Determination 947579
Partial decline of storm water damage claim as pre-existing damage, temporary accommodation costs and delay
Summary
The insurer partly accepted a storm water damage claim and declined pre-existing damage. AFCA upheld the exclusion but required temporary accommodation costs under the policy and $1,000 for non-financial loss due to delay.
Pre-existing damage and poor maintenance were excluded under the policy, but the home was treated as the principal residence entitling temporary accommodation, and the insurer's acknowledged delays warranted non-financial loss compensation.
Issues
- Claim denial primary · not upheld
“The insurer is entitled to exclude pre-existing damage and that caused by poor maintenance.”
- Delay secondary · upheld
“claim lodged 1 March 2022 and declined 6 January 2023, not in line with the General Insurance Code of Practice timeframe”
- Product terms interpretation secondary · upheld
“fair to treat the insured property as the principal place of residence; insurer required to pay temporary accommodation costs”
Subjects and remedies
home or building damagenatural disasterpay claimpay non financial loss
Text of the determination
Determination
Case number 947579
Financial firm AAI Limited (the insurer)
Determination | Case number: 947579 Page 1 of 7
Case number: 947579 21 September 2023
1 Determination overview
1.1 Complaint
Between 19 November 2021 and 19 November 2022, the complainant held a home and
contents insurance policy issued by the insurer.
Following a storm on 27 February 2022, on 11 March 2022, the complainant lodged a claim
for water damage to the insured property.
The insurer accepted the claim and appointed a builder and engineer to inspect the property
to determine the cause of damage. The insurer accepts some damage can be attributed to
the storm event but says some damage pre-existed the insured event. On the basis pre-
existing damage is excluded from cover, the insurer declined this portion of the claim.
The complainant seeks to have the insurer fully accept the claim, carry out repairs and
provide reimbursement for temporary accommodation costs.
1.2 Issues and key findings
Has the complainant established a claim for the disputed damage?
No. While the claim has been partly accepted, the complainant has been unable to
demonstrate all the claimed damage was caused by the storm. The insurer is entitled to
exclude pre-existing damage and that caused by poor maintenance.
Is the complainant entitled to temporary accommodation costs?
Yes. The complainant’s home is currently uninhabitable. The insurer is required to provide
temporary accommodation assistance for the period of repair, up to 52 weeks.
Is the complainant entitled to non-financial loss?
Yes. The acknowledged delays to resolving this claim has taken an unusual amount of time to
resolve the situation.
Why is the outcome fair?
The outcome is fair in all the circumstances as it requires the parties to act in accordance with
their good faith obligations under the insurance contract and compensates the complainant
and her family for the unnecessary stress and inconvenience caused by the insurer’s
conduct.
1.3 Determination
This determination is partly in favour of the complainant.
Within 14 days of the date the insurer is advised the complainant has accepted this
determination, it is required to pay her $1,000 in non-financial loss compensation and make
arrangements to meet the complainant’s temporary accommodation costs in line with the
policy.
Determination | Case number: 947579 Page 2 of 7
2 Reasons for determination
2.1 Has the complainant established a claim for the disputed
damage?
No. While the claim has been partly accepted, the complainant has been unable to
demonstrate all the claimed damage was caused by the storm. The insurer is entitled to
exclude pre-existing damage and that caused by poor maintenance.
The complainant must establish a claimable loss
When bringing a complaint to AFCA, the complainant is required initially to show it is more
likely than not there is a claimable loss under the policy. This means demonstrating the loss
or damage was caused by a risk that is covered under the policy.
Once the complainant proves there is a claimable loss, the insurer is liable for the loss unless
it shows an exclusion or limiting condition applies. The insurer has the responsibility to show it
is more likely than not the exclusion or condition applies.
The complainant has provided limited supporting evidence
The insurer has partially accepted the complainant’s claim. As a result, this complaint is
limited to additional damage which has been the subject of the insurer’s decision to deny
cover.
The complainant says the entire damage to the insured property was caused by the storm
event on 27 February 2023. She also says the property has suffered further subsequent
damage due to the insurer’s delay in providing an outcome on the claim.
To support her position, the complainant provided AFCA with photographs of the damage.
Unfortunately, there is insufficient information to show all the damage claimed on the property
is related to the claimed storm event.
In addition, the complainant had only purchased the property shortly before the insured event.
The complainant provided a pre-purchase report for the property to the insurer, who has
provided it to AFCA. This report, dated 1 October 2021, relevantly shows the property was
affected by:
major and minor defects including
> floors which required re-levelling on both stories
> missing finishing timber
> sagging support beam across ground floor living room ceiling
> missing weatherboards around the property
> no exterior paint on the weatherboards
> corrosion of the roof sheets
> the front veranda, steps and walkway needed replacing, including the roof
> the rear uncovered deck required substantial repair
> all window hoods required replacing
> the roof and guttering of the property required replacing
termite activity in the front wall
overall poor quality of workmanship and materials and
poor maintenance.
Determination | Case number: 947579 Page 3 of 7
The insurer relies on expert reports
The insurer appointed a builder, Company A, who inspected the home on 2 July 2022. The
builder ’s report relevantly noted some of the damages were related to the insured storm
event, but it could not ascertain the cause of other damage unrelated to the storm event
because of the overall poor condition of the insured premises.
The insurer appointed an engineer, Company K, to assess whether the damage on the
property was related to t he storm event. Company K was provided with the property’s pre -
purchase report to assist.
Company K relevantly said:
some damage could be attributed to the storm event including damage to:
> internal finishes to the rear portion of the upper and lower level of the house,
> lower level bedroom carpet and
> rear weatherboard
there were pre- existing issues occurring over the building’s life, including:
> deterioration to the roof, windows, external wall cladding, retaining wall and
> mouldy wall lining in the lower level bedroom
it reviewed
> the pre-purchase inspection report which showed several pre-existing issues consistent
with some of the damages claimed and
> realestate.com photos from October 2021 which also shows pre-existing damages.
Company K made recommendations to repair the damage related to the claimed event and
highlighted maintenance issues that needed to be fixed by the complainant.
The insurer is entitled to exclude pre -existing damage
The policy covers damage resulting from insured events including storm. However, the policy
coverage contains exclusions. It is the insurer’s responsibility to establish these exclusions
apply.
The policy terms set out in the Product Disclosure Statement specifically exclude damage
relating to any part of the building not in good condition, or caused by wear, tear, gradual
deterioration, defects and faulty workmanship.
I am satisfied the insurer, largely through the complainant’s own report, has established some
of the damage (that listed above) was pre-existing and was caused by the insured premises
not being in good condition.
It is entitled to reduce its liability on the claim in accordance with the terms and conditions of
the policy.
2.2 Is the complainant entitled to temporary accommodation
costs?
Yes. The complaina nt’s home is currently uninhabitable . The insurer is required to provide
temporary accommodation assistance for the period of repair, up to 52 weeks.
The policy provides for accommodation assistance in some circumstances
The policy relevantly states:
Determination | Case number: 947579 Page 4 of 7
We cover:
When you are covered for loss or damage to the building to the extent that the
building cannot be lived in, we will pay for your reasonable and necessary
temporary accommodation costs for the time it will take to repair or rebuild the
building so that it can be lived in again for:
• up to 4 weeks in short term accommodation agreed to by us (e.g. standard rates
for a hotel, motel or serviced apartment), then if reasonable and necessary;
• up to another 48 weeks in residential accommodation of a similar standard to the
building.
We will also pay the reasonable and necessary costs for:
• redirection of mail from the insured address for up to 52 weeks;
• utility connection costs such as water, electricity, gas at the temporary
accommodation residence;
• ass istance with bond payment if required, however any amount we pay in bond
is recoverable from you by us. We may deduct this amount from any amount
payable to you;
• if applicable, break fees associated with early termination of the lease or other
rental agreement at your temporary accommodation arising if you are able to
return to the building in accordance with this additional cover before the term of
the lease or rental agreement ends.
We don’t cover accommodation costs:
[…]
– if the building was not your principal place of residence at the time of the loss or
damage;
– if you had not intended to be living at the building during the repair period (had
the building not been damaged);
The complainant seeks temporary accommodation assistance
At the time of the storm, the complainant and her family were living in alternate
accommodation while renovations were being undertaken on the property after they had
settled on it in January 2022.
The complainant said she had, due to limited options, entered into a rental lease agreement
for a period of 12 months prior to the storm event, and had the intention of breaking the lease
once the renovations were complete.
Determination | Case number: 947579 Page 5 of 7
She also says but for the damage from the storm, the renovations would have been complete
within about a month, before the need for alternate temporary accommodation. The only
evidence provided in support of this position is a letter from her contractor advising:
work was programmed to commence in mid-February 2022
delays by the contractor caused rescheduling to March 2022
the work was due to be completed by April 2022 and
the works have never commenced due to the storm and resulting claim.
The complainant is entitled to temporary accommodation assistance
The policy does not define ‘principal place of residence’. It is fair in these circumstances to
treat the insured property as the principal place of residence however as:
it had been bought for the purpose of being the main dwelling for the family and
the renovations to be undertaken prior to moving in caused alternate accommodation to be
required for only a month.
I am also satisfied, on balance, had the insured premises not been damaged in the storm, the
complainant and her family would have moved in once the renovations were complete and
therefore intended to be living at the premises during the period of repair of the storm
damage.
The insurer is therefore required to pay reasonable and necessary temporary accommodation
costs in line with the terms of the policy.
2.3 Is the complainant entitled to non-financial loss?
Yes. The acknowledged delays to resolving this claim has taken an unusual amount of time to
resolve the situation.
Complainant is entitled to compensation for non-financial loss
AFCA will only award compensation for non-financial loss where there has been an unusual
amount of physical inconvenience, time taken to resolve a situation, or interference with the
complainant’s expectation of enjoyment or peace of mind.
In assessing whether to award compensation, AFCA expects the complainant to be
moderately robust, bear the normal degree of inconvenience experienced when a problem
occurs, and take reasonable steps to minimise the inconvenience suffered.
The insurer acknowledged delays
The insurer acknowledged there were several months delay in providing an outcome on the
claim. The claim was lodged on 1 March 2022 and declined on 6 January 2023, which is not
in line with the General Insurance Code of Practice timeframe.
It explained the severe East Coast Flooding event that occurred in February 2022 greatly
impacted the insurance and associated industries and their ability to meet required service
agreements. While I accept this is the case, it does not absolve the insurer of its
responsibilities at law or under the Code.
The insurer has recognised the delays caused by it and the inconvenience experienced by
the complainant. It has offered an apology.
While this is welcome, w ith regard to AFCA’s normal approach to awarding non -financial loss,
I am satisfied it is fair and reasonable for the insurer to pay $1,000 in compensation.
Determination | Case number: 947579 Page 6 of 7
2.4 Why is the outcome fair?
The outcome is fair in all the circumstances as it requires the parties to act in accordance with
their good faith obligations under the insurance contract and compensates the complainant
and her family for the unnecessary stress and inconvenience caused by the insurer’s
conduct.
Determination | Case number: 947579 Page 7 of 7
3 Supporting information
3.1 The AFCA process
AFCA’s approach is based on fairness
AFCA has determined this complaint based on what is fair in all the circumstances, having
regard to:
the legal principles
applicable industry codes or guidance
good industry practice
previous decisions of AFCA or its predecessor schemes (which are not binding).
The respective parties have completed a full exchange of the relevant information, and each
party has had the opportunity to address any issues raised. We have reviewed and
considered all of the information the parties have provided.
While the parties have raised a number of issues in their submissions, we have restricted this
determination to the issues that are relevant to the outcome.
We assess complaints on available information and circumstances
AFCA is not a court of law. We do not have the power to take or test evidence on oath, or to
require third parties to give evidence.
When we assess complaints, we consider:
available documents
the recollections of the parties
all relevant circumstances.
We give more weight to documents created at the time the events occurred. If there are no
relevant documents, we will decide what most likely occurred based on the available
information.
If there are conflicting recollections and these are evenly weighted, we may find that a claim
cannot be established.