / PRV report for the subject area from an experienced Occupational Hygienist. Product disclosure statement What we do not cover – general exclusions Page 40 .. You are not covered under any section of your policy for damage, loss, cost or legal liability that is caused by, arises from or involves: Wear, tear and gradual deterioration wear, tear, rust, fading, rising damp, mould, mildew, corrosion, rot, action of light, atmospheric or climatic conditions or gradual deterioration such as, but not limited to : • tiles and their adhesive or grouting br eak ing down; Determination | Case number: 956541 Page 26 of 29 What we do not cover – general exclusions • weathering of roof tiles or roof ridge capping; • gradual weathering and break down of brick s, mortar or concrete. .. How we settle building claim s Page 45 .. If we agree to pay a claim for loss, theft or damage to the building, we will decide if we will: • repair damage to the building; • rebuild the building; • pay you what it would cost us to repair or rebuild the building; • pay you the building sum insur ed shown on your certificate of insurance; Note: This does not apply if you have selected the Complete Replacement Cover® option. • give you a voucher, store credit or stored value card for the amount it would cost us to repair or rebuild an item. If we rebuild (or pay you what it would cost us to rebuild), we will do so on a `new for old‟ basis. If we repair (or pay you what it would cost us to repair), we will at our option do so on a `new f or old‟ basis or repair to a similar condition to what the bui lding was in before the loss or damage occurred. Unless we tell you otherwise, we will deduct any amounts you owe us from any amount we owe you. We will not: Determination | Case number: 956541 Page 27 of 29 How we settle building claim s • pay more than the relevant sum insured (unless you have the Complete Replac ement Cover® option ) or policy limit; • pay extra to repair or rebuild the building to a better standard, specification or quality than it was before the loss or damage occurred except as stated in the meaning of „new for old‟; • fix a fault that existed before the loss or damage occurred. „New for old‟ means: • New materials, new it ems we rebuild or repair wit h new it ems or new materials that are available at the time of replacement or repair from Australian suppliers. • New for old, regardless of age we rebuild or repair regardless of age, with no allowance for depreciation. • Same type, standard and specification as when new we replac e or repair to the same type, standard and specification (but not brand) as when new. If the same is not available, i t means of a similar type, standard and specification (but not brand) when new. We can replace wit h a different brand. „New for old‟ does not: • include paying the extra cost of replacing or purchasing an extended warranty on any item; • mean of a bette r standard, specification or qualit y than when new. .. Dealing with defects Determination | Case number: 956541 Page 28 of 29 Dealing with defects Page 49 .. If a k nown defect is the cause of the damage We do not pay for loss or damage caus ed by a defect, structural fault or design fault at the building that you k new about (or should reasonably have k nown about) and did not fix before the loss or damage occurred. If an unk nown defect is the cause of the damage If an incident covered by your policy damages the building and an unk nown def ect was the cause or part of the cause, we will pay for the resulting damage. If the unk nown defective part of the building is also damaged by the same incident, we will f ix this as well. We do not rectify structural or design faults When we accept a claim, we will not pay extra to rectify a structural or design fault at the building that you k new about (or should reasonably have k nown about). We will only pay you what it would have cost us to fix the damage from the incident covered by your policy or if we agree, you can pay us the extra amount it costs to rectify the structural or design fault at the building. If undamaged defective parts of the building will not suppor t repairs If undamaged defective parts of the building you k new about (or should reasonably have k nown about) will not support repairing the damage caused by an incident covered by your policy, we will only pay what it would have cost us to repair the dam age had the building not been defective. For k nown defects or faults Once you become aware of a defect, structural or design fault at the building, you must rectify it as soon as possible because there is no cover for loss or damage due to that defect. I f you do not rectify the defect or fault, you may not be Determination | Case number: 956541 Page 29 of 29 Dealing with defects covered or we might not offer a renewal of your policy.

Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.