Summary

A company's retaining wall collapsed after extreme rain and the insurer declined that part of the claim, citing inadequate drainage, exclusions and s54 ICA. AFCA found for the complainant and required the insurer to accept and assess the claim under the policy, with a cash settlement option based on a quote plus 15% contingencies.

Heavy rain and inadequate drainage were interdependent proximate causes, and the insurer did not discharge its onus of proving any exclusion or s54(2) ICA breach.

Issues

Subjects and remedies

broker or intermediaryhome or building damagenatural disastersmall businesspay claimrepair or rectify

Related

All Chubb determinations · Find similar determinations

Text of the determination

Determination Case number 952432 Financial firm Chubb Insurance Australia Limited Determination | Case number: 952432 Page 1 of 9 Case number: 952432 21 February 2024 1 Determination overview 1.1 Complaint The complainant holds an Industrial Special Risks insurance policy (policy) with the financial firm (insurer). The policy includes cover for material loss or damage to real and personal property. The complainant lodged a claim on the policy after a retaining wall collapsed following heavy rain on or around 26 - 27 February 2022. The insurer denied liability for the collapsed wall but accepted the claim for damage to the complainant’s building damaged by the collapse, including removal of debris to allow repair of building. The insurer says the wall collapsed due to a build up of hydrostatic pressure caused by inadequate drainage and relied on exclusions in the policy and on section 54 of the Insurance Contracts Act 1984 (ICA). The complainant says the insurer should accept the claim for the collapsed wall (damage) as the damage is not excluded by the policy. The complainant company is represented by the broker, CC. For simplicity, I will refer to the complainant and broker collectively as ‘the complainant’. 1.2 Issues and key findings Is the insurer entitled to decline the claim? No. While inadequate drainage contributed to the wall’s collapse, the extreme rainfall was also causative of loss. The available information establishes on the balance of proba bilities damage occurred due to a combination of inadequate drainage and heavy rainfall. As the collapse was unforeseen and unexpected, the complainant has established a valid claim under the policy. The insurer has not established that an exclusion applies that would entitle it to decline the claim. Why is the outcome fair? The outcome is fair because the insurer has not shown that an exclusion applies, or that it is otherwise entitled to decline the claim. Therefore, it is fair that the insurer covers the damage in accordance with the policy terms and conditions. 1.3 Determination The determination is in favour of the complainant. If the complainant accepts this determination, the insurer is required to accept the claim and assess it in accordance with the policy’s terms and conditions. If the insurer elects to pay the complainant a cash settlement for the claim, it must obtain a quote for the necessary repairs, based on the reasonable current cost payable by a consumer such as the complainant. It must pay the complainant the quoted amount plus a 15% contingencies uplift. The insurer’s liability is limited by the relevant policy sublimit. Determination | Case number: 952432 Page 2 of 9 2 Reasons for determination 2.1 Is the insurer entitled to decline the claim? No. While inadequate drainage contributed to the wall’s collapse, the extreme rainfall was also causative of loss. The available information establishes on the balance of probabilities damage occurred due to a combination of inadequate drainage and heavy rainfall. As the collapse was unforeseen and unexpected, the complainant has established a valid claim under the policy. The insurer has not shown an exclusion applies that would entitle it to decline the claim. Background to the current claim The insured property consists of several large-scale steel framed warehouses located in an industrial area. The majority of the property is paved with a relatively level concrete slab. The land has a natural slope and has retaining walls on the southern boundary of the property with an average height of 3250mm. A moderately sloping 6m width of lawn is located between the south retaining wall and paved carpark of the neighbouring south property. This determination concerns the retaining wall on the eastern portion of the southern property boundary line behin d the building referred to by the parties as ‘the factory’ . Until 2015, the relevant retaining wall was a concrete crib wall. Following a storm in 2015 part of the crib wall collapsed and part of the crib wall bowed. The complainant says, and the insurer does not dispute, that a 12m section collapsed at the western end of the wall and was replaced in 2015 by the complainant with a concrete panel and post wall (panel wall). The parties dispute what damage and work occurred beyond this. Circumstances of the 2022 loss and claim Following heavy rain on 26 - 27 February 2022 the concrete crib retaining wall was damaged and a large section collapsed. This was discovered on Monday 28 February 2022, and the complainant lodged a claim with the insurer. The damaged wall (disputed wall) was to the east of the panel wall built in 2015. The collapse of the disputed wall damaged approximately 12m of the factory’s sheet metal wall. The insurer has accepted the claim for the damage to the factory structure but not the retaining wall. The insurer says it is not required to pay the damage because it falls within the policy’s exclusion clauses. It says the proximate cause of the damage was not storm but a build up of hydrostatic pressure caused by an absence of granular fill and drainage. It says the wall was repaired or rebuilt as a crib wall after the 2015 event. Policy covers material loss or damage subject to terms and conditions The full details of the policy coverage, conditions, limitations, and exclusions are contained within the Policy Wording (PW). There is no dispute the insurer sent the PW to the complainant. Therefore, the insurer is entitled to rely upon the terms of the policy. The policy covers material loss or damage to all real and personal property (except as specifically excluded) belonging to the complainant during the period of cover. I accept the presence of material damage to the retaining wall during the period of insurance was unintentional and unexpected and is therefore a claimable loss. The onus therefore transfers to the insurer to show why it is not liable for the claimed damage. Determination | Case number: 952432 Page 3 of 9 . The insurer relies on exclusions to deny the claim The insurer says it is not required to cover the damage as it relies on paragraph (4) of the Perils Exclusions in the policy which relevantly states the insurer will not be liable under Section 1 (material damage) in respect of: 4. Physical loss, destruction or damage occasioned by or happening through (a) … a latent defect (b) wear and tear, fading, scratching or marring, gradual deterioration or developing flaws, normal upkeep or making good (c) error or omission in design, plan or specification or failure of design (d) normal settling, seepage, shrinkage or expansion in buildings or foundations, walls, pavements, roads and other structural improvements, creeping, heaving and vibration (e) faulty materials or faulty workmanship … The insurer also relies on: Condition 11 (applicable to all sections): 11. Precautions To Prevent Loss The Insured shall take all reasonable precautions to prevent loss, destruction or damage to the property insured by this Policy. (insurer’s emphasis) Insurer and complainant rely on expert reports Following the 2022 collapse of the disputed wall, the insurer engaged engineer, EC, to determine the cause of the collapse. EC inspected the damage on 5 April 2022. EC’s first report (EC1) is dated 21 April 2022. EC1 says:  the failure occurred to 12 metres of the concrete crib wall  the crib wall sustained failure by overturning  the remaining section of crib wall had a gradient greater than the 4:1 incline required in concrete crib wall construction and also appeared to be overturning  no damage was apparent to the panel wall  the soil behind both retaining (crib and panel) walls is clay-based earth  no free-draining granular material could be observed in the soil behind the crib wall which is required as a component of the drainage construction  the cause of the wall failure was build-up of hydrostatic pressure at the rear of the wall due to ineffective drainage  the damage to the crib wall was not consistent with damage caused during the recent heavy rainfall event or by another single event but was attributed to ineffective drainage over a long time. The complainant engaged engineers, AS, to determine the cause of the crib wall collapse. AS inspected the damage on 14 March 2022 and 20 May 2022. AS’s first report ( AS1) is dated 26 May 2022. AS1 says:  the crib wall is 50 to 60 years old Determination | Case number: 952432 Page 4 of 9  Bureau of Meteorology (BOM) data for the area shows rainfall of 68mm on Friday 25 February 2022; 224mm on Saturday 26 February 2022; and 193mm on Sunday 27 February 2022 (AS has attached that BOM data to AS1)  there is no Australian Standard that prescribes drainage to be installed with a retaining wall and, even if there was, EC would be comparing current standards with a structure designed and constructed at least 50 years ago  e ven if a 100mm ag pipe and granular material was installed as per EC1’s section drawing, the wall would have been subjected to the same hydrostatic pressure as a retaining wall without drainage  the collapse of the retaining wall is a direct consequence of the extreme rain event that occurred during the weekend of 26 February 2022. After EC1 and AS1 were prepared, the insurer provided the report and scope of works (SOW) prepared by engineer, CR, dated 12 June 2015, to EC and the complainant. CR ’s report responds to enquiries by a (different) insurer regarding the 2015 crib wall collapse and subsequent insurance claim. That report contains photos, including of the collapsed and bowed wall, and says:  12m of the crib wall collapsed  approximately 5m of the crib wall ‘is observed to be ‘bowing’ outwards from the retained soil adjacent to the collapsed section of the wall’  the collapsed sect ion of the wall has exposed the retained soil which reveals no ‘free draining granular fill’ or ‘geotextile fabric’  no surface drainage infrastructure was observed to be installed at the top of the retaining wall  the collapse occurred during a one-off extreme rainfall event  the proximate cause of the damage to the crib wall was inadequate drainage behind the retaining wall which has allowed an excessive build-up of hydrostatic pressures overloading the structure  the crib wall should comply with Australian Standard AS4678 but does not  there is little evidence the collapse occurred over the long term  the remaining length of the retaining wall appears to be inclined into the retained earth as it was constructed  CR’s opinion is that rebuilding the wall in part is not possible and complete deconstruction of the wall is required. The insurer has provided EC’s second report (EC2 ) dated 29 June 2022. EC2 commented on AS1 and also provided comment on CR ’s report relating to the 2015 collapsed of part of the crib wall, together with their earlier inspection and findings. EC2 says:  the CR report shows a large section of the crib wall collapsed in an identical fashion to the most recent collapse  the wall was replaced in 2015 making it far less than 50 years old and should have been reconstructed in accordance with AS4678 (2002) back in 2015  the CR report concluded that the retaining wall collapsed in 2015 due to hydrostatic pressure caused by absence of drainage medium. The 2022 collapse was from the same cause, as set out in EC1  the CR report stated that the wall could not be partially repaired and that the entire wall needed to be replaced with a new wall in accordance with AS4678 – Earth Retaining Structures  a crib wall that conforms with the Concrib installation manual 2024 and AS4678 (relevant standards) is free-draining and would not have been affected by hydrostatic pressure, causing the collapse Determination | Case number: 952432 Page 5 of 9  the relevant standards were in place in 2015, and were included in the CR report, when the works on the crib wall were undertaken  the CR report required the replacement wall to feature drainage as per the relevant standards. This was due to the wall failing in 2015 because of lack of drainage and consequential hydrostatic pressure  the replacement or repaired wall did not have drainage or meet the relevant standards. That left the wall susceptible to another failure  it is likely that AS was not told about the 2015 collapse and therefore their conclusion relied on incorrect assumptions about the age of the wall, construction and compliance requirements. The incorrect assumptions led to an incorrect conclusion. The complainant provided an email from AS dated 4 July 2022 ( AS2) addressing issues raised by EC. To the extent that new information was provided, AS2 says:  the overturning/collapse was a consequence of the elevated hydrostatic pressure on the back of the crib wall due to the extreme rain event. The resulting horizontal forces exceeded the resistance capacity of the crib wall  AS1 commented on the crib wall only, therefore the statement that the wall is 50 years old is correct  AS did not see and was unaware of the CR report when it prepared AS1. The insurer has provided EC’s third report (EC3 ) dated 28 October 2023. To the extent that new information was provided, EC3 attaches marked 2015, 2021 and 2022 aerial photos of the property identifying the various sections of retaining walls. It says:  the photos show the section of crib wall to the east of the panel wall was repaired and ‘appears to have been reinstated still containing unsuitable material for drainage…’  the photos show a section of panel wall was built extending to the western side the factory after the post 2015 panel wall construction  the shown discrepancies suggest an ongoing issue with the wall and past repair attempts  ‘[e]ven if the retaining wall was constructed 50 years ago, it was constructed specifically to prevent collapse due to excessive rainfall – particularly in the case of a crib wall…any collapse requires the determination of the specific defect that led to the collapse. ’  it included an aerial diagram which marks a section at the eastern end of the wall ‘unrepaired bowed crib wall’ and marks the middle section as ‘repaired bowed crib wall’  the ‘section of bowed crib wall beside (east of) [the panel wall] was repaired, however it appears to have been reinstated still containing unsuitable material for drainage causing the collapse to simply occur beside the newly installed panel wall’  relies on photo 4 of EC3 which shows gaps in the retained soil above the collapsed wall and marks a small section of the eastern most part of the wall ‘the undamaged crib wall’  effective reinstatement was not conducted to the full length of the damaged area. The insurer has provided EC’s fourth report (EC4 ) dated 4 January 2024. EC4 says:  ‘a section of the crib wall at which collapse occurred [in 2015] was not installed with a concrete panel retaining wall further down the wall but was put back together as a crib wall. This was the section that incurred collapse in 2022.’  the diagram in EC3 (from 2022 aerial view) shows the area of panel wall installed following the 2015 collapse. The 2022 collapse has occurred immediately beside this panel wall location  Photo 1 in EC3 ‘shows that the concrete panel wall did not previously extend down t he side of the factory, it used to end at a location beside the carport’  ‘Photo 3 (also from the 2015 report) shows that the wall had collapse d and bowed for a greater distance down the side of the factory.’  ‘photograph 2 in the 2015 [CR] report indicates the extent to which the collapse occurred. ’ Determination | Case number: 952432 Page 6 of 9  ‘Given that the new concrete panel wall was not installed in front of this collapsed location it is evident that the damaged crib wall was put back together at this location following the 2015 collapse’. Rebuild/repair after 2015 event The parties disagree about whether the disputed wall was repaired or rebuilt after 2015. The insurer says the complainant rebuilt or repaired part of the disputed wall after the 2015 event. It says that not all the 2015 collapsed wall was replaced by the panel wall and that some of the collapsed wall and some of the bowed wall (to the east of the panel wall) was replaced and/or repaired as a crib wall. It relies on EC’s reports including EC3 ’s aerial diagram which marks a section at the eastern end of the disputed wall: ‘the unrepaired bowed crib wall’ and marks the western section: ‘the repaired bowed crib wall’. However, the complainant says that it did not receive a copy of the CR report or SOW prior to the current claim. The complainant says it did not do any repairs or rebuilding to the disputed wall after the 2015 event. The complainant’ s marked aerial diagram provided on 27 October 2023 marks a section at the eastern end of the disputed wall: ‘8m undamaged crib wall 60 years old’ and marks the western section: ‘approx 15m collapsed crib wall after 2022 rain event 60 years old’. I accept that the available information does not show the CR report or SOW was provided to the complainant. I am not persuaded by the insurer ’s version that repairs and/or rebuilding work was done to the disputed wall after the 2015 collapse. That is because:  EC1 does not identify the disputed wall as being repaired or rebuilt in full or part  CR says that 12m of wall collapsed in 2015. The complainant says, and the insurer does not dispute, that the 12m panel wall was built at the location of the collapsed crib wall. This indicates that all of the 2015 collapsed wall was replaced by the panel wall. It is noted that the insurer’s submission of 27 October 2023 say ‘the collapsed part of the retaining wall was rebuilt as a steel post and concrete panel wall’ and that ‘the 5 metres of the retaining wall was observed by [CR] to have been bowing outwards. We further understand that this section that was bowing out was not rebuilt and is noted as being adjacent to the panel wall’  the photos provided do not show any new wall built or repaired (beyond the 12m panel wall)  the photos do not show that the 2015 collapsed wall extended beyond where the new panel wall was installed  it appears from EC3 and EC4 that EC reached this conclusion based on a desktop review of photos rather than its own independent inspection. In particular, EC provides no expert analysis of the date of materials or construction that points to post 2015 repair of the crib wall  I am not satisfied that the photos relied upon by EC support its conclusion. That is because the various perspectives from which the photos referred to by the insurer are taken cannot reliably line up the collapsed wall with external markers to determine the extent to which it was replaced by the panel wall  Photo 2 of CR’s report showing the extent of the 2015 collapse is consistent with the complainant’s version . It appears to show that the 2015 collapse did not extend beyond where the panel wall stands. Determination | Case number: 952432 Page 7 of 9 What is the proximate cause of the damage to the disputed wall? Where damage that is the subject of an insurance claim may have more than one cause, it is necessary to determine the proximate cause of the damage. Proximate cause is the dominant, efficient or operative cause of a loss. It is not required to be last in time or the sole cause. It is a question of fact that depends on the circumstances of each case and an evaluation of the evidence. Based on the available information, I am satisfied the wall collapsed because of a build-up of hydrostatic pressure behind the wall and that this had two interdependent proximate causes. They were the heavy rain that fell on the weekend of 26 February 2022, together with inadequate drainage behind the crib wall. I am satisfied the information shows that neither of these causes, on their own, would have caused the February 2022 collapse, but rather, t hese combined elements caused the wall to collapse. Insurer is not entitled to rely on exclusion clauses While I accept that an equal proximate cause of the damage to the wall was lack of drainage leading to a build up of hydrostatic pressure, that does not, of itself, mean that the policy does not cover the damage. Rather, the insurer bears the onus of showing that an exclusion or other limiting factor applies that entitles it to deny the claim. I am not satisfied the insurer has discharged that onus. That is because:  the exclusions for wear and tear, gradual deterioration and developing flaws relate to diminution, decay or damage that is ongoing or sustained over a period of time. The available information, including the 2015 event (which happened during an extreme rain event), does not support a finding that the collapse was the result of ongoing or sustained diminution, damage or other ongoing issue. While hydrostatic pressure may build up over time, the information does not show the wall had gradually deteriorated or developed a flaw over a sustained period. The information does not show that, but for the extreme rain event, the damage would have occurred  the insurer has argued that the ‘policy does not provide cover due to developing flaws due to a failure to attend to making good ’ . It is correct that the policy excludes damage caused by developing flaws irrespective of how they occurred. However, the section does not say the policy ‘ does not cover developing flaws due to a failure to attend to making good ’. In fact, t he section does not refer to ‘failure to make good’ or ‘ failure to attend to making good ’ . Rather, it says ‘it does not cover…loss…occasioned by or happening through… making good ’ . The available information does not show that any damage was occasioned by or happened through making good  the insurer has not shown the damage was caused by faulty workmanship. As stated above, I am satisfied the collapsed wall was built 50 to 60 years ago and was not repaired or rebuilt in 2015. The available information does not show the wall was not built as it was designed or that faulty workmanship occurred in its construction  while the insurer argues the damage was caused by error or omission in design, plan or specification or failure of design, the available information does not show the design and/or specifications were considered erroneous or insufficient at the time the wall was designed and/or built  the insurer has not shown that the wall collapsed due to a ‘ latent ’ defect. The Macquarie Dictionary says the term means a fault or imperfection that is ‘present, but not visible or apparent’. The insurer has said that the wall was defective due to lack of drainage in its construction. I am not persuaded by this as the available information does not show that it was defective judged by accepted building practices at the time it was built. The Australian Standard relied upon by the insurer was not in place when the wall was built. The insurer Determination | Case number: 952432 Page 8 of 9 has not shown any Australian Standard or manufacturer’s crib wall manual was available and industry standard at that time  The insurer has said the complainant did not comply with the policy term to take all reasonable precautions to prevent the loss or damage. It says it is therefore entitled to refuse to pay the claim in accordance with s.54 (2) of the ICA. It says the complainant did this by not rebuilding the wall in accordance with CR’s 2015 recommendation to demolish and rebuild the wall, by rebuilding or repairing the wall in breach of Australian Standards, and by having inadequate drainage behind the wall. However, the available evidence does not show that the complainant received CR’s report therefore I am not satisfied the complainant knew of its recommendations. As stated above, the insurer has not shown the disputed wall was repaired or rebuilt. Also, the circumstances of the 2015 collapse could reasonably have led the complainant to believe that damage was solely due to the extreme weather event. Accordingly, I am not satisfied the complainant failed to comply with this term of the contract and s.54 (2) of the ICA is not invoked. 2.2 Why is the outcome fair? The outcome is fair because the insurer has not shown that exclusions apply, or that it is otherwise entitled to decline the claim. Therefore, it is fair that the insurer covers the damage in accordance with the policy terms and conditions. Determination | Case number: 952432 Page 9 of 9 3 Supporting information 3.1 The AFCA process AFCA’s approach is based on fairness AFCA has determined this complaint based on what is fair in all the circumstances, having regard to:  the legal principles  applicable industry codes or guidance  good industry practice  previous decisions of AFCA or its predecessor schemes (which are not binding). The respective parties have completed a full exchange of the relevant information, and each party has had the opportunity to address any issues raised. We have reviewed and considered all of the information the parties have provided. While the parties have raised a number of issues in their submissions, we have restricted this determination to the issues that are relevant to the outcome. We assess complaints on available information and circumstances AFCA is not a court of law. We do not have the power to take or test evidence on oath, or to require third parties to give evidence. When we assess complaints, we consider:  available documents  the recollections of the parties  all relevant circumstances. We give more weight to documents created at the time the events occurred. If there are no relevant documents, we will decide what most likely occurred based on the available information. If there are conflicting recollections and these are evenly weighted, we may find that a claim cannot be established.

Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.