Storm damage claim settlement amount, temporary accommodation and claims handling

FirmQBE
Decided2023-10-24
ProductGeneral Insurance · Other general
OutcomeFor the complainant
Amount awarded$113,590
Non-financial loss$3,000
Amount claimed$217,407
SourceAFCA PDF

Summary

An owner-builder's property was damaged in a storm and the insurer reduced its settlement offer after initially agreeing a higher interim payment. AFCA increased the cash settlement to $105,909.73, added three months' temporary accommodation and awarded $3,000 non-financial loss.

Assessing each disputed item on the evidence, the panel found a fair cash settlement and temporary accommodation entitlement under the policy, and that misleading conduct and poor claims handling justified non-financial loss compensation.

Issues

Subjects and remedies

broker or intermediaryhome or building damagenatural disasterpay claimpay non financial loss

Related

All QBE determinations · Find similar determinations

Text of the determination

Determination Case number 941832 Financial firm QBE Insurance (Australia) Limited Determination | Case number: 941832 Page 2 of 11 Case number: 941832 19 October 2023 1 Determination overview 1.1 Complaint The complainant holds an owner builder construction insurance policy with the financial firm (the insurer) and lodge on 24 August 2022 after the property was damaged in a storm on 1 August 2022. The insurer accepted liability initially offered a partial settlement of $99,000. This was later reduced to $59,590. The complainant disputes the insurers offer and says its conduct has been misleading. The complainant seeks $217,407.03 to complete the works and compensation for the claims handling. 1.2 Issues and key findings Is the insurer’s offer of settlement fair in circumstances? No. The insurer should increase the offer to cash settle the damage claim to $105,909.73. Is the insurer required to cover the cost of temporary accommodation? Yes, the insurer is liable to cover the cost of temporary accommodation limited to a period of three months calculated at $2,560 per month. Is the complainant entitled to compensation for non-financial loss? Yes. The insurer has failed to handle this complaint in a timely manner and initially misled the complainant as to settlement of the claim. In the circumstances it is fair the insurer pays $3,000 compensation for non-financial loss. Why is the outcome fair? The panel has considered all available information in reaching this determination. The panel is satisfied that the cash settlement represents a fair assessment of the loss and damage caused by the storm event as covered under the terms of the policy. Compensation for non- financial loss is fair given the delays caused by the insurers claims handling 1.3 Determination The determination is the favour of the complainant. Within 14 days of notification of the complainant’s acceptance of this determination the insurer must pay the complainant:  $105,909.97 as a cash settlement for the damage claimed  $7,680 to cover temporary accommodation.  $3,000 compensation for non-financial loss pursuant to AFCA rule D3.3 The insurer is otherwise entitled to refuse the balance of the complainant’s claim in accordance with the terms of the policy. Determination | Case number: 941832 Page 3 of 11 2 Reasons for determination 2.1 Is the insurer ’ s offer of settlement fair in the circumstances? Complainant has the onus of establishing a claimable loss The complainant ’s policy is an owner/ builder construction insurance policy which provides cover up to the sum insured for insured damage to the construction works during the period of insurance. Insured damage is defined as physical loss or damage not otherwise excluded arising during the period of insurance. There is no dispute the property sustained damage in a storm on 1 August 2022 while under construction. The issues in dispute are:  whether the settlement offered covers the insured damage caused by the storm event?  whether the insurer misled the complainant and should pay compensation for any consequential loss? Circumstances of the loss The complainant’s property was undergoing an extension and renovation to an existing single-story dwelling. The works included removal of the existing roof and a second story addition, full renovation of the existing ground floor with a minor extension and construction of a new garage. The complainant contacted the insurer to lodge a claim for water damage to the property caused by a storm on 1 August 2022. The roof had been removed, first level structural beams installed and tarpaulins in place when the storm hit. The tarpaulins were displaced during the storm allowing a substantial amount of rainwater to enter the ground level of the property with resulting water related damage to appliances, joinery, flooring, plaster and painting. The complainant submitted photos of the damage sustained and provided quotes for the costs required to complete the works to the insurer. The insurer’s assessor initially provided a desktop assessment of the damage and recommended a partial settlement offer of $99,000 on 3 November 2022. A release was signed as a partial settlement on 10 November 2022. The complainant made further claims of water damage to the bathroom and sought an increase of the cash settlement to $151,000. The insurer organised MCL to assess the event damage to provide a comprehensive report and costings to bring finality to the claim. The insurer halted the partial settlement despite the signed release until the assessment was completed. The complainant was not notified of this and was expecting the partial payment to be processed. MCL attended the site on 14 November 2022 and provided its report on 2 December 2022. MCL notified the insurer that some of the damage was not event related but part of the renovations and was going to be removed or replaced. Relying on MCL’s report the insurer reduced the settlement offer to $59,590.00. During the AFCA complaint, the insurer offered an increased settlement amount of $85,000 to resolve the matter. The complainant declined the offer. Determination | Case number: 941832 Page 4 of 11 Parties disagree on the extent of the damage caused by the storm The complainant submitted structural drawings, quotes and her own expert report from BFL and says all the damage was caused by the storm event and should be covered under the policy. The insurer relies on MCL ’s findings and says it is not liable for all the damage. It says the damage to the items in dispute was either not a result of an insured event or forms part of construction/renovation work. The disputed damaged items were due to be replaced regardless of the event and as such the complainant had not suffered a loss. The panel will assess each item in dispute to determine whether the insurer is liable to cover the cost of the replacement or repairs. Kitchen and appliances The complainant seeks the cost of replacing the kitchen appliances being an oven cooktop and range hood, damaged in the storm event. BFL states that the insurer inspected the appliances prior to removal as recommended by an electrician and therefore, the insurer should cover the cost. The insurer has not addressed this issue. It has accepted liability to for the repair of the kitchen ($41,000). The revised quote from MCL does not include the appliances. In absence of any persuasive information to the contrary, the panel accepts that most likely the complainant was told to remove the appliances. Accordingly, it is fair the insurer should be liable for the loss. The insurer should pay the complainant $41,000 for the repair of the kitchen plus $3,927 for replacement of the kitchen appliances plus a further $1,540 for the installation of the appliances as quoted. Plaster and painting The complainant submitted a quote for plastering from EF and a painting quote from EI. The EF ’s quote states that all the plaster walls and ceilings to the ground level were water damaged due to the storm event and need replacement. The quotes include repairs and repainting of all the bedrooms, hallway and kitchen covering the ground floor. BFL’s says the EF and EI quotes are reasonable as it considers the walls that were going to be retained if the damage had not occurred. That is not necessarily consistent with the structural drawings. MCL says the structural drawings show that the work incorporated removal of internal walls to open up the floor plan and this would necessitate the removal of the plaster and require painting. MCL concluded the event damaged areas requiring plastering were minimal; limited to walls in the kitchen, the pantry, a ceiling and wall in one of the bedrooms. It made the same allowances for painting these areas where the plaster repair was accepted. The panel notes:  the BFL report does not provide any insight on its own observations but relies completely on the EF and EI quote which are not reports  the EF quote includes the kitchen wall and ceiling together with the hallway wall that was going to be removed which shows that it did not consider that these walls were going to be removed regardless of the event Determination | Case number: 941832 Page 5 of 11  the EI quote like the EF quote includes all areas in the ground floor to be painted and is not limited to the walls that were going to be retained if not damaged during the event The panel accepts that as part of the extensive renovation, walls were to be removed in the downstairs area and the whole area would require repainting. The panel is satisfied the MCL quote fairly represents the storm related damage. It is fair the insurer settles the damage to the plaster and painting as per the itemised quote from MLC for $8,350.00 Tarps The available information shows that the complainant purchased a tarp from ABC for $840 and hired two other tarps from CH prior to the event. CH invoicing indicates the hire arrangements pre-date the incident. The ABC invoice specifies that a builder’s floor tarp was purchased by the complainant. A picture of the displaced blue tarp has been provided in the BFL report. The insurer says it is not liable to cover the cost of the tarps required for the building process as it was a requirement for the complainant to have this item to protect the construction works. The panel agrees. The initial claim form notes the purchased tarp had been damaged in the storm. The insurer has not disputed this. While the tarps were necessary during the renovations, it is fair the insurer cover the costs to replace the tarp damaged in the storm. The insurer should increase its settlement offer by $840 to cover the replacement cost of the tarp. Electrical The complainant seeks cover for the electrical rewiring in the areas where the water damage occurred. A quote from CRP for $6,479.00 includes the areas that required rewiring. BFL says that since CRP is a licensed electrical contractor, the allowance proposed for rewiring should be accepted. The MCL allowance for electrical works is limited to replace fittings and switches. However, MCL does not provide any allowance for rewiring. MCL says the water ingress would not necessitate full rewiring as the water damage was not extensive. The panel acknowledges that CRP as a licensed electrical contractor has the right expertise to determine whether rewiring is required. It is unclear whether MCL had a licensed electrical contractor assess the electrical damage. The panel considers it fair in the circumstances that the insurer pays $6,479.00 to cover the electrical rewiring. Bathroom The complainant says the bathroom started showing signs of water ingress after the storm event and holds the insurer responsible for a total repair. The insurer says the storm related damage to the bathroom is limited to the plaster sheet to the ceiling, reinstatement of bathroom joinery, plumbing fittings and minor tiling to facilitate replacement of the same. MCL says that a full bathroom strip out and rebuild is not required because of the storm related damage. The extent of construction to relevel the existing floor was likely to cause Determination | Case number: 941832 Page 6 of 11 movement and cracking of bathroom tiles rather than any water ingress. This is supported by the structural drawings in the MCL report which note the need to replace footings and relevel the flooring. BCL states that the tiles cracking in the bathroom is a sign of water penetrating the wall cavities. This requires tile removal and replacement as the waterproofing becomes compromised and a full strip out and rebuild necessary. The failure of the waterproofing has resulted in the bathroom walls being saturated. The cost of the full replacement was assessed at $49,444.23. The panel is satisfied the bathroom was damaged in the storm event and most likely this has resulted in water penetrating the bathroom walls. Whether this is sufficient to justify a full bathroom replacement is unclear. It is difficult, based on the available information, to assess the extent of the storm related damage to the bathroom. The assessor was unsure as to the cause of damage. The quote from BCL seems excessive while the quote from MCL does not appear to cover all potential storm related damage. In the interests of finalising this complaint and without clear assessments of the claim related damage, the panel considers it fair, to settle the claim for 50% of the quoted bathroom repairs of $49,444.23. Accordingly, the panel determines the insurer is to contribute $24,722.11 to the cost to repair the storm related damage to the bathroom. Skip hire The complainant has claimed $1,400 for hire of two skips to clear debris following the storm. The insurer has included one skip at $700 in its offer. It is not clear why it has limited this to one skip. Given the panels finding with respect to the kitchen and bathroom, the panel is satisfied it is fair for the insurer to cover the cost of the skip hire of $1,400 as claimed. Flooring and Carpet The complainant says the flooring and the carpets were water damaged when the storm occurred and seeks cover for the replacement costs. The complainant says the hybrid flooring and carpets were not required to be removed as part of the renovations. The complainant says the subfloor and the floor could be accessed by removing the skirting which gave access to the floating hybrid boards that could be removed as they worked on an interlocking system. The same method was to be applied with carpet that could be pulled and re-pinned once the subfloor had been attended BCL says that pads were going to be dug from the subfloor area prior to the event. As the flooring was damaged and removed it allowed the use other options for pad construction. MCL says the carpet and the floor coverings were going to be removed regardless of the water damage. New stumps installed to support the first-floor extension had caused damage to the existing floor a result of the contract works. There was no evidence of other damage. The floating floor covering, and carpets were removed and not available for inspection. It is unclear when this occurred as none of the available pictures provide any view of the hybrid flooring or carpet before or after the damage. The only flooring that can be seen in these pictures is the subfloor which does not show any signs of water damage. Determination | Case number: 941832 Page 7 of 11 Given the extent of renovation works being carried out, on balance, the panel accepts that the carpet and the floating floors would have been replaced as part of the new open plan layout on the ground floor. Accordingly, the panel is satisfied that the insurer is not required to cover the cost of repairs to the hybrid flooring, carpets and subfloor. Hydronic heating The complainant says the hydronic heating was damaged in the storm event. A quote and a brochure from CC has been provided in support of her position. The quote states upgrade as the existing model she had is no longer available for replacement. The complainant says the technicians advised that the boiler had stopped working because they believe air or hydrogen gas build up caused corrosion due to harsh weather. BFL states that continuous exposure to rain was the main contributing factor for the damage to the hydronic heating. BFL has not provided any supporting information to show the hydronic heating was damaged by a single storm event. The report does not provide any explanation to how a single storm event can cause rust or corrosion. MCL report states that the reason for hydronic heating damage was wear and tear that occurred overtime and not from the single storm event. The report notes the unit was undercover and would not have been impacted by the rain. Photographs confirm this. The panel accepts that most likely the hydronic heating was damaged overtime due to wear and tear. This is supported by photographs showing rust on the pipes and possible corrosion which takes time to occur and is not a result of a single storm event. The panel is satisfied that the insurer is not required to cover the cost to repair or replace the hydronic heating. Entry door The complainant says the entry door was damaged by the insurers trades when removing the carpet. The entry door is an external door. It would not have been damaged in the storm event. The is no evidence the door was damaged by the insurer’s trades. In the absence of such evidence, the panel is not satisfied the complainant has established the damage falls within the terms of cover under the policy. The insurer is entitled to refuse liability for this aspect of the claim. Conclusion Based on the reasoning above the panel determines the insurer is to cash settle the complainants claim for damage arising from the storm event for $88,258.11. The cash settlement should be increased by 20% ($17,651.62) to allow for contingencies that may arise in the repair process. This brings the total cash settlement for the damage to $105,909.73. Determination | Case number: 941832 Page 8 of 11 2.2 Is the insurer required to cover the cost of temporary accommodation? Complainant says the insurer is liable for temporary accommodation The policy provides an additional benefit for temporary accommodation costs if incurred to expedite the commencement, reinstatement or replacement of the construction works following an insured damage. The policy schedule limits this benefit to $20,000 as per the certificate of insurance. The complainant says she and her family were living at the property while it was under construction. The complainant says the MCL assessor saw the arrangement that was in place as a temporary set up to stay in the property while the construction was being carried out. This is supported by the insurers claim notes on 16 November 2022. There is no information to indicate the complainant had any arrangement for temporary accommodation lined up during the construction period. The complainant says they had to move out as the property became uninhabitable after the storm event. The insurer does not dispute this. MCL comments that the complainant mentions that they intended to live in the property as long as possible whilst works were undertaken although this would be problematic given the extent of works required. MCL does not otherwise comment of the need to move out because of the storm related damage. The panel accepts the storm damage caused the complainant to move into temporary accommodation earlier than what would otherwise occurred during the renovation process. Insurer to cover the cost of temporary accommodation for the insured damage The complainant provided a copy of the rental agreement dated 9 September 2022 to support her claim. The rental agreement requires payment of $2,560 per month. Given the extent of the damage it is reasonable that the complainant had to move out of the property, so the construction works could commence. How long the complainant would have otherwise been able to stay in the home given the extensive renovations is problematic. No evidence has been provided with respect to this. At best, any assessment is an estimation. It could be anywhere between a month and two months but given the ongoing renovations not likely to be any longer. In the circumstances and again in the interest of bringing some finality to this complaint the panel considers it fair to allow three months temporary accommodation calculated at the rental agreement rate on $2,560 per month 2.3 Is the complainant entitled to compensation for non- financial loss? AFCA can award compensation for non-financial loss Under AFCA rule D.3.3 AFCA can award compensation of up to $5,400 for non-financial loss where a complainant suffers an unusual degree of physical inconvenience or time taken to resolve a situation or interference with the expectation of enjoyment or peace of mind. AFCA takes a conservative approach to the award of compensation and expects a complainant to be moderately robust and bear to normal degree of inconvenience experienced in a claim process. Determination | Case number: 941832 Page 9 of 11 Insurers misled complainant as to payment of interim settlement The complainant lodged her claim through her broker on 24 August 2022. When lodging the claim, the broker provided various quotes for the damage claimed. The insurer notified the broker and complainant on 28 September of need to review the quotes. A desktop assessment was completed by MCL in October 2022. The claim notes record the insurer advised a partial settlement offer had been made based on the documents provided and it would attend to interim payment before Christmas. A partial settlement release for $99,000 was sent to the complainant on 10 November 2022. This was signed by the complainant and returned to the insurer on 14 November 2022. The insurer subsequently advised the complainant that MCL would need to attend to assess the damage and no payment would be made. The insurer notified the complainant that no funds would be released until receipt of MCL report. That report was not received until 10 January 2023, more than four months after the claim was lodged. The complainant says the insurer misled her into believing an interim payment would be made based on the signed release. If she was told earlier that she was not entitled to $99,000 she would have escalated to review the decision either internally or externally. The panel accepts the insurer misled the complainant when handling the claim and providing the signed release. The complainant was entitled to believe that after over four months she would receive the interim payment as agreed. It has arguably breached the contract as agreed by the signed release. Claims handling has caused an unusual degree of inconvenience and stress The panel acknowledges that the insurer’s actions of first agreeing to an increased amount only to reduce it later has caused significant stress and anxiety for the complainant. The insurer had been provided relevant quotes on claim lodgement yet decided to proceed with a desktop assessment nearly two months after claim lodgement. The insurer had a reasonable opportunity to assess the damage but instead relied on the desktop assessment when making the interim offer that was accepted. The insurer provided a partial release agreement which was signed by the complainant. The insurer had no intention of proceeding with this agreement but did not inform the complainant until 22 December 2022 that no payment would be made and that it would await the further assessment by MCL. The panel acknowledges there were issues as to the extent of claim related damage. These issues existed before and during the release negotiation. Presumably this was a reason the release was to be for a partial settlement. To proceed with the initial offer and obtain a signed release before requesting a proper assessment of the claim indicates poor claims handling. To then insist on inspecting the damage and delaying the actual assessment of damage until three months after the event is poor claims management. The insurer was aware of the of the complainant’s circumstances and could have made an interim payment to allow th e complainant to proceed with repairs. It did not. The complainant has understandably suffered an unusual degree of physical inconvenience stress and anxiety given the delays and withdrawal of the initial interim agreement. This has resulted in the interf erence with the complainant’s expectation of enjoyment or peace of mind. In the panels view it is fair the insurer pays $3,000 compensation for non-financial loss. Determination | Case number: 941832 Page 10 of 11 Other issues Complainant says the insurer should extend the policy for 12 months Under A FCA Rule C.1.4, AFCA cannot consider a complaint about an insurer’s decision not to offer insurance, unless the complaint is about:  a decision that was made indiscriminately, maliciously, or based on incorrect information  the insurer misinforming you about the insurance  medical indemnity insurance. The complainant says that on renewal the insurer only agreed to extend the policy for 6 months timeframe and not for 12 months period. She says that the insurer should extend the policy cover for 12 months period same as before as she wants the property to be insured until construction is completed. The insurer has since provided further information confirming it has offered the limited period of cover given the nature of the policy allowing it to review it ongoing exposure. There is no evidence the insurer made the decision as to the terms of renewal indiscriminately, maliciously or based on incorrect information. The panel is unable to consider this aspect of the complaint further. Determination | Case number: 941832 Page 11 of 11 3 Supporting information 3.1 The AFCA process AFCA’s approach is based on fairness AFCA has determined this complaint based on what is fair in all the circumstances, having regard to:  the legal principles  applicable industry codes or guidance  good industry practice  previous decisions of AFCA or its predecessor schemes (which are not binding). The respective parties have completed a full exchange of the relevant information, and each party has had the opportunity to address any issues raised. We have reviewed and considered all the information the parties have provided. While the parties have raised several issues in their submissions, we have restricted this determination to the issues that are relevant to the outcome. A panel determined this matter Due to the nature of this complaint, we referred it to a panel for determination. The panel includes:  an ombudsman  a member with significant experience in consumer and small business advocacy  a member with extensive general insurance experience We assess complaints on available information and circumstances AFCA is not a court of law. We do not have the power to take or test evidence on oath, or to require third parties to give evidence. When we assess complaints, we consider:  available documents  the recollections of the parties  all relevant circumstances. We give more weight to documents created at the time the events occurred. If there are no relevant documents, we will decide what most likely occurred based on the available information. If there are conflicting recollections and these are evenly weighted, we may find that a claim cannot be established.