Text of the determination
Determination
Case number 954675
Financial firm AAI Limited
Determination | Case number: 954675 Page 2 of 7
Case number: 954675 15 February 2024
1 Determination overview
1.1 Complaint
On 12 February 2022, the complainant lodged a claim under his building and contents
insurance policy for storm damage said to have occurred on 3 January 2022.
The insurer accepted liability for the internal water damage and mould remediation but
declined liability to replace the dwelling’s roof (roof). The insurer says the roof presents with
wear and tear, gradual deterioration, structural design fault and foot traffic damage, which is
not covered under the policy.
The complainant disputes the insurer ’ s decision and says the insurer has unreasonably
delayed handling of the claim resulting in additional internal damage and caused undue levels
of stress, anxiety and physical inconvenience.
1.2 Issues and key findings
Is the insurer’s assessment of its liability fair?
No. The insurer is to contribute to the cost to repair the roof as set out in section 2.1 of this
determination. The insurer should also arrange for fresh and actionable
repair/remediation/replacement quotes of the internal water ingress damage, mould and
contents damage. The insurer can then cash settle the claim based on the quotes subject to a
10% uplift for contingencies.
Is the complainant entitled to non-financial loss compensation (NFL)?
Yes. The insurer is to pay the complainant $2,000 in NFL in line with the AFCA Rules.
Why is the outcome fair?
The outcome is fair because it is based on the information from the parties, the policy
provisions and what is considered fair in all the circumstances. It is also fair that the insurer
be required to pay NFL due to the undue delays, associated stress, anxiety and physical
inconvenience experienced by the complainant.
1.3 Determination
This determination is in favour of the complainant. Within 21 days of receiving notice of the
complainant’s acceptance of this determination, the insurer is to:
cash settle the complainant equal to 40% of the cost to replace the roof. This is to be
increased by a further 20% to allow for contingencies and transfer of risk in arranging the
works. This comes to $50,400 excluding GST
arrange for a fresh assessment of the internal water ingress damage, mould and contents
damage. The insurer is to cash settle the complainant for these works/losses based on the
fresh and actionable repair/remediation/replacement quotes. The cash settlement is to be
increased by 10%
pay the complainant $2,000 in NFL in line with the AFCA Rules.
Determination | Case number: 954675 Page 3 of 7
2 Reasons for determination
2.1 Is the insurer’s assessment of its liability fair ?
No. The insurer’s assessment of its liability is not fair in the circumstances.
The policy is an insured events contract of insurance
The insurer provided the complainant with the relevant policy documentation including the
product disclosure statement (PDS) and certificate of insurance (COI). I accept the insurer is
entitled to rely on the policy provisions to assess its liability under the claim.
The policy covers the insured property against loss or damage caused by one or more of the
listed insured events, including ‘ Storm ’. Cover under the policy is subject to the conditions,
limitations and exclusions specified in the PDS.
The complainant has also included the optional cover for accidental loss or damage to the
insured building and contents.
The complainant has shown damage that triggers cover under the policy
The complainant is first required to show, it is more likely than not, that the loss or damage
claimed triggers cover under the policy. Only if the complainant can do this, will the duty shift
to the insurer to show, on balance, it is entitled to decline cover in line with the policy wording
or otherwise.
There is no dispute a significant storm event occurred on 3 January 2022 accompanied with
severe winds and hail. Further, that this event has resulted in storm water ingress which has
caused internal damage to the insured building and contents. The insurer has accepted to
cover the complainant for this loss and damage.
The insurer says the complainant has not been able to show the roof was damaged to such
an extent that it requires completed replacement due to a single storm event. Rather, it is the
insurer’s position is that the roof was in an aged, deteriorated, rusted and poor condition with
pre-existing foot traffic damage. It says these are the reasons for the recommended
replacement, and which are excluded under the policy.
The complainant refutes the insurer’s position and says the insurer failed to arrange adequate
assessment and investigation of the roof. The consultants ‘SM’ sub -contracted by building
consultants ‘D’ (appointed by the insurer) were not suitably qualified to assess the roof.
Further, that his appointed bu ilding consultants ‘V’ , ‘SI’ a nd engineering consultants ‘ST’ have
shown the roof requires complete replacement due to storm damage.
Expert information supports the presence of some storm damage to the roof
In summary, the reports from V and SI reports dated 27 October 2022, 3 December 2022, 18
July 2023 and 24 August 2023 say:
the January 2022 storm appears to be a contributing factor to the water ingress
the property has been affected by extreme weather conditions and multiple events having
caused damage to the roof including hail, snow, extreme storm with lightning, wind and
rain
the evidence is consistent with the roof being damaged by the January 2022 storm
heavy winds during the January 2022 storm caused tree branches and debris from large
trees surrounding the property to break away and fall on the roof, impacting the roof sheets
and damaging the sheet profile
Determination | Case number: 954675 Page 4 of 7
this has created openings between the sheet joints and separation between screw heads
and sheet faces allowing the water ingress
the roof requires complete replacement to ensure warrantable repairs and to resolve the
water ingress issue. The leak locations have not been confirmed.
In summary, t he complainant’s structural engineer ST’s reports dated February and June
2023 say:
no evidence of the strength and disability of the roof structure have been compromised
rectification works to the roof could be made on structural grounds
water ingress from the roof at several locations is due to the dents caused by storm related
impact damage to the roof sheets
the water ingress occurs randomly and is consistent with damage to the roof sheets
rust found to external areas of the roof sheeting, however, no internal rust to sheeting
noted
current condition of the roof structure is due to wear and tear
the presence of dents to the roof sheets is likely from the storm event and can affect the
structural integrity of roof in future
strongly recommends roof replacement to address significant water leaks
there may be an argument for replacing half of the roof based on the concentration of
impacts being greater to the front half of the roof.
The complainant has also provided a letter from two employees residing at the property dated
22 May 2023. They say the roof was in good condition before the January 2022 storm and the
property was free from internal water damage.
T he insurer’s builder SM ’s roof report dated 14 March 2022 and D’s report dated 21 February
2022 say on inspection there was no observable storm damage to the roof. These reports
confirm stormwater ingress and associated internal building and electrical damage as well as
damage to contents in line with reports from restoration and mould remediation experts ‘SS’.
I accept the complainant’s concern that the reports obtained by the insurer from D and SM
are not persuasive with respect to the roof. I am not satisfied these consultants have provided
any compelling information in support of their conclusions that there was no storm related
damage to the roof.
The information and opinions from D and SM are clearly inconsistent with the available
information including many photos of the roof. These photos and reports from V, ST and SI
do show there does exist damage to the roof consistent with tree branch/debris impact during
a storm. In saying that, this evidence also shows the roof appears to be aged and subject to
wear and tear, gradual deterioration, rust and foot traffic dents.
I find the reports and supporting information from V, SI and ST to be more compelling on the
issue of whether the roof presents with some storm related impact damage, especially to the
front half of the roof. However, I am not satisfied these experts have provided any persuasive
information to support the recommendation that the roof requires complete replacement due
to January 2022 storm.
Rather, I am of the view the recommendations to replace the roof relate more so to concerns
surrounding the ability to warrant repairs and the fact the consultants have not been
successful in identifying the locations from where water is leaking through the roof. I am
satisfied the available information shows:
there definitely exist locations of damage which, in the absence of persuasive information
to the contrary, is consistent with storm related impact damage
there definitely exist dents to the roof which are consistent with foot traffic
Determination | Case number: 954675 Page 5 of 7
the roof sheets and fixings are aged and subject to wear, tear and gradual deterioration
the damage which can reasonably be linked to the storm event of January 2022 is limited
and not so wide spread or significant that it would be fair to require the insurer to cover a
complete roof replacement under the policy.
It is fair the insurer covers a portion of the roof replacement costs
Considering what is fair, consistent with the available information and to bring this complaint
to conclusion, I am satisfied it is reasonable that the insurer be required to cover 40% of the
cost to replace the roof. Further, that this cash settlement be increased by 20% to allow for
contingencies, the time elapsed since the quote from SI dated 27 October 2022 and transfer
of risk in arranging the repairs. This comes to a payment of $50,400 excluding GST.
I acknowledge the insurer’s position that the complainant refused to allow it to appoint
another engineer to investigate the cause and extent of damage to the roof. Although, I
accept the complainant’s genuine concerns regarding the insurer’s poor management of its
assessment of the damage, it was not reasonable for the complainant to ignore his policy
obligations to co-operate with the insurer.
In saying that, I am satisfied the insurer had reasonable opportunity and access to complete
adequate assessments and investigations before the complainant lo ss faith in the insurer’s
ability to assess the loss or damage. Further, I am also satisfied that there exists sufficient
information in the numerous reports and photo provided by the parties to allow me to come to
an informed decision.
I am not satisfied the insurer has established it has been prejudiced (given the available
information) by the complainant’s failure to co -operate in the later stages of the claim. Further,
I am of the opinion it not be productive, in the interest of either of the parties or reasonable to
allow the insurer re-start investigations at this time. This will only further exacerbate the
issues between the parties and unreasonably delay a resolution and settlement of the claim.
Insurer to arrange fresh repair, remediation and replacement quotes
There is no dispute the insurer has accepted to cover the complainant for the internal water
ingress damage, mould remediation and water/mould damaged contents under the claim. I
note the insurer has offered a cash settlement in the amount of $10,709.33 for the internal
damage. The complainant says this loss or damage has increased since the insurer’s
previous assessments given the delays experienced in bringing this claim to conclusion.
The insurer does not dispute that it is likely the extent of internal building and contents
damage will have increased. Further, I accept the quoted cost of repairs (materials and
labour) will have also increased since the insurer’s original assessments and associated
repair quotes. I am satisfied it is fair that the insurer be allowed to re-assess this damage and
settle these components of the claim on fresh scopes of work, lists and repair/remediation
estimates.
Accordingly, within 21 days of receiving notice of the complainant’s acceptance of this
determination, the insurer is to arrange (and the complainant is to permit) for suitably qualified
consultants to assess and provide fresh repair, remediation and contents repair/replacement
actionable quotes. The insurer is to cash settle the complainant based on the actionable
quotes provided plus a 10% uplift to allow for contingencies.
In the interest of completeness, if the complainant fails to reasonably co-operate and provide
the insurer with access to the insured dwelling, the insurer is not required to take any action
Determination | Case number: 954675 Page 6 of 7
until such time the complainant elects to co-operate. If this failure to co-operate extends past
a period of 3 months, it is fair that the insurer be permitted to decline the claim.
2.2 Is the complainant entitled to NFL?
Yes. The insurer is to pay the complainant $2,000 in NFL in line with the AFCA Rules.
AFCA Rules allow for an award of NFL in certain circumstances
The AFCA Rule D 3.3 allows for an award of up to $5,400 for non-financial loss
compensation, if the insurer caused the complainant to suffer an unusual degree or extent of
inconvenience, delay or interference. AFCA takes a conservative approach when considering
any award of compensation.
The complainant is entitled to $2,000 in NFL
The insurer admits it is responsible for some of the delays experienced under the claim as
well as not meeting the level of service it expects to provide its customers. I accept this to be
a reasonable self-assessment by the insurer. Its failure to originally appoint suitably qualified
consultants and failure to adequately respond to the complainant’s concerns has caused the
complainant to experience undue levels of stress, anxiety and physical inconvenience.
However, I also accept it would not be fair to place all the blame with the insurer alone. I
accept the available information shows the complainant has also contributed to the delays
and breakdown in co-operation between the parties. I acknowledge the complainant loss faith
in the insurer’s assessments and relies on his preferred consultants. However, it was not
reasonable to decline the insurer access to the property and the terms of appointing another
engineer could have been negotiated between the parties as well as mould remediation
consultants.
Accordingly, for these reasons, I am satisfied it is reasonable to require the insurer to pay the
complainant $2,000 in NFL in line with the AFCA Rules. This is to be paid within 21 days of
receiving notice of the complainant’s acceptance of this determination.
2.3 Why is the outcome fair?
The outcome is fair because it is based on the information from the parties, the policy
provisions and what is considered fair in all the circumstances. It is also fair that the insurer
be required to pay NFL due to the undue delays, associated stress, anxiety and physical
inconvenience experienced by the complainant.
Determination | Case number: 954675 Page 7 of 7
3 Supporting information
3.1 The AFCA process
AFCA’s approach is based on fairness
AFCA has determined this complaint based on what is fair in all the circumstances, having
regard to:
the legal principles
applicable industry codes or guidance
good industry practice
previous decisions of AFCA or its predecessor schemes (which are not binding).
The respective parties have completed a full exchange of the relevant information, and each
party has had the opportunity to address any issues raised. We have reviewed and
considered all the information the parties have provided.
While the parties have raised several issues in their submissions, we have restricted this
determination to the issues that are relevant to the outcome.
AFCA assesses complaints on available information and circumstances
AFCA is not a court of law. We do not have the power to take or test evidence on oath, or to
require third parties to give evidence.
When we assess complaints, we consider:
available documents
the recollections of the parties
all relevant circumstances.
We give more weight to documents created at the time the events occurred. If there are no
relevant documents, we will decide what most likely occurred based on the available
information.
If there are conflicting recollections and these are evenly weighted, we may find that a claim
cannot be established.
3.2 AFCA Rules
D.3.3 An AFCA Decision Maker may decide that the Financial Firm is to compensate
the Complainant for non-financial loss:
a) for a complaint relating to an individual’s privacy rights - injury has occurred to
the Complainant’s feelings or humiliation has been s uffered by the Complainant;
or
b) for other complaints – an unusual degree or extent of physical inconvenience,
time taken to resolve the situation or interference with the Complainant’s
expectation of enjoyment or peace of mind has occurred.
Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.