Home / Suncorp Group / Determination 946672
Determination 946672
Insurer declined the roof rectification claim as excluded and cash settled the internal storm water damage
Summary
The complainant claimed for storm damage to her home, and the insurer accepted internal water damage but declined roof works as excluded. AFCA upheld the roof decline but required a cash settlement of internal repairs increased by a 20% contingency.
The complainant did not show the roof issues were caused by an insured event and they fell within the exclusions for poor condition and gradual deterioration, while the cash settlement for internal repairs warranted a contingency uplift.
Issues
- Claim denial primary · not upheld
“The identified issues with the roof are not covered by the policy but rather excluded; fair for the insurer to decline the claim for the roof.”
- Claim amount dispute secondary · upheld
“I consider it is appropriate that the insurer increases its offer by 20% to factor in any contingencies.”
- Product terms interpretation secondary · not upheld
“Section 46 of the Act does not apply as the exclusions are blanket exclusions without reference to a point in time.”
Subjects and remedies
home or building damagenatural disasterpay claim
Text of the determination
Determination
Case number 946672
Financial firm AAI Limited
Determination | Case number: 946672 Page 1 of 4
Case number: 946672 10 August 2023
1 Determination overview
1.1 Complaint
The complainant lodged a claim with the financial firm (insurer) under her home building
insurance policy for storm damage to her property.
The insurer accepted the internal water damage. However, it denied to cover the works
required to the roof. The insurer says the damage to the roof was not caused by an insured
event but rather factors which are excluded under the policy.
The complainant disagrees and says she was not aware of these issues.
1.2 Issues and key findings
Is the insurer entitled to deny the claim for the roof?
Yes. The identified issues with the roof are not covered by the policy but rather excluded.
Why is the outcome fair?
The exchanged information shows the issues with the roof were not caused by one of the
listed insured events. This means the complainant has not met her onus to show the damage
is of a type covered by the policy. It is therefore fair for the insurer to decline the claim for the
roof.
1.3 Determination
This determination is substantially in favour of the insurer.
Within 14 days of receiving notification the complainant accepts this determination, the
insurer is required to pay the complainant $2,320.93. This is calculated as:
$2,767.44 for the internal repairs
$553.49 being 20% contingency
less $1,000 being the policy excess.
Determination | Case number: 946672 Page 2 of 4
2 Reasons for determination
2.1 Is the insurer entitled to deny the claim for the roof?
Yes. The identified issues with the roof are not covered by the policy but rather excluded.
The complainant has the onus to establish a claimable loss
When making a claim, an insured party has the onus of establishing they suffered a loss of a
type for which their insurance policy provides cover. The insured party must establish this on
the balance of probabilities (i.e. that it is more likely than not).
If a claimable loss is established, the insurer has the onus of establishing, on the balance of
probabilities, the application of any exclusion it relies on to reduce its liability.
The complainant’s policy provides cover for loss or damage to the building caused by several
insured events including a storm. It is not in dispute water entered the property and caused
internal water damage. The insurer has accepted the internal water damage and offered the
complainant a cash settlement of $1,767.44 ($2,767.44 less the policy excess of $1,000).
The complainant disagrees with the settlement and seeks for the insurer to:
undertake the repairs rather than cash settle the claim
rectify the issues with the roof.
Roof requires rectification due to non-compliant renovations
The insurer’s builder (HR) says there is no evidence of storm damage to the roof. HR notes
corrugated roof sheets being installed on top of the original roof sheets. HR says the previous
owner of the property carried out renovations to the front section of the house.
I note HR findings are consistent with the complainant’s builder (NB). NB provided a quote to
rectify the roof issues totalling $26,450. NB says the roof has compliance issues with the
current regulations due to work carried out years ago. NB says the following sections of the
roof are non-compliant:
guttering and box guttering
rain heads
overflow system
downpipes.
I accept the exchanged material does not establish that these issues were caused by an
insured event under the policy. Further, I consider these issues to be maintenance related
rather than an insurable loss.
The insurer is not liable for the roof rectification works
I have carefully considered the exchanged materials and the parties’ arguments . I accept the
complainant has not established a claimable loss for the roof damage.
The policy clearly and unequivocally excludes loss or damage caused by, connected with or
arising from any part of the building not being in good condition. One of the examples the
policy provides is a leaking roof during rain.
Further, the policy excludes wear, tear and gradual deterioration. I accept the roof requires
substantial rectifications to address the noncompliance issue to mitigate further damage.
However, this cost and the nature of damage clearly fall outside the scope of the policy.
Determination | Case number: 946672 Page 3 of 4
I am satisfied that the insurer is entitled to deny the rectification costs to the roof.
Section 46 does not assist the complainant
The complainant says she was not aware of the defects and workmanship issues with the
roof at the time of purchasing the property. She therefore believes section 46 of the Insurance
Contracts Act 1984 (Cth) (the Act) should assist her. I disagree.
The complainant has not discharged her initial onus that the loss was caused by an insured
event under the policy. However, for completion I will provide the following comments.
Once the onus shifts to the insurer (which is not the case here), this section of the Act
prevents an insurer from denying a claim on the basis of a policy exclusion which operates by
reference to a defect in a thing which existed before the policy was taken out, in
circumstances where the insured was not aware (and a reasonable person in the
circumstances could not be expected to be aware) of the defect at the time the policy was
taken out.
As the relevant exc lusions in the complainant’s policy are blanket exclusions without
reference to a point in time, then section 46 of the Act does not apply.
Section 46 of the Act is therefore not relevant to the decision to deny the claim. The exclusion
for gradual deterio ration does not require or rely on the complainant’s knowledge of the
deterioration. Further, the insurer is not seeking to rely on any defects exclusions. I am
satisfied section 46 has no relevance to this situation.
Insurer can cash settle internal repairs plus 20% contingency
The insurer says it is unable to complete and warrant the internal repairs due to condition of
the roof.
The complainant says the insurer is required to undertake the repairs given it authorised the
temporary repairs. I disagree.
I accept it was reasonable and appropriate for the insurer to take temporary measures to
mitigate further damage. This does not automatically mean the insurer is required to complete
permanent repairs.
The policy states when there is damage to the build ing and a member of the insurer’s supplier
network is unable to complete the repairs, the insurer will pay the insured the reasonable
assessed amount.
The insurer provided a liability quote for the plastering and painting of the internal damage
totalling $2,767.44. The complainant has not provided any quotes for the internal damage.
I do not consider the insurer’s quote to be actionable as the builder is not prepared to
undertake the repairs. I consider it is appropriate that the insurer increases its offer by 20% to
factor in any contingencies. An actionable quote should reflect the transfer of risk.
Within 14 days of receiving notification the complainant accepts this determination, the
insurer is required to pay the complainant $2,320.93. This is calculated as:
$2,767.44 for the internal repairs
$553.49 being 20% contingency
less $1,000 being the policy excess.
her initial onus to show the loss is covered by the policy. It is therefore fair for the insurer to decline the
claim for the roof.
Determination | Case number: 946672 Page 4 of 4
3 Supporting information
3.1 The AFCA process
AFCA’s approach is based on fairness
AFCA has determined this complaint based on what is fair in all the circumstances, having
regard to:
the legal principles
applicable industry codes or guidance
good industry practice
previous decisions of AFCA or its predecessor schemes (which are not binding).
The respective parties have completed a full exchange of the relevant information, and each
party has had the opportunity to address any issues raised. We have reviewed and
considered all the information the parties have provided.
While the parties have raised several issues in their submissions, we have restricted this
determination to the issues that are relevant to the outcome.
We assess complaints on available information and circumstances
AFCA is not a court of law. We do not have the power to take or test evidence on oath, or to
require third parties to give evidence.
When we assess complaints, we consider:
available documents
the recollections of the parties
all relevant circumstances.
We give more weight to documents created at the time the events occurred. If there are no
relevant documents, we will decide what most likely occurred based on the available
information.
If there are conflicting recollections and these are evenly weighted, we may find that a claim
cannot be established.
Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.