Dispute over scope of works and cash settlement amount for accepted storm damage claim, plus non-financial loss from delay
Text of the determination
Determination
Case number 944622
Financial firm Auto & General Services Pty Ltd
Determination | Case number: 944622 Page 1 of 8
Case number: 944622 30 November 2023
1 Determination overview
1.1 Complaint
The complainants, Mr and Mrs N, hold a Home and Contents Insurance Policy issued by the
financial firm (the insurer). On 27 September 2022, the complainants lodged a claim on this
policy for storm damage to the insured premises.
The insurer accepted the claim, but a dispute has subsequently arisen in respect of two
concerns raised by the complainants:
the Scope of Works (SOW) produced by the insurer’s contractors, Company T, is
inadequate as they have received quotes for the costs of rectification which are
significantly higher from their contractors, Company C and
the insurer has caused delays in the rectification of mould in the premises which has
caused Mrs N non-financial loss through exacerbating pre-existing medical conditions.
The complainants seek to have the insurer cash settle the claim for the amount of the
Company C quote and pay $5,000 in non-financial loss.
The insurer says its contractors are willing to complete the repairs or, alternately it will cash
settle the claim on the basis of its actionable SOW from Company T.
1.2 Issues and key findings
Is the insurer entitled to settle on the basis of its SOW?
Yes. I am not satisfied the Company C SOW is an appropriate reflection of the works required
to rectify the damage accepted as having been caused by the insured event. The Company T
SOW is actionable and, in the event the complainants maintain their request to be cash
settled, this is an appropriate basis on which to do so.
Are the complainants entitled to compensation?
Yes. The insurer has made a reasonable offer to compensate the complainants for the
additional loss (direct and non-financial) they have suffered.
Why is the outcome fair?
The parties agreed to an insurance policy to cover claims for damages and the insurer has
accepted both the relevant claim and the complainants’ relevant associated costs. I am
satisfied the insurer is willing to perform its obligations under the insurance policy and may do
so either by completing the works, or cash settling on the basis of the Company T SOW and
its undertakings in respect to the complainants’ non -financial loss and costs of pursuing the
complaint.
Determination | Case number: 944622 Page 2 of 8
1.3 Determination
This determination is partly in favour of the complainants.
Within 14 days of the date the insurer is advised the complainants have accepted this
determination, the insurer must:
re-state the offer to instruct Company T to complete the repair works at the insurer’s
direction and make this offer available to the complainants for consideration for at least 7
days
> if the offer is accepted, take all reasonable steps to resolve the claim on this basis in
accordance with the policy
> if the offer is rejected and the complainants maintain their position they wish to be cash
settled, pay to the complainants:
‒ $59,061.20 for the reinstatement and repair work plus
‒ $11,812.24 as a 20% uplift on this amount and
‒ $12,000.00 for temporary accommodation costs
pay the complainants:
> $7,837.50 to reimburse the complainants’ incurred cost for getting t heir own report and
> $2,500.00 to compensate the complainants stress and inconvenience.
Determination | Case number: 944622 Page 3 of 8
2 Reasons for determination
2.1 Is the insurer entitled to settle on the basis of its SOW?
Yes. I am not satisfied the Company C SOW is an appropriate reflection of the works required
to rectify the damage accepted as having been caused by the insured event. The Company T
SOW is actionable and, in the event the complainants maintain their request to be cash
settled, this is an appropriate basis on which to do so.
The insurer has a discretion about how to settle a claim
The policy allows the insurer to settle a claim by:
repairing the damage; or
paying the insured the reasonable amount it would cost to repair the property.
The insurer must exercise this discretion fairly, reasonably and consistent with the principles
of utmost good faith.
The insurer says it is prepared to complete the works and provide the complainants with the
lifetime guarantee. However, the insurer also says there were some maintenance issues in
the complainants’ property which needed to be addressed before doing so. It says once the
complainants address and fix the maintenance issues, it is willing to authorise the repairs for
the complainants.
It also says it is prepared to cash settle the complainants.
The complainants have requested a cash settlement
The complainants did not dispute the maintenance issues and says they have fixed them.
Nevertheless, the complainants have requested a cash settlement as they want to use their
own trades, Company C, due to issues they have had with the insurer’s builder, Company T,
during the claim process.
Company C has quoted for the relevant SOW as follows:
$4,459 for preliminaries
$26,000 for Project Manager/Construction Manager/Supervisor and Site Labour
$29,160 for joinery removal and reinstallation
$31,680 for flooring removal and repairs
$12,000 for mould cleaning preparation
$3,548 for mould treatment (including plant hire)
$3,250 for contract cleaning on completion
$7,100 for furniture removal and reinstatement
$3,120 for furniture storage
$6,985 for temporary accommodation costs and
$28,006 for a 20% builder’s margin on the $140,032 cost (inclusive of GST) on the above
I note Company C applied GST again to the uplifted total of $168,038 for a total quote of
$184,843.
The complainants have asked to be cash settled based on the Company C Scope of Works
as they say that is what it will cost them to complete the repairs.
Determination | Case number: 944622 Page 4 of 8
The insurer has agreed to cash settle the claim
The insurer has agreed to cash settle the claim, as requested.
However, it is only willing to settle on the basis of the Company T SOW, along with a 20%
uplift to cover any contingencies as the insurer says the Company C SOW is excessive.
In its letter dated 14 June 2023, the insurer noted $20,798.06 had already been cash settled
and paid for an air conditioner and contents, and put forward a final settlement offer as
follows:
$47,603.60 for repair SOW
$11,457.60 for restoration
$11,815.84 for a 20% uplift for contingencies relating to the above
$3,471.94 for make safes
$8,212.25 for fees and
$12,000 for 8 weeks’ temporary accommodation.
This offer equates to $59,061.20 for the necessary repair and restoration SOW, plus the 20%
contingency uplift.
The complainants rely on the Company C SOW
While I am satisfied both parties’ SOWs are generally consistent with each other, with
differences primarily related to the amount for each item.
However, the complainants say the Company T SOW provides insufficient:
project management allowance
labour costs and
furniture storage costs.
The complainants say a full-time supervisor is needed to make sure:
the property is properly opened and locked on a daily basis
the security and safety of their belongings while the builder conducts the repairs and
the quality of workmanship.
The insurer challenges the complainants’ position
While it has taken issue with Company C’s quote more generally, in respect of the
complainants’ specific issues raised, the insurer relevantly says:
supervision is not required throughout the whole duration of the repairs and a weekly
check in on site is sufficient, with the supervisor also coordinating the project management
remotely
the Company C labour costs are overstated, and Company T is willing to undertake the
works on the basis of its off-market costs as quoted and
Company T does not believe it is necessary for four men to take 20 hours to remove and
reinstate furniture during the works. It has allowed for 2 men to remove and reinstall
furniture instead.
The insurer’s quote is actionable
The insurer has confirmed it is willing to authorise Company T to proceed with the repairs
based on its SOW.
Determination | Case number: 944622 Page 5 of 8
Having reviewed the breakdown of the Company C SOW, I am not satisfied the detailed line
items are all applicable to, or appropriate in the context of, this claim. This is because the
Company C SOW included:
public liability insurance, car insurance and worker’s compensation insurance without any
explanation of why these insurances are attributable to this specific job and should not be
considered part of the builder’s general operation al costs
160 hours of supervision for the four-week timeframe quoted. This is an assessment the
work requires a full-time supervisor on site throughout the entirety of the repairs
an additional allowance of 80 hours for Lead Hand labour despite this falling within the
Supervisor’s functions
4 men, full time, for 5 days (160 hours) to prepare the insured premises for the mould
treatment
4 men, full time, for 3 days (96 hours) for the contract clean on completion, although this
was nevertheless entered and costed at 10 hours at $85 per hour, plus $1,250 to remove
rubbish bins
unexplained inconsistencies in the works quoted, for example:
> the granny flat flooring (25m 2 ) was quoted at:
‒ $9,140 for take up disposal
‒ $4,150 for sanding and sealing, yet
> the kitchen flooring (22m 2 ) was quoted at:
‒ $4,150 for take up disposal
‒ $14,240 for sanding and sealing and
a double allowance for GST (as noted above) and
costs for which the complainant had already been cash settled (air conditioning repairs,
blinds and curtains)
On this basis, I am not satisfied the Company T SOW is a reliable estimate of the actual costs
of the works which have been accepted.
In particular, I agree with the insurer that full time supervision is unnecessary. Any builder
who conducts the repairs should be sufficiently qualified, experienced, and responsible to
ensure the quality of the repairs and the security of the site.
It is fair for the insurer to allow the complainants to reconsider
On the basis of the above analysis, I am satisfied the insurer is entitled to cash settle the
claim on the basis of the Company T SOW as proposed.
However, I acknowledge the complainants’ preferred builder has provided a quote which is
substantially higher than this amount for essentially the same work.
In these circumstances, I am satisfied it would be fair, if the complainant accepts this
determination, for the insurer to reinstate its offer to have Company T conduct the repairs,
rather than cash settle the claim.
2.2 Are the complainants entitled to compensation?
Yes. The insurer has made a reasonable offer to compensate the complainants for the
additional loss (direct and non-financial) they have suffered.
Determination | Case number: 944622 Page 6 of 8
AFCA may award non-financial loss compensation
AFCA may award, in certain circumstances, non-financial loss compensation up to a
particular limit. For this complaint, the limit is $5,400.
However, AFCA will only award compensation for non-financial loss where there has been an
unusual amount of physical inconvenience, time taken to resolve a situation, or interference
with the complainant’s expectation of en joyment or peace of mind.
In assessing whether to award compensation, AFCA expects the complainant to be
moderately robust, bear the normal degree of inconvenience experienced when a problem
occurs, and take reasonable steps to minimise the inconvenience suffered.
The complainants seek non-financial loss
The complainants are a husband and wife, Mr and Mrs N. Mrs N suffers from chronic asthma
and during the time taken to resolve this claim, contracted pneumonia and COVID-19.
She says the symptoms of these conditions were exacerbated by the mould and lack of
proper climate control in the home while the claim was being assessed. She says she
endured four weeks of sick leave and needed to also take 3 weeks of annual leave to both
recover and engage with the claims process.
She seeks $5,000 in non-financial loss as a result.
The insurer’s offer is fair in all the circumstances
Despite the policy expressly excluding coverage for consequential or indirect loss,
inconvenience or expense, including loss of profit or income, the insurer has offered:
$2,500 in non- financial loss for the complainants’ claims handling experience and
to cover the reasonable costs of the complainant obtaining expert reports.
In the circumstances of this complaint, and with regard to AFCA ’s normal approach to
awarding non-financial loss, I am satisfied $2,500 is a fair offer for the stress and
inconvenience the complainants have experienced due to the delays caused by the insurer.
In assessing this, I am also satisfied the complainants have contributed to those delays.
With respect to the expert reports, the complainants have said the costs of obtaining their
independent reports were $17,737.50. The insurer has said it is willing to reimburse
$7,837.50 as the additional activities of the independent expert were not related to obtaining
the report. It relevantly said the invoices presented included project management fees and
general communications between the complainants’ builder and the complainants and these
items had no bearing on the cost of obtaining the report.
I am satisfied this is the case. I also note AFCA is generally capped at awarding $5,400 for
professional costs of pursuing a complaint except in special circumstances.
As a result, I am satisfied the insurer’s offer of the $7, 837.50 which can be evidenced as
being related to obtaining the report is reasonable in the circumstances.
2.3 Why is the outcome fair?
The parties agreed to an insurance policy to cover claims for damages and the insurer has
accepted both the relevant claim and the complainants’ relevant associated costs. I am
satisfied the insurer is willing to perform its obligations under the insurance policy and may do
so either by completing the works, or cash settling on the basis of the Company T SOW and
Determination | Case number: 944622 Page 7 of 8
its undertakings in respect to the complainants’ non -financial loss and costs of pursuing the
complaint.
Determination
This determination is partly in favour of the complainants.
Within 14 days of the date the insurer is advised the complainants have accepted this
determination, the insurer must:
re- state the offer to instruct Company T to complete the repair works at the insurer’s
direction and make this offer available to the complainants for consideration for at least 7
days
> if the offer is accepted, take all reasonable steps to resolve the claim on this basis in
accordance with the policy
> if the offer is rejected and the complainants maintain their position they wish to be cash
settled, pay to the complainants:
‒ $59,061.20 for the reinstatement and repair work plus
‒ $11,812.24 as a 20% uplift on this amount and
‒ $12,000.00 for temporary accommodation costs
pay the complainants:
> $7,837.50 to reimburse the complainants’ incurred cost for getting t heir own report and
> $2,500.00 to compensate the complainants stress and inconvenience.
Determination | Case number: 944622 Page 8 of 8
3 Supporting information
3.1 The AFCA process
AFCA’s approach is based on fairness
AFCA has determined this complaint based on what is fair in all the circumstances, having
regard to:
the legal principles
applicable industry codes or guidance
good industry practice
previous decisions of AFCA or its predecessor schemes (which are not binding).
The respective parties have completed a full exchange of the relevant information, and each
party has had the opportunity to address any issues raised. We have reviewed and
considered all of the information the parties have provided.
While the parties have raised a number of issues in their submissions, we have restricted this
determination to the issues that are relevant to the outcome.
We assess complaints on available information and circumstances
AFCA is not a court of law. We do not have the power to take or test evidence on oath, or to
require third parties to give evidence.
When we assess complaints, we consider:
available documents
the recollections of the parties
all relevant circumstances.
We give more weight to documents created at the time the events occurred. If there are no
relevant documents, we will decide what most likely occurred based on the available
information.
If there are conflicting recollections and these are evenly weighted, we may find that a claim
cannot be established.