Insurer declined cost of embankment stabilisation needed to repair storm-damaged deck
Summary
After storm damage, the insurer accepted the deck claim but declined embankment stabilisation costs of $538,865.25. AFCA found the insurer liable for repair including stabilisation and ordered it to assess the claim, leaving quantum to be agreed.
Expert evidence showed the deck cannot be properly repaired without stabilising the embankment, and no policy exclusion applied to such repair costs.
Issues
- Claim denial primary · upheld“Insurer liable for the deck and its cost of repair, likely including the cost to stabilise the embankment it is founded on.”
- Claim amount dispute secondary · unclear“Insurer to assess a fair amount for stabilisation costs; unclear if the $538,865.25 was the most cost effective method.”
- Product terms interpretation secondary · upheld“Soil exclusion not persuasive; complainant claims damage to the deck, not soil; no exclusion for stabilisation costs.”
Subjects and remedies
home or building damagenatural disasterreassess claim
Related
Text of the determination
Determination
Case number 941538
Financial firm Insurance Australia Limited
Determination | Case number: 941538 Page 1 of 5
Case number: 941538 8 August 2023
1 Determination overview
1.1 Complaint
The complainant holds a home and contents insurance policy with the financial firm (the
insurer). The complainant made a claim for damage to his property following a storm.
The insurer accepted the claim for loss of a pontoon, back boundary fence, concrete stairs,
irrigation system and a deck. However, it declined his claim for the cost of the remediation
work on the embankment supporting his deck, saying this is excluded in his policy. The
insurer says the remediation repairs to the embankment are required to prevent and/or
mitigate any future damage and are considered an improvement to the property.
The complainant disputes the insurer’s decision and wants the insurer to pay the cost of
remediation work totalling $538,865.25.
1.2 Issues and key findings
Is the insurer ’s offer fair ?
No. This is because the available information shows the insurer’s settlement would not enable
the complainant to repair the deck. Therefore, the insurer should assess the complainant’s
claim in line with section 2.1.
1.3 Determination
This determination is in favour of the complainant.
The insurer is to assess the complainant’s claim in line with section 2.1.
Determination | Case number: 941538 Page 2 of 5
2 Reasons for determination
2.1 Is the insurer liable for embankment stabilisation costs?
The policy covers loss or damage from a storm subject to exclusions
When making a claim, the initial onus is on the complainant to prove that he suffered a loss
covered by the policy. This means he must establish, on the balance of probabilities, that the
loss he is claiming for is covered by the policy.
The complainant ’s policy covers accidental damage to buildings or contents. Accidental
damage relates to loss or damage to buildings and contents as defined in the policy during
the period of insurance, subject to conditions and exclusions as set out in the policy
document. The insurer must show that any loss or damage is excluded from cover.
Specifically, the policy says:
You are insured against, accidental loss or damage (including the Specified
Events listed below) to your building, contents belonging to you. Your family or for
which you or they are legally responsible or both at the situation during the period
of insurance.
Specified events
‘Specified Events’ means loss or damage directly caused by the following events:
[…]
q) storm, flood, tempest, rainwater, wind, hail, tornado, cyclone or
hurricane, freeze or weight of snow
[…]
The parties obtained expert reports which discuss cause and repair of damage
The insurer has accepted liability for the deck and the concrete stairs. Presumably, these are
the stairs that lead to the pontoon and are placed on the embankment. Recently, the insurer
said the stairs have not been structurally damaged.
The deck is constructed and secured on part of the embankment. The embankment had
destabi lised following the storm and flood event. This exposed several of the deck’s footings.
The insurer, as part of its assessment of the claim, obtained reports from two engineers, CS
and CES. CES said embankment erosion at the site is an ongoing issue but floodwaters have
increased the active soil erosion. Further, the deck’s concrete footing has been exposed
reducing its stability. Significantly, CES said:
In our opinion, remediation of only the deck piers and supports will be a short-
term, unwarrantable solution as erosion at the site is a serious ongoing issue and
will require significant engineering to stabilise the site’s embankment along the
length of the embankment to prevent further damage to the deck and property
CS also found concerns with the embank ment’s stabilisation and noted the event likely
caused this.
Determination | Case number: 941538 Page 3 of 5
The complainant obtained a geotechnical assessment report from DP. DP explained that
considering the erosion, movement and potential for further deterioration of the current slope,
they recommended that a retention system be installed into the face of the embankment.
The insurer denied the claim for repairs to the embankment
The insurer, in its Notice of Response, says it accepts the claim for damage to the decking. It
has offered to settle this part of the claim for $13,530 based on UBS’s scope of works and
quotation dated 27 September 2022. The insurer denied the claim for stabilisation of the
embankment. This is because it says these costs are not to repair damage or physical harm
to the decking. The insurer says these repairs are required to prevent and/or mitigate any
future damage and that the repairs would significantly improve the property by re-engineering
the embankment and installing new retaining walls.
The insurer references the following policy terms:
How we will pay
Buildings
a) At our option we:
Repair the buildings. or
Replace the buildings to a condition substantially the same as, but not better
than when new, or
Pay the reasonable cost of its repair or replacement to a condition
substantially the same as when new, or
Pay up to the sum insured shown on your policy schedule
The insurer also says the embankment does not fa ll within the policy definition of ‘buildings’
which spe cifically excludes ‘soil’.
In addition, the insurer says the embankment had pre-existing erosion and the policy does not
cover this.
The complainant says that a building includes its footings or foundation. Therefore, if the
footings no longer provide support to the building and require remediation, physical loss or
harm has been suffered. The complainant disputes that embankment stabilisation work
constitutes betterment. He says that prior to February 2022 the embankment was secure and
that the footings of his deck were stable.
Insurer liable for embankment stabilisation costs
Having carefully considered the available information, the panel is persuaded by the
complainant’s position.
Significantly, CES notes remediation of only the deck piers and supports is an unwarrantable
solution. This indicates no contractor could do such works given they cannot be warranted.
Presumably, this is because the deck is likely structurally compromised given the
embankment, which it is secured to as part of its foundation, is destabilised.
Importantly, the insurer’s evidence provides no assurance that if UBS’s scope of works were
followed, the deck would be safe to use given the embankment ’s instability . In particular, if the
deck cannot be used after such works because it is unsafe, then the panel does not accept it
has been repaired within the ordinary meaning of this term.
The complainant’s main argument is that all the experts agree that the only way to rectify the
deck, which must include its foundation, is to remediate the embankment. This is consistent
Determination | Case number: 941538 Page 4 of 5
with the expert evidence. The expert evidence provides no support to the insurer’s position
that the deck could be repaired without stabilising the embankment. A short term,
unwarrantable solution, is not a viable repair method or one in line with the policy.
The insurer has not proposed any other method that would repair the deck. The panel is not
persuaded its current position would repair the deck given the embankment, which it is
founded on, is unstable and likely renders the deck unsafe.
Regarding the insurer’s argument that soil is not covered, this is not persuasive. As the
complainant submitted, he is not claiming for loss or damage to soil. He is claiming for
damage to the deck. The insurer accepts it is liable to repair the deck. It must therefore pay
for the cost to repair the deck. The exchanged information shows this likely includes the cost
to stabilise the embankment. There is no exclusion or limitation in the policy that says if repair
costs include the cost to stabilise soil, this can be excluded.
The insurer has referred to the embankment having pre-existing erosion and this being
excluded. However, all of the expert evidence, as well as the insurer’s own claim decision,
accept the claimed event damaged the deck by destabilising the embankment it is founded
on. None of the experts said the proximate cause of damage to the deck was the pre-existing
nature of the embankment.
Therefore, the insurer is liable for the deck and its cost of repair. For reasons outlined above,
this would likely include the cost to stabilise the embankment it is founded on.
Insurer to assess a fair amount for stabilisation costs
T he complainant’s claim is significant. He has spent $538,865.25.
It is not clear from the exchanged information if this was the most cost effective way to repair
the deck that satisfies the insurer’s policy obligations. For instance, CS’s report had several
possible methods that appear fairly cost effective. However, it is not clear how effective or
practical they were. It is also not clear all other practical methods were explored by the
complainant given the dispute proceeded due to the insurer refusing to meet the stabilisation
costs.
Given this, and the significant amount sought, the panel considers it fair the insurer be given
an opportunity to assess the complainant’s cost and explore any other alternative practical
methods that would enable it to effectively repair the deck in line with its policy obligations. In
doing so, the complainant must provide reasonable co-operation with the insurer and its
contractors.
If the parties are unable to agree on the quantum payable, the complainant can lodge a new
complaint at AFCA for a decision on this point.
Determination | Case number: 941538 Page 5 of 5
3 Supporting information
3.1 The AFCA process
AFCA’s appr oach is based on fairness
AFCA has determined this complaint based on what is fair in all the circumstances, having
regard to:
the legal principles
applicable industry codes or guidance
good industry practice
previous decisions of AFCA or its predecessor schemes (which are not binding).
The respective parties have completed a full exchange of the relevant information, and each
party has had the opportunity to address any issues raised. We have reviewed and
considered all of the information the parties have provided.
While the parties have raised a number of issues in their submissions, we have restricted this
determination to the issues that are relevant to the outcome.
A panel determined this matter
Due to the nature of this complaint, we referred it to a panel for determination. The panel
includes:
an ombudsman
a member with significant experience in consumer and small business advocacy
a member with extensive experience in the insurance industry.
We assess complaints on available information and circumstances
AFCA is not a court of law. We do not have the power to take or test evidence on oath, or to
require third parties to give evidence.
When we assess complaints, we consider:
available documents
the recollections of the parties
all relevant circumstances.
We give more weight to documents created at the time the events occurred. If there are no
relevant documents, we will decide what most likely occurred based on the available
information.
If there are conflicting recollections and these are evenly weighted, we may find that a claim
cannot be established.