Insurer sought to limit settlement of an accepted water leak damage claim and disputed claimable loss, retaining wall cover and costs
Text of the determination
Determination
Case number 950686
Financial firm Insurance Australia Limited
Determination | Case number: 950686
Page 2 of 11
Case number: 950686 16 February 2024
1 Determination overview
1.1 Complaint
The complainant holds a Home and Contents Policy with the financial firm (the insurer).
The complainant lodged a claim with the insurer in March 2019 after observing damage to the
property which she claimed to be from a leaking pipe from a neighbouring property.
The insurer initially declined the claim, however, after obtaining further expert reports, has
accepted the claim for damages. The insurer seeks to limit its liability for the damage claiming
that the complainant failed to report renovations and/or the state of disrepair of the property in
breach of her policy obligations. The insurer says this prejudiced its ability to assess the
damage.
The complainant seeks:
compensation for damages in the sum of $260,898;
payment of exploration, investigation and mitigation expenses in the sum of $31,941.04;
professional costs of $12,870; and
non-financial loss compensation.
The complainant is represented by a claims representative (CM) and a broker. For
convenience, unless indicated otherwise, any representation made on her behalf is
referenced as being from „the complainant‟.
1.2 Issues and key findings
Has the complainant established a claimable loss?
Yes. The complainant has established that, on balance, a water leak event caused the
damage.
Can the insurer limit settlement?
No. The insurer has not established that it is entitled to limit settlement of the claim.
Is the complainant entitled to payment of professional costs?
Yes. The insurer should pay the complainant $10,000 as contribution to the costs of CM for
claims management.
Is the complainant entitled to non-financial loss compensation?
Yes. The insurer caused delays, communicated poorly and failed to treat the complainant as
a vulnerable consumer. The delays and poor claims handling caused the complainant stress
and inconvenience. The insurer is to pay $4,500 in non-financial loss compensation.
Determination | Case number: 950686
Page 3 of 11
Why is the outcome fair?
It is fair that the insurer accepts the claim because the complainant has established a
claimable loss and the insurer has not shown a reasonable entitlement to exclude the claim or
reduce its liability.
1.3 Determination
This determination is in favour of the complainant.
Following receipt of notice that the complainant accepts this determination (notice), within 21
days of receiving the notice, the insurer is to:
pay the complainant $300,032.70 plus interest from 19 June 2023 until the date payment is
made to the complainant;
pay the complainant $28,066.89 for exploration costs and make safe plus interest from 30
September 2020 until the date of payment to the complainant;
pay the complainant $10,000 towards the professional costs of CM;
pay the complainant $4,500 in non-financial loss compensation.
Determination | Case number: 950686
Page 4 of 11
2 Reasons for determination
2.1 Has the complainant established a claimable loss?
Yes. The complainant has established that, on balance, a water leak event caused the
damage.
Circumstances of loss
The complainant says that in or around July 2017 she noticed tiles had cracked externally
and there was internal tile separation from the skirting in the games room. The complainant
engaged MC, an engineer to inspect.
MC undertook inspections on 24 July 2017 and 6 October 2017 and reported that there was
settlement of the external slab area, with vertical movement of tiles at the junction with the
main dwelling.
The complainant says that they continued to conduct exploratory works and engage with
engineers to determine the cause of damage. This included demolishing the eastern and
western sides of the southern portion of the slab in August 2018.
The complainant engaged a geotechnical engineer JK who undertook soil testing in October
2018.
The complainant started works for new piers to provide a new foundation for a new external
slab. Extensive water was found to be seeping through into the pier holes during construction.
On 6 December 2018, Sydney Water undertook investigations and determined that there was
a subterranean leak at the neighbouring property. The rate of the leak was estimated at 1,000
litres per day.
On 25 January 2019, MC provided a further report. MC concluded that the settlement of the
rear entertainment slab was due to the softening and saturation of the lower founding
material. This was due to the significant water leak.
In March 2019, the complainant lodged a claim with the insurer. She says that it wasn‟t until
the leak was discovered in December 2018 that she understood that there was an insurable
event.
The insurer initially declined the claim, saying that the damage had not been observed within
72 hours of the water leak as required under the terms of the policy. However, on 17 August
2020, the insurer revised their claim decision and accepted the claim. The insurer advised
that it would cover the resulting damage to the covered area slab, however, says that the
complainant had not established a claimable loss.
Onus on complainant to establish a claimable loss
The complainant is required to show, on the balance of probabilities (that it is more likely than
not), that she suffered a claimable loss under the policy. This means she must show the loss
was caused by a risk for which she is insured.
Once the complainant proves the existence of a claimable loss, the insurer is liable for the
loss unless it shows an exclusion or limiting condition applies. The insurer has the onus of
proving on the balance of probabilities the application of the exclusion or condition.
Determination | Case number: 950686
Page 5 of 11
The complainant‟s policy provides cover for listed specified events, including accidental
damage cover. The policy provides cover for:
Water and/or other liquids and/or substances discharged and/or overflowing
and/or leaking from any apparatus and/or appliance and/or pipes.
The complainant has provided several reports from MC who has consistently determined that
the water leak has caused damage. The complainant has also provided a report from Sydney
Water acknowledging the water leak at the neighbouring property which was vacant and
undergoing renovations.
Insurer claims that no claimable loss has been established
The insurer has obtained engineering reports from IH and IE.
IH claimed that the damage was because of a design defect as the eastern side outdoor
entertaining area slab was inadequate as it relied on existing fill for support. Further, the
games room slab was not provided with sufficient support as there were no piers or any other
mechanical connection to the slab.
However, MC refuted the findings of IH in relation to the poorly compacted soil and support
with further information in relation to the bearing capacity of the soil being exceeded based on
the geotechnical report of JK.
IE attended the property on 17 July 2020 and disagrees with the findings from IH in relation to
the poorly compacted fill causing settlement. IE believes that the games room slab had
translated laterally away from the dwelling possibly because of the reactive soil supporting the
base of the piers suffering from cyclic wetting and drying influences.
IE did not believe that it was likely that the water leak would have affected the slab on the
western side of the games room given the slope of the land and the proximity to bedrock. IE
also did not believe that the leak caused a bearing failure and surface settlement. IE did
suggest further investigation and information to confirm whether the water leak had
contributed to the bearing failure and surface settlement. However, this was not undertaken
by the insurer.
Water leak caused damage
The complainant says that a contour survey was conducted prior to construction of the
property. This survey confirms the land slopes from north east to south west. The
complainant says the fall of the shale bedrock is consistent with the contour plan referred to
above and that the subterranean water would flow in the same direction.
The insurer has not obtained a response from IE refuting these comments from the
complainant.
The panel prefers the position of MC who has consistently supported that the proximate
cause of damage was the water leak. This is consistent with the information from Sydney
Water confirming the leak at the neighbouring property and the observed timing of the
damage. Further, IE conceded that it was possible that the inundation from the neighbouring
property caused the damage.
Determination | Case number: 950686
Page 6 of 11
The insurer says that the reports from MC are biased as the complainant‟s husband was
previously employed by MC.
The panel does not believe there is a material conflict of interest because MC was engaged
and provided the reports prior to the claim and there was no meaningful relationship between
the complainant‟s husband and the expert. The reports from MC are clear and logical. Th ese
reports are also supported with findings from JK and JC, another engineer.
The complainant has established, on balance, that the loss and damage is of a type covered
by the policy. However, the coverage remains subject to the terms, exclusions and conditions
of the policy. The insurer bears the onus of establishing its reliance on these.
2.2 Can the insurer limit settlement?
No. The insurer has not established that it is entitled to limit settlement of the claim.
Complainant obtained quote and invoices
The complainant has obtained a quote from CJ dated 19 June 2023 in the amount of
$260,898. This quote was prepared based on a scope of works (SOW) prepared by MC. The
complainant says that this represents repairs to the water damaged areas, including
replacement of a retaining wall.
The complainant also seeks reimbursement for costs she says were incurred in investigating
the water leak and make safe repairs. She claims $31,941.04.
The complainant also says that her husband, a retired licensed builder, undertook much of
the labour, together with another labourer. However, she is not claiming reimbursement of
these costs but the costs of a labourer who assisted her husband.
Insurer cannot exclude costs of the retaining wall
The insurer has obtained a quote from BB based on a SOW prepared by IE. The quote
excludes the cost of replacing the retaining wall. The insurer says that it is not liable for the
repairs to the retaining wall.
The insurer says that there is no information to show that the retaining wall was damaged by
the water inundation. Further, information from IE shows that it was damaged by termites
which is excluded under the terms of the policy.
The complainant says that the retaining wall is required to be rebuilt as the damage and
rotation was caused by the volume of water which saturated the soil and put pressure on the
rear side of the wall.
The complainant also says that a large section of the retaining wall had to be removed to
access the underfloor area of the games room as part of the make safe works. The remaining
retaining wall was not viable and therefore removed.
The complainant says the soil stratum has been weakened by saturation, rendering the
original design and construction no longer adequate. The complainant also refers to
Australian Standard AS2870 and says the footing system for the games room has been
compromised due to excessive introduced moisture conditions.
Determination | Case number: 950686
Page 7 of 11
Therefore, the replacement of the retaining wall is necessary to stabilise and support the
games room. The complainant says that the insurer has failed to take this additional
surcharge loading into account in its SOW.
The complainant also says that while termite damage was found in the retaining wall, it is in a
limited area. The complainant says that the retaining wall was damaged by termites because
of the water leak, the termites being drawn to the wet environment.
While the panel is not satisfied that the termites were attracted to the water, the panel accepts
that the retaining wall will require replacement to give effect to the necessary repairs due to
the weakening of the soil by the excess of water. The panel accepts that the termite damage
did not become evident until the wall was removed during the repair process. That is, the wall
was required to be replaced regardless of the termite damage.
The panel considers that it is fair in the circumstances that the insurer replaces the retaining
wall and is not entitled to rely on an exclusion or otherwise to limit cover for this item.
Insurer has not established any basis to limit settlement
The insurer claims that the complainant undertook significant works when demolishing the
concrete slabs to the eastern and western portion of the property. The insurer says that the
complainant was obligated to tell it in accordance with the terms of the policy that she was
undertaking renovations to the building.
However, page 56 of the PDS requires the insured to tell the insurer if they are undertaking
renovations or if the building falls into a state of disrepair “which increase the ris k of loss,
damage or injury”.
The panel is not satisfied that the demolition of the slabs meets the definition of a renovation.
This is because the sole purpose of removing the slab was to investigate the source of the
leak. It was not for repairs or alterations to the property. Further, it had not fallen into a state
of disrepair. The information from MC supports that the area was damaged by a water leak
and works were undertaken by the complainant to identify and repair the damage.
The panel is therefore not satisfied there was any obligation on the complainant to report any
issue to the insurer as at August 2018.
Further, even if the insurer had established that the complainant had failed to comply with her
obligations to report the state of the condition of the property, according to the terms of the
PDS, the insurer‟s remedy is to cancel the contract. It does not allow the insurer to limit
settlement paid to the complainant.
Alternatively, the insurer relies on section 54 of the Insurance Contract Act 1984 (the Act) to
reduce its liability under the claim. The insurer says that the actions of the complainant have
limited the insurer‟s ability to assess the damage.
However, the panel is not satisfied that section 54 assists the insurer. Section 54(1) of the Act
is engaged when an act or an omission by an insured would excuse the insurer from an
obligation to pay a claim for a loss suffered by the insured. The proximate cause of the
damage being the water leak had already occurred during the period of cover. The insurer
has not established reliance on a policy condition that would allow it to engage the operation
of s 54(1) of the Act. It is therefore not necessary to consider the application of s 54(2) of the
Act.
Determination | Case number: 950686
Page 8 of 11
The insurer also says that the actions of the complainant in commencing structural foundation
works have prejudiced their ability to assess the damages.
The panel is satisfied that the complainant acted reasonably and with utmost good faith to
mitigate and preserve property before she became aware that she could lodge a claim. The
insurer has not shown that it would have managed the claim any differently had a claim been
lodged earlier. Further, as the insurer had initially declined the claim, the complainant was
obliged to manage the water leak damage.
The insurer has accepted a claimable loss under the water leak event. The panel is not
persuaded that there are any other significant contributing causes which would allow the
insurer to reduce its liability for the claimed damages.
Complainant’s quote preferred
The insurer has obtained a quote from BB in the sum of $75,522.48. The insurer has offered
to settle the complainant‟s claim for $168,210.24. This is based on the quote from BB and
consideration of CJ‟s quote with a deduction for external repairs (retaining wall) and a
reduction of 50% to the other ancillary repairs. That is, a contribution of $92,687.76 based on
the quote from CJ, together with the BB quote of $75,522.48.
The panel is satisfied that the quote from CJ is fair and reasonable and based on a
comprehensive SOW prepared by MC which includes the retaining wall. The insurer has not
disputed the additional costs of the replacement of the floor tiles.
The panel considers it is fair in the circumstances that the claim is finalised by way of the
insurer cash settling the complainant based on the quote from CJ, dated 19 June 2023. An
uplift of 15% is then to be applied to the quoted amount to allow for contingencies and the
loss of the lifetime guarantee that applies to insurer approved repairs. Interest is to apply from
19 June 2023 until payment is made to the complainant.
Complainant to be reimbursed for make safe repairs and investigative expenses
The complainant seeks $31,941.04 for make safe and investigative repairs.
The insurer has offered 50% of this amount in the sum of $15,970.52.
The panel is satisfied, based on the invoices provided, that the insurer should reimburse the
complainant the sum of $28,066.89 for make safe and investigative expenses. Interest is to
be paid from 30 September 2020 until the date of payment to the complainant.
The panel is satisfied that in the absence of any invoices or other supporting information, the
insurer is not required to reimburse the complainant for any labour costs.
Insurer not required to pay for SOW
The complainant seeks the cost of $15,169 for the preparation of a SOW by their appointed
engineer MC.
Over the course of the complaint, the complainant confirmed that notwithstanding that the
invoice was marked „paid‟, no payment had been made to date.
Given that the complainant confirms she has not incurred this cost to date, the insurer is not
required to reimburse this amount.
Determination | Case number: 950686
Page 9 of 11
2.3 Is the complainant entitled to payment of professional
costs?
Yes. The insurer should pay the complainant $10,000 as contribution to the costs of CM for
claims management.
The policy provides cover for professional fees
The complainant has provided a copy of an invoice from CM in the amount of $12,870.
The insurer has offered the sum of $5,000 which is the maximum amount under section 26 of
the „Additional Benefits‟ section of the policy.
The panel considers the insurer‟s offers of $5,000 towards this benefit fulfils its requirements
under the policy cover.
AFCA may require insurer to contribute to a compla inant’s professional costs
The AFCA Rules enable AFCA to require an insurer to contribute to the professional costs
incurred by the complainant. These costs are, however, usually capped at a total of $5,000,
unless special circumstances apply.
When considering whether to require an insurer to make a costs contribution, AFCA takes
into account the complexity of the complaint and whether the particular complainant needed
to incur costs to understand or establish their claim.
Complainant was assisted by CM
The panel considers that the complexity of the claim, together with the initial denial of the
claim by the insurer, that it was reasonable that the complainant sought professional advice
and assistance from CM.
The panel is satisfied that the insurer should contribute to the full extent as required by our
Rules in the amount of $5,000 towards the costs of CM.
2.4 Is the complainant entitled to non-financial loss
compensation?
Yes. The insurer caused delays, communicated poorly and failed to treat the complainant as
a vulnerable consumer. The delays and poor claims handling caused the complainant stress
and inconvenience. The insurer is to pay $4,500 in non-financial loss compensation.
AFCA can award compensation for non-financial loss
Under our Rules, AFCA can award up to $5,400 compensation for non-financial loss. This
must relate to poor claims handling or other actions of the insurer which causes:
an unusual degree of stress, delay, or inconvenience, and/or
interference with a person‟s expectation of enjoyment and/or peace of mind.
We expect complainants to be moderately robust, and we will not award compensation for the
ordinary degree of inconvenience involved in making a claim.
Determination | Case number: 950686
Page 10 of 11
Insurer has caused stress and inconvenience
The complainant advised the insurer in December 2022 that she was vulnerable, suffering
from poor health. The insurer failed to take this into consideration in their dealings with the
complainant.
While the insurer later accepted the resulting damage, it continued to maintain that the
complainant had not established a claimable loss. Further, the insurer acted unreasonably in
delaying payment of the claim and withholding payment for items which it had accepted
based on the documentation provided by the complainant. This continued to cause the
complainant stress and inconvenience.
The panel considers an award of non-financial loss compensation is appropriate in the
circumstances and considers the sum of $4,500 for the unusual degree of stress and
inconvenience appropriate.
2.5 Why is the outcome fair?
It is fair that the insurer accepts the claim because the complainant has established a
claimable loss and the insurer has not shown a reasonable entitlement to exclude the claim or
reduce its liability.
Determination | Case number: 950686
Page 11 of 11
3 Supporting information
3.1 The AFCA process
AFCA’s approach is based on fairness
AFCA has determined this complaint based on what is fair in all the circumstances, having
regard to:
the legal principles
applicable industry codes or guidance
good industry practice
previous decisions of AFCA or its predecessor schemes (which are not binding).
The respective parties have completed a full exchange of the relevant information, and each
party has had the opportunity to address any issues raised. We have reviewed and
considered all of the information the parties have provided.
While the parties have raised a number of issues in their submissions, we have restricted this
determination to the issues that are relevant to the outcome.
A panel determined this matter
Due to the nature of this complaint, we referred it to a panel for determination. The panel
includes:
an ombudsman
a member with significant experience in consumer and small business advocacy
a member with extensive experience in the insurance industry.
We assess complaints on available information and circumstances
AFCA is not a court of law. We do not have the power to take or test evidence on oath, or to
require third parties to give evidence.
When we assess complaints, we consider:
available documents
the recollections of the parties
all relevant circumstances.
We give more weight to documents created at the time the events occurred. If there are no
relevant documents, we will decide what most likely occurred based on the available
information.
If there are conflicting recollections and these are evenly weighted, we may find that a claim
cannot be established.