Insurer declined cost of embankment stabilisation needed to repair storm-damaged deck

FirmIAG
Decided2023-08-09
ProductGeneral Insurance · Home building and contents
OutcomeFor the complainant in part
Amount awarded—
Non-financial loss—
Amount claimed$538,865
SourceAFCA PDF

Summary

After storm damage, the insurer accepted the deck claim but declined embankment stabilisation costs of $538,865.25. AFCA found the insurer liable for repair including stabilisation and ordered it to assess the claim, leaving quantum to be agreed.

Expert evidence showed the deck cannot be properly repaired without stabilising the embankment, and no policy exclusion applied to such repair costs.

Issues

Subjects and remedies

home or building damagenatural disasterreassess claim

Related

All IAG determinations · Find similar determinations

Text of the determination

Determination Case number 941538 Financial firm Insurance Australia Limited Determination | Case number: 941538 Page 1 of 5 Case number: 941538 8 August 2023 1 Determination overview 1.1 Complaint The complainant holds a home and contents insurance policy with the financial firm (the insurer). The complainant made a claim for damage to his property following a storm. The insurer accepted the claim for loss of a pontoon, back boundary fence, concrete stairs, irrigation system and a deck. However, it declined his claim for the cost of the remediation work on the embankment supporting his deck, saying this is excluded in his policy. The insurer says the remediation repairs to the embankment are required to prevent and/or mitigate any future damage and are considered an improvement to the property. The complainant disputes the insurer’s decision and wants the insurer to pay the cost of remediation work totalling $538,865.25. 1.2 Issues and key findings Is the insurer ’s offer fair ? No. This is because the available information shows the insurer’s settlement would not enable the complainant to repair the deck. Therefore, the insurer should assess the complainant’s claim in line with section 2.1. 1.3 Determination This determination is in favour of the complainant. The insurer is to assess the complainant’s claim in line with section 2.1. Determination | Case number: 941538 Page 2 of 5 2 Reasons for determination 2.1 Is the insurer liable for embankment stabilisation costs? The policy covers loss or damage from a storm subject to exclusions When making a claim, the initial onus is on the complainant to prove that he suffered a loss covered by the policy. This means he must establish, on the balance of probabilities, that the loss he is claiming for is covered by the policy. The complainant ’s policy covers accidental damage to buildings or contents. Accidental damage relates to loss or damage to buildings and contents as defined in the policy during the period of insurance, subject to conditions and exclusions as set out in the policy document. The insurer must show that any loss or damage is excluded from cover. Specifically, the policy says: You are insured against, accidental loss or damage (including the Specified Events listed below) to your building, contents belonging to you. Your family or for which you or they are legally responsible or both at the situation during the period of insurance. Specified events ‘Specified Events’ means loss or damage directly caused by the following events: […] q) storm, flood, tempest, rainwater, wind, hail, tornado, cyclone or hurricane, freeze or weight of snow […] The parties obtained expert reports which discuss cause and repair of damage The insurer has accepted liability for the deck and the concrete stairs. Presumably, these are the stairs that lead to the pontoon and are placed on the embankment. Recently, the insurer said the stairs have not been structurally damaged. The deck is constructed and secured on part of the embankment. The embankment had destabi lised following the storm and flood event. This exposed several of the deck’s footings. The insurer, as part of its assessment of the claim, obtained reports from two engineers, CS and CES. CES said embankment erosion at the site is an ongoing issue but floodwaters have increased the active soil erosion. Further, the deck’s concrete footing has been exposed reducing its stability. Significantly, CES said: In our opinion, remediation of only the deck piers and supports will be a short- term, unwarrantable solution as erosion at the site is a serious ongoing issue and will require significant engineering to stabilise the site’s embankment along the length of the embankment to prevent further damage to the deck and property CS also found concerns with the embank ment’s stabilisation and noted the event likely caused this. Determination | Case number: 941538 Page 3 of 5 The complainant obtained a geotechnical assessment report from DP. DP explained that considering the erosion, movement and potential for further deterioration of the current slope, they recommended that a retention system be installed into the face of the embankment. The insurer denied the claim for repairs to the embankment The insurer, in its Notice of Response, says it accepts the claim for damage to the decking. It has offered to settle this part of the claim for $13,530 based on UBS’s scope of works and quotation dated 27 September 2022. The insurer denied the claim for stabilisation of the embankment. This is because it says these costs are not to repair damage or physical harm to the decking. The insurer says these repairs are required to prevent and/or mitigate any future damage and that the repairs would significantly improve the property by re-engineering the embankment and installing new retaining walls. The insurer references the following policy terms: How we will pay Buildings a) At our option we:  Repair the buildings. or  Replace the buildings to a condition substantially the same as, but not better than when new, or  Pay the reasonable cost of its repair or replacement to a condition substantially the same as when new, or  Pay up to the sum insured shown on your policy schedule The insurer also says the embankment does not fa ll within the policy definition of ‘buildings’ which spe cifically excludes ‘soil’. In addition, the insurer says the embankment had pre-existing erosion and the policy does not cover this. The complainant says that a building includes its footings or foundation. Therefore, if the footings no longer provide support to the building and require remediation, physical loss or harm has been suffered. The complainant disputes that embankment stabilisation work constitutes betterment. He says that prior to February 2022 the embankment was secure and that the footings of his deck were stable. Insurer liable for embankment stabilisation costs Having carefully considered the available information, the panel is persuaded by the complainant’s position. Significantly, CES notes remediation of only the deck piers and supports is an unwarrantable solution. This indicates no contractor could do such works given they cannot be warranted. Presumably, this is because the deck is likely structurally compromised given the embankment, which it is secured to as part of its foundation, is destabilised. Importantly, the insurer’s evidence provides no assurance that if UBS’s scope of works were followed, the deck would be safe to use given the embankment ’s instability . In particular, if the deck cannot be used after such works because it is unsafe, then the panel does not accept it has been repaired within the ordinary meaning of this term. The complainant’s main argument is that all the experts agree that the only way to rectify the deck, which must include its foundation, is to remediate the embankment. This is consistent Determination | Case number: 941538 Page 4 of 5 with the expert evidence. The expert evidence provides no support to the insurer’s position that the deck could be repaired without stabilising the embankment. A short term, unwarrantable solution, is not a viable repair method or one in line with the policy. The insurer has not proposed any other method that would repair the deck. The panel is not persuaded its current position would repair the deck given the embankment, which it is founded on, is unstable and likely renders the deck unsafe. Regarding the insurer’s argument that soil is not covered, this is not persuasive. As the complainant submitted, he is not claiming for loss or damage to soil. He is claiming for damage to the deck. The insurer accepts it is liable to repair the deck. It must therefore pay for the cost to repair the deck. The exchanged information shows this likely includes the cost to stabilise the embankment. There is no exclusion or limitation in the policy that says if repair costs include the cost to stabilise soil, this can be excluded. The insurer has referred to the embankment having pre-existing erosion and this being excluded. However, all of the expert evidence, as well as the insurer’s own claim decision, accept the claimed event damaged the deck by destabilising the embankment it is founded on. None of the experts said the proximate cause of damage to the deck was the pre-existing nature of the embankment. Therefore, the insurer is liable for the deck and its cost of repair. For reasons outlined above, this would likely include the cost to stabilise the embankment it is founded on. Insurer to assess a fair amount for stabilisation costs T he complainant’s claim is significant. He has spent $538,865.25. It is not clear from the exchanged information if this was the most cost effective way to repair the deck that satisfies the insurer’s policy obligations. For instance, CS’s report had several possible methods that appear fairly cost effective. However, it is not clear how effective or practical they were. It is also not clear all other practical methods were explored by the complainant given the dispute proceeded due to the insurer refusing to meet the stabilisation costs. Given this, and the significant amount sought, the panel considers it fair the insurer be given an opportunity to assess the complainant’s cost and explore any other alternative practical methods that would enable it to effectively repair the deck in line with its policy obligations. In doing so, the complainant must provide reasonable co-operation with the insurer and its contractors. If the parties are unable to agree on the quantum payable, the complainant can lodge a new complaint at AFCA for a decision on this point. Determination | Case number: 941538 Page 5 of 5 3 Supporting information 3.1 The AFCA process AFCA’s appr oach is based on fairness AFCA has determined this complaint based on what is fair in all the circumstances, having regard to:  the legal principles  applicable industry codes or guidance  good industry practice  previous decisions of AFCA or its predecessor schemes (which are not binding). The respective parties have completed a full exchange of the relevant information, and each party has had the opportunity to address any issues raised. We have reviewed and considered all of the information the parties have provided. While the parties have raised a number of issues in their submissions, we have restricted this determination to the issues that are relevant to the outcome. A panel determined this matter Due to the nature of this complaint, we referred it to a panel for determination. The panel includes:  an ombudsman  a member with significant experience in consumer and small business advocacy  a member with extensive experience in the insurance industry. We assess complaints on available information and circumstances AFCA is not a court of law. We do not have the power to take or test evidence on oath, or to require third parties to give evidence. When we assess complaints, we consider:  available documents  the recollections of the parties  all relevant circumstances. We give more weight to documents created at the time the events occurred. If there are no relevant documents, we will decide what most likely occurred based on the available information. If there are conflicting recollections and these are evenly weighted, we may find that a claim cannot be established.