Home / Youi / Determination 949001
Determination 949001
Claim for sewer pipe damage attributed to storm-related subsidence was denied as longer-term subsidence
Summary
The insurer denied a storm-related sewer pipe subsidence claim as excluded longer-term subsidence. AFCA found the claim covered, required reimbursement of proven repair costs with ICA interest less excess, and declined non-financial loss.
The complainant established a claimable loss under the storm-subsidence-within-72-hours cover, and the insurer, who bore the onus, failed to prove the subsidence or wear and tear exclusions applied.
Issues
- Claim denial primary · upheld“The complainant has on balance established a claimable loss for damage caused by subsidence within 72 hours of the storm; insurer has not shown exclusion applies.”
- Inadequate claim investigation secondary · upheld“CR's subsequent email comments involve speculation rather than confirmation.”
- Delay secondary · upheld“I acknowledge this claim has taken longer than it should have.”
Subjects and remedies
health or medicalhome or building damagenatural disasterpay claimpay interest
Related
Text of the determination
Determination
Case number 949001
Financial firm Youi Pty Ltd
Determination | Case number: 949001 Page 1 of 6
Case number: 949001 20 October 2023
1 Determination overview
1.1 Complaint
The complainant holds home building and contents insurance with the financial firm (insurer).
On 12 August 2022, she lodged a claim for damage to a sewer pipe. She attributed the
damage to a significant storm event in late February 2022.
The insurer has denied the claim. It says the damage is not consistent with having been
caused by a one-off storm event. Rather, it is due to longer term subsidence, which is
excluded under the policy terms.
The complainant maintains that storm related subsidence that occurred within 72 hours
caused the damage claimed. She wants the insurer to accept the claim and reimburse her for
the repair costs she incurred. She is also dissatisfied with the insurer’s claim handling .
1.2 Issues and key findings
Is the insurer entitled to deny the claim?
No. The complainant has on balance established a claimable loss for damage caused by
subsidence that occurred within 72 hours of, and directly because of, the storm. Further, the
insurer has not shown that the claim is excluded under the policy terms.
Is non-financial loss compensation payable?
No. While the claim has taken too long, the delays were in part due to factors out of the
insurer’s control. Further, the interest award on the cost of repairs adequately addresses the
insurer’s contribution to those d elays.
Why is the outcome fair?
The complainant has established a claimable loss and the insurer has not shown any policy
exclusions apply. It is therefore fair that the insurer accepts the claim. However, the interest
award adequately addresses the insurer’s contribution to the claim delays, such that it would
not be fair to require it to pay non-financial loss compensation.
1.3 Determination
This determination is in favour of the complainant.
If the complainant accepts this determination, the following steps are to be taken:
the complainant is to provide to the insurer proof of payment (such as invoices and
receipts) for the repair costs claimed
within 14 days of receiving the proof of payment, the insurer is to reimburse her for the
proven repair costs, and pay interest pursuant to the Insurance Contracts Act, 1984 (Cth)
(ICA) from the date each payment was made until the reimbursement is paid
if not previously paid, the insurer is entitled to deduct the applicable policy excess.
Determination | Case number: 949001 Page 2 of 6
2 Reasons for determination
2.1 Is the insurer entitled to deny the claim?
No. The complainant has on balance established a claimable loss for damage caused by
subsidence that occurred within 72 hours of, and directly because of, the storm. Further, the
insurer has not shown that the claim is excluded under the policy terms.
Complainant must show a claimable loss under the policy terms
The complainant is required to show on the balance of probabilities (that it is more likely than
not), that she suffered a claimable loss under the policy. This means she must show the loss
was caused by a risk for which she is insured.
Subject to the terms and conditions set out in the product disclosure statement (PDS), the
complainant’s policy covers damage to her home and its content s caused by a listed insured
event. Those events include ‘Storm’ as follows:
Loss or damage to the insured property caused by storm , lightning, wind, hail,
snow and storm water overflow from roof gutters and their downpipes or from the
area immediately around the premises …
Loss or damage to the insured property caused by landslip or subsidence that
occurs within 72 hours of, and directly because of, a storm .
…
On 12 August 2022, the complainant notified the insurer that following storm activity between
25 and 27 February 2022, she noticed a smell in the home’s main bathroom and toilet
blockages started occurring. She said the issues had worsened and a plumber had recently
discovered a sewer pipe had subsided. The plumber said this was due to the storm.
Once the complainant proves the existence of a claimable loss, the insurer is liable for the
loss unless it shows an exclusion or limiting condition applies. The insurer has the onus of
proving on the balance of probabilities the application of the exclusion or condition.
Insurer has denied the claim
The insurer appointed builder LJ to assess the property. The insurer has not provided AFCA
with a cop y of LJ’s report. The insurer’s notice of response to AFCA dated 22 February 2023
sets out a summary of that report and includes the following:
LJ said that the soil had become saturated during recent storm activity and subsided,
causing the 100mm sewer pipe to crack and leak under the house
the complainant told LJ that her plumber had advised that it was possible to repair the pipe
by relining it, without disturbing the pipe and subsoil
LJ concluded ‘ It is reasonable to believe that as a result of soil subsidence during extreme
weather rainfall event, damage has been sustained to the home ’ .
The insurer arranged engineer CR to investigate causation further. CR inspected the home
on 17 October 2022, and subsequently reported that:
it had engaged a plumber to undertake CCTV investigations but that did not proceed as
the complainant had already repaired the affected sewer pipe by having it relined
the complainant reported not being aware of any plumbing issues prior to the storm event
Determination | Case number: 949001 Page 3 of 6
she also advised that ‘at the time of the claim event’ , the main upper level toilet was
blocked, there was a backflow in the main floor and shower drains, and a smell in the
ensuite. The family had not used the toilet/bathroom since then
visual inspection and a floor level survey indicated there was no significant building
movement damage present
some of the external surface areas adjacent to the home ‘would allow surface and
seepage flows of water runoff towards the founding soils…’
the founding soils were likely to be moderately to highly reactive clay soils
there were several significant trees and shrubs in close proximity
it did not consider the damage to the sewer pipe to have resulted from a one off event
such as the storm
it could not confirm the cause of the damage . ‘ However, we can say that this type of
damage is generally caused by differential ground movement, the quality of the original
installation or affects from adjacent tree roots, though none of these can be confirmed
relevant to the Insured’s claimed damag e at this point in time ’ .
The insurer obtained CR’s responses to the complainant’s submissions and expert reports. In
various emails, CR has reconfirmed the comments set out in its report, and has said:
the damage depicted in CCTV images of the pipe is not consistent with or considered due
to stormwater flows or erosion associated with the storm
the alleged stormwater flow would have been a seepage type ground water flow. The
forces from any such flow would have been insufficient to damage the PVC piping
when it inspected the property, there was no evidence of soil scouring, erosion, depression
or gross settlement
even if all the soil surrounding the pipe was washed away the claimed damage would not
have occurred
the complainant’s repo rts are vague, lack detail, are unreliable and unsubstantiated
despite being based in Victoria, it holds appropriate qualifications to comment on the
complainant’s Queensland home.
According to the insurer, ‘ t he information supplied by [LJ] and [CR] indicates that the damage
is in relation to subsidence and not consistent with a single event ’ .
It says that the complainant has not established a claimable loss under the policy. Rather, the
damage claimed is from causes not covered by the policy given:
the ‘St orm’ insured event excludes cover for damage caused by ‘ landslip, subsidence, or
erosion occurring over time’ (PDS, page 15)
the general exclusion clauses applying to damage caused directly or indirectly by:
> subsidence or landslip, except (relevantly) where covered under the ‘Storm’ insured
event (PDS, page 29)
> wear, tear or deterioration (PDS, page 29).
Complainant says the claim should be accepted
The complainant maintains that the claim should be accepted under the ‘Storm’ insured
event. In doing so, she refers to LJ’s conclusion that the damage was the result of soil
becoming saturated during the storm, then subsiding.
She also relies on reports from ST, plumber. The first is not on letterhead and is undated but
was provided to AFCA by the complaint on 27 February 2023. ST indicated that the
significant amount of wet weather had increased the soil moisture level, causing the soil to
move and the pipe to move with it.
Determination | Case number: 949001 Page 4 of 6
ST’s second report is dated ‘March 2022’ ( I anticipate that should read ‘March 2023’ as the
report was provided to AFCA on 27 April 2023) and contains letterhead type details. ST said:
I have been out to the property multiple times. I have seen no evidence of tree
roots or erosion. I believe the excessive amount of rain we had in February 2022
is the cause of the cracked pipes and as mentioned, I do believe it to be sub soil
drainage that has put moisture into the soil under the slab causing the soil to
move resulting in the pipe moving with the soil.
The complainant has also provided a report dated June 2023 from BP, plumber, stating:
The sheer amount of water the Sunshine Coast had in February 2022 to cause
the subsidence and cracked pipes likely occurred within 72 hours of the storm,
however it would not be evident due to the concealed pipes.
She says that she could not afford a geotechnical engineering report. However, she has
provided an extract of an email she received from BB, geotechnical engineer. BB noted that
the author of the CR report was not registered in Queensland, so did not meet a legislative
requirement to provide engineering advice in that State.
The complainant had the pipe relined on 14 November 2022 by RS, drain repairers. She says
she did so as she had been unable to use the home’s main bathroom for months and the
insurer had advise d it could be another three months before CR’s report would be available.
She says she was never told by the insurer not to procced with repair work.
She has provided CCTV images RS took of the pipe damage and notes that there is no sign
of tree root entry.
The complainant says that prior to the storm she had not experienced any drainage issues,
and nor have there been any problems since the pipe was fixed. She notes that straight after
the storm, the bathroom smelt and there were toilet blockages. The problems worsened over
time.
She submits that the pipe was damaged by subsidence that occurred within 72 hours of the
storm and directly as a result of it.
Insurer is not entitled to deny the claim
From the exchanged information, I am on balance satisfied the complainant has established a
claimable loss and the insurer has not shown the claim is excluded. This is because:
LJ, ST and BP have all concluded that the pipe was damaged by soil movement caused by
the storm
LJ refers to soil subsidence occurring duri ng ‘the extreme weather event’
BP says the subsidence and cracked pipe likely occurred within 72 hours of the storm
the complainant has consistently stated that there were no prior issues with the bathroom
but immediately after the storm she noticed a smel l in the home’s main bathroom and toilet
blockages started occurring
the insurer ultimately accepts that soil subsidence caused the pipe to crack
i n its report, CR says ‘ this type of damage is generally caused by differential ground
movement, the quality of the original installation or affects from adjacent tree roots ’ but
acknowledges it could not confirm whether any of those potential causes were relevant
CR’s subsequent email comments involve speculation rather than confirmation.
Determination | Case number: 949001 Page 5 of 6
Accordingly, the insurer is required to accept the claim.
The complainant has already attended to repairs. I note from the insurer’s claim notes that on
26 August 2022, the insurer agreed to her arranging her own trades to undertake that work.
She has provided invoices:
dated 16 November 2022 for $12,000 issued by RS for the relining
dated 22 February 2023 and 3 May 2023 totalling $4,781.50 from ST for related plumbing.
The insurer has not said the invoices from RS and ST are unreasonable or provided quotes.
The invoices from RS and ST total $16,781.50. However, the complainant says she has
incurred costs exceeding $19,000.
If the complainant accepts this determination, she is to provide the insurer with proof of
payment for all the repair costs claimed. The insurer is to reimburse her for the proven repair
costs and pay interest pursuant to the ICA from the date each payment was made until the
reimbursement is paid. The insurer is entitled to apply the policy excess, if not paid already.
2.2 Is non-financial loss compensation payable?
No. While the claim has taken too long, the delays were in part due to factors out of the
insurer’s control. Further, the interest award on the cost of repairs adequately addresses the
insurer’s contribution to those delays.
AFCA can award compensation for poor claim handling
Under paragraph D.3 of the AFCA Rules, we may award compensation for non-financial loss
(capped at $5,400 per claim) where the insurer’s actions ha ve caused an unusual amount of:
physical inconvenience
time taken to resolve the situation
interference with the complainant’s expectation of enjoyment or peace of mind.
Insurer has caused stress and inconvenience
The complainant says the insurer’s delays and unjustified refusal to accept the claim have
caused her significant stress and inconvenience. She notes she was left without a functioning
main bathroom for months. She has provided a letter from her GP indicating the delay in
resolving the claim was causing her anxiety and contributing to insomnia and fatigue.
I acknowledge this claim has taken longer than it should have. Some of the delay was the
result of matters outside the insurer’s control (such as the complainant being overseas for a
month). Further, to the extent the insurer has contributed to the delay experienced, I consider
that is adequately addressed by the award of interest on the cost of repairs.
Accordingly, I am not satisfied it is reasonable to require the insurer to pay compensation.
2.3 Why is the outcome fair?
The complainant has established a claimable loss and the insurer has not shown any policy
exclusions apply. It is therefore fair that the insurer accepts the claim. However, the interest
award adequately addresses the insurer’s contribution to the claim delays, such that it would
not be fair to require it to pay non-financial loss compensation.
Determination | Case number: 949001 Page 6 of 6
3 Supporting information
3.1 The AFCA process
AFCA’s approach is based on fairness
AFCA has determined this complaint based on what is fair in all the circumstances, having
regard to:
the legal principles
applicable industry codes or guidance
good industry practice
previous decisions of AFCA or its predecessor schemes (which are not binding).
The respective parties have completed a full exchange of the relevant information, and each
party has had the opportunity to address any issues raised. I have reviewed and considered
all the information the parties have provided.
While the parties have raised several issues in their submissions, I have restricted this
determination to the issues that are relevant to the outcome.
We assess complaints on available information and circumstances
AFCA is not a court of law. We do not have the power to take or test evidence on oath, or to
require third parties to give evidence.
When we assess complaints, we consider:
available documents
the recollections of the parties
all relevant circumstances.
We give more weight to documents created at the time the events occurred. If there are no
relevant documents, we will decide what most likely occurred based on the available
information.
If there are conflicting recollections and these are evenly weighted, we may find that a claim
cannot be established.
Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.