Home / Youi / Determination 948182

Determination 948182

Cash settlement for flyover roofs, bathroom damage and air conditioning after cyclone repairs, plus non-financial loss

FirmYoui
Decided2023-12-12
ProductGeneral Insurance · Home building and contents
OutcomeFor the complainant
Amount awarded—
Non-financial loss$4,000
Amount claimed—
SourceAFCA PDF

Summary

After Cyclone Debbie, repairs by the insurer's builders were defective and the flyover roofs were removed but not reinstated. AFCA required a cash settlement on an actionable quote plus 10%, bathroom repair or cash settlement, and $4,000 non-financial loss, but rejected the air conditioning claim.

The insurer did not establish the flyover roofs were non-compliant, and in any event the rebuild costs were linked to accepted roof repairs; the insurer's handling caused significant delay and stress.

Issues

Subjects and remedies

home or building damagenatural disasterpay claimpay non financial lossrepair or rectify

Related

All Youi determinations · Find similar determinations

Text of the determination

Determination Case number 948182 Financial firm Youi Pty Ltd Determination | Case number: 948182 Page 1 of 7 Case number: 948182 29 November 2023 1 Determination overview 1.1 Complaint The complainants lodged a claim for damage to their property following Cyclone Debbie in March 2017. The insurer arranged for their panel builders to complete repairs. Issues arose with the repairs with rectification works undertaken including roof replacements, internal strip out, reinstatement and contents losses. The current com plaint relates to damage to a bathroom , air conditioning (AC) and the replacement of flyover roof s . The complainants say the offer for the outstanding works is insufficient and the insurer’s claim handling caused unnecessary stress and inconvenience. The complainants seek a reasonable cash settlement to reinstate the flyover roofs, the bathroom, and the AC. 1.2 Issues and key findings Should the insurer increase its offer for the flyover roofs? Yes. The insurer should settle the claim for the replacement of the flyover roofs based on an actionable quote to reinstate the flyover roofs as set out in section 2.1 of this determination. Is the insurer liable for the bathroom damage? Yes. The insurer is to settle the claim for the bathroom damage as set out in section 2.2 of this determination. Is the insurer liable to repair the air-conditioning unit? No. The insurer is not liable to cover the costs to repair the unit. Is the insurer required to pay any non-financial loss compensation? Yes. The insurer should pay $4,000 in non-financial loss compensation. Why is the outcome fair? This outcome is fair because the insurer’s cash settlement, on balance, is insufficient to complete the outstanding claim- related works. The insurer’s handling of the claim also caused significant unnecessary delays, stress and inconvenience to the complainants. 1.3 Determination This determination is substantially in favour of the complainants. Within 14 days of notification of the complainants accepting this determination the insurer is to:  pay the complainants $4,000 compensation for non-financial loss.  on receipt from the complainants of an actionable quote for reinstatement of the flyover roofs cash settle the claim as set out in section 2.1 of this determination.  arrange for the repair of the bathroom or cash settlement of the repairs as per section 2.2 of this determination. Determination | Case number: 948182 Page 2 of 7 2 Reasons for determination The complainants are represented by S. For brevity, both the complainants and S are referred to as the complainants in this determination. The parties provided numerous submissions to AFCA. While this determination does not refer to them all, the panel has taken each submission into account in reaching this decision 2.1 Should the insurer increase its offer for the flyover roofs? Yes. The insurer should cash settle the claim for the replacement of the flyover roofs based on an actionable quote from the complainants to reinstate the flyover roofs plus a 10% contingency allowance. Circumstances There is no dispute the re was damage to the complainants’ home because of an insured event in 2017 or that the insurer completed most of the repairs via its authorised builders. The insurer replacement of the roof of the both the main house and the granny flat. The repairs included removal of two pergola structures in the outdoor entertainment area (flyover roofs) because it suffered some damage during the claimed storm eve nt and it was necessary to facilitate the repairs. The flyover roofs/pergola acts like an external connection point between the entertaining area, the main residence and the granny flat. While the roof of the main house and the granny flat have been replaced, the flyover roofs are yet to be reinstated. Parties disagree on scope of works and suitability of insurer’s settlement The insurer says it is unable to authorize its builder to reinstate the flyover roofs because: > the structures were not built to code at the time of construction > the reinstatement requires additional costs to bring the structures to current code > the policy excludes additional costs resulting from building or any party thereof not being compliant with the most recent building codes, law and regulations. The insurer offered a cash settlement of $19,978. This is based on an estimate from its builder (JLG) for like for like costs to reinstate the flyover roof structure. The estimate excludes costs to construct the structure based on the recent building codes and regulations. The complainants disagree and submit the structures were compliant at the time of construction. Insurer relies on desktop report from CRD The insurer relies on a desktop report from an engineer (CRD) dated 28 June 2023. CRD notes the following :  the size of the flyover roofs at the time of loss is greater than what appears on the provided drawings  the structures were not designed and built in accordance with a design or certification and are non-compliant with regards to AS1684.1, AS1720.1 and BCA 2004 relevant at the time of construction (2004).  to reinstate the structures, the roofs will require structural design input from a suitably experienced service provider Determination | Case number: 948182 Page 3 of 7  t he insurer’s estimate of approximately $20,000 will cover the cost to replace the structure based on like for like costs. Complainants relies on reports from original engineer and council The complainants disagree and say the insurer is liable to reinstate the roof as it was removed as part of the insurance works. The complainants say the flyover roof s were part of the original structure and signed off by the local c ouncil, therefore, on balance , the structures were compliant. The complainants presented several documents in support of their position including (but not limited to) the following: > the original council plans > a letter dated 17 March 2022 from the local council > a letter dated 13 June 2003 from a design studio (HB) and > an email from the original engineer (GG). In its email of 3 October 2022, GG says: The residence as per the Architectural drawings were designed and certified to satisfy the relevant codes at that time, this included the pergola/entertainment area. At the time the residence was constructed Whitsunday Regional Council carried out the inspections and final sign off. As the pergola/entertainment area was shown on the architectural drawings and included in the structural design it would have been expected the original build and sign off by council would have included this area. If you can remember when myself and Benn visited site I mentioned the roof screw assemblies installed on your new roof were not as per t he engineer’s specification and you should inform your insurance company’. The panel accepts the information confirms the entertaining area was part of the original plan. It is fair the insurer settles the claim based on actionable costs Having consider ed all the available information, the panel does not consider the insurer’s cash settlement offer ($ 19,978) for the flyover roofs (pergola structures) reasonable. The panel acknowledges the policy excludes cover for repairs resulting from buildings being non-compliant. However, the panel is not satisfied the insurer has established, the flyover whilst possibly larger and not exactly as per the original plans was non-compliant. While the insurer relies on the report from CRD, the desktop report was not completed until six years after the event. The complainant on the other hand has supplied the original plans and the post construction approval from the council. Even if the flyovers were non-compliant, the panel does not consider the exclusion applicable in the circumstances because the costs to rebuild the flyover roofs are linked to the roof repairs accepted under the insurance policy. These works should form part of the insurance Determination | Case number: 948182 Page 4 of 7 scope of works. Further, the insurer removed and disposed the pergola without providing any alternate solutions to the complainants. In the circumstances, it is fair the insurer covers the costs to replace the flyover roofs having regard to the current building codes and regulations. It is fair the claim is settled based on what it would cost to replace the structures in the current market considering all relevant building codes and regulations. Given the delays, it is fair that the claim be settled based on an actionable quote provided by the complainants. Accordingly, the panel determines that the complainants provide an actionable quote from a suitably qualified roofer to replace the flyover roofs based on the current building codes and regulations. Within 14 days of receipt of the complainant’s actionable quote, the insure r must cash settle the claim based on the actionable quote plus a 10% contingency allowance. 2.2 Is the insurer liable for the bathroom damage? Yes. The insurer is to settle the claim for the bathroom damage. Complainants say the insurer’s trades damaged the bathroom The complainants say the insurer’s appointed trades , MS, chipped two tiles in the bathroom during repair works and that some of the tiles became ‘drummy’ due to the ongoing roof repairs. The insurer acknowledges there is damage to the bathroom caused during the repair works. The insurer says the damage is to the uppermost row of tiles and not part of the waterproofing of the bathroom. As it is unable to replace the tiles directly due to no matching tiles being available it has offered three rectification options (noted below): > Installation of an additional layer of gyprock ceiling as this would cover the chipped tile. > Installation of a slightly larger cornice throughout the bathroom. > Replacement of the entire uppermost level of tiles on the wall with feature tiles. The insurer denies the repairs have caused damage to the studs or caused some of the tiles to become drummy but has offered to repair the loose drummy tiles at the same time. The complainants say the insurer’s proposed solutions are not acceptable. In resolution, the complainants ask the insurer to cover the cost to reinstate the bathroom in the amount of $8,189.50 based on a quote from FT. Insurer’s proposed rectification options are reasonable The policy provides that while the insurer will always try to match colours and materials, where products are unavailable it will use the closest possible match that is available. Any additional costs resulting from the unavailability of matching materials are not covered. The policy also provides that when settling a claim, the insurer will only cover the damaged areas of the insured premises and will not pay for the costs to replace, repair or rebuild undamaged areas The panel notes the damage to the uppermost tiles is relatively minor. While the panel accepts the tiles cannot be matched, the insurer has offered three relatively simple solutions. The insurer says its offer is reasonable because the chipped tile is not part of the waterproofing in the bathroom and the chipped tiles are in the uppermost row of the bathroom Determination | Case number: 948182 Page 5 of 7 tiles. In its opinion, it is not reasonable to rebuild the entire bathroom as part of rectification works. The panel accepts the complainants are reasonably frustrated with the issues they have confronted during the repair proc ess. However, h aving considered the available information, the panel finds the insurer’s proposed options to settle the claim for the bathroom damage reasonable in the circumstances. In the panels view the second option offered, that is the installation of a larger cornice throughout the bathroom is a fair and reasonable solution. The insurer has also offered to repair the loose or drummy tiles in the bathroom at the same time. The panel considers this offer fair given the time that has elapsed since the damage was first reported. In the panels view it is fair for the insurer to complete the repairs to the bathroom as per the second option and repair the loose and drummy tiles at the same time. Should the complainants prefer to cash settle this aspect of the claim then the insurer can cash settle the claim based on its nominated repairers actionable quote to complete the repairs plus a 10% contingency allowance. 2.3 Is the insurer liable to repair the air-conditioning unit? No. The insurer is not liable to cover the costs to repair the unit. Complainants say the air-conditioning unit is not working The complainant says the insurer installed an air-conditioning unit in the guest room of the granny flat as part of the repair works and it is not working. In resolution, the complainant asks the insurer to repair the unit. Complainants have not shown a valid claim To assess the complainant’s concerns, the insurer engaged PBM. PBM ’s assessment report dated 24 June 2022 confirms t he air conditioning unit has lost refrigerant and requires a new outdoor coil. In the insurer’s opinion, this is related to general maintenance and not a claimed expense. The complainants have not provided any evidence to refute the insurer findings or show the loss/damage was caused by the insurer’s works. In the panel’s opinion, the complainants have not established a valid claim for the costs to repair this unit and the insurer is not liable to accept this cost. 2.4 Is the insurer required to pay any non-financial loss compensation? Yes. The insurer should pay $4,000 in non-financial loss compensation. AFCA can award compensation for non-financial loss compensation Under the AFCA Rules, we may award compensation (capped at $5,400) for non-financial loss where a complainant has suffered an unusual degree or extent of physical inconvenience, time taken to resolve the situation or interference with their expectation of enjoyment or peace of mind. Determination | Case number: 948182 Page 6 of 7 We take a conservative approach to compensation for non-financial loss. It is not awarded when a person simply suffers the normal degree of inconvenience to be expected when a problem occurs. Complainants entitled to compensation The available information confirms that as a result of issues with the insurers builders ongoing issues arose with the repairs. This led to rectification works undertaken including roof replacements, internal strip out, reinstatement and contents losses. This has had an impact on the complainants and their family, particularly moving in and out of the home whilst repairs and seemingly repeat repairs were undertaken since 2017. The insurers approach and inflexibility plus the complainant suffering through the failures of the repair process justifies, in the panels view, compensation at the upper end of non- financial loss. In the panel’s view an award of $4,000 compensation for non -financial loss is fair. 2.5 Why is the outcome fair? Where an insurer decides to cash settle a claim, the settlement amount should be based on a fair assessment of the cost to the complainant to repair or rebuild the property. The amount offered should be sufficient to ensure the complainants are able to engage their own contractors to complete the necessary work. The insure r’s offer to settle the damage to the flyover roofs is insufficient to complete the repairs and does not discharge its liability under the policy and conditions. Therefore, the insured is required to contribute further to reinstate the flyover roofs. The i nsurer’s resolution options for the bathroom damage are reasonable and a fair process to settle that aspect of the claim. I t would not be fair to require the insurer to repair undamaged areas. Determination | Case number: 948182 Page 7 of 7 3 Supporting information 3.1 The AFCA process AFCA’s approach is bas ed on fairness AFCA has determined this complaint based on what is fair in all the circumstances, having regard to:  the legal principles  applicable industry codes or guidance  good industry practice  previous decisions of AFCA or its predecessor schemes (which are not binding). The respective parties have completed a full exchange of the relevant information, and each party has had the opportunity to address any issues raised. We have reviewed and considered all the information the parties have provided. While the parties have raised several issues in their submissions, we have restricted this determination to the issues that are relevant to the outcome. A panel determined this matter Due to the nature of this complaint, we referred it to a panel for determination. The panel includes:  an ombudsman  a member with significant experience in consumer and small business advocacy  a member with extensive experience as in the insurance industry. We assess complaints on available information and circumstances AFCA is not a court of law. We do not have the power to take or test evidence on oath, or to require third parties to give evidence. When we assess complaints, we consider:  available documents  the recollections of the parties  all relevant circumstances. We give more weight to documents created at the time the events occurred. If there are no relevant documents, we will decide what most likely occurred based on the available information. If there are conflicting recollections and these are evenly weighted, we may find that a claim cannot be established.

Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.