Claim for cracking and subsidence damage said to be caused by earthquake declined as pre-existing damage from decayed stumps and reactive soil
Text of the determination
Determination
Case number 953800
Financial firm AAI Limited
Determination | Case number: 953800 Page 1 of 8
Case number: 953800 31 July 2023
1 Determination overview
1.1 Complaint
The complainant holds a ‘ Home Building Insurance’ policy with the financial firm (insurer). On
7 June 2022 the complainant lodged a claim for cracking to his house which he says was
caused by the earthquake that struck Victoria on 22 September 2021.
The insurer appointed CRD engineers to investigate the cause of the damage. Based on
C RD’ s report, the insurer declined the claim, saying the damage was pre-existing, caused by
‘ long-term differential footing movement’ attributable to decayed timber stumps and reactive
clay soil.
The complainant disputes the insurer’s findings and seeks that the insurer accept the claim.
In particular, the complainant wants the insurer to cover the cost of restumping at the rear of
the house.
1.2 Issues and key findings
Is the insurer entitled to decline the claim?
Yes. Based on the available information the complainant has not established the damage was
caused by an insured event within the terms of the policy. The insurer can deny the claim on
this basis.
Why is the outcome fair?
There is no dispute that the complainant had received the relevant policy documents. It is fair
in the circumstances that the insurer is entitled to rely upon the terms and conditions of the
policy in assessing the claim and determining the extent of its liability.
The available information indicates that the earthquake was not a cause of the damage
claimed. The damage was most likely caused by events not covered within the terms of the
policy. It is fair the insurer is entitled to deny liability.
1.3 Determination
This determination is in favour of the insurer. The insurer is not entitled to take any further
action.
Determination | Case number: 953800 Page 2 of 8
2 Reasons for determination
2.1 Is the insurer entitled to decline the claim?
Yes. Based on the available information the complainant has not established the damage was
caused by an insured event within the terms of the policy. The insurer can deny the claim on
this basis.
Complainant has initial onus to establish a valid claim
It is established insurance law that the initial onus is with the complainant to establish on the
balance of probabilities that the loss or damage claimed falls within the terms of the policy.
The policy is an ‘insured events’ policy. This means not all loss and damage is automatically
covered. Rather, only loss or damage caused by one or more of the insured events is
covered, subject to any policy exclusions. The insured events are set out in the product
disclosure statement (PDS) dated 18 September 2020. The PDS confirms that ‘loss or
damage caused by an earthquake’ is an insured event .
To establish a valid claim, the available information must show the cause of the damage
claimed is the September 2021 earthquake.
Once the complainant has established a valid claim, the onus shifts to the insurer to establish,
on balance, the application of a policy exclusion or that it is otherwise entitled to decline the
claim under the policy.
Complainant says the earthquake caused damage to his property
The complainant says the earthquake caused:
the rear end of the house (an extension) to subside
cracking to external brickwork
cracking to internal plastering
a skewed window frame
During the AFCA complaint process the complainant provided photographs taken after the
earthquake to demonstrate the damage he asserts has been caused directly by the
earthquake.
Insurer’s expert report concludes that the damage is pre-existing
After the claim was lodged, the insurer appointed CRD, building consultants and engineers, to
attend the property and assess the damage alleged to have been caused by the earthquake.
The CRD report dated 11 July 2022:
reported the following damage
> cracking of internal wall linings
> distortion of window frames
> expansion of an external building joint to the rear of the dwelling
> mortar cracking and general brick damage in the external brickwork
found evidence of long-term differential footing movement at the rear extension of the
dwelling, caused primarily by
> heavily decayed timber stumps at the rear of the property
> the presence of reactive clay soils
Determination | Case number: 953800 Page 3 of 8
referred to the presence of inadequate surface drainage and trees in close proximity as
additional factors affecting the damage to external brickwork
concluded that the damage observed to the dwelling was not caused by the earthquake.
Insurer declined the claim
After receiving the CRD report, the insurer declined the claim on that basis that the damage
was excluded under the policy. The insurer summarised its position in its letter of 15 July
2022 to the complainant:
As discussed your claim has not been accepted because your policy does not
cover loss or damage caused by ground movement and wear, tear and gradual
deterioration. The ground movement and wear, tear and gradual deterioration
exclusions in your Product Disclosure Statement ( PDS ) specifically apply to
exclude cover of your claim.
The insurer accepts that an ‘earthquake’ is an insured event. The policy provides that where
subsidence occurs within 72 hours and is directly caused by the earthquake, the loss is
claimable. However, having received the CRD report, the insurer relied on the following policy
exclusions to deny the claim:
ground movement
wear, tear and gradual deterioration
The detail of these terms of the policy is at section 3.2.
After the insurer denied the claim, the complainant requested that the insurer review its
decision. The insurer confirmed its decision to deny the claim, for the same reasons as its
original decision. In its letter of 10 October 2022, the insurer concluded the weight of the
evidence was that the earthquake did not cause the damage.
Further engineer reports obtained by insurer
During AFCA’s complain t process, the insurer obtained two supplementary engineer reports
because the complainant criticised the original CRD report. These reports are set out in
section 3.3. below but reiterate the findings of the original report.
On balance, the proximate cause of damage was not the earthquake
As indicated above, it is up to the complainant to establish on the balance of probabilities that
the damage to the house was caused by an insured event, in this case, an earthquake.
The complainant did not obtain his own expert report, but he does rely on his own mechanical
and production engineering background to critique the original CRD report and the first of the
supplementary engineer reports. The complainant has submitted extensive annotations to
these reports, as well as other submissions. The complainant says it is ‘ undeniable ’ that the
damage observed at the property by the insurer’s builder and CRD engineering consultants
was caused by the earthquake.
The complainant reaches this conclusion for the following key reasons:
a timber framed rear extension to a masonry house is prone to earthquake damage
only a small number of the timber stumps are decayed and this cannot explain the
subsidence that is now evident
the CRD engineer did not arrange for a soil test or geotech report and is therefore not in a
position to characterise the soil as moderate to high reactive
Determination | Case number: 953800 Page 4 of 8
the CRD report wrongly concludes that there is substantial evidence of repairs indicating
pre-existing subsidence and related cracking and window frame distortion
> any ‘repairs’ sighted by the CRD engineer were associated with prior renovations rather
than ground movement
the other factors mentioned in the CRD report as contributing to the ‘long term differential
footing movement’ – inadequate surface drainage, garden beds and trees in close
proximity to the house – do not reflect the conditions at the property adjacent to where
most of the damage at the rear of the house has occurred
t he masonry cracking, internal plaster cracking, window frame distortion and ‘extreme
movement’ (rear of house not level) the subject of the claim did not exist prior to the
earthquake.
I accept that based on the available information, the earthquake could be felt at the
complainant’s house and that this eventually prompted him to lodge a claim with the insurer,
approximately nine months later. I acknowledge the complainant’s own professi onal expertise
and that he genuinely considers that the damage the subject of the claim is a direct cause of
the earthquake. I have paid close attention to all the available information, especially the
expert reports, the complainant’s submissions on the i nsurer’s expert reports and other
material provided by the complainant (such as photographs and commentary). I note that the
primary outcome sought by the complainant is a payout that will cover the costs of restumping
the rear of the property.
In my view, the expert evidence produced by CRD engineers (the original CRD report and the
two supplementary reports) shows that on balance, the damage the subject of the claim is
primarily the result of the effect over time of decayed timber stumps and reactive soil
composition. These factors, combined with the lesser impact of prevailing surface drainage
and perimeter vegetation mean that the complainant has not established that the earthquake
was the proximate cause of the damage, even if it may in places have highlighted existing
damage.
In the circumstances I am not satisfied that the complainant has established a claim within the
terms of the policy. On this basis, the insurer can deny the claim.
2.2 Why is the outcome fair?
There is no dispute that the complainant had received the relevant policy documents. It is fair
in the circumstances that the insurer is entitled to rely upon the terms and conditions of the
policy in assessing the claim and determining the extent of its liability.
The available information indicates that the earthquake was not a cause of the damage
claimed. The damage was most likely caused by events not covered within the terms of the
policy. It is fair the insurer is entitled to deny liability.
Determination | Case number: 953800 Page 5 of 8
3 Supporting information
3.1 The AFCA process
AFCA’s approach is based on fairness
AFCA has determined this complaint based on what is fair in all the circumstances, having
regard to:
the legal principles
applicable industry codes or guidance
good industry practice
previous decisions of AFCA or its predecessor schemes (which are not binding).
The respective parties have completed a full exchange of the relevant information, and each
party has had the opportunity to address any issues raised. We have reviewed and
considered all of the information the parties have provided.
While the parties have raised a number of issues in their submissions, we have restricted this
determination to the issues that are relevant to the outcome.
We assess complaints on available information and circumstances
AFCA is not a court of law. We do not have the power to take or test evidence on oath, or to
require third parties to give evidence.
When we assess complaints, we consider:
available documents
the recollections of the parties
all relevant circumstances.
We give more weight to documents created at the time the events occurred. If there are no
relevant documents, we will decide what most likely occurred based on the available
information.
If there are conflicting recollections and these are evenly weighted, we may find that a claim
cannot be established.
3.2 Relevant terms of the policy
Page 27
Things we don’t cover
Loss or damage to, or caused by, connected with or arising from, or liability caused by,
connected with or arising from:
Ground movement
erosion, vibration, subsidence, landslip, landslide, mudslide, collapse, shrinkage or any
other earth movement, but we will cover landslide or subsidence that is specifically
covered under the following insured events:
Determination | Case number: 953800 Page 6 of 8
• ‘Flood’ (but only if you have cover for insured event ‘Flood’) page 39;
• ‘Storm’ page 41;
• ‘Storm surge’ page 42;
• ‘Earthquake and Tsunami’ page 45;
• ‘Escape of liquid’ page 47;
• ‘Explosion’ page 50.
Page 30
Things we don’t cover
Loss or damage to, or caused by, connected with or arising from, or liability caused by,
connected with or arising from:
Wear, tear and gradual deterioration
any part of the building that has wear, tear, rust, fading, rising damp, corrosion, rot,
action of light, atmospheric or climatic conditions or gradual deterioration such as, but
not limited to:
• tiles and their adhesive or grouting breaking down;
• weathering of roof tiles or roof ridge capping;
• gradual weathering and breakdown of bricks, mortar or concrete.
Page 45
Earthquake and tsunami
We cover
Loss or damage caused by an earthquake or tsunami.
We don’t cover
• loss or damage caused by flood;
• loss or damage caused by actions or movements of the sea or
storm surge;
• loss or damage that occurs more than 72 hours after the
earthquake or tsunami;
• loss or damage caused by erosion, vibration, subsidence, landslip,
landslide, mudslide, collapse, shrinkage or any other earth
movement, but we will cover damage to the building caused by a
Determination | Case number: 953800 Page 7 of 8
landslide or subsidence proved to have occurred within 72 hours
of, and directly because of, an earthquake or tsunami and not
because of erosion, structural fault or design fault.
3.3 Relevant terms of the policy
Report Key points
Builder appointed by
insurer – June 2022
Insurer’s expert
report (CRD
engineers )
11 July 2022
I nspection 15 June 2022.
Damage observed is cracks to external brickwork, cracks to lounge
wall plaster, window pane and window pane out of alignment
Signs of ongoing foundation movement.
Earthquake is not ‘initial cause’ of damage.
Foundation issues are pre - existing.
Claim should be rejected.
‘Make safe’ recommendation not required.
Inspection 2 9 June 2022.
> Interior – cracking of internal wall linings, distortion of window
frames: aged sealant to one frame indicates prior damage .
> Exterior – mortar cracking (less than 1mm) and general bric k
damage. Appearanc e suggestive of pre - existing damage – dull
crack edges & visible prior repairs. Expansion of external building
joint.
Hous e more than 40 years old and 120 km from eart hquake epicentre
Richter scale of earthquake was 5.9
Hous e ha s ha d a ‘series of extensions’
Inadequate surface drainage around perimeter of house
Trees in close proximity to house
‘Abnormal’ soil condition at property – ie., moderate to highly reactive
clay soil – this is proximate cause of damage to brickwork
Evidence of long term differential footing movement caused by -
> Decayed stumps
> Reactive onsite clay soils
Conclusion is that damage not caused by earthquake.
Report signed off by a forensic engineer.
Determination | Case number: 953800 Page 8 of 8
Insurer’s
supplementary expert
report (CRD
engineers )
21 March 2023
Insurer’s further
suppl ementary expert
report from same
CRD engineer (now at
M)
28 June 2023
Responds to complainant comment ary about 11 July 2022 report
‘Differential footing movement’ includes movement at rear of house
where timber stumps have decayed
Repeats that proximate cause of damage is decayed stumps rather
than earthquake – observed sufficient evidenc e of decayed stumps
Assumption that soil is ‘re active’ comes from ‘loc al knowledge’ and
Geological Survey of Victoria
Observed paint and caulking indicative of pre - existing masonry
cracking typically associated with reactive soils
Conc edes that roof is tin, not tiles, but has no effect on opinion that
earthquake is not the proximate cause
Degree of movement in rear of house, where most of damage was
observed, is consistent with long term damage from decayed stumps
Degree of movement in rear of house is not consistent with earthquake
of magnitude experie nced in September 2021
Distorted window is in vicinity of ‘considerably decayed’ rear timber
stumps .
Intended to respond to complainant commentary on 21 March 2023
supplementary
Confirms writer is the same registered structural engineer who
prepared the 11 July 2022 and 21 March 2023 reports.
Repeats opinion that decayed stumps is proximate cause of damage
Magnitude of tremor was not enough to cause damage or subsidence
at the house
Distortion of window frame in rear of hous e is due subsidence from
deca yed timber stumps.