Determination 943767
Insurer partly denied home damage claims from 2019 flood and 2021 escape of liquid, disputing slab movement, mould and moisture damage
Summary
The complainant's home was damaged by a 2019 flood and a 2021 burst flexi hose, and the insurer accepted only part of the damage. AFCA found the insurer liable for the slab, tiles, mould and moisture damage (not the patio slab), ordered it to complete repairs per the complainant's engineer's scope and pay $2,000 for non-financial loss.
The complainant's engineer's report was more persuasive that the damage was most likely caused by the insured events, the insurer had not established an exclusion, and delays in claim handling warranted compensation under Rule D.3.3.
Issues
- Claim denial primary · upheld
“Insurer denied slab, tiles and mould damage; AFCA found insurer liable for all except the patio slab.”
- Claim amount dispute secondary · upheld
“Cash settlement of $22,460.33 based on QAT scope did not cover all damage for which insurer liable.”
- Poor claim handling secondary · upheld
“Claims handling over both claims resulted in delays, physical inconvenience and stress; insurer should have completed mould remediation.”
- Inadequate claim investigation secondary · upheld
“Preferred FMP report over insurer's experts; no mould testing provided to show treatment was successful.”
- Delay secondary · upheld
“Geotechnical testing not completed until November 2019; NCE did not attend until April 2020; no reason given for delays.”
- Repairs or contractors secondary · upheld
“Insurer to appoint repair specialist to complete repairs per FMP scope of works, including slab relevelling and mould remediation.”
Subjects and remedies
home or building damagenatural disasterpay non financial lossrepair or rectify
Text of the determination
Determination
Case number 943767
Financial firm Hollard Insurance Partners Limited
Determination | Case number: 943767 Page 2 of 10
Case number: 943767 13 November 2023
1 Determination overview
1.1 Complaint
The complainant holds a Home Insurance policy with the financial firm (insurer) and lodged a
claim following damage to the home caused by heavy rain and flooding in February 2019. In
November 2021 a further claim was lodged after a bathroom flexi hose burst, flooding the
home.
The insurer accepted liability for both claims but says not all the damage claimed was caused
by the claim events.
The complainant says there are ongoing issues with the movement of the concrete slab,
moisture and mould since the 2019 flood event further exacerbated by the 2021 event. The
complainant seeks settlement of the claim based on the scope of works (SOW) provided by
her engineer FMP.
1.2 Issues and key findings
Is the insurer liable for the damage claimed?
Yes. I am persuaded by the report from the complainant‟s engineer „ FMP ‟ that the ongoing
damage (other than damage to the patio slab) most likely relates to the insured events in
2019 and 2021. I am satisfied the scope of works (SOW) provided by the FMP fairly reflects
the extent of the insurers liability.
Is the insurer liable to complete the repairs?
Yes. The policy provides the insurer will in consultation with the insured repair the damaged
property where it is practical and economical to do so. I consider it fair the insurer arranges
for the repairs to be completed as per FMP‟s SOW other than damage to the patio slab.
Is the complainant entitled to compensation?
Yes. The insurer should pay $2,000 compensation for non-financial loss.
Why is the outcome fair?
It is fair the insurer completes the relevant repairs as the available information supports a
finding that most likely the damage was caused by the insured events. The determination is
consistent with the liability under the terms of the policy.
1.3 Determination
This determination is in favour of the complainant. Within 21 days of notification that the
complainant accepts this determination, the insurer must:
appoint a suitably qualified repair specialist to complete the repairs as per the SOW
provided by FMP (other than damage to the patio slab) including the provisional items
relating to relevelling the concrete slab and mould remediation
pay the complainant $2,000 compensation for non-financial loss.
Determination | Case number: 943767 Page 3 of 10
2 Reasons for determination
2.1 Is the insurer liable for the damage claimed?
Yes . I am persuaded by the report from the complainant‟s engineer „FMP‟ that the ongoing
issues with the property most likely relate to the insured events in 2019 and 2021. I am
satisfied the scope of works (SOW) provided by the FMP fairly reflects the extent of the
insurer ‟ s liability.
Policy covers insured events subject to exclusions
The insurer‟s policy consists of the policy schedule and product disclosure statement (PDS).
It is not in dispute the insurer provided the policy documents to the complainant.
The policy is an „insured events‟ policy. This means not all loss and damage is automatically
covered. Rather, only loss or damage caused by one or more of the insured events, and not
subject to exclusions, is covered. The insured events are set out in the PDS and include flood
and escape of liquid.
The policy does, however, exclude cover for damage which is caused by, amongst other
things:
defects, structural or design faults, faulty workmanship or faulty design
the vibration, settling, shrinking or expanding of earth or any building, foundation, wall
pavement or path
condensation, mould, mildew, wet or dry rot, rising damp or damp, that has not been
caused by an event
loss or damage caused by wear, tear and gradual deterioration.
There is no dispute the property was damaged by both the flood event in February 2019 and
the escape of liquid event in November 2021. The insurer has accepted liability for some of
the damage but says it‟s repair specialist is unable to warrant the repairs due to the
maintenance related issues.
Circumstances of current dispute
The complainant raised concern with ongoing damp and movement issues believed to be
related to the February 2019 flood event. This was exacerbated by the flooding of the house
after a flexi pipe burst on 14 November 2021.
Following the flooding of the house on 14 November 2021 the insurer offered a cash
settlement of $22,460.33 based on a report and scope of works (SOW) from QAT for the
following :
Main Bedroom, Bedroom 1 and Bedroom 2: - Skirtings to left, rear, and right elevation
including wardrobe - Swelling to door.
Main Bathroom: - Swelling to door - Vanity toilet: - Popped skirting tile - Swelling to cavity
slider.
Laundry: - Cupboard unit - Swelling to internal door.
Bedroom Hallway: - Skirts to all elevations.
Front Entry: - Direct stick vinyl floor - Skirts to all elevations.6. Front Room: - Skirts to rear
and right elevation - Direct stick vinyl - Swelling to internal door.
The insurer has denied liability for the following:
Drummy and cracked tiles – defective works.
Determination | Case number: 943767 Page 4 of 10
Rear patio and pavers – regular building movement.
Concrete floor slab – regular building movement.
Recurring mould - pre-existing.
The insurer has relied on a geotechnical report from DP and reports from consulting
engineers NCE and SW to deny the balance of the claim. The complainant relies on a report
from a construction engineer FMP to support her claim.
Experts differ as to cause of concrete floor slab movement
Geotechnical testing carried out by DP in 2019 estimated that normal movement of 15 mm to
25 mm would be expected for the site, with an additional 5 mm to 10mm of movement
expected due to the trees immediately adjacent the western side of the patio.
SW first attended the property on 10 December 2021. SW arranged a floor level survey which
concluded the maximum level difference over the floor of the house is 62mm with a high point
near the middle of the house. SW says the patterns of contours indicate the floor is slightly
sloping down to the external perimeter walls.
SW says the movement is not consistent with the 2019 flood event because:
more damage would have been identified throughout the house if 62mm of movement had
occurred since 2019
the inspections and reporting indicate the external blockwork are in sound condition and
there is only minor cracking internally which is inconsistent
the damage is consistent with movement that has occurred over a prolonged period due to
seasonal moisture content changes, since the construction of the home
the engineering reports from DP and NC could not identify any appreciable movement to
the patio slab relative to the main house
the patio slab is likely similar or shallower than the main residence and it is not consistent
for there to be lack of movement to the patio slab
movements from normal seasonal moisture content variations would be expected up to 40
mm for a class M site.
I note SW refers to a report from QAT in February 2019. That report has not been exchanged
although SW refers to QAT identifying:
minor cracking to ceilings
subsidence to entrance pavers
subsidence around HWS
movement of the patio slab.
The complainant‟s expert FMP, believes the slab has heaved due to the 2019 flood and
requires rectification to restore it to pre-flood conditions.
Based upon analysis of the floor level survey carried out by SW, FMP concludes the
differential height of the building slab around the perimeter of the building, when disregarding
the western wall, is 20mm and performing within the assessed tolerance. FM concludes the
western wall is not performing. On this basis, FMP states:
the western wall of the building is where the sewage and grey water lines exit the
building‟s earth mound
it is through the bedding sand of this pipework that water has made its way into the
building
the water is trapped under the earth mound as it has reached saturation point
ongoing damage is expected to be caused by the mound heave
Determination | Case number: 943767 Page 5 of 10
the level of deflection noted by SW are 4 to 6 times more than the permissible deflects for
the design.
Movement exceeds the expected seasonal movement based on the
geotechnical testing
As noted, SW identified 62mm difference across floor level. I accept, therefore, that the level
of movement the property has experienced exceeds typical seasonal movement expected at
the site as identified by DP.
The report from NCE dated 3 April 2020 identifies minor cracking in the ceilings, cracking
along plaster joints. NCE commented that prolonged rainfall and moisture would see
increased cracking. The QAT report referred to by SW suggests the cracking and subsidence
was present following the February flood.
While some of the movement at the property is likely due to typical seasonal movement this
would not explain the 62mm difference in floor level identified by SW.
SW, relying largely on google map images, notes that flood waters did not enter the home.
That is correct, however the available evidence confirms the property was surrounded by
flood waters in what was an unprecedented monsoonal rain and flood event. The
geotechnical report suggests 10-25mm would be typical of seasonal movement but that the
soils would be impacted by abnormal moisture content. I accept the area was subject to
abnormal moisture levels resulting most likely in variations in the normal seasonal movement
of the soils.
FMP opines that, the amount of movement exceeds the permissible deflects for the design
and, therefore, underpinning of the slab is required. SW believes the site will still experience
movement due to the soil conditions even if underpinning is carried out. SW otherwise does
not comment as to whether rectification is presently required, however, it does describe the
degree of movement to be „significant‟.
I find the report from FMP more persuasive as to the likely cause of movement of the
concrete flooring slab. The report is detailed and consiste nt with the complainant‟s
observations at the time and following the events.
I accept FMP ‟s finding that most likely the heave affecting the slab was caused by the
February 2019 flood which likely exacerbated the normal seasonal movement. I am satisfied
that most likely the additional movement which exceeds the site classification has likely been
caused by the flood. It is fair and reasonable in the circumstances that the insurer accept
liability for the relevelling of the concrete floor slab.
Insufficient evidence to show patio slab and pavers have moved due to flood
NCE attended after the 2019 flood event and DP also investigated potential movement of the
patio slab. The complainant identified some markings to the residence walls which she
believes suggest movement of the patio slab.
NCE noted the displacement of the hot water pipe work is less than 10mm and well within any
expected tolerances. The patio slab and the pavers were still abutting each other with
negligible difference in height and the lightweight louvre framing which had been installed
only just prior to the 2019 event showed no indication of movement or separation.
The experts agree the scuff mark identified on the wall of the residence is likely a scuff mark
which occurred when the patio was being prepared for painting. There is also uniform
Determination | Case number: 943767 Page 6 of 10
agreement the cracking to the patio predates the 2019 flood as there is paint in the fine
cracks.
I acknowledge FMP says the patio slab may have heaved and risen but at a different rate as
the building foundation on the western side. The only evidence relied upon to substantiate
this seems to be a paint line on a downpipe. Considering the balance of evidence outlined
above, I am not satisfied this is sufficient to establish movement of the patio slab.
I am also not persuaded by the report from SME in April 2019. SME concluded the patio slab
had dropped 25 mm and the residence exhibits no signs of ground movement. Noting the
floor level survey showed movement to the residence, I do not find SME ‟s visual i nspections
to be persuasive. The report is very brief and provides no photographs and limited reasoning
for its conclusions.
Based upon the available information, I am not satisfied the movement of the patio slab was
due to the flood event in 2019. The insurer is entitled to decline liability for damage to the
patio slab.
Insurer is liable for the bathroom tiles
The evidence shows wall tiles to the northern side of the water closet have debonded from
the wall sheeting.
The insurer‟s experts say the tiles h ave debonded due to a lack of expansion joins at the
junction between the tiles and fixed elements which has contributed to the tiles delaminating
from the substrate.
SW also says slab movements can increase the likelihood of drummy tiles and the 62mm
difference over the floor of the house indicates significant footing system movement and
could be a contributing factor.
Noting it is accepted the 2019 flood contributed to the movement of the property, I am not
satisfied that the insurer has shown the tiles would have debonded without the slab
movement. I am not satisfied the insurer has established an exclusion to deny the claim for
damage to the bathroom tiles. The insurer is required to accept this damage.
Insurer is liable for the mould under the direct stick vinyl
The carpet in the bedroom was accepted by the insurer as part of the 2019 flood claim. The
restoration report prepared by LR shows the insurer removed and disposed of the original
carpet and carried out mould remediation to the affected area and other areas of the property.
The complainant was then cash settled for the carpet and installed direct stick vinyl.
SW says it sighted a mould-like growth to the direct stick vinyl and that testing to the concrete
floor should have been carried out to ensure it was dry prior to laying the direct stick vinyl.
While I accept the complainant‟s trades laid the direct stick vinyl, it does not appear the
complainant was settled for any testing to the concrete floor or that the insurer undertook this
testing. I also note the insurer undertook remediation of the area and that mould reoccurred
after this. Therefore, I consider the mould growth under the direct stick vinyl is, on balance,
due to incomplete remediation of the area. The insurer is required to accept liability for the
damage caused by the mould and for its remediation.
An insured event caused elevated moisture of the concrete subfloor
The insurer‟s expert SW, conducted an inspection of the property in December 2021.
Determination | Case number: 943767 Page 7 of 10
At this point it was noted there was an elevated moisture content in the concrete that was
persisting despite efforts by the restorers. SW recommended the concrete be tested for
appropriate dryness prior to any new covering being installed. At this time SW observed
sections of concrete covered with plastic and the plastic sheet covered with water. The
photographs also show, what SW describes as “very high” moisture readings to sections of
the concrete floor.
The inspection by SW occurred on 15 December 2021 and the final Restorx report states that
on 22 November 2021 there is no further work required by Restorx and readings have
returned below industry standard.
It is unclear whether this testing as recommended by SW was carried out and the claim notes
do not indicate any further drying or work was carried out by Restorx.
SW believes the moisture is attributable to the escape of liquid event and, if the moisture
persists beyond the appropriate drying time, this would indicate contribution from another
source. The alternative sources suggested by SW are either the air conditioning units and/or
a failure of the vapour barrier.
FMP identified cracks throughout the concrete floor that appear to still be holding moisture.
FMP believes the moisture has been caused by the heave compromising the sealed junction
in the bathroom after the 2019 flood event. Both experts agree the wall junctions for the
lateral walls have been compromised.
I accept the moisture in the concrete floor was most likely caused by either the flood or
escape of liquid event. The insurer‟s expert has not provided any evidence of what the
appropriate drying time would be to show other causes are causing or contributing to the
moisture in the concrete subfloor, presently.
Accordingly, I am satisfied it is fair for the insurer to undertake moisture testing of the
concrete subfloor and carry out recommended works if required and accept the rising damp at
the property.
Insurer required to undertake further mould testing of the property
FMP notes there are mould spores trapped in the paint throughout the property and likely an
ongoing mould infection. Mould staining to the entry hallway, kitchen/dining, living room,
laundry, toilet, bathroom and bedrooms was identified. Much of the staining is listed as having
occurred to the walls and ceiling and is intrenched in the paint.
No testing has been carried out to confirm this. While an engineer may visually comment on
potential mould in the property, engineers are not specialists in this area. This is particularly
relevant when the comments refer to trapped mould spores, which would seem difficult to
confirm with visual inspection alone.
Given the concerns with moisture in the slab and the mould under the direct stick vinyl, it is
reasonable to conclude mould issues may have arose in connection with these issues.
Further, moisture in the ceiling cavity after the rain during the 2019 event likely contributed to
the cracking in the ceiling in the kitchen, living room and the entrance to the bedroom
hallways. While the insurer carried out some mould treatment to the bedroom floors and
disbursed some mould treatment through the property, no mould testing has been provided to
show the treatment was successful.
As it has been found the insurer is responsible for these areas it is fair it undertakes mould
testing of the property and accept this damage.
Determination | Case number: 943767 Page 8 of 10
2.2 Is the insurer liable to complete the repairs?
Yes. The policy provides the insurer will in consultation with an insured repair the damaged
property where it is practical and economical to do so. In the circumstances I consider it fair
the insurer arranges for the repairs to be completed as per the SOW from FMP other than
damage to the patio slab.
The issues preventing QAT from warranting the repairs are largely required to
be accepted by the insurer
The PDS applicable to the 2019 event and 2021 event provides the insurer the discretion
whether to cash settle a claim. The PDS also provides the insurer will in consultation with the
insured repair the damaged property where practical and economical to do so. AFCA can
consider what is a fair and reasonable exercise of this discretion.
When offering to settle the claim for $22,460.33 the insurer relied on the report from QAT that
it could not warrant repairs. The QAT report states there is no pre-existing damage to the
affected areas. Based upon the reasoning section of the report, QAT could not warrant the
repairs due to issues raised with the mould and rising damp. QAT states that once an
engineer or specialist confirms there are no defects present in the existing slab, it can then
provide a reinstatement works on warrantable repairs.
The complainant prefers the insurer carry out the repairs as she does not believe she could
manage the repair process. As the insurer is liable for the repairs and to confirm there are no
ongoing issues with moisture in the slab and mould then QAT would be able to warrant
repairs when these issues are resolved. On this basis , given the complainant‟s concerns
about completing the repairs I consider it fair and reasonable for the insurer to complete the
repairs.
Insurer to complete repairs
The complainant and the insurer have both provided a scope of works.
QAT‟s quote does not cover all the damage for which I consider the insurer liable. FMP‟s
scope of works does not provide any costings to repair the property or labour breakdown. It
does contain additional work to address the mould at the property and provisional items. I
accept it fairly reflects the damage to the property and necessary repairs required.
In the circumstances, I consider it fair and reasonable that the insurer to carry out the repairs
in accordance with the scope of works prepared by FMP other than the damage to the patio.
Within 21 days of notification of the complainant accepting this determination, the insurer
must:
appoint a suitable repair specialist to complete the repairs as per the SOW provided by
FMP (other than damage to the patio slab) including the provisional items relating to
relevelling the concrete slab and mould remediation.
2.3 Is the complainant entitled to compensation?
Yes. The complainant has suffered stress and inconvenience because of the insurer‟s
handling of the claims.
Determination | Case number: 943767 Page 9 of 10
AFCA can award compensation for poor claim handling
Under paragraph D.3.3 of the AFCA Rules, we may award compensation for non-financial
loss (capped at $5,400) where the insurer‟s actions have caused an unusual amount of:
physical inconvenience
time taken to resolve the situation
interference with the complainant‟s expectat ion of enjoyment or peace of mind.
Complainant has been inconvenienced by claims handling
The complaint‟s property was first damaged in February 2019. The complainant raised issues
with the slab movement and mould / dampness from that time.
SME was appointed by QAT and reported on 18 April 2019 that flooding during the rain event
had resulted in movement of the slab. SME recommended work be done to reinstate the slab.
The insurer chose to have geotechnical testing done which was not completed to November
2019. No reason has been provided for this delay.
The insurer then appointed NCE to provide a report. NCE did not attend the property until
April 2020. Again, the insurer has not explained the delay. NCE ‟s report is largely limited to
damage to the patio.
Following the 14 November 2021 flooding of the property, the complainant has been living
without flooring and in mouldy conditions. The insurer had not completed the mould
remediation.
While I accept the impact of covid-19 may have contributed to delays, in my view the delays
have been prolonged by the insurer‟s handling of both claims. In particular, the insurer could
have and should have completed the mould remediation following the 2019 flood and
completed further testing after the November 2021 event.
I am satisfied the claims handling over both claims has resulted in delays, physical
inconvenience and stress for the complainant. In the circumstances I consider it fair that the
insurer pays the complainant $2,000 compensation for non-financial loss pursuant to AFCA
rule D.3.3.
Why is the outcome fair?
It is fair the insurer completes the relevant repairs as the available information supports a
finding that most likely the damage was caused by the insured events. The determination is
consistent with the liability under the terms of the policy.
Determination | Case number: 943767 Page 10 of 10
3 Supporting information
3.1 The AFCA process
AFCA’s approach is based on fairness
AFCA has determined this complaint based on what is fair in all the circumstances, having
regard to:
the legal principles
applicable industry codes or guidance
good industry practice
previous decisions of AFCA or its predecessor schemes (which are not binding).
The respective parties have completed a full exchange of the relevant information, and each
party has had the opportunity to address any issues raised. We have reviewed and
considered all the information the parties have provided.
While the parties have raised several issues in their submissions, we have restricted this
determination to the issues that are relevant to the outcome.
We assess complaints on available information and circumstances
AFCA is not a court of law. We do not have the power to take or test evidence on oath, or to
require third parties to give evidence.
When we assess complaints, we consider:
available documents
the recollections of the parties
all relevant circumstances.
We give more weight to documents created at the time the events occurred. If there are no
relevant documents, we will decide what most likely occurred based on the available
information.
If there are conflicting recollections and these are evenly weighted, we may find that a claim
cannot be established.