Home / IAG / Determination 954451
Determination 954451
Storm damage claim: scope of cash settlement for terracotta roof replacement to meet bushfire (BAL) regulations
Summary
The complainant's storm claim was partly cash settled, with the insurer limiting the terracotta roof repair to damaged areas. AFCA found the whole terracotta roof must be replaced to meet bushfire regulations, required a new scope and quote, an assessment of further damage, and waiver of the excess.
The policy covers the cost to meet current building regulations for the damaged part of the home, and the evidence showed the terracotta roof could not be repaired in isolation while complying with BAL requirements.
Issues
- Claim amount dispute primary · upheld
“insurer's settlement offer is insufficient to adequately repair the terracotta roof to a condition which meets relevant building/bushfire requirements”
- Inadequate claim investigation secondary · upheld
“It is not clear that any further investigation of those concerns has occurred.”
- Product terms interpretation secondary · upheld
“terracotta roof as a whole should be treated as one individual 'part' of the insured home which was 'damaged'”
Subjects and remedies
home or building damagenatural disasterreassess claimrefund fees or chargesrepair or rectify
Text of the determination
Determination
Case number 954451
Financial firm Insurance Australia Limited
Determination | Case number: 954451 Page 1 of 6
Case number: 954451 31 August 2023
1 Determination overview
1.1 Complaint
The complainant holds a home and contents insurance policy with the financial firm (insurer).
He lodged a claim for damage to the roofing of the property, as well as for water ingress
damage to several areas of the house following a storm event.
The insurer accepts he established a valid claim for this damage. It has accepted the metal
sheeting roof will require replacement, and that there is storm damage to the separate
terracotta tiled roof. However, the insurer decided to cash settle the damage to the terracotta
roof, saying it is only liable for the damaged areas, not a full roof replacement. The
complainant does not accept this. He says the damaged areas of the terracotta roof cannot
be repaired in isolation, since that would make it non-compliant with applicable bushfire
regulations. He is also unhappy that further damage has occurred since the storm, including
mould.
1.2 Issues and key findings
Has the insurer correctly assessed its liability for the claim?
No. The insurer’s assessment of its liab ility for the terracotta roof is not consistent with its
policy obligations. That is because the available evidence shows, on balance, the terracotta
roof as a whole will need to be replaced in order to ensure compliance with the relevant
bushfire regulations. The policy requires the insurer to cover the cost to meet current building
regulations to repair or rebuild the part of the home that was damaged. In this case, it is fair to
regard the terracotta roof as a whole as being the ‘part of the home that was damaged’.
The parties are also required to work together to allow the insurer to thoroughly investigate
the complainant’s concerns of further damage from the storm event (including mould growth).
Why is the outcome fair?
The complainant has established a valid claim for storm damage, and the evidence indicates
the insurer’s settlement offer is insufficient to adequately repair the terracotta roof to a
condition which meets relevant building/bushfire requirements. In the circumstances, it is fair
the insurer ’s settlement be increased (based on a new scope and quote) to reflect the full cost
of repairs to ensure the roof is compliant. It is also fair that further claimed damage be
thoroughly investigated to enable the insurer to assess its liability for that.
1.3 Determination
This determination is substantially in favour of the complainant. As soon as reasonably
possible after the complainant accepts this determination, the insurer is required to obtain a
new scope of works/actionable quote for full replacement of the terracotta roof, covering all
necessary costs to ensure compliance with the applicable bushfire/building regulations, in
accordance with its policy obligations. It must either promptly cash settle as set out below, or
undertake the required work itself. It is also required to promptly arrange an assessment of
the further damage being claimed. The insurer must waive the policy excess, as offered.
Determination | Case number: 954451 Page 2 of 6
2 Reasons for determination
2.1 Has insurer correctly assessed liability for the claim?
Policy covers additional costs to meet compliance
There is no dispute the complainant has established a valid claim for storm damage. The
insurer has accepted that the damage to the roofing is claim-related.
In dealing with the claim-related damage, the policy requires the insurer to cover the cost of
repairs to meet building regulations, as follows:
If a listed event causes loss or damage to your home and you need to meet
current building regulations to repair or rebuild the part of your home that
was damaged.
Covered under buildings insurance
the cost to meet current building regulations to repair or rebuild the part of
your home that was damaged.
Not covered
Costs to meet building regulations:
for undamaged parts of your home – for example, installing insulation in
ceilings that were not damaged.
Insurer disputes its liability for full roof replacement
The insurer acknowledges that the insured property is in a Bushfire Attack Level zone (BAL)
and that BAL regulations apply.
The insurer accepts the policy covers the cost of bringing the damaged areas of the roof up to
the BAL standards. It has also acknowledged that the full roof may need replacing to make it
BAL compliant, as repairs cannot be made to just one area.
The insurer still maintains, however, that it is not liable for the full roof replacement since that
would involve covering ‘unda maged parts ’ .
The insurer offered to cash settle $15,328.39 for all roof repairs, including the metal roof
replacement, based on its builder M’s scope of works/quote (dated 5 May 2023). This scope
of works includes $750 (plus GST) for work to 8m2 of the terracotta roof.
The insurer says it is entitled to cash settle the claim under the policy, given that it is not liable
for a full replacement of the terracotta area.
Determination | Case number: 954451 Page 3 of 6
Complainant says isolated repairs not possible
The complainant disagrees with the insurer’s scope of works and quote.
The complainant provided consultant ABCS with the insurer’s reports and scopes of works for
review. ABCS is stated as being recognised by the relevant State Rural Fire Service as a
qualified consultant in bushfire risk assessment. The insurer has not disputed ABCS’
qualifications. I accept ABCS is a suitably qualified expert in bushfire-related building issues.
ABCS provided a draft bushfire assessment report and a separate persuasive and
comprehensive response to the insurer’s evidence , and concluded:
While I agree that the [Bushfire Attack Level Flame Zone (BAL FZ)] requirements
only apply to the new work, it is my view that this cannot be practically achieved in
isolated areas and a whole roof replacement is necessary. It is my view that the
roof experts/estimators should consider the content of the BAL FZ construction
requirements and the practicality of compliance when considering the scope of
works required for your roof repair.
The insurer, in its own submissions, has agreed it does not dispute that the roof will likely
need a full replacement to bring it up to BAL compliance levels.
Terracotta roof is the ‘part’ of the building which was damaged
I accept that only a section/sections of the terracotta roof appears to have been physically
impacted by the storm. However, the available evidence indicates the practical effect of the
storm on those sections of roof (even when repaired) is that the whole roof has been
compromised, in the context of the particular physical environment and zoning (BAL FZ), and
by reference to the applicable bushfire regulations.
In the circumstances, I consider that outcome from the storm event represents ‘damage’ to
the roof which is broader than just, for example, isolated areas of hail impact. It follows that
the terracotta roof as a whole should be treated as one individual ‘part’ of the insured home
which was ‘damaged’.
Insurer is liable for full terracotta roof repair/replacement to ensure compliance
I am satisfied the available evidence supports the conclusion that the terracotta roof repairs
cannot be done in isolation, having regard to BAL requirements. That means the insurer is
liable for the full terracotta roof replacement in a manner consistent and compliant with the
current applicable building regulations (BAL FZ). That includes ensuring appropriate
certification is obtained on the completion of the work.
Under the terms of the policy, the insurer may choose to undertake the work itself or to cash
settle. If it chooses to cash settle, it must do so based on a new quote and scope to be
obtained from a suitably qualified and experienced builder. That quote must be actionable by
the complainant as a retail customer.
The insurer has not provided any information to show M’s scope of works/quote reflects the
work needed to ensure the roo f is compliant. M’s scope/quote is stated as having been
prepared for the insurer ‘for cash settlement purposes’. It did not make any specific reference
to, or provide any assurances with regard to, BAL or any other relevant building regulations.
Determination | Case number: 954451 Page 4 of 6
That is despite the insurer stating elsewhere ‘ Those areas will be cash settled with an
inclusion to the costs for the BAL requirement ’ .
I also acknowledge the hail damage assessment report provided for the insurer by consultant
IS following an inspection in December 2021. IS refers briefly to BAL and suggests the home
could be repaired with ‘no BAL upgrading…required or imposed’. However, they also note
that the principal contractor for any work would be ‘responsible for complying with Local
Council Regulations, Bushfire Attack Level requirements or the like that may be associated
with the repairs. These items fall outside of this report.’
Having weighed all the available evidence, I am not persuaded that individual spot repairs of
the terracotta roof would be sufficient to ensure compliance with BAL, nor that the full scope
of work which I accept is necessary would be exempt from BAL requirements.
That means I am not satisfied the insurer’s cash settlement offer is fair or sufficient to meet its
policy obligations with respect to covering the cost of meeting building regulations when
repairing the damage for which it is liable.
The insurer is liable for the cost of full replacement of the terracotta roof. It is required to
obtain a new scope of works and quote (actionable by the complainant as a retail customer)
for full replacement of the terracotta roof, covering all necessary costs to ensure compliance
with the applicable bushfire and building regulations, in accordance with its policy obligations.
If the insurer decides to cash settle the claim for the terracotta roof, rather than undertake the
work itself, then the quoted amount should be increased by 10% to allow for contingencies
and the transfer of risk to the complainant.
To be clear, in its settlement for the other damaged area of roofing (metal sheeting) which the
insurer has already agreed to cover, its policy obligations also extend to covering the cost of
ensuring compliance. In that regard, I note the comment of builder M that ‘additional fees may
be incurred for the upgrade of the metal roofing to comply with bushfire attack levels relevant
to the location’. The insurer is responsible for ensuring any cash settlement/repair work with
regard to the metal roofing is also sufficient to meet those obligations.
Complainant says further damage (and mould) has occurred
The complainant has also submitted that further damage has occurred since (and as a result
of) the claimed storm event. That includes further mould growth, despite the insurer’s
previous remediation work. It is not clear that any further investigation of those concerns has
occurred.
The parties are required to work together to enable the insurer to investigate and assess any
such damage to determine if it is claim-related or if the insurer should otherwise be liable for
it. To be clear, the complainant will need to cooperate with the insurer to enable the
investigations to be carried out.
Fair that policy excess be waived, as offered
In the course of this complaint, the insurer has apologised to the complainant for the time
taken dealing with the claim. It also offered to waive the $1,000 policy excess. I understand
that offer is still open.
In the particular circumstances, and in rec ognition of the complainant’s claims experience, I
consider it fair and appropriate that the policy excess be waived as offered.
Determination | Case number: 954451 Page 5 of 6
2.2 Why is the outcome fair?
The outcome is fair in all the circumstances because it is consistent with the policy terms and
the available evidence. The complainant has established a valid claim under the policy. The
damage cannot, on balance, be repaired in isolation without compromising compliance with
the applicable building and bushfire regulations. It is therefore fair that the insurer covers the
full repair/cost of repair of the damaged terracotta roof, and settles the claim as a whole in
line with its policy obligations. It is also fair that the insurer investigates the complainant’s
concerns about further claim-related damage.
Determination | Case number: 954451 Page 6 of 6
3 Supporting information
3.1 The AFCA process
AFCA’s approach is based on fairness
AFCA has determined this complaint based on what is fair in all the circumstances, having
regard to:
the legal principles
applicable industry codes or guidance
good industry practice
previous decisions of AFCA or its predecessor schemes (which are not binding).
The respective parties have completed a full exchange of the relevant information, and each
party has had the opportunity to address any issues raised. We have reviewed and
considered all of the information the parties have provided.
While the parties have raised a number of issues in their submissions, we have restricted this
determination to the issues that are relevant to the outcome.
We assess complaints on available information and circumstances
AFCA is not a court of law. We do not have the power to take or test evidence on oath, or to
require third parties to give evidence.
When we assess complaints, we consider:
available documents
the recollections of the parties
all relevant circumstances.
We give more weight to documents created at the time the events occurred. If there are no
relevant documents, we will decide what most likely occurred based on the available
information.
If there are conflicting recollections and these are evenly weighted, we may find that a claim
cannot be established.