Partial denial of storm damage claim (roof and upper ceilings excluded as wear and tear) and cash settlement amount
Text of the determination
Determination
Case number 953798
Financial firm AAI Limited (insurer)
Determination | Case number: 953798 Page 1 of 8
Case number: 953798 6 October 2023
1 Determination overview
1.1 Complaint
On 14 June 2021, the complainant was issued a home and contents insurance policy by the
insurer. The excess payable under the policy in the event of a claim was $5,000.
In February 2022, the insured property was damaged in heavy storms affecting the Brisbane
area. The complainant lodged a claim with her insurer in August 2022, following a suggestion
from her builder.
The insurer assessed the damages and partially accepted the claim, noting water had
entered the property due to a poorly maintained roof which had suffered from deteriorated
ridge capping – an exclusion under the policy terms. The insurer obtained three different
scopes of works (SOWs) for the insured damage, but even the highest value SOW was only
marginally above the excess payable.
The complainant has sourced her own quotes which are substantially higher than those
obtained by the insurer and says she cannot repair the damage for the costings produced by
the insurer. She seeks an outcome where the insurer accepts the claim for damage to the
roof and completes the repairs in line with her quotation.
1.2 Issues and key findings
Was the partial acceptance of the claim correct?
Yes. On balance, the insurer is entitled to deny the portion of the claim relating to damage to
the roof as it has not been shown this was caused by the storm, rather was the result of wear
and tear.
What is an appropriate settlement of the claim?
The appropriate amount of cash settlement is $4,132.41, based on a 25% contingency on the
Company CMB quote, less the modified amount of excess required by the insurer.
Why is the outcome fair?
The outcome balances the obligations of the insurer under the policy with as fair an
assessment of the proximate cause of the damage that can be achieved in the
circumstances.
While I sympathise with the significant amount of work which needs to be completed at the
complainant’s expense, I am also not satisfied all of the works in the insured premises were
required as a result of damage caused by the February 2022 storm.
1.3 Determination
This determination is in favour of the insurer.
Within 14 days of the date it is informed the complainant has accepted this determination, the
insurer must cash settle the complainant’s claim for $4,132.41.
Determination | Case number: 953798 Page 2 of 8
2 Reasons for determination
2.1 Was the partial acceptance of the claim correct?
Yes. On balance, the insurer is entitled to deny the portion of the claim relating to damage to
the roof as it has not been shown this was caused by the storm, rather was the result of wear
and tear.
The complainant has established a claimable loss
When bringing a complaint to AFCA, the complainant is required initially to show it is more
likely than not there is a claimable loss under the policy. This means demonstrating the loss
or damage was caused by a risk that is covered under the policy.
Once the complainant proves there is a claimable loss, the insurer is liable for the loss unless
it shows an exclusion or limiting condition applies. The insurer has the responsibility to show it
is more likely than not the exclusion or condition applies.
There is no dispute a storm event in February 2022 caused damage to the insured premises.
On this basis the insurer has accepted the part of the claim relating to damage to the interior
of the premises.
I am therefore satisfied that the complainant has established a claimable loss as a result of
the storm.
The insurer says relevant exclusions for wear and tear apply
However, the insurer says while the internal ceilings were damaged by the storm, the roof
was not damaged by a storm event, rather damage to the roof was caused by wear, tear and
gradual deterioration.
The Product Disclosure Statement (PDS) relevantly says there are things the policy does not
cover including:
Loss or damage to, or caused by, connected with or arising from, or liability
caused by, connected with or arising from:
Wear, tear and gradual deterioration
any part of the home, unit or contents that has wear, tear, rust, fading, rising
damp, corrosion, rot, action of light, atmospheric or climatic conditions or gradual
deterioration such as, but not limited to:
— tiles and their adhesive or grouting breaking down;
— weathering of r oof tiles or roof ridge capping […]
In making the decision on the claim that the damage to the roof was caused by wear, tear and
gradual deterioration and not the February 2022 storm, the insurer relies on:
a Company CMB roof report, dated 29 September 2022 and
a Company AB roof report, dated 16 January 2023.
Determination | Case number: 953798 Page 3 of 8
The Company CMB roof report relevantly observed:
pre-existing damage to the roof included cracked tiles, missing and cracked pointing,
rotted and incorrect flashing of centre section of the right-hand side wall and
evidence of previous maintenance included silicone on cracked tiles and ridge tiles
there was no evidence of:
> storm created openings or
> impact from hail.
In summary, it said:
The roof is in fair condition with four cracked tiles. The ridge pointing is in poor
condition with cracking and missing sections. The guttering is blocked. The
weatherboard cladding and window flashing in the centre section of the right-hand
side wall is rotting, damaged and is incorrectly installed with incorrect materials
used in some areas. I believe this is where most of the water egress is occurring.
The Company AB roof report relevantly said:
Upon inspection of the property because of the event is from leaking roof tiles and
cladding to right-hand side of property.
After review of roof report, the roof has not been impacted by the storm event and
the pointing and cracked tiles are damaged due to general wear and tear and
age.
The upper-level living room ceiling is under construction and has large amount of
pre-existing damage, which cannot be contributed to the storm event. The ceilings
throughout the other rooms on upper level also show signs of wear and tear and
age which is consistent age of the property.
Lower-level wall living room wall linings and window has been affected by water
ingress from external cladding and is consistent with the event.
Unfortunately, while I accept there was a significant delay between the February 2022 storm
and the August 2022 claim, these reports do not explain:
why the cracked tiles and roof pointing could not have been caused by impacts of debris or
other factors caused by the storm or
what led the roofing specialist to conclude the pointing and cracked tiles were damaged
due to age and general wear and tear.
I accept the complainant has complicated the assessment of the damage, initially by her
delay in bringing the claim, and then by undertaking her own renovations. However, I am
satisfied in the circumstances of this complaint, this was not intentional and arises from her
lack of home ownership experience coupled with her role as an Emergency Room nurse
being particularly busy and stressful at the relevant time.
Determination | Case number: 953798 Page 4 of 8
The complainant’s counter evidence is not persuasive
T o contrast the insurer’s reports, t he complainant relies on a Company CC storm damage
report she obtained. The report is undated but based on an inspection on 18 October 2022.
The Company CC storm damage report relevantly says about the first-floor kitchen area:
In my opinion during the storm, damages occurred to the exterior of the roof
allowing water to track within the roof space which caused the evident damages
to the ceiling area as shown in the photos below. The exterior roof damages are
loosening and deterioration of the pointing around the ridge capping as shown in
the photos below.
The report goes on to say the following about the roof exterior:
In my opinion during the February 2022 storm, damages occurred to the exterior
of the roof allowing water to track within the roof space causing the evident
damages to the ceiling. The exterior roof damages are loosening and
deterioration of the pointing around the ridge capping.
I was instructed by the owner of the property the exterior of the roof did not need
a tarp over it to protect it from water entering the property prior to the February
2022 storm. I was further instructed the insurance company supplied and installed
the tarp on the roof post February 2022 storms due to the storm damage that
occurred to the roof and ceiling below.
The photo below shows a section of pointing which appears to have been recently
dislocated as the section of tile below the pointing is clean. In my opinion this
indicates the high possibility of the ridge pointing deterioration occurring during
the February 2022 storm.
As a result, it appears the Company CC conclusion about the cause of the damage to the roof
was based upon:
the complainant’s report of no lea ks occurring prior to the February 2022 storm and
a single clean tile below a section of pointing.
Unfortunately, the Company CC report does not explain why:
the ‘ loosening and deterioration of the pointing around the ridge capping ’ was caused by
the storm and not gradual deterioration, particularly given the evidence of previous
maintenance efforts of silicone on cracked tiles and ridge tiles observed three weeks
earlier by Company CMB and
the ‘recently dislocated’ section of pointing could not have become dislocated more
recently than February 2022 (in the intervening eight months).
The insurer has established the exclusion applies
While both sets of reports have issues, on balance, I am satisfied the damage to the upper
level ceilings arose from the weathering of the roof tiles and ridge capping.
This damage is therefore excluded from cover.
Determination | Case number: 953798 Page 5 of 8
In making this assessment, I also note the policy said the complainant relevantly must not do
the following things:
— do not dispose of any damaged parts or items of the home or contents without
our consent unless it is necessary for health and safety reasons;
— do not carry out or authorise repairs without our consent unless you cannot
contact us and need to make emergency repairs to protect your home or contents
or it is necessary for health and safety reasons;
With respect to the upper level ceilings, both of these things were done by the complainant
prior to making the claim. This has made it impossible for the insurer to fairly assess the
damage caused by the roof.
Accordingly, even if I am wrong on balance about the exclusion, I am satisfied it would not be
fair in all the circumstances to require the insurer to meet this portion of the claim.
2.2 What is an appropriate settlement of the claim?
The appropriate amount of cash settlement is $4,132.41, based on a 25% contingency on the
Company CMB quote, less the modified amount of excess required by the insurer.
The insurer has accepted and costed the internal damage
The insurer ’s contractors are unwilling to complete th e repairs but have provided three
different quotes for the work they consider needs to be done. The most recent of these is the
quote from Company CMB dated 28 November 2022 in the amount $4,505.93.
This quote arises from a SOW which, in summary, covers the following works:
Loungeroom:
> Remove and replace damaged plasterboard
> Allowance to remove damaged plaster board around square set window
> Prepare and paint walls
> Prepare and paint skirting boards
Bedroom 1: Prepare and paint skirting boards
Living room:
> Remove and replace cornice
> Remove and replace damaged plasterboard
> Prepare and paint cornice
The complainant has provided a competing quote
The complainant seeks to have Company CC undertake the repair works and has obtained a
quote for the works, dated 18 October 2022, in the amount of $22,992.45.
This quote, in summary, covers the following works:
Ground level Rear Room:
Demolition - 1 labourer at $60 p/h x 4 hrs = $240
- Removal of the metal corner and finishing trims around the windows reveal
Determination | Case number: 953798 Page 6 of 8
- Removal of the timber skirting at floor level below the window
-Cut and remove the water damaged plasterboard to the walls beside and below
the window plus the return sections into the window, clean the framework ready
for new lining
Plastering = $1,000
- Supply and install new plasterboard and metal trims
- Supply and apply 3 coat setting to the area including sanding ready for paint
Carpentry 1 carpenter at $75 p/h x 2 hrs = $150
- Re-install the skirting board
Painting = $1,500
- Paint the walls and skirting board including supply of materials
Total ex GST = $2,890
First floor kitchen area
Demolition - 2 x labourers at $60 p/h x 8 hrs = $960
- Removal of approximately 32m2 of damaged plasterboard ceiling lining, plaster
and screw fixings
Plastering = $5,200
- Supply and install 32m2 of new plasterboard to the ceiling
- Supply and apply 3 coat setting to the area including sanding ready for paint
Electrical = $1,500
- Allowance for an electrician to remove and re-install the light fittings, ceiling fan
and A/C diffuser
Painting = $2,800
- Painting to the entire ceiling and cornice throughout the kitchen area
Total ex GST = $10,460
Roof
Roofing = $800
- Allowance to re-point the ridge capping of the roof where necessary
The quotes are not comparable
As can be seen, the two quotes broadly cover different repairs and the complainant’s quote
includes $11,260 of works which are attributable to damage which is excluded for the reasons
set out under section 2.1 of this determination.
To the extent there is agreement between the quotes on the necessary repairs, I am satisfied
the Company CMB quote is the more generous to the complainant and it would be fair
therefore to use this as the basis for settlement.
Determination | Case number: 953798 Page 7 of 8
It would also be reasonable for the insurer to provide a settlement inclusive of a 25%
contingency, due to:
the complainant losing their lifetime guarantee under a cash settlement,
the likely increase in costs of materials and labour since the quote was provided and
the potential increase of costs the complainant may incur based on any unforeseen
consequences of the repairs not having been completed in the time since the last
assessment.
As a result, I am satisfied it is fair in all the circumstances for the insurer to cash settle this
claim for $5,632.41.
The complainant is required to pay an excess
During the course of this complaint, the insurer offered to reduce the payable excess to
$1,500. I am satisfied this is a fair compromise by the insurer in all the circumstances of this
complaint.
Accordingly, the net balance to be paid to the complainant is $4,132.41.
2.3 Why is the outcome fair?
The outcome balances the obligations of the insurer under the policy with as fair an
assessment of the proximate cause of the damage that can be achieved in the
circumstances.
While I sympathise with the significant amount of work which needs to be completed at the
complainant’s expense, I am also not satisfied all of the works in the insured premises were
required as a result of damage caused by the February 2022 storm.
Determination | Case number: 953798 Page 8 of 8
3 Supporting information
3.1 The AFCA process
AFCA’s approach is based on fairness
AFCA has determined this complaint based on what is fair in all the circumstances, having
regard to:
the legal principles
applicable industry codes or guidance
good industry practice
previous decisions of AFCA or its predecessor schemes (which are not binding).
The respective parties have completed a full exchange of the relevant information, and each
party has had the opportunity to address any issues raised. We have reviewed and
considered all of the information the parties have provided.
While the parties have raised a number of issues in their submissions, we have restricted this
determination to the issues that are relevant to the outcome.
We assess complaints on available information and circumstances
AFCA is not a court of law. We do not have the power to take or test evidence on oath, or to
require third parties to give evidence.
When we assess complaints, we consider:
available documents
the recollections of the parties
all relevant circumstances.
We give more weight to documents created at the time the events occurred. If there are no
relevant documents, we will decide what most likely occurred based on the available
information.
If there are conflicting recollections and these are evenly weighted, we may find that a claim
cannot be established.