Dispute over the amount of settlement offered for repair of flood damage from two flood events
Text of the determination
Determination
Case number 955255
Financial firm AAI Limited
Determination | Case number: 955255 Page 2 of 9
Case number: 955255 27 September 2023
1 Determination overview
1.1 Complaint
The complainants hold a home and contents insurance policy underwritten by the financial
firm (insurer). They lodged a claim (first event) for building and contents damage after their
property was inundated by storm and flood waters on 8 March 2023. Their home was flooded
again, and more significantly, on 6 July 2022 (second event)
The insurer made a joint offer to address the damage from the respective events for
$285,934. The complainants seek up to $246,686.50 for the first event and $435,116 for the
se cond event. They consider the insurer’s offer is not sufficient to address damage.
Given the delays and inconvenience they have experienced, the complainants also seek
compensation for non-financial loss.
1.2 Issues and key findings
Is the proposed settlement fair?
No. The exchanged material does not show the amount the insurer offered will be sufficient to
address the damage at the home. The complainant’s quotes are not properly itemised to
permit a fair review. This means a new expert must be appointed to review and devise a
scope of works (SOW) which can then be quoted. This process and the options for resolution
is detailed in section 2.1 of this determination.
Is an award of compensation appropriate?
Yes. The insurer’s claims handling caused the complain ants an unusual degree of physical
inconvenience and stress. It must pay non-financial loss compensation of $2,000.
Why is the outcome fair?
A new SOW and quote will better address the overall damage to the property. It will allow the
complainants to proceed with an actionable quote or to receive a cash settlement and use
their preferred builder. Any cash settlement must include a contingency uplift of 15% to
compensate the complainants for the loss of the lifetime guarantee and the transfer of risk.
Compensation is required due to the insurer’s poor handling of the claim.
1.3 Determination
This determination is mostly in favour of the insurer.
The parties are required to work together to engage an independent building consultant or
structural engineer. This person will inspect the property and provide a full SOW for all
required repairs. This process and how it is to be used to resolve the matter is detailed in
section 2.1 of this determination.
The insurer is also required to pay $2,000 compensation for non-financial loss.
Determination | Case number: 955255 Page 3 of 9
2 Reasons for determination
2.1 Is the proposed settlement fair?
No. The exchanged material does not show the amount the insurer offered will be sufficient to
address the damage at the home. The complainant’s quotes are not properly itemised to
permit a fair review. This means a new expert must be appointed to review and devise a
SOW which can then be quoted. This process and the options for resolution is detailed below.
Complainants say the insurer ’s offer is not sufficient compensation
The ins ured property includes a 1950’s -era home situated on mostly brick stumps, with a
separate detached rear unit.
The complainants lodged two claims in 2022 for separate flood events. The insurer agrees
both events are covered under the terms of the policy. The complainants requested both
claims be dealt with seperately and they want their own builder to repair the damage.
However, the parties disagree over the amount payable for each event.
For the first event, the insurer arranged for builder JL to compile a SOW. JL initially quoted
$246,868.50. This SOW was provided to the complainants and they accepted it. This amount
included costs for items the insurer says were not required. It asked JL to provide another
quote. This was for $156,299.70. The insurer then offered to pay this amount.
The complainants do not believe the recalculated JL quote is fair. They say they accepted the
original quote and this should be the settlement amount for the first event.
For the second event, the complainants obtained two quotes to address the outstanding
damage at the property. They want the insurer to settle this claim based on the cheaper of the
two quotes, which came from their preferred builder LU for $435,116.
The insurer also obtained a JL quote to repair the damage from the second event. It says this
was for $162,280.69 (though a copy of this quote was not provided). However, the insurer
later made a joint offer for both claims for $285,934.08. The basis of this offer, and how it was
calculated, is not clear from the exchanged material.
The insurer says it attempted to arrange an onsite inspection to address the complainants’
concerns. They refused as they consider the insurer has already had ample opportunity to
inspect the damage.
Policy provides building cover of $462,000 with a safety net for an extra 25%
The policy is made up of the Certificate of Insurance (COI) and the Product Disclosure
Statement (PDS). There is no dispute the insurer sent these documents to the complainants.
In relation to the settlement of claims, the policy says:
When your claim for loss or damage to the home is covered, we will engage a
builder from our supplier network to prepare a scope of works and provide a quote
on the cost to repair or rebuild the ho me on a ‘new for old’ basis.
Once the scope of works and quote is provided to us, we will arrange for it to be
assessed. This will involve reviewing the quote to make sure that the quote is
appropriate and reasonable for the scope of works. This includes a consideration
Determination | Case number: 955255 Page 4 of 9
of the appropriateness of materials, repair method, labour and material costs and
overall cost.
Based on the above, the insurer says it was reasonable for it to rely on the resubmitted JL
quote for the first event and the quote it submitted for the second event. Further, when
making a claim, the PDS requires that the complainants:
allow us to inspect the damaged home and/or contents;
allow us to arrange for experts to assess the damaged home and/or
contents and to quote on repair or replacement
The insurer says the complainants’ refusal to permit additional inspections of the property is
in breach of the policy and has hampered its ability to resolve the claim.
Under the policy terms, the complainants have a ‘home sum insured’ of $462,000. They also
hold optional cover for ‘safety net home protection’. This provides that when the cost to repair
or replace a home exceeds the sum insured, the insurer will cover a ‘further percentage’ to :
repair or replace the home;
pay you the amount quoted by a member of our builder supplier network to
repair or replace the home
Pursuant to the level of cover held by the complainants, the insurer agrees to pay:
up to a further 25% of the home sum insured for any one incident
Given the sum insured for buildings is $462,000, the complainants are therefore potentially
entitled to up to $577,500 under the policy for the repair of the home and the rear unit
following each claim. There is no persuasive evidence the repairs for either claim should
exceed this amount.
Likely overlap in damage caused to home in the respective events
T he complainants’ rear unit was inundated to 700mm in the first event and there was some
inundation of the laundry in the main dwelling.
The second event impacted the insured property before the damage from the first event could
be addressed. Some asbestos removal was done and there may have been stripping of some
of the affected areas in the rear unit, but the property remained unrepaired.
In the second event, the home was inundated to at least 50mm and the rear unit inundated
again (this time to about 1.2m). The damage from this event was more extensive.
I accept the damage from the second event likely worsened some of the damage caused in
the first event.
Insurer says there was building movement prior to the flooding events
Part of the reason for the discrepancy between the quotes may be explained in the expert
evidence from engineer, SE.
Determination | Case number: 955255 Page 5 of 9
SE attended the property for the insurer after both flood events. It found (after the second
event) the variation in the floor levels due to long-term movement and not the individual flood
events.
I am not satisfied SE’s evidence shows there should be any limitations on the extent of cover
provided for the flood events. Whilst I acknowledge there may have been pre-existing
movement cracks present, it is clear the flooding events caused significant damage to the
home. I accept the foundations would have been moved by the weight of water which flowed
through the site, noting the level of inundation.
On balance, whilst the home was aged and imperfect, I accept it was functional, watertight
and fit for purpose prior to the flood events. The insurer cited no exclusions which I consider
apply to limit the claimed damage. Therefore, I am satisfied the insurer is wholly responsible
to cover any damage to the buildings that was caused.
Significant differences in the quoting is not properly explained by either party
For the first event, both parties quoted to repair the rear unit and the laundry of the main
home. Most of the damage was sustained to the rear unit.
JL initially quoted $246,868.50 for the insurer. Its revised quote was $156,299.70. LU quoted
$257,640.52 to repair the damage for the complainant. However, the complainants said they
would accept the initial quote from JL. They will not accept the revised quote.
JL in its initial quote allowed $25,790.80 for laundry repairs. This includes the builder’s margin
and GST. However, it excludes any consideration for insurance, administration, event loading
and supervision costs. In its revised quote, JL quoted $21,585.96. For the same repairs, LU
quoted $37,090.63. This amount is inclusive of all costs.
For the balance of the repairs to the rear unit, JL allowed $101,817.32 (including the builder’s
margin and GST). There was also allowance for an additional $32,896.42 which accounts for
insurance, supervision, event loading and GST. LU allowed $220,550 in total.
LU offered no explanation for the higher costs it quoted or why it considers these higher costs
are necessary.
The main differences in the two JL quotes are:
the reduction in the overall scope ($145,103.20 including GST in the initial quote and
$107,307.20 in the revised quote)
the reduction in the builder’s margin (37.24% in the initi al quote and only 15% in the
second quote) – t he builder’s margin therefore fell from $54,039,24 to $ 16,096.08, a
difference of $37,941.16
there was also a significant reduction in the administration costs ($5,405 to nil).
These were not the only differences, but they were substantive differences. I acknowledge
the insurer has access to a building network which permits it to obtain building quotes at a
rate which is often less than that available to the public. This is not an unfair advantage if the
insurer is prepared to undertake the work at the quoted price.
Despite this, there is insufficient analysis from both parties as to why the quotes were so far
apart. I acknowledge some of this is due to aspects of the damage the insurer did not agree
to cover. I am satisfied this damage (including the foundations) should be covered and
included in any SOW. I also acknowledge there will likely be a difference in work rates and
margins, though this cannot be explored as LU did not provide this information.
Determination | Case number: 955255 Page 6 of 9
Not satisfied either quote is satisfactory to be relied upon for settlement
The respective repairers quoted the damage differently. JL was more detailed and specific
about the nature of the work to be undertaken. It provided a more thorough examination of
the proposed work. LU summarised each section generally but provided no detail about the
costings for individual items.
Of the two methods, I consider JL’s preferable. It is more likely to be accurate about the
extent of work required and easier for the purposes of a comparison analysis.
I am unable to compare quotes for the second event as I did not receive JL’s quote for
$162,280.69. LU submitted a quote for $435,116. The extreme difference in these quotes is a
concern. I am not persuaded that LU’s quote should be accepted in the absence of JL’s
quote. I consider LU’s quote to be unsatisfactory as it does not individually itemise the
repairs. It merely offers a singular quoted amount and GST.
I consider a more substantial analysis of the damage is required to ascertain a singular repair
estimate to cover all damage at the home. Despite the complainants’ preference for the
claims to remain separate, I consider the more practical way to address the losses is to
prepare a joint repair quote.
There is no suggestion the repair of the home would have exceeded the sum insured and the
safety home net protection for either claim. This means a singular quote should be able to
address all damage and ensure it is repaired. I am satisfied the complainants will not be
prejudiced by proceeding in this fashion.
I acknowledge an excess applies to each claim ($600). Given there are two claims, I am
satisfied the insurer may apply two excesses when attending to settlement.
Parties to work cooperatively to arrange new SOW and settle the claim
There is a significant amount of damage present at the home. There is also a sizaeble
difference between what the insurer ultimately offered ($285,934.08) and what the
complainants want ($681,984.50). The insurer ascertained a singular repair figure for the two
claims. I am satisfied this is appropriate, however I do not consider the insurer adequately
explained how this sum was reached.
I consider the insurer’s offer cannot be relied upon as it has not been sufficiently quoted and it
does not include allowance for footings or possible restumping. I accept these items should
be included as part of the repair.
My concern with the LU quotes is they are not itemised. It is not possible to isolate differences
in individually quoted items or to determine how the builder’s margin is calculated . The scope
of works in LU’s quote is also unclear. Given this, I am not persuaded LU’s quote is fair.
Therefore, I consider the parties must engage an independent building consultant or
structural engineer (expert) to inspect the property and provide a full SOW for all the required
repairs. The expert should be one agreed to by the parties. This can be done by the insurer
providing a list of three experts that the complainants can choose one from. The expert
should be appropriately licenced and qualified.
The expert’s costs are to be borne by the insurer.
Once this expert has been engaged and has completed the SOW, each party can obtain at
least one, and no more than two, quotes based on that SOW.
Determination | Case number: 955255 Page 7 of 9
Any quote obtained and considered must be actionable. This means the repairer must be
prepared to undertake the proposed work for the amount quoted.
If only one quote is obtained, then the insurer is to cash settle the claim based on that quote ,
with allowance for a 15% contingency uplift. If more than one quote is obtained, then the
insurer is to cash settle the claim based on the average of those quotations with a 15%
contingency.
The contingency uplift serves to address the transfer of risk to undertake the work passes to
the complainants and the loss of the lifetime guarantee. It also caters to the possibility there
may likely be variations required during the works.
Given any cash settlement will be based on an up-to-date estimates with a contingency uplift,
I am satisfied there is no need to award interest.
2.2 Is an award of compensation appropriate?
Yes. The insurer’s claims handling caused the complainants an unusual degree of physical
inconvenience and stress. It must pay non-financial loss compensation of $2,000.
AFCA can award compensation for non-financial loss
Under our Rules, AFCA can award up to $5,400 compensation for non-financial loss. This
must relate to poor claims handling or other actions of the insurer which cause an unusual
degree of stress, delay, or inconvenience.
We expect complainants to be moderately robust, and we will not award compensation for the
ordinary degree of inconvenience involved in making a claim.
Insurer to pay compensation for non-financial loss of $2,000
I accept due to the catastrophic nature of two significant weather events that the
complainants were severely inconvenienced. There were significant delays which impacted
the insurer ’ s ability to respond to the claim. There were also issues with availability of experts
to provide reports, quotes and assessments in relation to the damage.
The insurer is not responsible for the events, or the significance of the damage. It is only
liable to the extent its poor conduct affected the complainants with the handling of the claims.
The insurer acknowledges its handling of the matters did not meet the complainants’
expectations. The insurer notes these were two major events and its resources were depleted
due to the extent of damage caused along the southeast coast of Australia. It apologises for
the inconvenience caused and offered to pay compensation for non-financial loss of $1,000.
The complainants believe this offer is insulting, noting they lost all their belongings in the
floods (which has since been settled) and their lives had been ‘turned upside down’. Whilst I
acknowledge this, as already noted, the insurer is not to blame for the significant losses and
inconvenience such an event caused.
On balance, I am satisfied the insurer attempted to address the damage for the respective
claims and the complainants’ concerns. I accept it did not always do so as promptly,
successfully and perhaps even as sensitively as it should have.
The complainants note they have been separated from their home and their animals for about
18 months. I accept this has been a long time and extremely stressful. However, I also
consider the complainants contributed to this by refusing to permit ongoing inspections of the
Determination | Case number: 955255 Page 8 of 9
property to properly consider the extent of the loss. Further, much of this was due to the
claimed event itself rather than the insurer’s conduct.
I am satisfied this was not a straightforward matter for the insurer to review. The first event
caused extensive damage and required careful analysis to ascertain a fair amount to repair
the damage. The second event made the task to evaluate the extent of damage harder.
These events were understandably devastating for the complainants. I accept this heightened
sense of loss was exacerbated by the extended period taken to review and determine the
extent of damage. The complainants have also felt vulnerable and attacked when discussing
the matter with the insurer ’s representatives.
I am satisfied the available information confirms the complainants have suffered an unusual
degree of physical inconvenience and stress because of the insurer ’ s claims handling. It is
fair that the insurer pays the complainants $2,000 compensation for non-financial loss.
2.3 Why is the outcome fair?
A new SOW and quote will better address the overall damage to the property. It will allow the
complainants to proceed with an actionable quote or to receive a cash settlement and use
their preferred builder. Any cash settlement must include a contingency uplift of 15% to
compensate the complainants for the loss of the lifetime guarantee and the transfer of risk.
Compensation is required due to the insurer’s poor handling of the claim .
Determination | Case number: 955255 Page 9 of 9
3 Supporting information
3.1 The AFCA process
AFCA’s approach is based on fairness
AFCA has determined this complaint based on what is fair in all the circumstances, having
regard to:
the legal principles
applicable industry codes or guidance
good industry practice
previous decisions of AFCA or its predecessor schemes (which are not binding).
The respective parties have completed a full exchange of the relevant information, and each
party has had the opportunity to address any issues raised. We have reviewed and
considered all of the information the parties have provided.
While the parties have raised a number of issues in their submissions, we have restricted this
determination to the issues that are relevant to the outcome.
We assess complaints on available information and circumstances
AFCA is not a court of law. We do not have the power to take or test evidence on oath, or to
require third parties to give evidence.
When we assess complaints, we consider:
available documents
the recollections of the parties
all relevant circumstances.
We give more weight to documents created at the time the events occurred. If there are no
relevant documents, we will decide what most likely occurred based on the available
information.
If there are conflicting recollections and these are evenly weighted, we may find that a claim
cannot be established.