Summary
The complainant disputed the insurer's partial acceptance of a storm damage claim and its cash settlement offer. AFCA found for the insurer, as the balcony was excluded as wear and tear, the retaining wall was excluded, and only part of the fence was shown to be storm damaged.
The complainant did not show the additional damage was caused by a covered storm event, and the policy excludes retaining walls and wear and tear.
Issues
- Claim denial primary · not upheld
“I am not satisfied that the complainant has shown, on balance, that the damage to the balcony and the whole of the side fence and retaining wall are covered”
- Claim amount dispute secondary · not upheld
“Insurer entitled to cash settle; complainant to provide reasonable quote, plus 10% uplift”
- Poor claim handling secondary · not upheld
“I am not satisfied the information shows the insurer mishandled the claim.”
- Delay secondary · not upheld
“The information does not show that there has been an unusual delay by the insurer in dealing with the claim.”
Subjects and remedies
home or building damagenatural disasterno remedy
Text of the determination
Determination
Case number 955762
Financial firm AAI Limited
Determination | Case number: 955762 Page 1 of 8
Case number: 955762 20 September 2023
1 Determination overview
1.1 Complaint
The complainant holds a home building policy with the financial firm (the insurer). The
complainant lodged a claim on 17 October 2022 for storm damage to her home, retaining wall
and boundary fence caused by multiple severe weather events in October 2022.
The insurer has partially accepted the claim and offered the complainant a cash settlement. It
accepts damage to a section of the side boundary fence and resultant damage from a water
leak from the balcony were caused by the storm event. It says other damage claimed is
excluded under the policy.
The complainant says the cash settlement offered in partial acceptance of the claim is
inadequate to repair the storm damage. She wants the insurer to repair the whole side
boundary fence and the retaining wall that supports it. She also wants the insurer to repair the
balcony which she says was damaged by the storm event.
The complainant also says the insurer mishandled the claim.
1.2 Issues and key findings
Is the insurer entitled to partially decline the claim?
Yes. I am not satisfied that the complainant has shown, on balance, that the damage to the
balcony and the whole of the side fence and retaining wall are covered by the policy.
Is the insurer entitled to cash settle the claim?
Yes. The policy allows for cash settlement where the insurer’s builders cannot undertake
repairs. The complainant is to provide a reasonable quote and once reviewed by the insurer
the insurer can cash settle the claim.
Did the insurer mishandle the claim?
No. I am not satisfied the information shows the insurer mishandled the claim.
Why is the outcome fair?
Where the complainant has not shown that the damage was caused by an event covered by
the policy it would not be fair to require the insurer to pay to repair the damage.
1.3 Determination
The Determination is in favour of the insurer.
If the complainant accepts the determination, she must provide the insurer with a reasonable,
actionable quote for repair of the items listed in the JW scope of works of February 2023.
Once the insurer reviews the quote and agrees it is reasonable, the insurer is to pay the
complainant the quote amount plus 10% uplift within 14 days of receiving the quote.
Determination | Case number: 955762 Page 2 of 8
2 Reasons for determination
2.1 Is the insurer entitled to partially decline the claim?
Yes. I am not satisfied that the complainant has shown, on balance, that the damage to the
balcony and the whole of the side fence and retaining wall are covered by the policy.
Complainant must show loss is covered by the policy
The onus is on the complainant to show, on the balance of probabilities, a claim within the
terms of the policy. This is commonly called a prima facie claim. Once shown the onus
transfers to the insurer to show, on the balance of probabilities, it is entitled to:
rely upon a condition or an exclusion contained within the policy to refuse the claim
otherwise deny the claim.
Policy covers loss due to storm subject to exclusions
The complainant’s policy covers damage to the building caused by storm subject to a number
of exclusions.
The policy documents include the Product Disclosure Statement (PDS) and the Certificate of
Insurance (COI). There is no dispute the insurer provided these documents to the
complainant.
Page 41 of the PDS details the cover for storm damage:
Storm
We cover
Loss or damage caused by a storm.
We don’t cover
…
• loss or damage to retaining walls, sea walls, revetments, garden
borders and free standing outdoor walls;
…
Page 29 PDS details the exclusion for wear and tear:
Wear, tear and gradual deterioration
any part of the building that has wear, tear, rust, fading, rising damp, corrosion,
rot, action of light, atmospheric or climatic conditions or gradual deterioration such
as, but not limited to:
• tiles and their adhesive or grouting breaking down;
• weathering of roof tiles or roof ridge capping;
• gradual weathering and breakdown of bricks, mortar or concrete.
Determination | Case number: 955762 Page 3 of 8
Circumstances of the claim
The complainant lodged the claim for storm damage to the property. She described the event
as follows when she made the claim:
Due to the severe weather conditions the balcony at the front of the home has
leaked. This has allowed water to entered [sic] the inside of the home. It is
dripping through the window below. The left-hand side fence and retaining wall
have started to lean …
The insurer’s assessor JW inspected the property on 21 October 2022 and reported on the
claimed damage. JW noted the following:
posts are loose and on a lean
retaining wall is starting to collapse
the window architrave in the study has water streaks
the balcony above the entry porch showed signs that the waterproofing has failed.
JW arranged for a leak detection test to be carried out on the balcony. On 3 November 2022
plumber SP carried out the leak detection test which showed there was a leak in the balcony
due to a failure of the waterproof membrane.
The insurer declined the claim on the basis that the water damage was caused by wear and
tear to the balcony and the likely cause of damage to the fence was long term earth
movement.
The complainant arranged for builder EH to inspect the damage on 19 December 2022. EH
said the whole length of the side fence was damaged by the storm event.
The insurer then sent all reports to property assessor BS to conduct a desktop assessment
on 1 February 2023. BS agreed the cause of damage was long term and excluded under the
policy.
After the complainant expressed dissatisfaction with decision to decline the claim the insurer
agreed to send another assessor PJ to attend with JW to inspect the damage. PJ and JW
attended the property together and inspected the damage on 13 February 2023.
After the joint inspection the insurer agreed to accept damage to part of the side fence, the
side gate and the resultant damage from the balcony leak to the porch ceiling below and the
window architrave.
The insurer has offered the complainant a cash settlement of $6,165.36 less any policy
excess which it says is the cost of repairing the damage to those items.
Complainant disagrees with insurer’s partial decline of the claim
The complainant wants the insurer to repair the whole length of the side fence. She says
because the fence sits on the retaining wall it cannot be repaired without first repairing the
retaining wall, and so the insurer should also pay to repair the retaining wall.
The complainant disagrees that the balcony should be excluded due to wear and tear
because she had the whole balcony re-waterproofed and re-tiled about 6 years ago.
Determination | Case number: 955762 Page 4 of 8
The complainant says cash settlement offered by the insurer is not enough to cover the
necessary repairs.
I am not satisfied the complainant has shown additional damage is covered by
the policy
I am not satisfied the complainant has shown, on balance, that the damage to whole length of
the side fence, retaining wall and balcony insurer is covered by the policy.
Balcony
I am satisfied damage to the balcony is excluded under the wear and tear exclusion in the
policy. Plumber SP observed that the grout and silicone was deteriorating, and a large
amount of efflorescence has formed between the tiles. The leak test undertaken by the SP
clearly shows a leak in the balcony and that the waterproofing membrane has failed.
SP concluded:
… the damage to the porch ceiling, as wel l as to the front windowsill, has been
caused by water leaking through from the balcony directly above. We discovered
the balcony's waterproofing has failed, and therefore it is allowing water to leak
through into the ceiling below, causing a large extent of the damage.
We also found several large cracks and gaps have developed within the rendered
walls, as well as between the rendered walls and the window frame, where further
water is easily leaking through and running down into the ceiling and wall below,
contributing to the damage.
The complainant has not provided any information to show she had the balcony re
waterproofed and re tiled 6 years ago.
I am satisfied the insurer has established the exclusion for wear and tear to the balcony
applies.
Side Fence
The complainant relies on two reports in relation to the side fence.
The first report is from the complainant’s builder EH who says:
In reference to the fence/ retaining wall, in my professional opinion, the damage
was not pre-existing and has occurred as a result of the recent storms (heavy rain
and damaging winds) we entailed [sic].
It was clear how rapidly the fence and retaining wall are declining and have made
note of the client having to move the latch of the gate connected to the fence,
which has also dropped approx 20-25 mm.
EH does not give any explanation why he concludes the storm damaged the entire length of
the fence. He notes the fence and retaining wall are declining rapidly but does not provide
any information about how this is related to the storm.
The second report is from assessor PJ who re assessed the damage. PJ does not agree that
the whole section of the side fence was damaged. In his report of 13 February 2023 PJ says:
A perimeter inspection of the property was completed with the builder, and it was
noted the claimed event caused damage to the following areas:
• Section of side fence
Determination | Case number: 955762 Page 5 of 8
• Gated area of fence
• Damage to underneath of eaves on front porch under balcony
The complainant has provided photos showing the fence was undamaged in 2020 prior to the
storm. The photos after the storm show the gate area and a small section of fence which
have been accepted as storm damage by the insurer. There is no information to show that the
whole length of the side fence was damaged by the storm.
I am not satisfied, on balance, that the complainant has shown the whole side fence was
damaged by the storm. I am satisfied the insurer’s scope of works from JW adequately
reflects the extent of damage from the storm event.
Retaining Wall
Damage to retaining walls caused by storm is expressly excluded under the policy, and the
relevant provision at page 41 of the PDS is extracted above. I am satisfied the insurer is not
liable to repair the retaining wall.
2.2 Is the insurer entitled to cash settle the claim?
Yes. The policy allows for cash settlement where the insurer’s builders cannot undertake
repairs. The complainant is to provide a reasonable quote and once reviewed and agreed to
by the insurer the insurer can cash settle the claim.
Insurer says it cannot complete repairs
The insurer says it cannot complete the repairs to the fence because the retaining wall it sits
on needs to be repaired first. It says it cannot repair the resultant damage from the leaking
balcony because the waterproof membrane needs to be repaired first.
Page 76 of the PDS specifies how claims will be settled when the insurer cannot undertake
the repairs. The complainant has optional complete replacement cover:
When a me mber of our supplier network is unable to complete the repair or
rebuild and you have Complete Replacement Cover®
When your claim for loss or damage to the building is covered and a member of
our supplier network is unable to complete the repair or rebuild, we will ask you to
engage a builder to provide a scope of works and provide a quote on the cost to
repair or rebuild the building on a ‘new for old’ basis.
Once the scope of works and quote is provided to us, we will arrange for it to be
assessed. This will involve reviewing the quote to determine it is appropriate and
reasonable for the scope of works. This includes a consideration of the
appropriateness of materials, repair method, labour and material costs and overall
cost effectiveness.
If the quote is appropriate and reasonable for the scope of works, we will then pay
you the assessed amount. If it is not, the quote may be adjusted. This may
include, adjusting the scope of works or the quote. We will then pay you the
adjusted amount of the quote.
Determination | Case number: 955762 Page 6 of 8
I am satisfied the scope of works provided by the JW in February 2023 includes all the storm
damage covered by the policy.
Under the policy, the complainant is entitled to provide a reasonable quote for repairs from
her builder who will do the work. Therefore, I consider it fair for the complainant to provide a
reasonable, actionable quote for the insurer to review. The items to be covered by the quote
are those items detailed in the JW scope of works. They include:
replacement of the porch ceiling
repair of the study window architrave
replacement of 8 LM of fence
replacement of the gate
replacement of 0.5 LM of fence.
Once the insurer has reviewed the quote in accordance with the policy the insurer is entitled
to cash settle the claim.
Uplift is to be applied to the cash settlement amount
When an insurer resolves a claim through cash settlement, it is generally appropriate to apply
an uplift to the quoted amount for covered repairs to allow for contingencies and the loss of
the lifetime guarantee that applies to the insurer ’s approved repairs.
The insurer did not allow any uplift in the cash settlement offer it made to the complainant.
As the complainant will provide a new and actionable quote the uplift does not need to allow
for contingencies. The complainant will not receive the benefit of the lifetime guarantee,
however, so I consider an uplift of 10% to be fair in the circumstances.
2.3 Did the insurer mishandle the claim?
No. I am not satisfied the information shows the insurer mishandled the claim.
AFCA can award compensation for non-financial loss in certain circumstances
Under the AFCA Rules, we may award compensation for non-financial loss (capped at
$5,400) where the insurer’s actions have caused an unusual amount of:
physical inconvenience
time taken to resolve the situation
interference with the complainant’s expectation of enjoyment or peace of mind.
AFCA takes a conservative approach to compensation and expects a complainant to bear a
normal degree of inconvenience during a claim.
Compensation for non-financial loss is not warranted in the circumstances
The complainant says the insurer failed to attend the property to do a make safe within the 24
to 48 hours it promised when she lodged the claim. She says it did not happen until she
called to follow up two weeks later.
The complainant also says it took four months for the insurer to agree to send the second
assessor PJ who agreed that there was some storm damage that should be accepted by the
insurer.
Despite there being some delays in the initial claims handling and the make safe, I am
satisfied the claim progressed reasonably overall.
Determination | Case number: 955762 Page 7 of 8
The claim was lodged in October 2022. The assessment was carried out in a reasonable time
frame and the initial claim decision was made in November 2022.
After the complainant’s objection a further inspection was done by her builder EH in
December with another desktop assessment undertaken by the insurer on 13 February 2023
looking at all the reports, including the report from EH.
When the complainant expressed her dissatisfaction again assessor PJ inspected with the
original assessor JW in February 2023 and some damage was accepted as being covered by
the policy.
The information does not show that there has been an unusual delay by the insurer in dealing
with the claim. While I understand the complainant has felt frustrated by the claims process, I
do not consider she has had to endure an unusual amount of physical inconvenience or
interference with her peace of mind beyond that which would be expected when lodging an
insurance claim.
I do not consider a payment of compensation for non-financial loss is warranted on the
circumstances.
2.4 Why is the outcome fair?
Where the complainant has not shown that the damage is covered by the policy it would not
be fair to require the insurer to pay to repair the damage.
Insurer has met its liability under the policy
The insurer has offered to settle the claim by paying the cost to repair the damage that is
covered by the policy. This is the resultant damage from the balcony leak and a section of the
side fence and gate.
Where the policy excludes liability for the retaining wall and items damaged due to wear and
tear it is not fair to require the insurer to accept the claim for these items.
It is fair for the insurer to cash settle the claim in accordance with the policy. It cannot do the
work because the excluded retaining wall and balcony membrane must be repaired before
the storm damaged items can be repaired.
As the complainant will lose the benefit of the ins urer’s lifetime guarantee, it is fair to require
the insurer to pay a 10% contingency in addition to the agreed quote amount.
Determination | Case number: 955762 Page 8 of 8
3 Supporting information
3.1 The AFCA process
AFCA’s approach is based on fairness
AFCA has determined this complaint based on what is fair in all the circumstances, having
regard to:
the legal principles
applicable industry codes or guidance
good industry practice
previous decisions of AFCA or its predecessor schemes (which are not binding).
The respective parties have completed a full exchange of the relevant information, and each
party has had the opportunity to address any issues raised. We have reviewed and
considered all the information the parties have provided.
While the parties have raised a number of issues in their submissions, we have restricted this
determination to the issues that are relevant to the outcome.
We assess complaints on available information and circumstances
AFCA is not a court of law. We do not have the power to take or test evidence on oath, or to
require third parties to give evidence.
When we assess complaints, we consider:
available documents
the recollections of the parties
all relevant circumstances.
We give more weight to documents created at the time the events occurred. If there are no
relevant documents, we will decide what most likely occurred based on the available
information.
If there are conflicting recollections and these are evenly weighted, we may find that a claim
cannot be established.
Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.