1 Determination overview
1.1 Complaint
The complainant holds a home and contents insurance policy with the financial firm (insurer).
She lodged a claim after a storm event in March 2022 caused damage to her building and
contents. The insurer accepted the claim and offered a cash settlement of $5,536.23. The
complainant ’s quotes for building work are significantly more than that.
The insurer says that the complainant has not allowed them to inspect the property for
damaged contents (as they have been disposed of).
To resolve this complaint the complainant wants the insurer to provide a cash settlement in
line with the amounts quoted by her builders and to cover the damaged contents.
1.2 Issues and key findings
Has the insurer correctly assessed the building claim?
Yes, the available evidence shows, on balance, the insurer is entitled to limit its settlement to
the damage it has accepted. However, the proposed cash settlement amount of $5,536.23
should be increased by 10%, given the quote on which it is based is now over 12 months old.
Has the insurer correctly assessed the contents claim?
The insurer’s expert identified significant carpet damage, however the cost of replacement
has not been included in its cash settlement offer. The insurer is liable for the reasonable cost
of replacement of damaged carpet. However, since the insurer has been unable to assess or
appropriately quantify the remaining claimed contents items, it is not required to make any
additional payment for those.
Why is the outcome fair?
The outcome is fair because the complainant has not provided evidence to show further
damage was sustained to the house as a result of the storm, in addition to that which the
insurer has already identified/accepted. The quotes supplied by the complainant include
repairs for work not related to the claim and so it would not be fair to require the insurer to
cover those. However, it is fair that the insurer also cash settle for damaged carpets identified
by its builder but not included in its offer.
As the insurer has been unable to inspect or assess the remaining contents items being
claimed, it would not be fair for them to pay for that claimed loss.
1.3 Determination
The determination is partly in favour of the complainant. The insurer is required to cash settle
the claim for building damage by paying $6,089.85. It is required to work with the complainant
to obtain quotes for replacement of the damaged carpet, and to pay the complainant the
reasonable cost of that replacement in accordance with the policy terms.
Determination | Case number: 950084 Page 3 of 7
2 Reasons for determination
The policyholder is represented in this complaint by family members. For simplicity, all
references to the ‘complainant’ will include references to the policyholder and her
representatives, as the context allows.
2.1 Has the insurer correctly assessed the building claim?
Policy covers insured events
The onus is on the complainant to show, on balance (that is, more likely than not), the
claimed loss or damage falls within the scope of cover under the policy.
The policy covers listed insured events only. That includes cover for loss or damage from
‘storm, rainwater and flood’. There is no dispute there was a storm event.
However that cover is subject to terms, conditions and exclusions. In seeking to decline the
claim (or part of it), the insurer needs to show, on balance, that exclusions apply or that it is
otherwise entitled to do so.
Insurer ’s experts identified claim -related damage
After the claim was lodged, the insurer arranged for a roof inspection to be conducted to
ascertain the cause of the damage. Builders JAL were appointed.
After attending the property on 28 June 2022, JAL identified that there were issues with the
gutters and chipped tiles on the roof, which had caused the gutters and blocked downpipes to
be overwhelmed, allowing water into the building. JAL found no impact damage as a result of
the storm.
The insurer then also appointed builder JLG to re-inspect the roof and the remainder of the
building. In their report dated 31 August 2022, JLG noted the following:
make safe place tarp on roof above kitchen, as water ingress caused some damage to
ceiling and cornices.
minor damage caused to kitchen cabinetry; just one door will need replacing.
some kitchen kick boards will need replacing.
vast volume of water spilled out into the dining room damaging the carpet. Carpet appears
raised and folded in some parts.
insured claims damage to rangehood, however, unlikely caused by claimed event.
insured also claims damage to fascia and eaves at front of home. Upon inspection, they
appear worn and dirty but not damaged by the claimed event.
It was found that the garage ceiling, some parts of the kitchen and the carpets were damaged
as a result of the storm, the insurer accepted the claim for that damage. (The carpets are
covered under the ‘ contents ’ section of the policy.)
Based on the recommendations from JAL and JLG, however, the insurer did not accept the
claim for any damage to the roof, the rangehood or the fascia and eaves of the home. That is
because the evidence did not show the damage to the rangehood was from the insured storm
event, the condition of the fascia and eaves was not the result of the storm event and the roof
showed no signs of damage which would have been caused by the storm.
Determination | Case number: 950084 Page 4 of 7
Based on the evidence provided, the decision by the insurer to partially accept the claim
appears reasonable in the circumstances. It should be noted that the complainant has not
provided any evidence to support that the claim decision made by the insurer is incorrect.
Insurer offered cash settlement
JLG also provided an itemised scope of works (SOW) for repairs in the garage and kitchen for
the damage accepted under the claim. JLG pointed out that the complainant was responsible
for carrying out maintenance work on the gutters and downpipes before other repairs could
commence.
After the complainant confirmed that she was seeking a cash settlement for the repair work,
the insurer (in May 2022) offered settlement $5,536.23, in line with JLG’s SOW. That is based
also on JLG being prepared to do the work, once the complainants had completed other
maintenance repairs.
Complainant submitted her own building repair quotes
Prior to the insurer inspecting the property, the complainant had arranged for her own builder
to provide a quote for repairs. MC ’s quote dated 14 March 2022 was for $153,714.00
(including GST). In the course of further assessment of the claim, the complainant also
obtained a quote from IB dated 30 May 2023 in the amount of $145,000 plus GST.
Having considered those quotes, the insurer did not change their cash settlement offer.
Complainants ’ quotes excessive and include non-claim related repairs
MC’s quote was obtained prior to the insurer confirming the extent of the damage that would
be accepted under the claim. It includes additional repairs which have not been accepted,
such as (amongst others):
garage ceiling repairs for an additional 115 square metres
garage wall repairs
repairs of the roof, gutters, downpipes and fascia
replacement of the outdoor pergola
electrical works in the roof
installation of new vinyl in the kitchen
installation of new kitchen, including new appliances.
The quote also fails to adequately itemise/explain the individual amounts.
Similarly, IB ’s quote does not include an itemised account of the costs for each individual line
item. As well it includes items which are outside the accepted scope of the claim.
Insurer has correctly assessed the building claim
The insurer has provided supporting evidence for their claim decision and a quantifiable
scope of works and actionable quote on which they have based their cash settlement offer.
The complainant’ s quotes do not explain the cause of damage to all the items included, and
do not establish all the work falls within the scope of cover under the policy. I am not satisfied
the complainant has shown the additional work included in her quotes is for claim-related
damage, or should otherwise be covered by the insurer.
I am satisfied, on the available evidence, the insurer has correctly assessed the scope of its
liability for the building repair component of the claim.
Determination | Case number: 950084 Page 5 of 7
However, while the quote on which the insurer based its cash settlement was stated by JLG
as being actionable by the complainants on the basis that JLG would do the work, that offer
was made in at least May 2022 (over 1 year ago). It is also not clear the complainant would
be able to have that work done by a repairer of her own choice.
I therefore consider it fair in the circumstances that the offer of $5,536.23 for the building
repairs be increased by 10 %. The insurer is required to pay $6,089.85 for that component of
the claim.
2.2 Has the insurer correctly assessed the contents claim?
JLG identified claim-related damage to carpet
In their inspection, report of 31 August 2022, JLG noted:
vast volume of water spilled out into the dining room damaging the carpet. Carpet
appears raised and folded in some parts.
They concluded the ‘carpet has sustained sufficient water damage and will need to be
replaced’.
I appreciate the insurer has said no further assessment of the carpet was able to be carried
out, because it was disposed of. I also note the complainant was invited to provide a quote for
the damaged carpet, but it does not appear she has done so. It also appears there may be
some dispute about the extent of the carpeted area which should be covered.
However, I consider the available evidence is sufficient to establish (based on JLG’s
contemporaneous observations of the carpet in situ) that the insurer should be liable under
the policy for the damaged carpet (as ‘ contents ’) . No allowance for the carpet has been made
in the insurer’s settlement offer.
The insurer is required to work with the complainants to obtain quotes for its replacement in
accordance with the policy terms (having regard to considerations including the area of
damage, the type of carpet and so on).
Any replacement of damaged carpet will also be subject to the terms of the policy’s ‘matching
benefit’, which sets out the limitations (on page 59 of the policy document)
The insurer is required to cover the reasonable cost of that replacement in line with the policy
terms and conditions.
Insurer has been prevented from assessing other claimed contents
While JLG was able to inspect the damaged carpets, the other contents items claimed have
not been assessed:
60cm Rangehood and Duct
LG 420 Bottom Mount Fridge
Westinghouse WLE625WA 60cm oven and cooktop
Haier 143L Chest Freezer HCF143
Shelving units in garage X 5
The complainant said she disposed of these items and no longer hold the receipts as proof of
ownership or purchase. She has also confirmed that since JLG attended the property, she
Determination | Case number: 950084 Page 6 of 7
removed and disposed of the damaged carpet. Apart from the carpet, the insurer/JLG have
been unable to assess the claimed contents items. That is despite information which indicates
the insurer’s assessor was in contact with the complainant to arrange an inspection of the
contents.
Insurer entitled to decline cover for remaining contents
The PDS states that when making a claim, the complainant can ‘ do what you can to prevent
further loss, damage, cost or liability ’ , however it also states that the complainant should not
dispose of any damaged property. The PDS also states that the insurer may ask for relevant
documents such as proof of ownership or purchase.
The complainant disposed of the contents items prior to the insurer being able to assess
them. She has not provided evidence of ownership or value in any case.
It would not be fair or reasonable to require the insurer to cover a claimed loss where no such
loss has been established.
The insurer is not liable for any damaged contents, beyond the carpet.
2.3 Why is the outcome fair?
The complainant has not provided evidence to show that further damage was sustained to the
house as a result of the storm, over and above what the insurer has accepted. Her quotes
have not been substantiated as being reasonable or based only on claim-related damage.
The insurer’s scope of works do es, on balance, reflect the damage for which the insurer is
liable, although given the passage of time it is fair that the quoted amount be slightly
increased. It would not be fair to require the insurer to pay more, apart from the amount
payable for the carpet which still needs to be finalised.
The complainant prevented the insurer from assessing the claimed loss of other contents. It
would be unfair to require it to pay anything for those contents in the circumstances.
Determination | Case number: 950084 Page 7 of 7
3 Supporting information
3.1 The AFCA process
AFCA’s approach is based on fairness
AFCA has determined this complaint based on what is fair in all the circumstances, having
regard to:
the legal principles
applicable industry codes or guidance
good industry practice
previous decisions of AFCA or its predecessor schemes (which are not binding).
The respective parties have completed a full exchange of the relevant information, and each
party has had the opportunity to address any issues raised. We have reviewed and
considered all of the information the parties have provided.
While the parties have raised a number of issues in their submissions, we have restricted this
determination to the issues that are relevant to the outcome.
We assess complaints on available information and circumstances
AFCA is not a court of law. We do not have the power to take or test evidence on oath, or to
require third parties to give evidence.
When we assess complaints, we consider:
available documents
the recollections of the parties
all relevant circumstances.
We give more weight to documents created at the time the events occurred. If there are no
relevant documents, we will decide what most likely occurred based on the available
information.
If there are conflicting recollections and these are evenly weighted, we may find that a claim
cannot be established.
Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.