Claim declined for water damage to timber floors; insurer relied on lack of a single escape of liquid event and the seepage exclusion
Text of the determination
Determination
Case number 947525
Financial firm AAI Limited
Determination | Case number: 947525 Page 1 of 7
Case number: 947525 17 October 2023
1 Determination overview
1.1 Complaint
The complainant holds a home and contents policy with the financial firm (insurer). He lodged
a claim after noticing water had caused timber floors in his home to rot and deteriorate. The
insurer identified water pooling under the property but found no leaks or other water sources
at the property. It therefore declined the claim on the basis the complainant had not
established the damage was caused by a loss covered under the terms and conditions of the
policy.
The complainant subsequently provided reports which identified the possible source of water
ingress to be a damaged stormwater drain in a neighbouring property.
The insurer initially failed to consider this information. However, following a prior AFCA
determination (848257), the insurer reinvestigated the damage. The insurer now relies on a
policy exclusion for seepage to decline the claim.
The complainant wants the insurer to accept the claim. He also says the insurer caused
delays.
1.2 Issues and key findings
Is the insurer entitled to decline the claim?
Yes. The information shows the damage is due the lack of adequate drainage and ventilation,
which led to water pooling under the property over an extended period and led to the damage
now claimed. This cause of damage is not covered under the policy.
Is the complainant entitled to any further non-financial loss compensation?
No. I do not consider further non-financial loss compensation is warranted.
Why is the outcome fair?
I empathise with the complainant as he has clearly suffered a loss. However, in
circumstances where the policy does not cover the cause of the damage, it would be unfair to
require the insurer to accept the claim.
1.3 Determination
The determination is in favour of the insurer.
The insurer is entitled to decline the claim and is not required to take any further action.
Determination | Case number: 947525 Page 2 of 7
2 Reasons for determination
2.1 Is the insurer entitled to decline the claim?
Yes. The information shows the damage is due the lack of adequate drainage and ventilation,
which led to water pooling under the property over an extended period and led to the damage
now claimed. This cause of damage is not covered under the policy.
Complainant has initial onus to establish loss covered by terms of policy
It is accepted insurance law that the complainant carries the initial onus to establish, on the
balance of probabilities (that is, more likely than not), a loss which is covered by the terms
and conditions of the policy.
Only if the complainant can do this, will the onus shift to the insurer to show, on balance, it is
entitled to decline cover in line with the policy wording or otherwise.
Policy covers escape of liquid damage, subject to conditions and exclusions
The policy is an ‘insured events’ policy. This means not all loss and damage is automatically
covered. Rather, only loss or damage caused by one or more of the insured events, and not
subject to exclusions, is covered. The product disclosure statement (PDS) covers escape of
liquid as follows:
Loss or damage caused by liquid leaking, overflowing or bursting from any of the
following:
…
• any drain, fixed pipes, drainage and sewage systems (not forming part of a
shower cubicle wall, floor or base);
The PDS also says an incident is a single event, accident or occurrence which was
unintended and unexpected.
AFCA provided prior determination
AFCA issued a prior determination on 27 October 2022 (complaint number 848257) which
stated the insurer: ‘i s entitled to further assess the cause of the claimed damage. It may
withhold a decision until it has been afforded an opportunity for further assessment. ’ The
determination also stated the insurer was to pay $4,000 in compensation for non-financial
loss and reimburse the complainan t’s reasonable costs in making the complaint.
Since that determination was issued, the insurer conducted a further assessment of the
damage by appointing its engineer (CR). It says this report supports its findings that the
complainant has not shown that a single defined incident caused the damage. It also says the
damage is excluded under the exclusion for seepage.
The insurer relies on the following exclusion in the PDS to decline the claim:
Seepage of water
water seeping or running:
• through the earth (hydrostatic water seepage);
• down the sides of earth or earth fill that is up against the building; …
Determination | Case number: 947525 Page 3 of 7
The complainant says the damage is due to a series of leaks from neighbouring properties as
follows:
stormwater drainage pipe from roof of 2 B Avenue not correctly plumbed, meaning every
rainfall event water from this property was being discharged illegally
obvious cracking and lack of drainage in driveway of 2 B Avenue meaning at every rainfall
event water from this property was being discharged illegally
collapsed stormwater and sewage pipes on property at 4 B Avenue, meaning at every
rainfall event water from this property was being discharged illegally
blocked stormwater drains in pipes between B Avenue and B Street, leading to stormwater
escaping from pipes and being discharged through neighbouring properties.
The complainant also says:
the insurer failed to adequate address the source of water being a failure from the
neighbouring property to legally discharge stormwater from the driveway and downpipes
the insurer failed to adequately address the source of water being a major stormwater pipe
collapse from a neighbouring property
the insurer failed to respond to evidence of stormwater drain blockages in surrounding
pipes
the insurer disregarded his engineering report
the huge volume of water hitting his property is an insurable event
the insurer’s engineer refers to inadequate site drai nage and ventilation at the subfloor, but
he has evidence that the drainage is sufficient
it is the sheer volume of continuous water from neighbouring properties that created this
insurance event.
Reports show multiple issues with drainage and ventilation at the property
The insurer’s builder (PB) attended the property on 18 October 2021 and noted water pooling
under the property, moisture damage to flooring, and evidence of movement. PB also noted
the presence of mould.
The insurer’s plumber (NL) attended on 26 October 2021 to identify any leaks. NL says the
damage was consistent with a long-term leak yet found no issues with any drains or pipes at
the complainant’s property. NL carried out a dye test and from this concluded the most likely
source of water ingress was ground water.
The complainant provided a report from an engineering geologist (DM) dated 19 November
2021. DM says:
due to the number of variables that may be involved and considering that most of these
factors are sub surface, it can be very difficult to accurately and definitively determine the
actual source of the excess soil water
it is clearly evident that the water service lines to the two properties uphill of the
complainant’s property are leaking significantly
some water will flow into the kerb and channel, a significant amount will also be flowing
through the subsurface soil, downhill to beneath the complainant’s property
the soil profile in the area consists of an upper sandy layer, and a lower, impermeable clay
layer, and water permeates the sand, before flowing across clay to ward the complainant’s
building
the downpipes to the neighbouring house to the east are likely contributing to the water
ingress under the property
it is likely affected by seasonal conditions also, resulting in very damp to saturated soils in
wetter months and less damp to moist soils in drier months
Determination | Case number: 947525 Page 4 of 7
the elevated level of moisture in the subfloor soil of the original building and associated
problems are likely to have been compounded by the lack of effective sub floor ventilation
beneath this section of the building
it does not accept the assertion raised that run-off from the paving along the south side of
the house is contributing to the water issue to any significant extent, as the paving is
narrow and the significant amount of water collecting in the subfloor area is
disproportionate to the area of paving.
The complainant also provided information from his local council (BD). BD confirmed
stormwater drain blockages at nearby properties.
The complainant also provided a report from a plumber (BZ) dated 31 January 2022 that
attended another property near the complainant’s home. BZ found a stormwater drain was
crushed, creating a large void below ground. This, in turn, significantly undermined a sewer
drain 3 to 3.5 meters below ground. BZ says this subsequently caused the boundary
trap/shaft to completely collapse.
The insurer provided a report from its engineer (CR) dated 6 January 2023. The report states
the damage to the property generally consists of cracking to the internal linings and
degradation of the timber flooring and subfloor. It says the cracks around the door between
the hall and open living area, are located around the intersection between the original
dwelling and the recent extension. It says long-term differential footing movement has been
exacerbated by the different footing systems.
CR inspected the subfloor space and says the timber decay, rot and mould to the bearers,
joists and timber flooring is consistent with long-term deterioration caused by moisture over a
long period.
CR also noted site drainage issues, including:
the ground level of the subfloor in some locations was lower than the external paving,
which allows external groundwater and surface runoff to accumulate within the subfloor
area
the subfloor space was inadequately ventilated, and as a result it has insufficient capacity
to dry out when water does enter
in some locations around the extension, the ground and paving adjacent to the dwelling is
poorly graded as it directs surface water towards the dwelling, rendering it non-compliant
despite there being only 1.0mm of rain at the nearest rain station on the day of inspection
and drainage improvements had been performed to the neighbouring properties, there was
water flowing across the footpath, indicating that the drainage issues are not completely
resolved.
CR says multiple issues were contributing to the pooling of water under the house, including
inadequate stormwater drainage at the neighbouring properties to the South, and inadeq uate
site drainage and subfloor ventilation at the subject property.
CR says had the site drainage and subfloor ventilation been compliant, the damage would not
have occurred as the water would not have accumulated in the subfloor. It also says the
extension works contributed to the problem by eliminating any ventilation present at the East
end of the dwelling and by increasing the height of the paving.
Damage can have more than one cause. When deciding whether the policy responds, I need
to identify what the proximate cause of the damage was. This is a question of fact depending
on the circumstances. The proximate cause is not necessarily the first or last or the sole
cause of the loss. It is the effective, dominant or operative cause of the loss.
Determination | Case number: 947525 Page 5 of 7
Given the presence of mould and rot, it is clear the issue with water pooling under the
property has been occurring for some time. Whilst there may have been excess water being
directed to the property from several sources, there is insufficient information to show this
was due to a one-off escape of liquid event rather than multiple events over time and from
potentially several different sources. I cannot be satisfied a single escape of liquid event was
the sole or proximate cause of the damage.
Rather, I accept the damage claimed to the property would not have occurred if not for issues
with the drainage and ventilation at the property. CR states if the site drainage and subfloor
ventilation had been compliant, the damage would not have occurred, and water would not
have accumulated in the subfloor.
I do not consider the complainant provided sufficient information to dispute this finding. Even
DM accepts the lack of effective sub floor ventilation beneath this section of the building has
compounded the issue. I accept the proximate cause of the damage was the lack of adequate
drainage and ventilation, which led to water pooling under the property over an extended
period and led to the damage now claimed. I also accept this contributed to long-term
differential movement at the property, which led to the cracking present.
Fair for the insurer to decline the claim
The policy covers loss or damage caused by liquid leaking, overflowing or bursting from
several items, including drains, pipes and drainage systems. The complainant states water
was entering underneath the building after every rainfall event. Whilst I accept water from
neighbouring properties likely contributed to the excess water pooling under the
complainant’s property, I do not consider a single escape of liquid event was the proximate
cause of the damage claimed. Rather, I accept the proximate cause of the damage was the
lack of adequate drainage and ventilation.
Even if I was satisfied the complainant had established a claimable loss for damage occurring
from an escape of liquid event, I consider the damage was due to seepage of water into the
soils over an extended period from multiple sources. I accept this was due to the issues with
the drainage and ventilation at the property, not a single escape of liquid event. This means
this exclusion applies in the circumstances to allow the insurer to decline the claim.
2.2 Is the complainant entitled to any further non-financial loss
compensation?
No. I do not consider further non-financial loss compensation is warranted.
Insurer not required to pay additional compensation
The previous determination addressed the complainant’s claim for non -financial loss
compensation for the insurer’s actions on the claim. This determination will therefore only
address any new allegations made after the determination was issued.
The complainant says the insurer caused significant delays in reassessing the claim. He says
the previous AFCA determination outlined time was of the essence in relation to the claim, yet
the insurer has been very slow. He says the insurer took four weeks to engage an engineer,
the engineer attended the property on 25 November 2022, and did not provide the report until
10 January 2023. He also says he had to follow up multiple times for the compensation
payments.
Determination | Case number: 947525 Page 6 of 7
The insurer says it contacted the complainant on 14 November 2022 and agreed to reassess
the claim. It then appointed CR on 15 November 2022 and requested an urgent assessment
of the property. While CR attended the property within 10 days, it did not provide a report to
the insurer until 6 January 2023. However, the information shows the insurer requested
updates from CR during this period. I also note this was close to public holidays and
Christmas shut down period, which should be taken into consideration as delays over this
time tend to be outside an insure r’s control .
I am satisfied the information shows the insurer contacted the complainant within a
reasonable timeframe upon receiving the report.
Whilst I accept this has been an upsetting experience for the complainant, I do not consider
the insurer acted unreasonably or caused undue delays on the claim since the prior
determination was issued. Further compensation for non-financial loss is not warranted.
2.3 Why is the outcome fair?
I empathise with the complainant as he has clearly suffered a loss. However, in
circumstances where the policy does not cover the cause of the damage, it would be unfair to
require the insurer to accept the claim.
Determination | Case number: 947525 Page 7 of 7
3 Supporting information
3.1 The AFCA process
AFCA’s approach is based on fairness
AFCA has determined this complaint based on what is fair in all the circumstances, having
regard to:
the legal principles
applicable industry codes or guidance
good industry practice
previous decisions of AFCA or its predecessor schemes (which are not binding).
The respective parties have completed a full exchange of the relevant information, and each
party has had the opportunity to address any issues raised. We have reviewed and
considered all of the information the parties have provided.
While the parties have raised a number of issues in their submissions, we have restricted this
determination to the issues that are relevant to the outcome.
We assess complaints on available information and circumstances
AFCA is not a court of law. We do not have the power to take or test evidence on oath, or to
require third parties to give evidence.
When we assess complaints, we consider:
available documents
the recollections of the parties
all relevant circumstances.
We give more weight to documents created at the time the events occurred. If there are no
relevant documents, we will decide what most likely occurred based on the available
information.
If there are conflicting recollections and these are evenly weighted, we may find that a claim
cannot be established.