Home / Suncorp Group / Determination 951897

Determination 951897

Insurer declined claim for cracked bathroom tiles after a storm, relying on ground movement exclusion

FirmSuncorp Group
Decided2023-08-25
ProductGeneral Insurance · Home building and contents
OutcomeFor the firm
Amount awarded—
Non-financial loss—
Amount claimed—
SourceAFCA PDF

Summary

The complainant claimed for storm damage to his home, including cracked bathroom tiles. The insurer cash settled the storm damage but declined the tiles; AFCA found in favour of the insurer.

Expert evidence showed the proximate cause of the tile damage was long-term ground movement, not the storm, and the policy excludes ground movement.

Issues

Subjects and remedies

home or building damagenatural disasterno remedy

Related

All Suncorp Group determinations · Find similar determinations

Text of the determination

Determination Case number 951897 Financial firm AAI Limited Determination | Case number: 951897 Page 2 of 8 Case number: 951897 25 August 2023 1 Determination overview 1.1 Complaint The complainant held a home building insurance policy with the financial firm (insurer). The complainant lodged a claim with the insurer following a storm event in February 2022. He sought cover for water damage to the ceilings, walls and some contents, as well as cracked bathroom tiles. The insurer accepted the claim for damage to the interior of the property caused by water ingress, but declined to cover the damage to the bathroom tiles. The insurer says this damage was not due to storm and the cause of this damage was ground movement, which is excluded under the policy. The complainant disagrees with the insurer’s decision and wants the insurer to repair the broken tiles or pay the cost of the repair. He says that:  he previously completed maintenance works, including water diversion works and relevelling of the house;  the storm event was the direct cause of the damage to the bathroom tiles; and  the insurer did not respond to the claim and arrange inspections in a timely manner. 1.2 Issues and key findings Is the insurer entitled to deny the claim? Yes. The insurer is entitled to decline the claim for damage to the bathroom tiles. The expert evidence establishes, on balance, that long term ground movement is the proximate cause of the damage to the tiles, and the policy excludes damage of this nature. Did the insurer handle the claim reasonably? Yes. There were delays at the beginning of the claim, but this was not unreasonable given the large volume of claims the insurer received at the time. The insurer was entitled to investigate the claim. It provided the complainant with regular updates regarding the status of the claim. Why is the outcome fair? The evidence establishes the damage to the bathroom tiles was not caused by an insured event and it is also excluded under the terms of the policy. It is fair that the insurer relies on the terms of the policy to deny liability. 1.3 Determination This determination is in favour of the insurer. The insurer is entitled to rely on the terms of the policy to refuse payment of the claim in respect of the bathroom tiles. Determination | Case number: 951897 Page 3 of 8 2 Reasons for determination 2.1 Is the insurer entitled to deny the claim? Yes. The insurer is entitled to decline the claim for damage to the bathroom tiles. The expert evidence establishes, on balance, that long term ground movement is the proximate cause of the damage to the tiles, and the policy excludes damage of this nature. Complainant must show damage caused by an insured event It is accepted insurance law that an insured has the initial onus to show, on the balance of probabilities (that it is more likely than not), that the loss or damage claimed falls within the terms of the policy. The complainant holds a home insurance policy with the insurer. The policy provides cover for loss and damage arising from a series of insured events subject to the terms and conditions set out in the product disclosure statement (PDS). Page 38 of the policy states: Loss or damage to the building We Cover We cover loss or damage to the building at the insured addressed caused by an insured event in the period of insurance. Page 41 of the policy states: Storm We cover Loss or damage caused by a storm We don’t cover … • loss or damage caused by erosion, vibration, subsidence, landslip, landslide, mudslide, collapse, shrinkage or any other earth movement, but we will cover loss or damage to the building caused by a landslide or subsidence proved to have occurred within 72 hours of, and directly because of, a storm and not because of erosion, structural fault or design fault; It is agreed that a storm event occurred in February 2022 which caused damage to the property. However, the onus rests with the complainant to show that the damage to the bathroom tiles was caused by storm for the policy to respond to that damage. Determination | Case number: 951897 Page 4 of 8 The complainant says the damage to the bathroom tiles was caused directly by the storm because a significant amount of water passed under the property and the foundations shifted, which caused the cracking. The insurer says there is no evidence the proximate cause of the damage to the bathroom tiles is storm or any other insured event. The insurer relies on the opinion of engineer EC. Expert evidence regarding the cause of damage EC made the following findings in their first report dated 5 July 2022:  There is evidence of previous fill repairs, packing of multiple stumps throughout the subfloor, ponding of water and rutting where storm water has run under the centre of the building on the ground surface, below the dwelling.  There were previous efforts to stabilise foundations, and the surface water and subfloor dampness issue have both been affecting the building foundations for an extended period.  The bathroom perimeter floor tile has cracked at the junction to perimeter wall tile in the absence of sufficient clearance/movement joint.  A timber batten was installed where the tiles cracked, however this did not address the underlying issue which resulted in cracking of tiles in the bathroom.  Foundation movement occurred due to a combination of ongoing and pre-existing conditions at the property and is not the result of an isolated event. The complainant refuted EC’s conclusion regarding the cause of the damage on the basis that EC did not consider that the property was re-levelled and well maintained. In particular, the complainant stated that pooling of water under the property ceased in 2017 after drainage and water flow measures were implemented. In response, EC provided a supplementary report which maintained their initial findings and provided further evidence in support of their conclusion. EC made the following findings in their supplementary report:  At the time of inspection, the insured identified movement issues in the bathroom and kitchen they believed were the result of a recent event. However, there is clear history indicating the movement issues at the property have been ongoing.  Attempts to disguise cracking of tiles by adding a timber batten where tiles were cracked, did not address the underlying issue resulting in cracked tiles, and hence cracking of tiles continued in the bathroom.  With a clear history of repair attempts, past foundation movement and subfloor maintenance, cracking of tiles in the bathroom represents an on-going condition.  The installation of gardens does not change the property grade and there is moss pigment in pavers evidencing frequent water flow over the area.  Photos taken under the house show damp staining and efflorescence on subfloor piers which indicate the flow of surface water through the subfloor in two directions.  The works undertaken by the complainant would not stop the building foundations from responding to changes in ground moisture where surface water has continued to flow through the subfloor at the property. EC concluded as follows: There is a history of movement related repair attempts and re-levelling at the property due to surface water entering the property subfloor from weather periods preceding the claimed event. As there is a timeline of repairs and maintenance Determination | Case number: 951897 Page 5 of 8 preceding the claimed event, the condition is considered on-going and not directly attributable to a single isolated weather event. Rectification works undertaken by the complainant The complainant acknowledges the findings by EC that there is evidence of storm water flowing under the house. However, the complainant says that EC’s reports do not accurately reflect the fact that he addressed these issues to direct water away from the foundations. He says the property was purchased in 2014 and he identified that rain water was pooling under the home. The insurer’s records show that the complainant lodged previous claims in 2014 and 2019 in relation to water damage and movement of the house. In 2019, the complainant advised the insurer that there was a problem with rain water flowing underneath the house and pooling around the timber foundations causing them to move. The complainant has outlined a timeline of maintenance history at the property. The following works were undertaken around 2017 to redirect heavy rain fall:  laying garden edging along one side of the property to divert water to the front;  redirecting water overflow by installing a garden hose to the tank’s overflow pipes, to divert water to the front of the property;  asking a neighbour to replace their pool pump to pump excess water from his pool to the street. The complainant said that, after these items were completed, pooling of water underneath the house no longer occurred during rain events. He then arranged for a builder to carry out maintenance works to re-level the home and prevent future issues at a cost of approximately $8,000. This included additional stumping under the house and repairing cracking to the bathroom (including tiles and walls) as a result of the re-level. These works were completed in 2019, hence the additional stumping and packing of stumps identified by EC. The complainant says the completed work, including the perimeter grade of the paving, had been successful in diverting water for several years prior to the storm event in February 2022. That event washed a lot of the paving base away due to the amount of rain received. The proximate cause of the damage is excluded from cover Having reviewed all evidence, I am satisfied based on the expert reports by EC that the proximate cause (that is, the dominant or effective cause) of the damage to the bathroom tiles was ongoing movement of the foundations. I find EC’s reports persuasive because they provide a detailed explanation of how damage occurred together with photographs. Although rainfall may have contributed to the ongoing damage to the property, there is no evidence that the storm in February 2022 was the operative cause of the damage to the bathroom tiles. The complainant has therefore failed to establish that the damage claimed was caused by an insured event and so the insurer is not required to pay the claim. Further, the proximate cause of the damage was, on balance, due to excluded causes. Page 26 of the policy states: Things we don’t cover Determination | Case number: 951897 Page 6 of 8 Loss or damage to, or caused by, connected with or arising from, or liability caused by, connected with or arising from: Ground movement erosion, vibration, subsidence, landslip, landslide, mudslide, collapse, shrinkage or any other earth movement, but we will cover landslide or subsidence that is specifically covered under the following insured events: … • ‘Storm’ page 41; However, the policy will cover loss or damage to the building caused by a landslide or subsidence if it has occurred within 72 hours of, and directly because of, a storm. EC has identified evidence of ongoing surface drainage issues and explained that the installation of the garden did not change the property grade from the rear boundary to the subfloor. I acknowledge that the complainant has acted as a prudent home owner and undertaken significant maintenance works in an effort to prevent future damage as a result of water entering the subfloor area. Despite these works, the expert evidence establishes that water has still been able to enter the subfloor area. Further, the report by EC and information provided by the complainant confirms that previous repairs have been undertaken to correct movement damage including crack fill repairs, packing of stumps throughout the subfloor area and installation of timber where floor tiles had cracked. This confirms that there is a history of ongoing movement at the property. On balance, I accept that the damage to the bathroom tiles occurred due to ongoing subfloor drainage issues resulting in long-term ground movement. There is no evidence that the damage occurred within 72 hours of, and directly because of, a storm. As the proximate cause of the damage to the bathroom tiles was due to causes excluded from cover under the policy, the insurer is entitled to decline the claim for that damage. 2.2 Did the insurer handle the claim reasonably? Yes. There were delays at the beginning of the claim, but this was not unreasonable given the large volume of claims the insurer received at the time. The insurer was entitled to investigate the claim and provided the complainant with regular updates regarding the status of the claim. History of the claim The complainant says the insurer did not respond to the claim and arrange inspections in a timely manner and the engineer’s report was prepared 6 months after claim lodgement . The history of the claim is as follows:  The claim was lodged by the complainant on 1 March 2022 following heavy rainfall and flooding to South East Queensland in late February 2022.  On 4 March 2022, the insurer advised the complainant by email that his claim was being processed and they were experiencing delays due to severe weather.  Further updates were provided by SMS and email on 16 March 2022 and 4 April 2022.  The insurer engaged RPF to assess the damage to the property. RPF attended the property on 21 April 2022 and obtained a roof report from CNR on 29 April 2022. Determination | Case number: 951897 Page 7 of 8  RPF recommended that an engineer be appointed to report on movement at the property and the insurer advised them to go ahead with this on 16 May 2022.  An engineer from EC inspected the property on 24 June 2022 and produced a report dated 5 July 2022.  On 9 August 2022, the insurer wrote to the complainant advising that it would be cash settling the cost of repairing the storm damage to the property.  The insurer followed up with a telephone call on 22 August 2022 and appointed an internal assessor to review EC ’s findings on 4 September 2022.  The complainant em ailed the insurer querying the findings in EC’s report on 3 October 2023 and the insurer sought further advice from EC by email on 6 October 2022.  EC prepared a supplem entary report dated 18 October 2022.  On 1 Novem ber 2022 and 30 November 2022, the insurer wrote to the complainant advising that it would cash settle the storm damage for $19,414.05, but the damage relating to ground movement had not been accepted. The first engineer’s report was prepared 4 months after claim lodgement, not 6 months as alleged by the complainant. The insurer maintained regular contact with the complainant throughout this tim e and provided regular updates on the status of his claim. The insurer handled the claim reasonably I acknowledge that there were some delays and the claim was not handled as well as it could have been, but there is no evidence that the insurer acted unreasonably or breached its obligations under the General Insurance Code of Practice. The main delay was following claim lodgement when the insurer was inundated with claims arising from the floods in South East Queensland. This event was declared by the Insurance Council of Australia to be an Insurance Catastrophe resulting in abnormally high claim numbers. The insurer was entitled to investigate the claim and it kept the complainant informed of the status and progress of the claim. RPF and CNR attended the property and prepared reports within 2 m onths of claim lodgement and EC was subsequently appointed on their recommendation. Although it took 4 months to obtain the first engineer’s report, which is not ideal, this can probably be explained by trade shortages at the time. The insurer did act promptly to obtain a supplementary report from EC following the complainant ’s email in October 2022. I consider that the ins urer’s conduct was reasonable in all the circumstances. There is also no evidence that the complainant suffered detriment by reason of the delay obtaining expert reports. 2.3 Why is the outcome fair? The evidence establishes the damage to the bathroom tiles was not caused by an insured event and it is also excluded under the terms of the policy. It is fair that the insurer relies on the terms of the policy to deny liability. Determination | Case number: 951897 Page 8 of 8 3 Supporting information 3.1 The AFCA process AFCA’s approach is based on fairness AFCA has determined this complaint based on what is fair in all the circumstances, having regard to:  the legal principles  applicable industry codes or guidance  good industry practice  previous decisions of AFCA or its predecessor schemes (which are not binding). The respective parties have completed a full exchange of the relevant information, and each party has had the opportunity to address any issues raised. We have reviewed and considered all of the information the parties have provided. While the parties have raised a number of issues in their submissions, we have restricted this determination to the issues that are relevant to the outcome. We assess complaints on available information and circumstances AFCA is not a court of law. We do not have the power to take or test evidence on oath, or to require third parties to give evidence. When we assess complaints, we consider:  available documents  the recollections of the parties  all relevant circumstances. We give more weight to documents created at the time the events occurred. If there are no relevant documents, we will decide what most likely occurred based on the available information. If there are conflicting recollections and these are evenly weighted, we may find that a claim cannot be established.

Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.