Determination 954696

Dispute over scope of liability under lifetime repair guarantee for roof rectification and water ingress damage, and whether damage falls under a new claim with excess

FirmSuncorp Group
Decided2023-09-29
ProductGeneral Insurance · Home building and contents
OutcomeFor the complainant in part
Amount awarded—
Non-financial loss$2,000
Amount claimed—
SourceAFCA PDF

Summary

Homeowners disputed the insurer's limiting of its lifetime repair guarantee liability for roof rectification and water ingress, with most internal damage assigned to a new claim with excess. AFCA found the insurer's position largely reasonable but ordered $2,000 non-financial loss for poor claims handling.

Expert reports reasonably showed most water damage arose from gutter maintenance issues independent of roof installation, but the insurer's handling caused unreasonable delay and stress warranting NFL under Rule D.3.3.

Issues

Subjects and remedies

home or building damagenatural disasterpay non financial lossrepair or rectify

Related

All Suncorp Group determinations · Find similar determinations

Text of the determination

Determination Case number 954696 Financial firm AAI Limited Determination | Case number: 954696 Page 2 of 8 Case number: 954696 20 September 2023 1 Determination overview 1.1 Complaint The complainants hold a home building and contents insurance policy (policy) with the financial firm (insurer). On 3 March 2022, the complainants contacted the insurer seeking cover for damage to the insured building under the insurer’s lifetime repair gua rantee (LRG). This relates to the roof replacement arranged by the insurer under a previous claim (original claim) lodged on 28 November 2014. The insurer accepts there are works to be rectified under the policy’s LRG. However, it says the rectification works are minor and the cause for the water ingress damage in March 2022 is mostly due to maintenance related issues. The insurer has offered to repair the internal water ingress damage under a new claim (new claim). The complainants disagree and believe the roof rectification works and internal water ingress damage should be covered under the LRG. The complainants are seeking non-financial compensation (NFL). 1.2 Issues and key findings Is the insurer’s assessment of its liability under the policy reasonable? Yes. The available information shows:  the insurer’s assessment of repairs that require rectification under the original claim and associated limited water ingress damage is reasonable  there is water ingress damage unrelated to the roof rectification issues and which is fair to be considered under a new claim subject of the required policy excess  the complainants are responsible to arrange the maintenance works recommended by the insurer. Are the complainants entitled to NFL? Yes. The insurer is to pay the complainants $2,000 in NFL given their poor experience relating to the insurer’s management of the claims. Why is the outcome fair? The outcome is fair because the experts have correctly identified the required rectification works and associated limited internal water ingress damage. It is fair that the unrelated internal damage be assessed and covered under the new claim and the complainants arrange the required maintenance works. It is also fair that the insurer pays the complainants NFL in these circumstances. 1.3 Determination This determination is substantially in favour of the insurer. Determination | Case number: 954696 Page 2 of 8 The insurer is to arrange settlement of the claims as set out in section 2.1 of this determination. The insurer is to pay the complainants $2,000 in NFL. Determination | Case number: 954696 Page 3 of 8 2 Reasons for determination 2.1 Is the insurer’s assessment of its liability reasonable ? Yes. The available information supports the insurer’s assessment of its liability under the LRG benefit, as well as, its position that most of the internal water ingress damage is to be accepted under a new claim. Historical Information relevant to the consideration of this complaint The available information provides:  the complainants lodged a claim in 2014 for storm damage to the insured property. The insurer has accepted the claim and part of the works authorised included a complete roof replacement  on 28 March 2021, the complainants contacted the insurer to advise of stormwater ingress damage, which they believed was due to issues with the roof replaced by the insur er’s consultants ‘D’ under the 2014 claim  the insurer lodged a new claim (second claim). Its assessment of the claim found the damage was not related to any issues with the roof. Rather, that there were concerns regarding the gutters i.e. there were no overflow points  the cost to repair the internal water ingress damage was found to be less than the policy excess of $5,000 and the claim was withdrawn  the complainants dispute they agreed with the insurer’s assessment of the second claim and this was the reason the claim was withdrawn. Rather, they say at the time, they were not in a position to dispute the insurer’s assessment and proceeded to arrange the repairs themselves  on 3 March 2022, the complainants again contacted the insurer due to leaks in the roof and resultant water ingress damage. The complainants believe, as was the case in 2021, that this is due to issues with the roof installation and needs to be addressed under the original claim and the policy’s LRG. The policy is an insured events contract of insurance The insurer provided the complainants with the relevant policy documentation including the product disclosure statement (PDS) and certificate of insurance (COI). I accept the insurer is entitled to rely on the policy provisions to assess its liability under the claim. I note the policy, relevant to the policy period 13 May 2014 to 13 May 2015 also covered accidental loss or damage. The policy period, 12 July 2021 to 12 July 2022, relevant to the new claim covers the insured property against loss or damage caused by one or more of the listed insured events, including ‘ Storm ’. Cover under the policy is subject to the conditions, limitations and exclusions specified in the PDS. The complainants have shown damage that triggers cover under the policy The complainants are first required to show, it is more likely than not, the loss or damage claimed triggers cover under the policy. Only if the complainants can do this, will the duty shift to the insurer to show, on balance, it is entitled to decline cover in line with the policy wording or otherwise. Determination | Case number: 954696 Page 4 of 8 There is no dispute the complainants’ home suffered stormwater ingress damage on or about 27 February 2022, for which a claim was lodged on 3 March 2022. The policy covers storm damage, therefore, I am satisfied the complainants have established the insured building has suffered damage which triggers cover under the policy. The issues in contention between the parties are:  whether the stormwater ingress damage is due to issues with roof installation authorised under the original claim  should the complainants have been required to lodge the new claim and are obliged to pay the $5,000 policy excess; and  is it reasonable for the insurer to refuse to authorise the internal repairs until such time that the complainants arrange the recommended maintenance works. Insurer’s assessment of its obligations under the LRG benefit is reasonable I am satisfied the insurer’s investigations and associated offer to arrange rectifications works under the original claim is fair. This includes the insurer’s assessment of the ex tent of stormwater ingress damage caused by the issues with the roof’s installation. The insurer has provided a roof report from consultants’ ‘R’ dated 14 March 2023, which identified areas of new damage near the chimney on the driveway side. This was due to poorly sealed chimney flashings (and potentially rivets). Further, that the rivets and joins in flashings were found unsealed or insufficiently sealed. Building consultants’ ‘H’, after reviewing R’s roof report advise in their report dated 10 April 2022 that the majority of the roof has issues with it from the original roof installation allowing water ingress. The original roofers that installed the roof back in 2014 would need to rectify these issues and fix internal damages. A roof report from consul tants’ ‘C’ dated 11 October 2022 provides that C noticed both fire place chimneys have issues with the flashing which was causing water to build up then enter the property. C notes the gutters had no overflow points and that it was likely during heavy storms the gutters overload and allow water ingress. C noted some rusty screws, which it refers to as a maintenance issue. The insurer arranged for C to complete a leak detection test. In its report dated 16 December 2022, C says the water ingress issues are not related to the roof, rather, it is more likely that the significant rainfall in February 2022 caused the gutters to overload allowing water into the ceiling and wall cavity. This is because the gutters do not have overflow points. The insurer’s internal assessor completed a dual assessment with C. In the rectification report, the assessor confirms the insurer is liable to arrange rectification works under the original claim including:  rectification to roof chimney flashing  rectification (repairs) for water ingress in bedroom upstairs  rectification (repairs) to upstairs extension ceiling (right hand side only). The complainants have not provided any independent or equally qualified information in disputing the insurer’ s assessment of its liability under the LRG. Having considered all the reports, I am satisfied the insurer’s assessment and identification of issues with the roof installed under the original claim is reasonable. This being based on the opinions from suitably qualified consultants who have provided compelling explanations and supporting information. Determination | Case number: 954696 Page 5 of 8 I acknowledge the complainants’ reference to H’s report and concern that the insurer has given preference to the information from C a nd not H’s opinion. I accep t H’s report says most of the roof has issues with it from the original install and that this is the cause for the stormwater ingress damage. However, I am not satisfied H has provided persuasive information in support of this view. H’s report is based on the roof report from R, which on my review does not establish most of the roof has issues from its original installation. Accordingly, I accept the insurer’s assessment of and associated offer to cover the complainants under the LRG is fair and consistent with its policy obligations. It is fair that the complainants were requested to lodge the new claim I am satisfied the information from the various consultants establishes that not all the internal stormwater ingress damage is due to the noted roof installation issues. Rather, it is more likely that most of the internal damage is due to stormwater ingress caused by issues identified with the guttering (maintenance related). I am satisfied there is a consistent view in the reports from R, ‘A’, C and the insurer’s internal assessors that the absence of overflow points in the gutters is most likely allowing stormwater ingress into the building. It appears it is not an issue that becomes evident each time it rains, but that it becomes an issue in significant rainfall events. I am not satisfied the insurer has shown the absence of overflow points constitutes a building defect in line with the relevant building standards or codes. However, I accept the information does establish that most of the internal stormwater damage is due to issues independent of the identified roof installation issues. Therefore, it would be unfair to require the insurer to repair this damage under the original claim and LRG. I am satisfied the insurer’s decision to accep t liability for this internal damage under the new claim, and subject to the applicable policy excess, is fair and consistent with the policy provisions. I accept the insurer’s view that the complainants are responsible for arranging the recommended maintenance works to the gutters which needs to be arranged before the internal repairs are authorised. In the interest of completeness, I am not satisfied the complainants are responsible for the repairs to the noted rusted and skewed roof sheet screws as a maintenance issue. It is more likely this relates to the roof installation and should be covered by the insurer as part of the rectification works. Insurer is to settle the claims as set out below The insurer relies on two scopes of works and associated quotes from C in the amounts $12,373.90 (rectifications works under the original claim) and $7,064.92 to repair the internal stormwater ingress damage accepted under the new claim. The insurer is prepared to authorise and arrange these repairs, subject to the complainants arranging the recommended maintenance works to the gutters. Alternatively, should the complainants refuse to arrange the maintenance works, the insurer says it will cash settle the complainants under the claims. I am satisfied the insurer’s position is reasonable. However, in the instance the complainants are cash settled under the claims, the insurer is to increase the payments by 15% percent to allow for contingencies, transfer of risk and loss of the policy LRG benefit. Determination | Case number: 954696 Page 6 of 8 2.2 Are the complainants entitled to NFL? Yes. The insurer is to pay the complainants $2,000 in NFL given their poor experience over the insurer’s management of the claims. AFCA Rules allow for an award of NFL in certain circums tances The Rules (Rule D 3.3) allow for an award of up to $5,400 for non-financial loss compensation, if the insurer caused the complainant to suffer an unusual degree or extent of inconvenience, delay or interference. AFCA takes a conservative approach when considering any award of compensation. Insurer to pay the complainants $2,000 in NFL I am satisfied it is fair to require the insurer to pay the complainants $2,000 in NFL given their experience over the life of the multiple claims. I accept the complainants have suffered unreasonable levels of stress, inconvenience and delays in bringing these matters to conclusion. It is fair to accept the complainants experienced unreasonable delays, mainly because of the issues with the roof replacement and associated repeated instances of water ingress, and have experienced stress, anxiety and inconvenience. This will have been exacerbated by the insurer’s failure to identify and accept liability for the rectification issues much earlier than it ultimately did once a third claim was lodged. I accept the complainants’ frustration with the insurer at one stage (April 2022) informing the complainants that all the damage would be accepted as rectification works, only to then appoint further consultants and limit its liability in this regard. There is no evidence showing the complainants have suffered any financial prejudice or that it would be fair to require the insurer to accept all the damage under the original claim for this reason alone. However, as noted, I accept this was added to the complainants’ frustration and poor experience under the claims. For these reasons and accepting the complainants’ overall experience under the claims has been poor, I am satisfied it is fair to require the insurer to pay the complainants $2,000 in NFL within 14 days of receiving notice of the complainants ’ acceptance of this determination. 2.3 Why is the outcome fair? The outcome is fair because the experts have correctly identified the required rectification works and associated limited internal water ingress damage. It is fair that the unrelated internal damage be assessed and covered under the new claim and the complainants arrange the required maintenance works. It is also fair that the insurer pays the complainants NFL in these circumstances. Determination | Case number: 954696 Page 7 of 8 3 Supporting information 3.1 The AFCA process AFCA’s approach is based on fairness AFCA has determined this complaint based on what is fair in all the circumstances, having regard to:  the legal principles  applicable industry codes or guidance  good industry practice  previous decisions of AFCA or its predecessor schemes (which are not binding). The respective parties have completed a full exchange of the relevant information, and each party has had the opportunity to address any issues raised. We have reviewed and considered all the information the parties have provided. While the parties have raised several issues in their submissions, we have restricted this determination to the issues that are relevant to the outcome. We assess complaints on available information and circumstances AFCA is not a court of law. We do not have the power to take or test evidence on oath, or to require third parties to give evidence. When we assess complaints, we consider:  available documents  the recollections of the parties  all relevant circumstances. We give more weight to documents created at the time the events occurred. If there are no relevant documents, we will decide what most likely occurred based on the available information. If there are conflicting recollections and these are evenly weighted, we may find that a claim cannot be established. 3.2 AFCA Rules D.3.3 An AFCA Decision Maker may decide that the Financial Firm is to compensate the Complainant for non-financial loss: a) for a complaint rela ting to an individual’s privacy rights - injury has occurred to the Complainant’s feelings or humiliation has been suffered by the Complainant; or b) for other complaints – an unusual degree or extent of physical inconvenience, time taken to resolve the s ituation or interference with the Complainant’s expectation of enjoyment or peace of mind has occurred.