Home / IAG / Determination 950686

Determination 950686

Insurer sought to limit settlement of an accepted water leak damage claim and disputed claimable loss, retaining wall cover and costs

FirmIAG
Decided2024-02-22
ProductGeneral Insurance · Home building and contents
OutcomeFor the complainant
Amount awarded$328,100
Non-financial loss$4,500
Amount claimed$305,709
SourceAFCA PDF

Summary

The complainant's home was damaged by a neighbouring water leak, and the insurer accepted the claim but sought to limit settlement and disputed a claimable loss. AFCA found in her favour, ordering a cash settlement with uplift, reimbursement of make-safe costs, a professional costs contribution, interest and non-financial loss compensation.

The complainant established on balance that a covered water leak caused the damage, and the insurer failed to prove any exclusion, policy condition or section 54 basis to limit its liability.

Issues

Subjects and remedies

broker or intermediaryhealth or medicalhome or building damagethird party authoritypay claimpay compensationpay interestpay non financial loss

Related

All IAG determinations · Find similar determinations

Text of the determination

Determination Case number 950686 Financial firm Insurance Australia Limited Determination | Case number: 950686 Page 2 of 11 Case number: 950686 16 February 2024 1 Determination overview 1.1 Complaint The complainant holds a Home and Contents Policy with the financial firm (the insurer). The complainant lodged a claim with the insurer in March 2019 after observing damage to the property which she claimed to be from a leaking pipe from a neighbouring property. The insurer initially declined the claim, however, after obtaining further expert reports, has accepted the claim for damages. The insurer seeks to limit its liability for the damage claiming that the complainant failed to report renovations and/or the state of disrepair of the property in breach of her policy obligations. The insurer says this prejudiced its ability to assess the damage. The complainant seeks:  compensation for damages in the sum of $260,898;  payment of exploration, investigation and mitigation expenses in the sum of $31,941.04;  professional costs of $12,870; and  non-financial loss compensation. The complainant is represented by a claims representative (CM) and a broker. For convenience, unless indicated otherwise, any representation made on her behalf is referenced as being from „the complainant‟. 1.2 Issues and key findings Has the complainant established a claimable loss? Yes. The complainant has established that, on balance, a water leak event caused the damage. Can the insurer limit settlement? No. The insurer has not established that it is entitled to limit settlement of the claim. Is the complainant entitled to payment of professional costs? Yes. The insurer should pay the complainant $10,000 as contribution to the costs of CM for claims management. Is the complainant entitled to non-financial loss compensation? Yes. The insurer caused delays, communicated poorly and failed to treat the complainant as a vulnerable consumer. The delays and poor claims handling caused the complainant stress and inconvenience. The insurer is to pay $4,500 in non-financial loss compensation. Determination | Case number: 950686 Page 3 of 11 Why is the outcome fair? It is fair that the insurer accepts the claim because the complainant has established a claimable loss and the insurer has not shown a reasonable entitlement to exclude the claim or reduce its liability. 1.3 Determination This determination is in favour of the complainant. Following receipt of notice that the complainant accepts this determination (notice), within 21 days of receiving the notice, the insurer is to:  pay the complainant $300,032.70 plus interest from 19 June 2023 until the date payment is made to the complainant;  pay the complainant $28,066.89 for exploration costs and make safe plus interest from 30 September 2020 until the date of payment to the complainant;  pay the complainant $10,000 towards the professional costs of CM;  pay the complainant $4,500 in non-financial loss compensation. Determination | Case number: 950686 Page 4 of 11 2 Reasons for determination 2.1 Has the complainant established a claimable loss? Yes. The complainant has established that, on balance, a water leak event caused the damage. Circumstances of loss The complainant says that in or around July 2017 she noticed tiles had cracked externally and there was internal tile separation from the skirting in the games room. The complainant engaged MC, an engineer to inspect. MC undertook inspections on 24 July 2017 and 6 October 2017 and reported that there was settlement of the external slab area, with vertical movement of tiles at the junction with the main dwelling. The complainant says that they continued to conduct exploratory works and engage with engineers to determine the cause of damage. This included demolishing the eastern and western sides of the southern portion of the slab in August 2018. The complainant engaged a geotechnical engineer JK who undertook soil testing in October 2018. The complainant started works for new piers to provide a new foundation for a new external slab. Extensive water was found to be seeping through into the pier holes during construction. On 6 December 2018, Sydney Water undertook investigations and determined that there was a subterranean leak at the neighbouring property. The rate of the leak was estimated at 1,000 litres per day. On 25 January 2019, MC provided a further report. MC concluded that the settlement of the rear entertainment slab was due to the softening and saturation of the lower founding material. This was due to the significant water leak. In March 2019, the complainant lodged a claim with the insurer. She says that it wasn‟t until the leak was discovered in December 2018 that she understood that there was an insurable event. The insurer initially declined the claim, saying that the damage had not been observed within 72 hours of the water leak as required under the terms of the policy. However, on 17 August 2020, the insurer revised their claim decision and accepted the claim. The insurer advised that it would cover the resulting damage to the covered area slab, however, says that the complainant had not established a claimable loss. Onus on complainant to establish a claimable loss The complainant is required to show, on the balance of probabilities (that it is more likely than not), that she suffered a claimable loss under the policy. This means she must show the loss was caused by a risk for which she is insured. Once the complainant proves the existence of a claimable loss, the insurer is liable for the loss unless it shows an exclusion or limiting condition applies. The insurer has the onus of proving on the balance of probabilities the application of the exclusion or condition. Determination | Case number: 950686 Page 5 of 11 The complainant‟s policy provides cover for listed specified events, including accidental damage cover. The policy provides cover for: Water and/or other liquids and/or substances discharged and/or overflowing and/or leaking from any apparatus and/or appliance and/or pipes. The complainant has provided several reports from MC who has consistently determined that the water leak has caused damage. The complainant has also provided a report from Sydney Water acknowledging the water leak at the neighbouring property which was vacant and undergoing renovations. Insurer claims that no claimable loss has been established The insurer has obtained engineering reports from IH and IE. IH claimed that the damage was because of a design defect as the eastern side outdoor entertaining area slab was inadequate as it relied on existing fill for support. Further, the games room slab was not provided with sufficient support as there were no piers or any other mechanical connection to the slab. However, MC refuted the findings of IH in relation to the poorly compacted soil and support with further information in relation to the bearing capacity of the soil being exceeded based on the geotechnical report of JK. IE attended the property on 17 July 2020 and disagrees with the findings from IH in relation to the poorly compacted fill causing settlement. IE believes that the games room slab had translated laterally away from the dwelling possibly because of the reactive soil supporting the base of the piers suffering from cyclic wetting and drying influences. IE did not believe that it was likely that the water leak would have affected the slab on the western side of the games room given the slope of the land and the proximity to bedrock. IE also did not believe that the leak caused a bearing failure and surface settlement. IE did suggest further investigation and information to confirm whether the water leak had contributed to the bearing failure and surface settlement. However, this was not undertaken by the insurer. Water leak caused damage The complainant says that a contour survey was conducted prior to construction of the property. This survey confirms the land slopes from north east to south west. The complainant says the fall of the shale bedrock is consistent with the contour plan referred to above and that the subterranean water would flow in the same direction. The insurer has not obtained a response from IE refuting these comments from the complainant. The panel prefers the position of MC who has consistently supported that the proximate cause of damage was the water leak. This is consistent with the information from Sydney Water confirming the leak at the neighbouring property and the observed timing of the damage. Further, IE conceded that it was possible that the inundation from the neighbouring property caused the damage. Determination | Case number: 950686 Page 6 of 11 The insurer says that the reports from MC are biased as the complainant‟s husband was previously employed by MC. The panel does not believe there is a material conflict of interest because MC was engaged and provided the reports prior to the claim and there was no meaningful relationship between the complainant‟s husband and the expert. The reports from MC are clear and logical. Th ese reports are also supported with findings from JK and JC, another engineer. The complainant has established, on balance, that the loss and damage is of a type covered by the policy. However, the coverage remains subject to the terms, exclusions and conditions of the policy. The insurer bears the onus of establishing its reliance on these. 2.2 Can the insurer limit settlement? No. The insurer has not established that it is entitled to limit settlement of the claim. Complainant obtained quote and invoices The complainant has obtained a quote from CJ dated 19 June 2023 in the amount of $260,898. This quote was prepared based on a scope of works (SOW) prepared by MC. The complainant says that this represents repairs to the water damaged areas, including replacement of a retaining wall. The complainant also seeks reimbursement for costs she says were incurred in investigating the water leak and make safe repairs. She claims $31,941.04. The complainant also says that her husband, a retired licensed builder, undertook much of the labour, together with another labourer. However, she is not claiming reimbursement of these costs but the costs of a labourer who assisted her husband. Insurer cannot exclude costs of the retaining wall The insurer has obtained a quote from BB based on a SOW prepared by IE. The quote excludes the cost of replacing the retaining wall. The insurer says that it is not liable for the repairs to the retaining wall. The insurer says that there is no information to show that the retaining wall was damaged by the water inundation. Further, information from IE shows that it was damaged by termites which is excluded under the terms of the policy. The complainant says that the retaining wall is required to be rebuilt as the damage and rotation was caused by the volume of water which saturated the soil and put pressure on the rear side of the wall. The complainant also says that a large section of the retaining wall had to be removed to access the underfloor area of the games room as part of the make safe works. The remaining retaining wall was not viable and therefore removed. The complainant says the soil stratum has been weakened by saturation, rendering the original design and construction no longer adequate. The complainant also refers to Australian Standard AS2870 and says the footing system for the games room has been compromised due to excessive introduced moisture conditions. Determination | Case number: 950686 Page 7 of 11 Therefore, the replacement of the retaining wall is necessary to stabilise and support the games room. The complainant says that the insurer has failed to take this additional surcharge loading into account in its SOW. The complainant also says that while termite damage was found in the retaining wall, it is in a limited area. The complainant says that the retaining wall was damaged by termites because of the water leak, the termites being drawn to the wet environment. While the panel is not satisfied that the termites were attracted to the water, the panel accepts that the retaining wall will require replacement to give effect to the necessary repairs due to the weakening of the soil by the excess of water. The panel accepts that the termite damage did not become evident until the wall was removed during the repair process. That is, the wall was required to be replaced regardless of the termite damage. The panel considers that it is fair in the circumstances that the insurer replaces the retaining wall and is not entitled to rely on an exclusion or otherwise to limit cover for this item. Insurer has not established any basis to limit settlement The insurer claims that the complainant undertook significant works when demolishing the concrete slabs to the eastern and western portion of the property. The insurer says that the complainant was obligated to tell it in accordance with the terms of the policy that she was undertaking renovations to the building. However, page 56 of the PDS requires the insured to tell the insurer if they are undertaking renovations or if the building falls into a state of disrepair “which increase the ris k of loss, damage or injury”. The panel is not satisfied that the demolition of the slabs meets the definition of a renovation. This is because the sole purpose of removing the slab was to investigate the source of the leak. It was not for repairs or alterations to the property. Further, it had not fallen into a state of disrepair. The information from MC supports that the area was damaged by a water leak and works were undertaken by the complainant to identify and repair the damage. The panel is therefore not satisfied there was any obligation on the complainant to report any issue to the insurer as at August 2018. Further, even if the insurer had established that the complainant had failed to comply with her obligations to report the state of the condition of the property, according to the terms of the PDS, the insurer‟s remedy is to cancel the contract. It does not allow the insurer to limit settlement paid to the complainant. Alternatively, the insurer relies on section 54 of the Insurance Contract Act 1984 (the Act) to reduce its liability under the claim. The insurer says that the actions of the complainant have limited the insurer‟s ability to assess the damage. However, the panel is not satisfied that section 54 assists the insurer. Section 54(1) of the Act is engaged when an act or an omission by an insured would excuse the insurer from an obligation to pay a claim for a loss suffered by the insured. The proximate cause of the damage being the water leak had already occurred during the period of cover. The insurer has not established reliance on a policy condition that would allow it to engage the operation of s 54(1) of the Act. It is therefore not necessary to consider the application of s 54(2) of the Act. Determination | Case number: 950686 Page 8 of 11 The insurer also says that the actions of the complainant in commencing structural foundation works have prejudiced their ability to assess the damages. The panel is satisfied that the complainant acted reasonably and with utmost good faith to mitigate and preserve property before she became aware that she could lodge a claim. The insurer has not shown that it would have managed the claim any differently had a claim been lodged earlier. Further, as the insurer had initially declined the claim, the complainant was obliged to manage the water leak damage. The insurer has accepted a claimable loss under the water leak event. The panel is not persuaded that there are any other significant contributing causes which would allow the insurer to reduce its liability for the claimed damages. Complainant’s quote preferred The insurer has obtained a quote from BB in the sum of $75,522.48. The insurer has offered to settle the complainant‟s claim for $168,210.24. This is based on the quote from BB and consideration of CJ‟s quote with a deduction for external repairs (retaining wall) and a reduction of 50% to the other ancillary repairs. That is, a contribution of $92,687.76 based on the quote from CJ, together with the BB quote of $75,522.48. The panel is satisfied that the quote from CJ is fair and reasonable and based on a comprehensive SOW prepared by MC which includes the retaining wall. The insurer has not disputed the additional costs of the replacement of the floor tiles. The panel considers it is fair in the circumstances that the claim is finalised by way of the insurer cash settling the complainant based on the quote from CJ, dated 19 June 2023. An uplift of 15% is then to be applied to the quoted amount to allow for contingencies and the loss of the lifetime guarantee that applies to insurer approved repairs. Interest is to apply from 19 June 2023 until payment is made to the complainant. Complainant to be reimbursed for make safe repairs and investigative expenses The complainant seeks $31,941.04 for make safe and investigative repairs. The insurer has offered 50% of this amount in the sum of $15,970.52. The panel is satisfied, based on the invoices provided, that the insurer should reimburse the complainant the sum of $28,066.89 for make safe and investigative expenses. Interest is to be paid from 30 September 2020 until the date of payment to the complainant. The panel is satisfied that in the absence of any invoices or other supporting information, the insurer is not required to reimburse the complainant for any labour costs. Insurer not required to pay for SOW The complainant seeks the cost of $15,169 for the preparation of a SOW by their appointed engineer MC. Over the course of the complaint, the complainant confirmed that notwithstanding that the invoice was marked „paid‟, no payment had been made to date. Given that the complainant confirms she has not incurred this cost to date, the insurer is not required to reimburse this amount. Determination | Case number: 950686 Page 9 of 11 2.3 Is the complainant entitled to payment of professional costs? Yes. The insurer should pay the complainant $10,000 as contribution to the costs of CM for claims management. The policy provides cover for professional fees The complainant has provided a copy of an invoice from CM in the amount of $12,870. The insurer has offered the sum of $5,000 which is the maximum amount under section 26 of the „Additional Benefits‟ section of the policy. The panel considers the insurer‟s offers of $5,000 towards this benefit fulfils its requirements under the policy cover. AFCA may require insurer to contribute to a compla inant’s professional costs The AFCA Rules enable AFCA to require an insurer to contribute to the professional costs incurred by the complainant. These costs are, however, usually capped at a total of $5,000, unless special circumstances apply. When considering whether to require an insurer to make a costs contribution, AFCA takes into account the complexity of the complaint and whether the particular complainant needed to incur costs to understand or establish their claim. Complainant was assisted by CM The panel considers that the complexity of the claim, together with the initial denial of the claim by the insurer, that it was reasonable that the complainant sought professional advice and assistance from CM. The panel is satisfied that the insurer should contribute to the full extent as required by our Rules in the amount of $5,000 towards the costs of CM. 2.4 Is the complainant entitled to non-financial loss compensation? Yes. The insurer caused delays, communicated poorly and failed to treat the complainant as a vulnerable consumer. The delays and poor claims handling caused the complainant stress and inconvenience. The insurer is to pay $4,500 in non-financial loss compensation. AFCA can award compensation for non-financial loss Under our Rules, AFCA can award up to $5,400 compensation for non-financial loss. This must relate to poor claims handling or other actions of the insurer which causes:  an unusual degree of stress, delay, or inconvenience, and/or  interference with a person‟s expectation of enjoyment and/or peace of mind. We expect complainants to be moderately robust, and we will not award compensation for the ordinary degree of inconvenience involved in making a claim. Determination | Case number: 950686 Page 10 of 11 Insurer has caused stress and inconvenience The complainant advised the insurer in December 2022 that she was vulnerable, suffering from poor health. The insurer failed to take this into consideration in their dealings with the complainant. While the insurer later accepted the resulting damage, it continued to maintain that the complainant had not established a claimable loss. Further, the insurer acted unreasonably in delaying payment of the claim and withholding payment for items which it had accepted based on the documentation provided by the complainant. This continued to cause the complainant stress and inconvenience. The panel considers an award of non-financial loss compensation is appropriate in the circumstances and considers the sum of $4,500 for the unusual degree of stress and inconvenience appropriate. 2.5 Why is the outcome fair? It is fair that the insurer accepts the claim because the complainant has established a claimable loss and the insurer has not shown a reasonable entitlement to exclude the claim or reduce its liability. Determination | Case number: 950686 Page 11 of 11 3 Supporting information 3.1 The AFCA process AFCA’s approach is based on fairness AFCA has determined this complaint based on what is fair in all the circumstances, having regard to:  the legal principles  applicable industry codes or guidance  good industry practice  previous decisions of AFCA or its predecessor schemes (which are not binding). The respective parties have completed a full exchange of the relevant information, and each party has had the opportunity to address any issues raised. We have reviewed and considered all of the information the parties have provided. While the parties have raised a number of issues in their submissions, we have restricted this determination to the issues that are relevant to the outcome. A panel determined this matter Due to the nature of this complaint, we referred it to a panel for determination. The panel includes:  an ombudsman  a member with significant experience in consumer and small business advocacy  a member with extensive experience in the insurance industry. We assess complaints on available information and circumstances AFCA is not a court of law. We do not have the power to take or test evidence on oath, or to require third parties to give evidence. When we assess complaints, we consider:  available documents  the recollections of the parties  all relevant circumstances. We give more weight to documents created at the time the events occurred. If there are no relevant documents, we will decide what most likely occurred based on the available information. If there are conflicting recollections and these are evenly weighted, we may find that a claim cannot be established.

Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.