Home / Suncorp Group / Determination 955674

Determination 955674

Insurer declined a flood inundation claim under the flood exclusion; complainant said the cause was stormwater

FirmSuncorp Group
Decided2024-01-18
ProductGeneral Insurance · Business / commercial
OutcomeFor the firm
Amount awarded—
Non-financial loss—
Amount claimed—
SourceAFCA PDF

Summary

A business's insurance claim for water inundation in February 2022 was declined because the insurer said it was flood, which was not covered. AFCA found in favour of the insurer.

Stormwater mixing with floodwater is treated as flood, and the complainant had not selected optional flood cover, so the exclusion applied.

Issues

Subjects and remedies

business interruptionhome or building damagenatural disastersmall businessno remedy

Related

All Suncorp Group determinations · Find similar determinations

Text of the determination

Determination Case number 955674 Financial firm AAI Limited Determination | Case number: 955674 Page 1 of 6 Case number: 955674 18 January 2024 1 Determination overview 1.1 Complaint The complainant holds a business insurance policy with the financial firm (insurer) covering the business property and business interruption. A claim was lodged in March 2022 after the business was inundated with water between 26 February 2022 and 28 February 2022. The insurer says the inundation to the property was caused by floodwaters. Flood is an exclusion under the policy and the insurer declined the claim. The complainant says the business was inundated with stormwater and that the insurer’s hydrologist (WRM) did not consider the effect of backflow valves installed by the local council in 2011. The complainant also disagrees that the premises could only flood if there were 6m of rain the local catchment area. 1.2 Issues and key findings Is the insurer entitled to decline the claim? Yes. The inundation was caused by stormwater run-off mixing with floodwater. Stormwater that mixes with flood water is considered flood and therefore excluded under the policy. Has the insurer mishandled the claim? No. The insurer provided an outcome to the claim within relevant timeframes. There is no other information to show why compensation is warranted. Why is the outcome fair? Based on the available information, the outcome is fair as the insurer has established the inundation was caused by floodwaters, which was not an option selected on the policy. The claim was correctly declined. 1.3 Determination This determination is in favour of the insurer. The insurer is entitled to refuse payment of the claim in accordance with the terms and conditions of the policy. Determination | Case number: 955674 Page 2 of 6 2 Reasons for determination The complainant is a business and is being represented. Any reference to the complainant business and representative will be ‘the complainant’, unless otherwise noted. 2.1 Is the insurer entitled to decline the claim? Yes. The inundation was caused by stormwater run-off mixing with floodwater. Stormwater that mixes with flood water is considered flood and therefore excluded under the policy. Policy does not provide cover for flood The complainant’s business insuranc e policy provides cover for accidental loss or damage to the property during the period of insurance. The policy provides optional cover for flood if flood is shown on the policy schedule. The certificate of insurance (COI) confirms the optional cover for flood was not taken out. The exchanged material confirms the complainant was aware they did not have cover for flood under the policy. Flood is defined in the PDS as: the covering of normally dry land by water that has escaped or been released from the normal confines of any of the following:  a lake (whether or not it has been altered or modified);  a river (whether or not it has been altered or modified);  a creek (whether or not it has been altered or modified);  another natural watercourse (whether or not it has been altered or modified);  a reservoir;  a canal;  a dam. Circumstances of the loss The complainant lodged a claim on 8 March 2022 for water inundation to the business between 26 to 28 February 2022. The complainant says rainwater first entered the premises during the night of 26 February. The front of the building doorway is lower by some 100mm from the rear entry doorway, and water was in the rear street (G Street) and side street (B street). The complainant says all water levels were connected with C Street from 3:00pm on 26 February 2022. The complainant says there are no recorded depths and timelines in the local catchment zone of C Street, only Brisbane River. There was only an assumption of the maximum total heights after three days. The complainant says the insurer tried to link the water flow from the Brisbane River to the local area. The complainant says there is no evidence the Brisbane River floodwaters mixed into the local area at the time of inundation. Determination | Case number: 955674 Page 3 of 6 Complainant’s expert says flooding did not cause inundation The complainant presented a report from SLR. SLR conducted a site inspection on 27 May 2022, and it notes that:  the floor level of the workshop was approximately 2.6mAHD  the closest gauges to the site are R and I Creek  the gauge at Milton is located approximately 800m upstream of the point where the stormwater pipelines from the C Street outlet  the water level at Milton continued to rise about 10:00pm on Friday 25 February and peaked to 5.23 mAHD at approximately 9:40am on 28 February 2022, when the high tide was occurring in the lower Brisbane River  C Drive runs along Brisbane River, is generally above 6.0mAHD and the flood level in the Brisbane River was insufficient to overtop Coronation Drive  the combination of the backflow prevention devices and the level of C Drive likely prohibited floodwaters from the Brisbane River inundating the property  the complainant advised SLR that there was oily residue left in and around the site due to the presence of oil within the property, however, there was no silt from the Brisbane River. SLR concluded that the peak inundation at the site was 2.2m, which corresponds to a peak level of 4.8mAHD. The peak flood in the Brisbane River near the site was 5.23mAHD. SLR says the site was not affected by the Brisbane River flooding. Insurer’s expert says inundation by flood The insurer provided a report from its hydrologist (WRM) dated 23 August 2022, which was prepared following a site inspection on 27 June 2022. WRM noted that the insured property has a floor level of the office and reception at 2.7mAHD (Australian Height Datum). Peak inundation was measured at 2.1m above floor level. The floor level of the workshop is 2.6mAHD. Peak inundation was measured at 2.2m above floor level. WRM reported that stormwater along Castlemaine Street is drained by several stormwater inlets, the inlets are also connected to a larger stormwater network incorporating other street drainage areas. The Brisbane City Council (BCC) mapping shows floodgates at the end of the C Street stormwater network where it outlets to the Brisbane River. It was noted that three of the floodgates are gravity-controlled flap valves which only allows stormwater discharge when the head from the stormwater network exceeds the head in the Brisbane River. The fourth floodgate is an active backflow (Active floodgate) prevention device connected to the C Street stormwater network. This floodgate was opened numerous times during the February event. The Active floodgate was opened around 4:00pm on 26 February 2022, meaning the ponding on C Street, G Street and B Street was a mixture of water released from Brisbane River backflowing and local stormwater that could not drain away. The Active floodgate closed at 10:30pm on 26 February 2022, pausing the backflow, at this time the Brisbane River floodwaters would have already entered C Street and moved above the floor level of the property. The Active floodgate was opened at 12:45pm on 27 February 2022 and remained opened until 2:15am on 28 February 2022. WRM reports that the Brisbane River reached the height of the lowest point on C Street, where the insured building was located at around 16.00 on 26 February 2022. This then limited the stormwater network’s ability to freely discharge into the Brisbane River. The fourth floodgate was open which meant the ponding water on C Street was a mix of floodwater and storm water, which could not drain away. Determination | Case number: 955674 Page 4 of 6 By 19.13 on 26 February 2022 the Brisbane River had risen to 2.6 mAHD. The active floodgate was still open. Water continued to inundate and was a mix of riverine and storm water. The floodgate was eventually closed at 22.30 on 26 February 2022 by which time the mix of flood and storm water was already above the floor level of the insured property. The active floodgate was reopened at 12.45 on 27 February 2022 and remained open until 02.15 on the 28 February 2022. Rain continued to fall and the Brisbane River continued to rise. The inundation on C Street continued to rise as well. The River peaked at 4.6 mAHD, similar to the height recorded at the insured property. The water at the property, due to the open floodgates, was a mix of storm and riverine flood. WRM states that the rainfall on its own, was not sufficient to cause the degree of flooding that occurred, despite the other three gravity-controlled floodgates being closed and preventing water escaping. WRM concluded that the initial and peak above floor inundation of the property was caused by a mixture of local stormwater runoff and floodwaters (from the Brisbane River). Stormwater runoff alone would not have caused above floor inundation at the property. On balance, inundation was caused by mixture of floodwater and run off The complainant does not agree with the findings of WRM. The complainant initially submitted details from another AFCA complaint and another unrelated claim, which was against another financial firm. This information was not considered in any detail because it does not directly relate to the events which occurred at the complainant’s property. Th e complainant says since the other financial firm found in favour of the other clients, this insurer should also accept the claim because a ‘precedent has been set’. The panel acknowledges the complainant’s submissions, including the witness statements. The writers of the witness statements note that the water was clean when they entered the premises on 26 February 2022. However, it is not in dispute water entered the property at this time. Rather, the issue is whether the floodwaters entered from the Brisbane River or not. The panel is not persuaded the cause of the initial inundation of the premises was storm water. The panel finds WRM’s report is more persuasive . WRM provides a more accurate reflection of the stormwater network that services the catchment, in particular the active floodgate and its operation. SLR refers to the extensive stormwater pipe drainage system into the Brisbane River and notes the Brisbane City Council had installed backflow prevention devices (floodgates) on the outlets of these pipes. However, SLR did not recognise the active floodgate or the impact this had on the water entry to the premises. The complainant says the absence of silt is a good indication that the floodgates prevented Brisbane River water mixing with local run-off. WRM advised there are many contributing factors as to the appearance of water, including property size, location and the size and land use in the catchment. The absence of silt does not mean the inundation was not floodwater. The information shows the abo ve floor inundation of the complainant’s property was caused by stormwater run-off mixing with floodwaters and entering the property. This is supported with data from the C Drive gauge. Rainwater that mixes with flood water is flood The courts have established that once rainwater/stormwater mixes with flood water, it is all considered flood water. Where stormwater mixes with flood water and causes damage, a flood exclusion will usually apply to defeat the claim. Determination | Case number: 955674 Page 5 of 6 The panel has considered whether there was any stormwater runoff damage before the flood water arrived at the insured property. The report from WRM is persuasive that the timing of the initial inundation occurred while the active floodgate was open. The initial inundation would be due to a combination of stormwater runoff and floodwater. Accordingly, the panel is satisfied the cause of the initial and peak inundation was flood. As the complainant opted not to have flood cover, the insurer is entitled to decline the claim and is not required to take any further action. 2.2 Has the insurer mishandled the claim? No. The insurer provided an outcome to the claim within relevant timeframes. No evidence of unreasonable delay or mishandling of claim The complainant says they are expecting the maximum non-financial loss awarded to them. The panel accepts the complainant believed a precedent was set when another insurer accepted claims for other tenants in the area. However, this does not automatically mean compensation is warranted. There is no information showing where the claim was mishandled. The claim was lodged on 8 March 2022. The insurer arranged a site inspection for 14 March 2022 and on the same day appointed WRM to complete a hydrology report. The insurer kept the complainant informed of the progress with the report. WRM attended the site on 27 June 2022. Once the report was provided, the insurer completed its decision. While the panel accepts it took three months from lodgement of the claim for the insurer to make its decision, this is not unreasonable given the nature of the event. 2.3 Why is the outcome fair? Based on the available information, the outcome is fair as the insurer has established that the inundation was caused by floodwaters, which was not an option selected on the policy. It is fair that the insurer relies on the terms and conditions of the policy to decline liability for the claim. Determination | Case number: 955674 Page 6 of 6 3 Supporting information 3.1 The AFCA process AFCA’s approach is based on fairness AFCA has determined this complaint based on what is fair in all the circumstances, having regard to:  the legal principles  applicable industry codes or guidance  good industry practice  previous decisions of AFCA or its predecessor schemes (which are not binding). The respective parties have completed a full exchange of the relevant information, and each party has had the opportunity to address any issues raised. We have reviewed and considered all the information the parties have provided. While the parties have raised several issues in their submissions, we have restricted this determination to the issues that are relevant to the outcome. A panel determined this matter Due to the nature of this complaint, we referred it to a panel for determination. The panel includes:  an ombudsman  a member with significant experience in consumer and small business advocacy  a member with extensive experience within the insurance industry. We assess complaints on available information and circumstances AFCA is not a court of law. We do not have the power to take or test evidence on oath, or to require third parties to give evidence. When we assess complaints, we consider:  available documents  the recollections of the parties  all relevant circumstances. We give more weight to documents created at the time the events occurred. If there are no relevant documents, we will decide what most likely occurred based on the available information. If there are conflicting recollections and these are evenly weighted, we may find that a claim cannot be established.

Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.