Home / Suncorp Group / Determination 950554

Determination 950554

Insurer declined a strata water damage claim after a storm, relying on a defect exclusion

FirmSuncorp Group
Decided2024-04-22
ProductGeneral Insurance · Strata
OutcomeFor the complainant
Amount awarded$178,442
Non-financial loss$4,000
Amount claimed$205,303
SourceAFCA PDF

Summary

Owners of three strata units claimed for storm water damage; the insurer declined relying on a defective gutter exclusion. AFCA found the exclusion not established and ordered payment of $178,441.90 with interest, $2,000 to each complainant, and loss of rent on proof.

The damage was accidental and covered, and the insurer failed to prove a defect existed, caused the loss, and that the complainants should reasonably have known of it.

Issues

Subjects and remedies

home or building damagethird party authoritypay claimpay interestpay non financial lossrefund fees or charges

Related

All Suncorp Group determinations · Find similar determinations

Text of the determination

Determination Case number 950554 Financial firm AAI Limited Determination | Case number: 950554 Page 2 of 10 Case number: 950554 25 March 2024 1 Determination overview 1.1 Complaint The complainants lodged a claim on 3 October 2022 on their strata insurance policy for water damage to each of the units after a storm on 26 August 2022. The insurer denied the claim and says the roof gutters were defective and this caused the gutters to overflow into the units. The insurer says the complainants should reasonably have been aware of the defects prior to the storm. 1.2 Issues and key findings Has the complainant established a valid claim within the terms of the policy? Yes. The policy provides cover for accidental damage. The damage to the 3 units was accidental damage within the terms of the policy. Has the insurer established the application of a relevant exclusion? No. The insurer has not established an exclusion applies or that the complainants should reasonably have been aware of any defects in the guttering. The insurer is to settle the claim as set out in section 2.2 of this determination including the complainants report costs. Are the complainants entitled to loss of rent? Yes, for the time taken to repair the units subject to the complainant’s providing proof the units were either tenanted or would have been tenanted within the terms of the policy. Are the complainants entitled to compensation for non-financial loss? Yes. Compensation of $2,000 should be paid to each of the complainants. Why is the outcome fair? The insured property was damaged accidentally, which is covered under the policy. As the insurer has failed to show an exclusion applies to allow it to decline the claim, it is fair for the insurer to settle the claim in accordance with the terms of the policy. 1.3 Determination This determination is in favour of the complainants. Within 14 days of receiving notice that the complainants accept this determination, the insurer is pay the complainants:  $178,441.90 in settlement of the claim as set out in section 2.2 of this determination plus interest pursuant to section 57 of the Insurance Contracts Act 1984 (Cth)  $2,000 compensation to each complainant pursuant to AFCA Rule D3.3  Subject to providing adequate proof, compensation for loss of rent as set out under section 2.3 of this determination in accordance with terms of the policy. Determination | Case number: 950554 Page 3 of 10 2 Reasons for determination The complainants were members of a strata plan property which contained 3 units. The first complainant (TP) was the owner of Unit 1 and the second complainant (NL) was the owner of units 2 and 3. TP is acting as representative of all complainants. Reference to the complainants in this determination includes reference to submissions made by TP. 2.1 Has the complainant established a valid claim within the terms of the policy? Yes. The policy provides cover for accidental damage. The damage to the 3 units was accidental damage within the terms of the policy. Complainant has initial onus to establish claim falls within terms of policy It is established insurance law that an insured has the initial onus to prove a on the balance of probabilities (i.e. that it is more likely than not) that the loss falls within the terms of the policy. Onus established the onus shifts to the insurer, if it wants to decline the claim to establish the application of a relevant exclusion. The Strata Insurance policy held by the complainants covers the insured buildings, being Units 1-3 for accidental loss or damage subject to various conditions and exclusions. Accidental loss or damage is defined in the policy to mean loss or damage that occurs without intent and includes loss or damage from events listed under the policy. Relevant policy terms are quoted in section 3.2 of this determination. No dispute buildings sustained accidental damage The complainants lodged a claim on 10 October 2022 for damage sustained to Units1-3 following a storm on 26 August 2022. The complainants say the damage occurred when:  a dead pigeon had obstructed the gutter on the roof  rainwater from the storm had then back flowed into the roof space of the insured property  the water has then flowed to each of the three units which comprised the strata property. There is no dispute the damage occurred without intent. Damage has been assessed to all three units with the damage since repaired by the complainants. The panel is satisfied the complainants have established a valid claim for accidental damage. The onus is therefore on the insurer, if it is to decline the claim to prove the application of a relevant exclusion. 2.2 Has the insurer established the application of a relevant exclusion? No. The insurer has not established the application of an exclusion or that the complainants should reasonably have been aware of any defects in the guttering. Determination | Case number: 950554 Page 4 of 10 Insurer says it is entitled to decline the claim due to exclusion The policy excludes cover for damage caused by inherent defects, faulty design, structural defects, structural fault or faulty/poor workmanship. However, this only applies where the defect, fault or workmanship issue was something the complainants should have reasonably known about or observed before the damage occurred. For the insurer to rely on the defect exclusion, the insurer is required to show:  a defect existed  the defect caused the loss and damage claimed  the complainant ought to have reasonably been aware or observed the defect before the damage was sustained. Conflicting expert opinion as to whether box gutter defective There is no dispute a dead bird had clogged the guttering. The damage followed this event. The insurer engaged engineers and builders MCS, to assess the cause of the damage. MCS provided several reports and say:  there were no overflow mitigation measures as required by AS3500.3  the box gutter was constructed smaller than designed and without a sump  the intent of overflow provision is to prevent the inflow of water into the property when there is a significant blockage  the proximate cause of the water damage was the lack of overflow provision with the box gutter, which was a construction defect at the time of construction of the property in 2009. The panel notes MCS did not fully inspect the box gutter. MCS, although initially believing the gutter was poorly designed, now states the design was adequate but the box getter was poorly constructed. The complainant provided reports from a plumber and gasfitter JPG and BE. JPG concluded that while the damage had been repaired at time of inspection (28 March 2023) the box gutter was not defective. BE following examination of the building plans and roof concluded the box gutter and downpipes were larger than required and not defective. BE considered the proximate cause of the damage was the clogged gutter due to the dead bird. In the panel ’ s view the available information is inconclusive as to whether box gutter was defective or whether the proximate cause of the damage was defective guttering. In the circumstances the panel is not satisfied the available information is sufficient to establish the application of the exclusion. Even if it was found that the lack of overflow provision was a defect and that this caused the damage claimed, the insurer still needs to show the complainant would have reasonably been aware or observed the defect before the damage occurred. Complainants would not have been reasonably aware of any defect The insurer says the complainants should have been reasonably aware of the defect or observed the defect because:  the property had been the subject of several water ingress claims before this storm Determination | Case number: 950554 Page 5 of 10  a claim lodged in September 2020 identified maintenance issues with the property, including the defective nature of the box gutter  a claim lodged in May 2021 identified blockage of the gutters and downpipe because of bird waste  a claim lodged in May 2022 identified damage caused due to overflowing gutters  a report dated 16 August 2021, which the insurer said was provided to the complainants following a previous gutter overflow, recommended that ‘works associated with the identification and repair of water ingress pathways should be completed. The insurer says because of the prior claims the complainants should have known or have reasonably been aware or otherwise observed the defect in question. The panel does not agree with the insurer. The panel does not accept the complainants knew or should reasonably have known or observed the box gutter was defective because:  none of the previous claims identified any issue with a lack of overflow provision or any requirement to investigate this issue.  the September 2020 claim records the damage was caused by a combination of grout and sealant failure allowing water to flow into the wall from the courtyard and a disconnected stormwater pipe to the spigot from the box gutter drain on roof. There is no reference to a defective gutter box.  the 2021 claim was caused by blockage due to bird waste. The recommendation made in the associated report was to flush out the waste and preventative measures to deter/ control further bird nesting. There is no reference to any issues with the construction of the gutters themselves or to have them checked. The complainants have since installed bird wire on the roof to deter further nesting.  the 2022 claim was declined on the basis the insurer found no evidence of water entry on that occasion from any overflow of the gutter. It said the water damage observed in that instance was pre-existing.  the 16 August 2021 report was prepared in the context of an identified failure in the water integrity envelope of the building, that is the membrane. The comment concerning the investigation of water ingress pathways should be considered in that context. There is no reference to any issues with the guttering or water entering from roof level. While not relevant, the complainants have supplied evidence it has acted on the advice by repairing water proofing membranes.  the complainant TP did not purchase unit 1 until May 2023 with the transfer of ownership registered on 5 July 2023  there is no evidence NL was either provided the earlier reports or informed of a view the box gutter was defective. The panel notes that while MCS says in its report of 16 December 2022, that a reasonable person should have identified the defect prior to this storm. It says also in the same report: Upon reviewing documentation provided to me regarding previous claims, it is not clear to me if the proximate cause of the interior water damage, (poor box gutter design) was specifically identified and communicated to the insured after previous water damage was sustained within the property, (most notably in October 2020). The above quote conflicts with MCS ’s earlier reasoning that the complainant would have been reasonably aware of the defect. Determination | Case number: 950554 Page 6 of 10 In the circumstances, the insurer has not established that in the event the lack of overflow provision was a defect and that it caused loss or damage, that the complainants would have been reasonably aware of the defect prior to this storm. The insurer has not established the application of the exclusion. Insurer had opportunity to assess the damage caused by storm The insurer had the opportunity to assess the event related damage. SBG conducted a site inspection on 26 October 2022. The report confirms multiple areas of storm related damage to the three units. The report notes as follows: - Unit one. Located on the ground floor is unit one of which resultant damage has already been repaired by the insured prior to site inspection. The insured advised that he has replaced the skirting boards, replaced the flooring, replaced the ceilings and replaced the kitchen cabinetry of which SBG can confirm. The outstanding repairs still to be completed to unit one is a vanity unit in the bathroom and a second vanity unit in the bedroom two ensuite. SBG would recommend obtaining the insured's own quotes for SBG to validate as fair and reasonable. Unit two. Located in unit two appears to show extensive damage to the ceiling in bedroom two along with a fusion of the electric switchboard. Also noted was damage to the bathroom ceiling which shows staining and discolouration consistent with storm damage, damage was noted to the kitchen ceiling and the kitchen cabinetry of which swelling was present to the cabinetry and benchtops. The skirting boards are also damaged in the Open Plan kitchen area. Unit three. Located on the top floor is unit three of which shows damage to the bathroom ceiling and vanity unit along with the skirting boards to the kitchen area however the ceiling has been replaced in the kitchen area by the owner. The damages observed are consistent with storm related damages. SBG prepared a scope of works but noted it did not include supply and fitting of cabinetry for three kitchens, shelving, or vanity units for which the complainants were obtaining quotes or for the work completed by the complainants. SBG recommended a cash settlement and that quotes obtained by the complainants be forwarded to it for validation. The insurer subsequently offered an ex gratia payment of $21,407.29 based on SBG’s limited SOW. The insurer did not ask SBG to validate the quotes/invoices from the complainants. It did not despite the opportunity to do so seek to validate the quotes provided. The insurer has requested the opportunity to assess these costs should it be found liable under this complaint. Insurer to cash settle the claim The complainants have completed the repairs to the three units from the storm. It was reasonable to do this to mitigate any loss given the insurer ’ s rejection of the claim. The complainants have provided invoices with detailed costings of the repairs totalling $182,528.44 as follows:  CKC … Unit 1 … $68,584.94 (incl. $5,454.54 loss of rent)  CKC … Unit 2 … $42,348.90 Determination | Case number: 950554 Page 7 of 10  CKC … Unit 3 … $49,201.90  BCM … Units 1 - 3 … $22,392.70 While the complainants claim $205,303.28 in total including the ex gratia allowance of $21,407.29, the actual repair cost incurred is $178,441.90 after deducting the allowance for loss or rent. Given the insurer had the opportunity to assess these costs and that the repairs have been completed, in the panel ’ s view there would be little to be gained by the insurer now seeking to validate the repair costs. The report from SBG detailed the extensive damage and the insurer has had adequate opportunity to assess the cost of repairs. It would not be fair to delay payment of the claim any further. The complainants also incurred professional costs of $1368 providing reports from BE ($250), PBI ($341), Council plans ($197) and electrical reconnection ($580) Accordingly, the panel determines the insurer should pay the complainants $178,441.90 plus interest to be calculated pursuant to section 57 of the Insurance Contracts Act 1984 (Cth) from 27 April 2023 (being 7 days after the date of the invoice for repairs) to date of payment of the claim. 2.3 Are the complainants entitled to loss of rent? Yes, for the time taken to repair the units subject to the complainant’s providing proof the units were either tenanted or would have been tenanted within the terms of the policy. Policy provides cover for loss of rent The policy provides that if following an incident covered under the policy, a tenanted unit cannot be lived in or cannot be re-leased, the insurer will pay the weekly rental amount for the time it should take to repair or rebuild the building or unit so that it can be lived in or re-leased. The policy does not cover loss of rent if the unit was not occupied by a paying tenant at the time of the loss unless the complainants can prove it would have been rented to a tenant, during the time taken to repair, replace or rebuild the unit. Complainant TP has claimed 10 weeks loss of rent for the repair period 30 August 2022 to 9 November 2022 at $600 per week. TP advises that he had only recently purchased the unit and completed refurbishment, so Unit 1 could be rented out. He provided a signed exclusive management agreement with a real estate agent dated 5 August 2022 to manage the rental of the unit. According to the complainant, a tenant was ready to sign but this fell through after the unit was damaged. There is no dispute Unit 1 was not tenanted at the time of the loss. The panel accepts the Unit would not have been liveable and could not have been leased until the repairs were completed. The panel accepts that if the complainant can show the Unit would have been rented then it is fair the insurer pays loss of rent for the 10-week period. To establish this, the complainant TP will need a statement from the real estate agent confirming that a tenant had been organised or would have been organised to rent the unit during the time taken to repair the unit. The panel is not satisfied the exclusive management agreement is sufficient proof the Unit would have been rented. Determination | Case number: 950554 Page 8 of 10 No information has been exchanged as to the occupancy of Units 2 or 3. Again, if complainant NL can show either tenancy or that the Unit(s) would have been tenanted then it is fair the insurer pays the claim for loss of rent. 2.4 Are the complainants entitled to compensation for non- financial loss? Yes. Compensation of $2,000 should be paid to each of the complainants Compensation offered by the insurer for non-financial loss is fair Under the AFCA Rules, AFCA may award compensation (capped at $5,400) for non-financial loss where complainants have suffered an unusual amount of physical inconvenience or time t aken to resolve the situation or interference with the complainant’s expectation of enjoyment or peace of mind. AFCA takes a conservative approach when considering any award of compensation. The insurer has offered to pay $1,000 for non-financial loss to the complainant. It says this payment was for an earlier miscommunication as to the coverage position. There was evidence available to the insurer that it was unlikely the complainants had been informed of any actual defects in the box gutter. Despite this the insurer maintained the complainant should have reasonably been aware of the defects (which the panel considers has not been established). The insurers expert notified the insurer that it had real doubts that this had been communicated to the complaina nts. The insurer’s conduct has led to the complainants incurring considerable cost to complete the repairs and mitigate any loss. This has placed the complainants under an unusual degree of physical inconvenience, stress and pressure. In the panels view it is fair that the insurer pays compensation of $2,000 to each of the complainants for non-financial loss. 2.5 Outcome is fair in the circumstances The insured property was damaged accidentally, which is covered under the policy. As the insurer has failed to show an exclusion applies to allow it to decline the claim, it is unfair for it to do so. It is fair for the insurer to accept the claim and assess their liability in accordance with the policies terms and conditions. Determination | Case number: 950554 Page 9 of 10 3 Supporting information 3.1 The AFCA process AFCA’s approach is based on fairness AFCA has determined this complaint based on what is fair in all the circumstances, having regard to:  the legal principles  applicable industry codes or guidance  good industry practice  previous decisions of AFCA or its predecessor schemes (which are not binding). The respective parties have completed a full exchange of the relevant information, and each party has had the opportunity to address any issues raised. We have reviewed and considered all the information the parties have provided. While the parties have raised several issues in their submissions, we have restricted this determination to the issues that are relevant to the outcome. A panel determined this matter Due to the nature of this complaint, we referred it to a panel for determination. The panel includes:  an ombudsman  a member with significant experience in consumer and small business advocacy  a member with extensive insurance industry experience. We assess complaints on available information and circumstances AFCA is not a court of law. We do not have the power to take or test evidence on oath, or to require third parties to give evidence. When we assess complaints, we consider:  available documents  the recollections of the parties  all relevant circumstances. We give more weight to documents created at the time the events occurred. If there are no relevant documents, we will decide what most likely occurred based on the available information. If there are conflicting recollections and these are evenly weighted, we may find that a claim cannot be established. Determination | Case number: 950554 Page 10 of 10 3.2 Relevant policy wording Page Wording 3 What we cover Accidental loss or damage cover We cover accidental loss or damage to the building and common contents, including for incidents like flood, fire (including bushfire), escape of liquid and impact. 30 We do not cover Defects, faults, workmanship • loss or damage caused by, connected with or arising from, or liability caused by, connected with or arising from inherent defects, faulty design, structur al defects, structural fault or faulty/poor workmanship (e.g. structural posts, beams or load bearing walls have been removed without taking into account structural enginee ring requirements), if you knew o r should have reasonably known abou t it (e.g. because the defect or fault was able to be observed by you or because it was identified in a pre - purchase building inspection report) 36 Building cover We cover the building at the insured address for: • accidental loss or damage caused by an i ncident; • loss or damage caused by the inciden ts described on pages 37 to 45, in the period of insurance provided that the loss or damage is not excluded, and subject to the conditions of your policy.

Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.