Cash settlement amount for water damage to building; insurer relied on non-actionable quote
Text of the determination
Determination
Case number 955942
Financial firm Insurance Australia Limited
Determination | Case number: 955942 Page 1 of 7
Case number: 955942 26 September 2023
1 Determination overview
1.1 Complaint
The complainant holds a home and contents insurance policy underwritten by the financial
firm (insurer). The water filtration system in her refrigerator burst whilst she was on holiday
and caused damage to the home. The complainant lodged a claim.
The insurer accepted the claim. It offered to cash settle the complainant $48,658.33. Whilst
the complainant says there was more damage, the insurer says it is not related to the escape
of water from the refrigerator and it is not liable for this. Accordingly, the insurer also says it is
unable to arrange or warrant the claim-related repairs.
The complainant is dis satisfied with the insurer’s decision and maintains the insurer’s quote
does not address all the claim-related damage. She says the settlement should be based on
the quote obtained from her builder for $121,318.46.
1.2 Issues and key findings
Is the insurer’s offer fair?
No. The insurer’s settlement offer is not fair or adequate. The insurer is required to cash settle
the claim by paying $115,818.46. This amount is based on the quote from the complainant’s
builder, less the estimate for the glass window damage, which was not claim-related.
Is an award of compensation appropriate?
Yes. The insurer’s handling of the claim caused the complainant to experience an unusual
degree of stress, delay and inconvenience. It is fair that the insurer pays non-financial loss
compensation of $2,000.
Why is the outcome fair?
The insurer’s offer for settlement was not based on an actionable quote. This meant the
complainant retained her own builder to repair the damage. It is fair that the insurer covers
these costs, which were guaranteed, less the amount noted. Given the stress, delay and
inconvenience caused, it is also fair the insurer pays non-financial loss compensation.
1.3 Determination
This determination is in favour of the complainant.
The insurer is required to cash settle the claim by paying the complainant $115,818.46 for
building repairs. It is also required to continue paying temporary accommodation costs and
storage until these repairs are complete. Other costs are specified in section 2 of this
determination.
Within 14 days of the complainant’s acceptance of this determination the insurer is also to
pay the complainant $2,000 compensation for non-financial loss.
Determination | Case number: 955942 Page 2 of 7
2 Reasons for determination
2.1 Is the insurer’s offer fair?
No. The insurer’s settlement offer is not fair or adequate. The insurer is required to cash settle
the claim by paying $115,818.46. This amount is based on the quote from the complainant’s
builder, less the estimate for the glass window damage, which was not claim-related.
Complainant found home damaged after returning from holiday
The complainant says she returned from holiday on 8 January 2023, to find her home was
extensively water damaged. She was initially unsure if this was due to storm inundation
damage or a leak inside the home.
Subsequent investigations found most of the damage was due to a burst canister in the water
filtration system for the refrigerator. This caused water to escape and damage various areas
of the home over the course of up to a week.
The insurer accepts this damage is covered under the terms of the policy. The parties differ
over the extent and value of this damage.
Parties disagree on scope of works to repair the water damage
It is not in dispute that the insurer accepts the complainant is entitled to cover for contents,
carpets, temporary accommodation and storage. However, the parties disagree as to the
adequacy of the insurer’s scope of works (SOW) for settlement of the bui lding damage.
The insurer offered a cash settlement of $48,658.33. This amount is based on a quote from
builder WW based on a SOW from engineer CF. The insurer also included some additional
costs to resolve the matter. The insurer says it cannot undertake the work, due to
maintenance issues cited at the home by CF.
The complainant does not believe WW’s quote reflects the true cost required to repair the
property. The insurer acknowledges:
there may be additional works that increase the repair [SOW] above this amount.
The complainant wants the insurer to cash settle her in accordance with the quote prepared
by her builder, MB. This quote totals $121,318.46.
Insurer says it should only have to pay $48,658.33 for building damage
The insurer considers the MB quote is excessive and not commensurate with the extent of
damage caused by the water leak event.
CF provided a detailed review of the damage and noted water ingress damage was not
limited to the claimed event. CF says there was also water ingress through a skylight, which
leaked water onto some of the upstairs flooring. The insurer says this damage is not linked to
a storm or any other listed event in the policy. It maintains it is not liable for this damage.
Further, CF found there were several construction and other issues with the roofing, which
had the potential to permit water ingress into the home. Whilst this damage was not
considered in either SOW, the insurer recommended the issues be addressed by the
complainant. The complainant does not contest these findings.
Determination | Case number: 955942 Page 3 of 7
Based on these issues, the insurer says it should be entitled to rely on the WW quote to settle
the matter.
Frustrated by the delays and the insurer’s approach, the complainant opted to accept the MB
quote. She authorised MB to proceed with the repairs (totalling $121,318.46). The
complainant says this was a contracted amount, meaning MB would undertake the repairs for
this price, without alteration.
The insurer maintains it is not liable to settle the complainant based on the MB quote. It
agreed to pay based on the WW quote and to include a 15% contingency uplift ($6,085.87).
T he contingency uplift serves to compensate the complainant for the loss of the insurer’s
repair guarantee and the transfer of risk. The insurer also agreed to pay an additional $2,000
in ‘ good faith ’ , lifting its settlement offer to $48,658.33.
The insurer says this amount should be the limit of its obligation to the complainant for the
building damage.
WW quote missed damage caused in the claimed event
MB’s original quote was $221,196.63. This included additional maintenance and structural
works to correct defects to the roof not related to the claimed event. The insurer is not liable
for this. On 26 May 2023, the insurer offered to review its position if a further quote was
provided. Whilst the complainant provided an additional MB quote (for $121,318.46), the
insurer did not address it, re-attend the property or revisit the costs.
The complainant says the WW quote is flawed and not representative of the true extent of the
damage. She says WW did not do an onsite inspection of the damage and simply based its
figures on CF’s SOW. Further, as the insurer admitted there were some aspects of the quote
which may be revised, the complainant says it is not fair for it to be relied upon.
Given WW was not prepared to undertake or warrant the work, the panel considers the quote
is not actionable. The complainant could not rely on it to have the claimed-related repairs
addressed. The panel agrees it is not a fair basis to settle the claim.
Further, the complainant says WW’s quote did not include the following damage she insists
was caused by the claimed event:
repair of the kitchen joinery
floor patching and sanding around the refrigerator in the kitchen area
project management fees for a builder to oversee the work
a crack in a custom window
mould remediation.
The insurer has not responded to the revised MB quote or addressed the issues the
complainant raised about the WW quote. It has not explained why any of the items not
included in the WW quote would be unreasonable.
The panel considers most of the additional items cited should be part of the repair work:
Repair of the kitchen joinery – the assessment by builder LF noted there was ‘visible
swelli ng to bottom of side boards within the kitchen cabinetry’ and cupping of the floors.
Photographs confirm this. On balance, the panel is satisfied this damage was caused by
the claim-related escape of liquid
Floor patching and sanding around the refrigerator in the kitchen area - photographs
show apparent water damage and noticeable movement. CF reported high moisture
readings in the timber flooring around the balcony doors next to the kitchen and lounge
room. The panel is satisfied, on balance, the flooring was caused by the escape of liquid
Determination | Case number: 955942 Page 4 of 7
Project management fees for a builder to oversee the work – with the insurer not
undertaking the repairs, it was necessary for the complainant to have someone to oversee
the work, arrange contractors and provide a warranty. In the absence of information to the
contrary, t he panel is satisfied this builder’s fee is fair and reasonable as the damage is
extensive, as is the required repair work
Crack in the custom window - the complainant says the window cracked when the
property was vacant and was due to the site being closed off and uninhabitable for six
months. This is separate damage and not covered under the claimed event
Mould remediation – the extent of inundation, the time taken since the loss and
photographs showing apparent mould inundation lead the panel to accept remediation is
both reasonable and required.
Fair that the insurer settles the claim based on the MB quote
The terms of the policy include the Certificate of Insurance (COI) and the Product Disclosure
Statement (PDS). There is no dispute the insurer sent these documents to the complainant.
The PDS says the insurer has discretion to decide whether it repairs, rebuilds, pays the
reasonable cost to repair or rebuild or pay the sum insured for the property. Such discretion
must be exercised fairly. When making a cash settlement, the amount relied upon must be
based on an actionable quote, noting the insurer does not intend to repair the damage.
The panel accepts the WW quote is not appropriate to be used as a fair basis for settlement
of this claim, as:
it is not clear if WW based its figures on a site inspection
the quote was not actionable and therefore could not have been relied upon by the
complainant to repair the claimed damage
there is strong evidence additional damage was not considered in the WW quote
the insurer acknowledged additional damage may be present
the complainant obtained a viable alternate quote
the insurer did not review or consider this quote as it undertook to do.
Given the above, the panel considers the only viable alternative is that the insurer must settle
the complainant based on the MB quote.
However, this quote includes an allowance for the window damage, which the panel accepts
is not part of the claim. The quote allows $5,500 for this repair, which the panel agrees should
be removed.
Therefore, the panel is satisfied the insurer must pay the complainant $115,818.46.
Insurer is not required to all additional costs sought by the complainant
The complainant also sought cover for additional items not included in the SOW.
She wants reimbursement to purchase and install a new hot water heater for $3,859.04. The
insurer agreed to cover these costs.
The complainant also provided quotes for gardening ($1,750) and pool ($2,500) expenses.
She says both have effectively fallen into disrepair whilst her family have not been living at
the home. The complainant believes the insurer should reimburse her for these expenses.
Whilst the insurer offered to pay $2,500 for pool expenses, this offer was made with the
insurer only prepared to pay $48,658.33 for the repair work. As such, the panel considers this
was a commercial offer, not recognition of a claimable loss. The panel is not satisfied the
insurer is liable for either the gardening or the pool expenses.
Determination | Case number: 955942 Page 5 of 7
The complainant retains her onus to maintain the home, despite not living in it. The panel
considers these expenses are not caused by or sufficiently related to the claimed loss.
The same applies to the insurer’s offer to refund the $2,000 policy excess. The panel is
satisfied the excess is applicable and the offer was based on the insurer’s belief it should not
be required to pay more than the WW quote. The panel accepts the excess is not refundable.
The insurer undertook to reimburse the complainant for carpet expenses ($8,831.59),
however the panel accepts this expense should be covered within the scope of MB’s quote. It
is not specified in the quote, so the complainant will need to provide evidence to the insurer
that this expense was incurred separately to MB’s repairs to be covered for it.
Should the complainant establish that she incurred the carpet expenses separate from the
MB quote, the panel is satisfied the insurer may limit its settlement to $8,831.59. This is
because the insurer was able to source replacement carpet for this amount.
The insurer also agreed to pay $40,429.57 (less the $2,000 policy excess) for settlement of
the damaged contents. The panel is satisfied this is fair.
Insurer remains liable for temporary accommodation and storage costs
The complainant arranged for MB to attend to the necessary repairs to the home. They are
not yet complete. The insurer continues to cover the complainant’s temporary
accommodation and storage costs whilst the matter awaits an outcome.
The panel agrees this is appropriate and is satisfied this arrangement should continue until
the repairs are complete.
2.2 Is an award of compensation appropriate?
Yes. The in surer’s handling of the claim caused the complainant to experience an unusual
degree of stress, delay and inconvenience. It is fair that the insurer pays non-financial loss
compensation of $2,000.
AFCA can award compensation for non-financial loss
Under our Rules, AFCA can award up to $5,400 compensation for non-financial loss. This
must relate to poor claims handling or other actions of the insurer which cause an unusual
degree of stress, delay, or inconvenience.
We expect complainants to be moderately robust, and we will not award compensation for the
ordinary degree of inconvenience involved in making a claim.
Complainant entitled to an award of non-financial loss compensation
The complainant says the insurer did not communicate in a fair, reasonable, or timely
manner. She says she provided all information requested by the insurer including receipts,
documentary evidence and believes she cooperated with the insurer in attempting to reach a
resolution. However, she does not believe the insurer acted appropriately or fairly.
She was also required to move several times due to the temporary accommodation locations
changing and this caused distress and frustration, noting she has a young family. The
complainant says the insurer would only extend the temporary accommodation arrangements
for short durations, meaning she had to continuously re-engage. She says this was time
consuming and frustrating.
Determination | Case number: 955942 Page 6 of 7
The panel notes the insurer has cash settled the complainant for the for contents, provided
temporary accommodation and storage for furniture. T he panel accepts the insurer’s
communication and customer service fell short of the complainant’s reasonable expectations .
The insurer has acknowledged this during a conciliation held by AFCA, apologised and
offered to pay $2,000 compensation for non-financial loss. The panel accepts this amount is
fair compensation in the circumstances.
The complainant also says she incurred several extraordinary expenses, which she blames
the insurer’s delays for. This includes interest on loans and costs to purchase replacement
items for her children. The panel acknowledges the complainant was inconvenienced by this,
although these additional costs arose from the loss event, not the insurer’s conduct. The
panel is satisfied the insurer is not liable for these expenses.
2.3 Why is the outcome fair?
The insurer’s offer for settlement was not ba sed on an actionable quote. This meant the
complainant retained her own builder to repair the damage. It is fair that the insurer covers
these costs, which were guaranteed, less the amount noted. Given the stress, delay and
inconvenience caused, it is also fair the insurer pays non-financial loss compensation .
Determination | Case number: 955942 Page 7 of 7
3 Supporting information
3.1 The AFCA process
AFCA’s approach is based on fairness
AFCA has determined this complaint based on what is fair in all the circumstances, having
regard to:
the legal principles
applicable industry codes or guidance
good industry practice
previous decisions of AFCA or its predecessor schemes (which are not binding).
The respective parties have completed a full exchange of the relevant information, and each
party has had the opportunity to address any issues raised. We have reviewed and
considered all of the information the parties have provided.
While the parties have raised a number of issues in their submissions, we have restricted this
determination to the issues that are relevant to the outcome.
A panel determined this matter
Due to the nature of this complaint, we referred it to a panel for determination. The panel
includes:
an ombudsman
a member with significant experience in consumer and small business advocacy
a member with extensive experience in the insurance industry.
We assess complaints on available information and circumstances
AFCA is not a court of law. We do not have the power to take or test evidence on oath, or to
require third parties to give evidence.
When we assess complaints, we consider:
available documents
the recollections of the parties
all relevant circumstances.
We give more weight to documents created at the time the events occurred. If there are no
relevant documents, we will decide what most likely occurred based on the available
information.
If there are conflicting recollections and these are evenly weighted, we may find that a claim
cannot be established.
Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.