Partial decline of storm damage claim (ground floor, floor tiles) and decline of loss of rent
Text of the determination
Determination
Case number 947232
Financial firm AAI Limited
Determination | Case number: 947232 Page 1 of 10
Case number: 947232 22 January 2024
1 Determination overview
1.1 Complaint
The complainnat lodged a claim with the financial form (insurer) for damage suffered following
a storm event in July 2022.
The insurer partially accepted the claim. It declined cover for damage to the ground floor and
floor tiles due to seepage, gradual deterioration and wear and tear. The insurer declined
cover for loss of rent (LOR) as the damage accepted under the policy terms did not result in
the property being unliveable.
The complainant disagrees and seeks cover for the disputed damage.
1.2 Issues and key findings
Is the insurer entitled to decline the ground floor damage?
No. The insurer is to cover the damage to the plasterboard, skirting boards and internal
timber framing in the kitchen, lounge and study of the ground floor. The insurer can decline
cover for damage to the floor tiles.
Is the insurer entitled to decline cover for loss of rent (LOR)?
No. The property would be unliveable during the repair of the accepted ground floor damage.
The insurer is required to settle the LOR as set out in section 2.2 of this determination.
Why is the outcome fair?
The complainant has established the ground floor was damaged from the storm event. I am
satisfied the damage to the ground floor is covered under the policy and on balance, would
result in the property being unliveable during a repair process. As the insurer has not shown
this damage is excluded, it would be unfair for the insurer to decline cover for it. It is also fair
that the insurer to pay the appropriate LOR for the time taken to repair this damage.
1.3 Determination
This determination is partially in favour of the complainant. Within 14 days of notification of
the complainant accepting of this determination the insurer is to:
cash settle the claim for the repairs to the plasterboard, skirting boards and internal timber
framing of the kitchen, lounge and study of the ground floor based on the invoices/receipts
incurred by the complainant for the repairs or if it disputes the invoices,
appoint two independent builders to provide relevant quotes for completion of those repairs
plus an estimated repair period. The insurer may then cash settle the claim based on the
higher of the quotes plus a 15% uplift to cover contingencies including the transfer of risk.
cash settle the claim for loss or rent based on the estimated repair period as calculated
If it has not already done so, cash settle the claim for the damage to the second floor as
per its offer of $2,938.66
Determination | Case number: 947232 Page 2 of 10
2 Reasons for determination
2.1 Is the insurer entitled to decline the ground floor damage?
No. The insurer is to cover the damage to the plasterboard, skirting boards and internal timer
framing in the kitchen, lounge and study of the ground floor. I am satisfied the insurer can
decline cover for damage to the floor tiles.
Complainant has initial onus to prove claim falls within terms of policy.
It is established insurance law that an insured has the initial onus to establish on the balance
of probabilities (that is more likely than not) that the loss or damage claimed falls within the
terms of the policy.
The complainant’s Strata policy provides cover for accidental loss or damage to the building
and common contents as a result of an incident during the period of insurance including
incidents like flood, fire (including bushfire), escape of liquid and impact.
Incident is defined as a single event, accident or occurrence which you did not intend or
expect to happen that is not excluded by your policy. A series of incidents attributable to one
source of originating cause is deemed to be the one incident.
The relevant particulars of cover are set out in section 3.2 of this determination.
Circumstances of claim
There is no dispute that water entered the property following a heavy storm in July
2022.
The complainant provided a report from his builder DC dated 4 May 2023 confirming water
entered the property from flash flooding. DC reported that due to flash flooding water runs
down from vacant land at the rear of the property and enter the rear of the complainant’s
property. DC noted:
the property falls from south to north, directing the flash flooding to the north side and then
falling in a westly direction,
the flash flooding falls down the northern side in a westly direction causing water entering
through the side door on the northern side entering the kitchen and living area causing
resulting damage from flash flooding.
DC later confirmed that in his opinion the water was coming from the side door when there
was flash flooding. The damage was new and not due to an ongoing leak.
The insurer ’ s engineer CR reported on 16 June 2023 that the event was considered a ‘very
frequent’ rainfall event for 5-minute duration over a period of 7 days. CR says water has been
entering the property for an extended period based on the frequency of the event.
The insurer accepts the storm contributed to the damage claimed. The insurer has accepted
cover for the water staining damage to the upstairs ceiling.
I accept based on the information exchanged that the complainant has established the claim
falls within the terms of the policy. To the extent the insurer seeks to limit its liability the
Determination | Case number: 947232 Page 3 of 10
insurer must show, on balance, a policy exclusion applies, or it is otherwise entitled to decline
the claim.
Policy excludes liability for damage caused by seepage, wear and tear and
gradual deterioration
The insurer, relying largely on reports from CR and builder, SG, says the damage to the
ground floor was contributed to by seepage of water, wear and tear and gradual deterioration.
Such damage is excluded under the terms of the policy. The insurer says the damage at the
property is not the result of a single insured event or occurrence covered by the policy.
Insurer ’ s reports differ as to cause of damage
While there is no dispute there was damage caused by the storm, the expert reports differ as
to the extent of that damage.
CR’s report says damage was a result of construction/maintenance issues from inadequate
drainage and weatherproofing of the subfloor walls. CR says this is substantiated by the
rainfall analysis, which shows that the event was considered a ‘very frequent’ rainfall event for
5-minute durations.CR says that water has been entering the property for an extended period.
SG noted the home is built into the hill-side which slopes steeply from rear to front. A council
park at the rear would also have stormwater run-off down the hill into the rear yard of the
insured's property. The property has some drain grates and sloping paths to direct water
down sides of home, but the rear path is built up to brick vents level, which can allow water
entry.
SG considered due to ground saturation and run-off, stormwater is entering the sub-floor area
of the home and seeping through foundations and earth and making its way through the
masonry retaining walls under the home and then into the lower ground rooms through the
lower plasterboard walls and under skirting boards.
SG noted a removed a section of wall lining exposed a masonry wall in behind the
stud/plasterboard wall which, has either failed or non-existent waterproofing. SG says this
allowed water seepage through the masonry walls and through the lower plasterboard areas
from the sub-floor foundations.
SG identified damage to the lower plasterboard walls and skirting boards water damaged in
the kitchen, lounge and study room. SG considered the complainant will need to rectify the
water ingress causes and issues prior to any internal works being started and we suggest, if
claim approved, the resultant damage repairs be cash settled.
Further details of the expert reports are outlined in section 3.3.
Insurer liable for damage to the plasterboard walls and skirting boards in the
ground floor area
It is not in dispute there was high rainfall in the complainant’s local area around July 2022.
CR’s report says the rain event was ‘very frequent’ rainfall for 5-minute durations in the
periods from 1 July 2022 to 7 July 2022. I am satisfied that represents a ‘storm’ for the
purposes of the policy.
The insurer relies on the ‘Seepage of water’ exclusion to decline this part of the claim . The
policy excludes damage caused by:
Determination | Case number: 947232 Page 4 of 10
“ water seeping or running:
through the earth (hydrostatic water seepage);
down the sides of earth or earth fill that is up against the building;
down the sides, against the sides or underneath swimming pools, spas or tanks;
against or through retaining walls;
from agricultural or overflow pipes.
The reports indicate the water entering the subfloor area leading to the damage to the
plasterboard and skirting boards was most likely surface storm water runoff due to the slope
of the land rather than water seeping through the earth or against or through retaining walls.
CR reported evidence of efflorescence and rising damp along the base of the brick walls in
the subfloor space, which is long-term and not related to the event. However, CR attended
the property nearly a year after the storm event.
There is no evidence there was any water damage to the ground floor area of the property
prior to the storm event. The complainant provided a pre-purchase building report which did
not note any significant water damage.
I am satisfied, on balance, the damage to the plasterboards and skirting boards in the ground
floor kitchen, lounge and study room first presented after the storm event. I do not consider
this was a gradual process over time. I am satisfied the insurer is liable to meet the costs of
repairing the damage to the plasterboards and skirting boards in the ground floor kitchen,
lounge and study room.
The complainant has completed repairs to the plasterboard and skirting board in order to
have the property relet. According to the complainant the repairs also required repair of water
damaged timber framing. I accept such damage should be covered under the terms of the
policy.
There are maintenance issues at the property identified in the pre-purchase inspection report
and in the reports from CR and SG. These issues are the responsibility of the complainant to
repair not the insurer.
SG suggests that the complainant should consult with drainage experts to keep water out of
sub-floor area and waterproof sub-floor masonry walls to stop any water ingress. The
complainant has had DC complete some drainage works. It is unclear whether any
waterproofing works have been completed to the subfloor masonry wall.
No evidence floor tiles damaged by incident
The complainant claims cracked and drummy tiles on the ground floor were damaged in the
event. The complainant says the tiles were in good condition prior to water entering the
downstairs area. He says the tiles started becoming drummy after the storm event.
Limited evidence has been provided to support the complainant’s claim for this damage. The
pre- inspection report refers to the condition of the interior as ‘average’. There are no
photographs of the tiles or any comments as to the condition of the tiles.
The photographs in SG ’s report show the tiles have hairline cracks and are chipped in certain
areas. This is not consistent with damage caused by storm water inundation. SG confirmed
the tiles are drummy, but considered it likely due to age, wear & tear as several cracked and
broken tiles were evident. The complainant has not provided any information to dispute this.
I am not satisfied given the available information that the complainant has established his
claim for damage to the floor tiles falls within the terms of the policy.
Determination | Case number: 947232 Page 5 of 10
I am satisfied given the limited available information that most likely the damage to the floor
tiles was due to wear and tear and gradual deterioration. I am satisfied the insurer is entitled
to rely on the terms of the policy to deny liability for damage to the floor tiles.
Insurer is liable to increase settlement offer
The insurer has offered to settle the complainant ’ s claim for damage to the second-floor
ceiling and bedroom for $2,938.66. I am satisfied this is a fair offer given the information
provided.
I am satisfied the insurer should increase the cash settlement offer to include the cost to
complete the repair to the damage to the ground floor. The complainant has completed these
repairs. The complainant must provide the insurer with the details of the trades used and
invoices/receipts for the repair of the plasterboard, skirting boards and internal timber framing
of the kitchen, lounge and study of the ground floor plus the time taken to complete the
repairs. The insurer can then either accept the cost of the repairs and cash settle the claim. If
it disputes the invoices, then it must appoint two independent builders to assess the cost of
repairs and cash settle the claim based on the higher assessment plus a 15% uplift for
contingencies.
Accordingly, I determine that within 14 days of the complainant’s acceptance of this
determination the insurer is to:
cash settle the claim for the repairs to the plasterboard, skirting boards and internal timber
framing of the kitchen, lounge and study of the ground floor based on the invoices/receipts
incurred by the complainant for the repairs or if it disputes the repair cost,
appoint two independent builders to provide quotes for completion of those repairs plus an
estimated repair period. The insurer may then cash settle the claim based on the higher of
the quotes plus a 15% uplift to cover contingencies including the transfer of risk.
If it has not already done so, cash settle the claim for the damage to the second floor as
per its offer of $2,938.66
If the parties are unable to agree on the quantum, the complainant can lodge a new complaint
at AFCA for a decision on this point.
2.2 Is the insurer entitled to decline cover for loss of rent
(LOR)?
No. I am satisfied the damage to the ground floor which is covered under the policy would on
balance, deem the property unliveable during the repair. The insurer is required to settle the
appropriate LOR for the time it will take to the repair the damage at the property.
Loss of rent is covered under the policy
The complainant seeks loss of rent (LOR). The complainant says the property cannot be re-
let in its current condition until the repairs are completed.
The insurer says the claim for LOR is expressly excluded from cover under the policy terms.
The insurer says LOR is not payable as:
the property is considered liveable by its assessor
the complainant’s tenant still had an obligation to pay the rent since they broke the lease
and are in breach of the rental contract
Determination | Case number: 947232 Page 6 of 10
The policy covers the weekly rental amount for the time it would take to repair the building or
re-leased in the instance the building cannot be lived in or re-leased following an incident.
I am satisfied there is additional damage to the ground floor which is covered under the
policy. On balance, this would result in the property being unliveable during the repair
process. This is because the damage is spread across the entire ground floor including the
kitchen and this would be inaccessible during the repairs.
The complainant has completed the repairs to the ground floor and should be able to provide
to the insurer a brief statement from the repairer/s as to how long it took to complete those
repairs.
The insurer can then either rely on this estimate or:
obtain an estimate of the time to the repair the damage at the property from the
complainant’s repairer .
calculate the loss of rent payable for the period to complete the repairs and
cash settle the claim based on the loss or rent as calculated plus a 15% allowance for
contingencies.
2.3 Why is the outcome fair?
The complainant has established the ground floor was damaged from the storm event. I am
satisfied the damage to the ground floor is covered under the policy and on balance, would
result in the property being unliveable while being repaired.
As the insurer has not shown this damage is excluded, it would be unfair for the insurer to
decline cover for it. Given this, it is also fair that the insurer pays the appropriate LOR for the
time it took to the repair the damage at the property.
Determination | Case number: 947232 Page 7 of 10
3 Supporting information
3.1 The AFCA process
AFCA’s approach is based on fairness
AFCA has determined this complaint based on what is fair in all the circumstances, having
regard to:
the legal principles
applicable industry codes or guidance
good industry practice
previous decisions of AFCA or its predecessor schemes (which are not binding).
The respective parties have completed a full exchange of the relevant information, and each
party has had the opportunity to address any issues raised. We have reviewed and
considered all the information the parties have provided.
While the parties have raised several issues in their submissions, we have restricted this
determination to the issues that are relevant to the outcome.
We assess complaints on available information and circumstances
AFCA is not a court of law. We do not have the power to take or test evidence on oath, or to
require third parties to give evidence.
When we assess complaints, we consider:
available documents
the recollections of the parties
all relevant circumstances.
We give more weight to documents created at the time the events occurred. If there are no
relevant documents, we will decide what most likely occurred based on the available
information.
If there are conflicting recollections and these are evenly weighted, we may find that a claim
cannot be established.
3.2 Relevant policy terms
Date Action
WHAT WE COVER – THE
DETAILS
WHAT YOU ARE COVERED
FOR – ACCIDENTAL LOSS
OR
DAMAGE
Accidental loss or damage to the building and common
contents
Building cover
We cover the building at the ins ured address for:
accidental loss or damage caused by an incident;
loss or damage caus ed by the incidents described on pages 37 to
45,
in the period of insurance provided that the loss or damage is not
excluded, and
subject to the conditions of your policy.
Determination | Case number: 947232 Page 8 of 10
THINGS WE DON’T COVER
There are some things we
don’t cover under
your policy and we want to be
upfront about
this.
Loss or damage to, or caused by, connected with or arising from, or
liability caused by, connected with or arising from:
Seepage of water
water seeping or running:
through the eart h (hydrostatic water seepage);
down the sides of earth or eart h fill that is up against the building;
down the sides, against the sides or underneath swimming pools,
spas or tanks;
ag ainst or through retaining walls;from agricultural or overflow
pipes.
Wear, tear and gradual deterioration
any part of the building or common contents that has wear, tear,
rust, fading, rising damp, corrosion, rot, action of light, atmospheric
or climatic conditions or gradual deterioration such as, but not
limited to:
tiles and their adhesive or grouting breaking down;
weat hering of roof tiles or roof ridge capping;
gradual weathering and breakdown of bricks, mortar or concrete
WORDS WITH SPECIAL
MEANINGS
Accidental loss or damage
means loss or damage that occurs without intent and includes loss
or damage from the incidents shown on pages 37 to 45.
Incident
means a single event, accident or occurrence which you did not
intend or expect to happen that is not excluded by your policy. A
series of incidents attributable to one source of originating cause is
deemed to be the one incident.
Storm
means a storm, cyclone or severe atmospheric disturbance. It can
be accompanied by strong
winds, rain, light ning, hail, snow or dust.
ADDITIONAL COVERS THAT
COME WITH YOUR POLICY
Loss of rent following an insured incident
If following an incident covered by this policy a tenanted unit in the
building cannot be lived in or cannot be re - leased, we will pay the
unit owner the weekly rental amount for the time it should take to
repair or rebuild the building or unit so that it
can be lived in or re - leased.
We will engage a builder to determine how long the repairs or
rebuild should take. For example, if you have a claim for fire damage
and our builder determines that the repairs should take 4 weeks to
complete, the unit owner may be entitled to 4 weeks of loss of rent
under this additional cover.
We don’t cover
Loss of rent:
if the tenant still has an obligation t o pay the rent to the unit owner;
Determination | Case number: 947232 Page 9 of 10
if the tenant has not paid rent or vacated the unit with rent owing;
3.3 Expert reports
Record Key points
Financial firm’s expert ( CR )
Engineer r eport
16 - 05 - 2023
There was newly installed drainage (following the subject event)
incorporating new surface strip drains and drainage pits.
T he northern entrance into the Lower Level was located at a lower
finished floor level than the external area north of the building.
There is no adequate means of directing surface water awa y from
this door opening.
E vidence of efflorescence and rising damp along the base of the
brick walls in the subfloor space.
No evidence of drainage in the subfloor space.
Observed an opening in the subfloor space, adjacent to the
Kitchen, which led direct ly to the internal timber framing of the
lower Level.
No drainage or waterproofing was observed in this location.
The highest observed rainfall for the 5 - minute duration was 7.4mm
on the 2nd of July 2022.
The damage was a result of construction/maintenance issues
pertaining to inadequate drainage and weatherproofing of the
subfloor walls.
This is corroborated by the rainfall analysis, showing that the
subject event was considered a ‘very frequent’ rainfall ev ent for 5 -
minute durations.
Based on the frequency of this event, it is my opinion that water
has been ent ering the property for an extended period of time.
The lack of adequat e drainage provisions along the brick subfloor
retaining walls contravenes the p rovisions outlined in the NSW
Local Ordinance 1973, relevant at the time of construction .
Determination | Case number: 947232 Page 10 of 10
Record Key points
Financial firm’s expert ( SB )
Builders r eport
28 - 11 - 2022
Lower plasterboard wall lining areas and skirting boards in kitchen,
that separate sub - floor foundations fro m below ground level
rooms, are water damaged from seepage through sub - floor area.
The same lower wall damage are noted to the rear wall areas of
the lounge r oom and adjacent study which is from seepage
through the lower walls.
The insured advised the floor tiles in these rooms is now 'drummy'
(lost adhesion) from the water ingress.
The tiles are drummy, but likely due to age, wear & tear as a
number of cracked and brok en tiles was evident, (see photos).
The insured's builder re move d a section of damaged wall lining
which exposed a masonry wall in behind the stud/plasterboard wall
which, has either a failed or non - existent waterproofing, which is
allowing water seepage through the masonry walls and through
the lower plasterboard areas from the sub - floor foundations.
Due to ground saturation and run - off, stormwater is entering the
sub - floor area of the home and seeping through foundations and
earth and maki ng its way through the masonry retaining walls
under the home and then into the lower ground rooms through the
lower plasterboard walls and under skirting boards.
Seepage of stormwater through ret aining walls, sub - floor areas of
the home - insufficient dra inage to keep water out from sub - floor
area.
Complainant’s expert ( DC )
Builder’s r eport
04 - 05 - 2023
Due to flash flooding wat er runs down from vacant land at the rear
of the property and enter the rear
The property directing the flash flooding to the nor t h side and then
falling in a westly direction .
The flash flooding falls down the northern side in a westly direction
causing water entering through the side door on the northern side
entering into the kitchen and living area causing resulting damage
from flas h flooding.