Home / Youi / Determination 949001

Determination 949001

Claim for sewer pipe damage attributed to storm-related subsidence was denied as longer-term subsidence

FirmYoui
Decided2023-10-25
ProductGeneral Insurance · Home building and contents
OutcomeFor the complainant
Amount awarded$16,782
Non-financial loss—
Amount claimed$19,000
SourceAFCA PDF

Summary

The insurer denied a storm-related sewer pipe subsidence claim as excluded longer-term subsidence. AFCA found the claim covered, required reimbursement of proven repair costs with ICA interest less excess, and declined non-financial loss.

The complainant established a claimable loss under the storm-subsidence-within-72-hours cover, and the insurer, who bore the onus, failed to prove the subsidence or wear and tear exclusions applied.

Issues

Subjects and remedies

health or medicalhome or building damagenatural disasterpay claimpay interest

Related

All Youi determinations · Find similar determinations

Text of the determination

Determination Case number 949001 Financial firm Youi Pty Ltd Determination | Case number: 949001 Page 1 of 6 Case number: 949001 20 October 2023 1 Determination overview 1.1 Complaint The complainant holds home building and contents insurance with the financial firm (insurer). On 12 August 2022, she lodged a claim for damage to a sewer pipe. She attributed the damage to a significant storm event in late February 2022. The insurer has denied the claim. It says the damage is not consistent with having been caused by a one-off storm event. Rather, it is due to longer term subsidence, which is excluded under the policy terms. The complainant maintains that storm related subsidence that occurred within 72 hours caused the damage claimed. She wants the insurer to accept the claim and reimburse her for the repair costs she incurred. She is also dissatisfied with the insurer’s claim handling . 1.2 Issues and key findings Is the insurer entitled to deny the claim? No. The complainant has on balance established a claimable loss for damage caused by subsidence that occurred within 72 hours of, and directly because of, the storm. Further, the insurer has not shown that the claim is excluded under the policy terms. Is non-financial loss compensation payable? No. While the claim has taken too long, the delays were in part due to factors out of the insurer’s control. Further, the interest award on the cost of repairs adequately addresses the insurer’s contribution to those d elays. Why is the outcome fair? The complainant has established a claimable loss and the insurer has not shown any policy exclusions apply. It is therefore fair that the insurer accepts the claim. However, the interest award adequately addresses the insurer’s contribution to the claim delays, such that it would not be fair to require it to pay non-financial loss compensation. 1.3 Determination This determination is in favour of the complainant. If the complainant accepts this determination, the following steps are to be taken:  the complainant is to provide to the insurer proof of payment (such as invoices and receipts) for the repair costs claimed  within 14 days of receiving the proof of payment, the insurer is to reimburse her for the proven repair costs, and pay interest pursuant to the Insurance Contracts Act, 1984 (Cth) (ICA) from the date each payment was made until the reimbursement is paid  if not previously paid, the insurer is entitled to deduct the applicable policy excess. Determination | Case number: 949001 Page 2 of 6 2 Reasons for determination 2.1 Is the insurer entitled to deny the claim? No. The complainant has on balance established a claimable loss for damage caused by subsidence that occurred within 72 hours of, and directly because of, the storm. Further, the insurer has not shown that the claim is excluded under the policy terms. Complainant must show a claimable loss under the policy terms The complainant is required to show on the balance of probabilities (that it is more likely than not), that she suffered a claimable loss under the policy. This means she must show the loss was caused by a risk for which she is insured. Subject to the terms and conditions set out in the product disclosure statement (PDS), the complainant’s policy covers damage to her home and its content s caused by a listed insured event. Those events include ‘Storm’ as follows: Loss or damage to the insured property caused by storm , lightning, wind, hail, snow and storm water overflow from roof gutters and their downpipes or from the area immediately around the premises … Loss or damage to the insured property caused by landslip or subsidence that occurs within 72 hours of, and directly because of, a storm . … On 12 August 2022, the complainant notified the insurer that following storm activity between 25 and 27 February 2022, she noticed a smell in the home’s main bathroom and toilet blockages started occurring. She said the issues had worsened and a plumber had recently discovered a sewer pipe had subsided. The plumber said this was due to the storm. Once the complainant proves the existence of a claimable loss, the insurer is liable for the loss unless it shows an exclusion or limiting condition applies. The insurer has the onus of proving on the balance of probabilities the application of the exclusion or condition. Insurer has denied the claim The insurer appointed builder LJ to assess the property. The insurer has not provided AFCA with a cop y of LJ’s report. The insurer’s notice of response to AFCA dated 22 February 2023 sets out a summary of that report and includes the following:  LJ said that the soil had become saturated during recent storm activity and subsided, causing the 100mm sewer pipe to crack and leak under the house  the complainant told LJ that her plumber had advised that it was possible to repair the pipe by relining it, without disturbing the pipe and subsoil  LJ concluded ‘ It is reasonable to believe that as a result of soil subsidence during extreme weather rainfall event, damage has been sustained to the home ’ . The insurer arranged engineer CR to investigate causation further. CR inspected the home on 17 October 2022, and subsequently reported that:  it had engaged a plumber to undertake CCTV investigations but that did not proceed as the complainant had already repaired the affected sewer pipe by having it relined  the complainant reported not being aware of any plumbing issues prior to the storm event Determination | Case number: 949001 Page 3 of 6  she also advised that ‘at the time of the claim event’ , the main upper level toilet was blocked, there was a backflow in the main floor and shower drains, and a smell in the ensuite. The family had not used the toilet/bathroom since then  visual inspection and a floor level survey indicated there was no significant building movement damage present  some of the external surface areas adjacent to the home ‘would allow surface and seepage flows of water runoff towards the founding soils…’  the founding soils were likely to be moderately to highly reactive clay soils  there were several significant trees and shrubs in close proximity  it did not consider the damage to the sewer pipe to have resulted from a one off event such as the storm  it could not confirm the cause of the damage . ‘ However, we can say that this type of damage is generally caused by differential ground movement, the quality of the original installation or affects from adjacent tree roots, though none of these can be confirmed relevant to the Insured’s claimed damag e at this point in time ’ . The insurer obtained CR’s responses to the complainant’s submissions and expert reports. In various emails, CR has reconfirmed the comments set out in its report, and has said:  the damage depicted in CCTV images of the pipe is not consistent with or considered due to stormwater flows or erosion associated with the storm  the alleged stormwater flow would have been a seepage type ground water flow. The forces from any such flow would have been insufficient to damage the PVC piping  when it inspected the property, there was no evidence of soil scouring, erosion, depression or gross settlement  even if all the soil surrounding the pipe was washed away the claimed damage would not have occurred  the complainant’s repo rts are vague, lack detail, are unreliable and unsubstantiated  despite being based in Victoria, it holds appropriate qualifications to comment on the complainant’s Queensland home. According to the insurer, ‘ t he information supplied by [LJ] and [CR] indicates that the damage is in relation to subsidence and not consistent with a single event ’ . It says that the complainant has not established a claimable loss under the policy. Rather, the damage claimed is from causes not covered by the policy given:  the ‘St orm’ insured event excludes cover for damage caused by ‘ landslip, subsidence, or erosion occurring over time’ (PDS, page 15)  the general exclusion clauses applying to damage caused directly or indirectly by: > subsidence or landslip, except (relevantly) where covered under the ‘Storm’ insured event (PDS, page 29) > wear, tear or deterioration (PDS, page 29). Complainant says the claim should be accepted The complainant maintains that the claim should be accepted under the ‘Storm’ insured event. In doing so, she refers to LJ’s conclusion that the damage was the result of soil becoming saturated during the storm, then subsiding. She also relies on reports from ST, plumber. The first is not on letterhead and is undated but was provided to AFCA by the complaint on 27 February 2023. ST indicated that the significant amount of wet weather had increased the soil moisture level, causing the soil to move and the pipe to move with it. Determination | Case number: 949001 Page 4 of 6 ST’s second report is dated ‘March 2022’ ( I anticipate that should read ‘March 2023’ as the report was provided to AFCA on 27 April 2023) and contains letterhead type details. ST said: I have been out to the property multiple times. I have seen no evidence of tree roots or erosion. I believe the excessive amount of rain we had in February 2022 is the cause of the cracked pipes and as mentioned, I do believe it to be sub soil drainage that has put moisture into the soil under the slab causing the soil to move resulting in the pipe moving with the soil. The complainant has also provided a report dated June 2023 from BP, plumber, stating: The sheer amount of water the Sunshine Coast had in February 2022 to cause the subsidence and cracked pipes likely occurred within 72 hours of the storm, however it would not be evident due to the concealed pipes. She says that she could not afford a geotechnical engineering report. However, she has provided an extract of an email she received from BB, geotechnical engineer. BB noted that the author of the CR report was not registered in Queensland, so did not meet a legislative requirement to provide engineering advice in that State. The complainant had the pipe relined on 14 November 2022 by RS, drain repairers. She says she did so as she had been unable to use the home’s main bathroom for months and the insurer had advise d it could be another three months before CR’s report would be available. She says she was never told by the insurer not to procced with repair work. She has provided CCTV images RS took of the pipe damage and notes that there is no sign of tree root entry. The complainant says that prior to the storm she had not experienced any drainage issues, and nor have there been any problems since the pipe was fixed. She notes that straight after the storm, the bathroom smelt and there were toilet blockages. The problems worsened over time. She submits that the pipe was damaged by subsidence that occurred within 72 hours of the storm and directly as a result of it. Insurer is not entitled to deny the claim From the exchanged information, I am on balance satisfied the complainant has established a claimable loss and the insurer has not shown the claim is excluded. This is because:  LJ, ST and BP have all concluded that the pipe was damaged by soil movement caused by the storm  LJ refers to soil subsidence occurring duri ng ‘the extreme weather event’  BP says the subsidence and cracked pipe likely occurred within 72 hours of the storm  the complainant has consistently stated that there were no prior issues with the bathroom but immediately after the storm she noticed a smel l in the home’s main bathroom and toilet blockages started occurring  the insurer ultimately accepts that soil subsidence caused the pipe to crack  i n its report, CR says ‘ this type of damage is generally caused by differential ground movement, the quality of the original installation or affects from adjacent tree roots ’ but acknowledges it could not confirm whether any of those potential causes were relevant  CR’s subsequent email comments involve speculation rather than confirmation. Determination | Case number: 949001 Page 5 of 6 Accordingly, the insurer is required to accept the claim. The complainant has already attended to repairs. I note from the insurer’s claim notes that on 26 August 2022, the insurer agreed to her arranging her own trades to undertake that work. She has provided invoices:  dated 16 November 2022 for $12,000 issued by RS for the relining  dated 22 February 2023 and 3 May 2023 totalling $4,781.50 from ST for related plumbing. The insurer has not said the invoices from RS and ST are unreasonable or provided quotes. The invoices from RS and ST total $16,781.50. However, the complainant says she has incurred costs exceeding $19,000. If the complainant accepts this determination, she is to provide the insurer with proof of payment for all the repair costs claimed. The insurer is to reimburse her for the proven repair costs and pay interest pursuant to the ICA from the date each payment was made until the reimbursement is paid. The insurer is entitled to apply the policy excess, if not paid already. 2.2 Is non-financial loss compensation payable? No. While the claim has taken too long, the delays were in part due to factors out of the insurer’s control. Further, the interest award on the cost of repairs adequately addresses the insurer’s contribution to those delays. AFCA can award compensation for poor claim handling Under paragraph D.3 of the AFCA Rules, we may award compensation for non-financial loss (capped at $5,400 per claim) where the insurer’s actions ha ve caused an unusual amount of:  physical inconvenience  time taken to resolve the situation  interference with the complainant’s expectation of enjoyment or peace of mind. Insurer has caused stress and inconvenience The complainant says the insurer’s delays and unjustified refusal to accept the claim have caused her significant stress and inconvenience. She notes she was left without a functioning main bathroom for months. She has provided a letter from her GP indicating the delay in resolving the claim was causing her anxiety and contributing to insomnia and fatigue. I acknowledge this claim has taken longer than it should have. Some of the delay was the result of matters outside the insurer’s control (such as the complainant being overseas for a month). Further, to the extent the insurer has contributed to the delay experienced, I consider that is adequately addressed by the award of interest on the cost of repairs. Accordingly, I am not satisfied it is reasonable to require the insurer to pay compensation. 2.3 Why is the outcome fair? The complainant has established a claimable loss and the insurer has not shown any policy exclusions apply. It is therefore fair that the insurer accepts the claim. However, the interest award adequately addresses the insurer’s contribution to the claim delays, such that it would not be fair to require it to pay non-financial loss compensation. Determination | Case number: 949001 Page 6 of 6 3 Supporting information 3.1 The AFCA process AFCA’s approach is based on fairness AFCA has determined this complaint based on what is fair in all the circumstances, having regard to:  the legal principles  applicable industry codes or guidance  good industry practice  previous decisions of AFCA or its predecessor schemes (which are not binding). The respective parties have completed a full exchange of the relevant information, and each party has had the opportunity to address any issues raised. I have reviewed and considered all the information the parties have provided. While the parties have raised several issues in their submissions, I have restricted this determination to the issues that are relevant to the outcome. We assess complaints on available information and circumstances AFCA is not a court of law. We do not have the power to take or test evidence on oath, or to require third parties to give evidence. When we assess complaints, we consider:  available documents  the recollections of the parties  all relevant circumstances. We give more weight to documents created at the time the events occurred. If there are no relevant documents, we will decide what most likely occurred based on the available information. If there are conflicting recollections and these are evenly weighted, we may find that a claim cannot be established.

Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.