Complainant sought further settlement beyond sum insured after fire, alleging misleading sum insured calculator, inadequate make safe, claim mishandling and delay, and loss of rent
Text of the determination
Determination
Case number 941426
Financial firm Allianz Australia General Insurance Limited
Determination | Case number: 941426 Page 1 of 9
Case number: 941426 27 September 2023
1 Determination overview
1.1 Complaint
The complainant held a landlord insurance policy with the financial firm (insurer). She lodged
a claim for the resulting damage when her property was significantly damaged by a fire on 30
August 2022. The insurer accepted the claim and cash settled the complainant for the
building sum insured ($200,000) plus the demolition costs limit (10% of the building sum
insured), less the $5,000 policy excess. It also made a second payment to her for the sum
insured safety net (20% of building sum insured), less the temporary fencing cost ($261.80).
The complainant says the insurer is liable for further settlement payments because:
the make safe work was inadequate
the insurer mishandled the claim, causing delays which have led to additional property
damage beyond the policy limit
she is entitled to loss of rental income in addition to the claim settlement
she was under-insured because she was misled by the insurer‟s website estimating tool.
The insurer disagrees and says it has settled the claim up to the limit of its liability. The
insurer acknowledges some claim mishandling but maintains this has not resulted in the
additional losses claimed. It says it is not liable beyond the settlement already paid.
1.2 Issues and key findings
Has insurer misled complainant about the sum insured?
No. The complainant has the onus to ensure that the policy meets her needs. The evidence
does not show the under-insurance occurred because the insurer misled her.
Is insurer liable for alleged claim mishandling?
No. The insurer has handled the claim reasonably overall and compensation is not warranted.
Has insurer correctly assessed its liability for the fire claim?
Yes. The insurer has appropriately assessed its liability under the policy. The complainant‟s
various submissions have not shown the insurer should increase the settlement made.
Why is the outcome fair?
The events the complainant described are unfortunate and it is clear she faces substantial
financial loss. However, the property was under-insured, and it was the complainant ‟s
responsibility to ensure she had adequate cover in place. She has not established the insurer
was responsible for that. It would not be fair to require the insurer to increase its settlement
beyond the policy limits, when it has not been shown it has any further liability for her loss.
1.3 Determination
This determination is in favour of the insurer. It is not required to take any further action.
Determination | Case number: 941426 Page 2 of 9
2 Reasons for determination
2.1 Has insurer misled complainant about the sum insured?
Complainant has the onus to ensure she is sufficiently insured
The complainant is responsible for ensuring the insurance cover she takes out is adequate for
her needs and circumstances. She claims, however, that she was under-insured for building
damage because the insurer misled her about the amount she needed to insure the property.
There is no dispute the sum insured under the policy for building damage was $200,000 at
the time of the loss, with a $5,000 policy excess. The policy does not include optional
contents cover or landlord extras cover.
Policy was taken out online by the complainant
The complainant took out the policy online and she did not speak to any of the insurer‟s
representatives while doing so. The complainant‟s position is that she was misled by relying
on an estimate offered by a sum insured calculator during the online policy setup process.
The complainant says market value for rebuilding the property at the time of taking out the
policy was $500,000. She says the insurer‟s estimate tool at the time she lodged the AFCA
complaint showed a value of $330,000, which is after an increase in building costs.
Complainant’s evidence is insufficient to show she was misled by insurer
On the available evidence, the panel is not satisfied it would be fair to set aside the sum
insured limit. The insurer‟s calculator tool and prefilled option on the website is clearly
accompanied by disclaimers explaining these are estimates which do not take into account
th e full circumstances of the complainant‟s property.
At each stage of the policy inception process, there is evidence of warnings about the
suggested figure being an estimate, which does not allow for the specifics of the particular
property. It cautions the complainant to review the data and the assumptions it uses to arrive
at the figure and adjust it accordingly. The panel is satisfied the insurer did caution the
complainant against relying on the estimate figure alone.
The panel also notes the sum insured ultimately selected is a round figure. It would be
unusual for a calculator tool to supply an exact figure rounded to the nearest $100,000 mark.
This means the panel considers it is more likely than not that the complainant has selected
this figure when insuring the property.
The panel has considered whether the figure apparently selected by the complainant was
influenced by the estimate offered in the policy setup process. However, even if „ influenced ‟
by a figure, that does not necessarily mean she was misled by it, particularly given the
accompanying information provided by the insurer on the website, and the context of the
process. In the absence of any inter action with the insurer‟s staff (or any specific personal
advice from them), it is reasonable to expect the complainant would read the information the
insurer provided on the website to ensure the policy selected accurately reflected her needs.
The extract in the insurer‟s response dated 11 April 2023 shows a screenshot of the relevant
part of the policy application process. This clearly states:
Determination | Case number: 941426 Page 3 of 9
Before you use the estimate that has been generated as your sum insured, make
sure you review the data and assumptions used to confirm they‟re correct. Review
or recalculate your estimate here (this is a link). You can also enter a specific
value.
It appears more likely than not that the complainant read this, as a specific value was entered
as the sum insured. If she did not read and/or act on it, then she was at increased risk of
taking out cover for an incorrect/inadequate sum insured, which is what transpired.
The complainant‟s response suggests she did use the calculator but did not save the figure it
generated at the time. The insurer has provided further evidence from the creator of the
calculator (C) showing what using the calculator link looks like and the warnings it includes in
its use.
The panel is satisfied the disclaimers are clear and recommend the complainant fully
considers the information used in the creation of the figure and corrects any errors.
Finally, the complainant argued one of the reasons to consider she was misled is the figure in
the calculator being wildly inaccurate, as she alleges the calculator was still under-insuring
the property by $170,000 at the time of lodging the complaint. The complainant ‟s copy of the
report indicates the rebuild cost estimate at that time was $328,404.
However, the only evidence provided to support the cost of the rebuild is the complainant‟s
reported conversations with builders. She has not supplied an actionable quote, or any details
showing the value discussed is one the C estimate should have predicted, given the inputting
of correct specific information. Accordingly, the panel is not satisfied there is sufficient
evidence showing the value was inaccurate, based on the parameters/factors applied, nor
that it (or the context in which it was presented) was otherwise misleading.
While the panel empathises with the complainant‟s circumstances, the onus to ensure the
property is reasonably and adequately insured remains hers. The insurer did not give
personal advice regarding the value to apply for the purposes of insuring the property, or
indicate the estimate provided could be relied upon without further consideration.
The policy application process also provided the complainant with the opportunity and tools to
change the sum insured if she felt the estimate was too low.
2.2 Is the insurer liable for alleged claim mishandling?
Complainant argues three errors made by the insurer
The complainant‟s submissions show she considers there were three main errors by the
insurer which caused further damage and liability.
These are:
the decision to declare the building a total loss
the make safe work to the roof was inadequate and negligently so
the mishandling of the claim resulted in delays which, combined with make safe errors,
allowed additional water damage to the property.
Determination | Case number: 941426 Page 4 of 9
Insufficient evidence showing an error in the total loss assessment
The panel is not satisfied the complainant has shown the assessor was wrong in stating the
property was a total loss. The insurer supplied a report from its building consultant (SW)
advising the reasons it believes the building is beyond economical repair. This includes the
assessor‟s expert opinion that the footings are undersized by reference to current standards
(given the age of the building and the changes in the building Code since 1968).
The complainant has supplied a copy of the building footing plan which is presumably from
the building‟s original construction , since the measurements are in feet and inches. The
complainant has coupled this with an allegation that SW is not the correct expert to comment
on whether or not the building footings meet Code, as no such requirement was raised by her
rebuilding certifier.
The complainant has not provided any evidence showing SW‟s building consultant (a licensed
builder) is not suitably qualified to report on and assess the property. The panel is satisfied,
on balance, it is reasonable to accept his report and conclusions as part of the body of expert
evidence in this claim/complaint.
The complainant, by contrast, has not provided any expert evidence beyond the actions of
her current rebuilding certifier and what she can infer from them. Their qualifications are not
known, nor are their reasons for saying the property can be rebuilt on the existing
foundations.
The complainant‟s evidence is not sufficient to uphold her position over the insurer‟s. The
panel is not satisfied, on balance, she has established the insurer made an error when
assessing the building as a total loss.
Complainant has not shown make safe error caused additional loss
The complainant said the building consultant was not onsite until three months after the fire.
However, the insurer points out that SW did attend first on 8 September 2022, 9 days after
the fire. SW says that any further delay was because of the issue of likely asbestos
(considered below).
It is also important to note that the relevant experts said a tarpaulin could not be installed over
the exposed sections of roof as part of the make safe, because of structural issues. They
reported that they understood the complainant was going to try to arrange her own trades.
The complainant is claiming wood (fungal) decay and mould has developed since the fire.
She has provided an extract from a timber pest inspection report (from July 2023). That report
says there is evidence of fungal decay through most of the property, but does not identify the
property in question. Nor does the report address the cause or age of the damage.
The complainant has not provided evidence that there is additional loss beyond the rebuild
costs of the property as noted above; nor what, if any, error occurred that might have caused
such a loss. The available evidence shows the property already required a substantial rebuild.
The complainant herself conceded the property was beyond repair in her email to the insurer
of 7 December 2022. The panel is not satisfied there is sufficient evidence showing the
damage significantly increased during the period between the fire and that date, or that the
insurer was in any position to prevent any damage which may have occurred, given the state
of the property.
The insurer is not liable for any additional damage which may have arisen from further water
ingress, or otherwise, following the fire.
Determination | Case number: 941426 Page 5 of 9
Insurer has shown delay was reasonable and unavoidable
For completeness, the panel also reviewed the complainant‟s argu ment that the insurer
unreasonably delayed the claim as it did not request the police report sooner and that it
delayed make safe work because of an error in asbestos assessment, or that delays were
deliberate on the insurer‟s part.
The insurer has shown evidence the police had not completed their report and would not
make it available on 28 November 2022. This was shortly before the complainant‟s email of 7
December 2022 accepting the property was now damaged beyond repair. Accordingly, the
panel is satis fied even in the complainant‟s estimation of the timing of the property damage,
the delay in settling the claim was not something the insurer could reasonably have avoided.
In September 2022, SC identified asbestos in the property, saying it needed to be removed
by a licensed asbestos removalist. Protective fencing and asbestos signage were erected. In
December 2022, SW reported the asbestos make safe was to be put on hold at the
complainant ‟s request as she would undertake asbestos removal.
While it is arguable the original asbestos assessment may have been in error (given that it
was subsequently found there was no friable asbestos in the property), the panel is not
satisfied it would have been reasonable or practicable in the circumstances for the insurer to
have adopted the risk of allowing tradespeople or others into a property with possible
asbestos contamination. It followed expert guidance and did not receive any contrary
information until after 22 October 2022.
This means the only window in which the complainant might claim the insurer is liable for
delay is between 22 October 2022 and 7 December 2022. There is no evidence showing
what damage, separate from that arising from the water originally deposited by the fire
services, occurred during this time.
Finally, the panel sees no evidence the insurer made any attempt to deliberately delay the
outcome of the claim or complaint. The claim was lodged on 7 September 2022, and
settlement was completed by mid-January 2023. Given the nature of the complaint, and the
involvement of third parties such as the police, this timeframe is not excessive or unusual.
The panel is not satisfied the complainant has established the insurer should be liable for any
additional loss over and above the claim-related loss for which it has already accepted
liability.
Insurer entitled to cancel the policy
The complainant also disputes the insurer‟s cancellation of her policy, which it did after paying
the claim.
However, the PDS explains how a „total loss‟ claim affects cover, as follows:
If we pay a claim under part of the policy for the total sum insured, then your
insurance cover under the relevant part of the policy will end and no refund will be
given. …
Determination | Case number: 941426 Page 6 of 9
If you were paying your premium by monthly instalments, the balance of your
annual premium will be deducted from your claim. You‟ll need to take out new
insurance to cover any replacement property.
The PDS defines „total loss‟ as:
when the property insured is damaged or destroyed to such an extent it cannot be
rebuilt or repaired and/or the total sum insured under the policy has been
exhausted.
The panel is satisfied the damage to the property meant the insurer was entitled to treat it as
a total loss. The total building sum insured has been exhausted. That means the insurer was
also entitled to bring the policy to an end and retain the balance owing for the annual
premium.
2.3 Has insurer correctly assessed its liability for fire claim?
Insurer has assessed its liability against the correct policy wording
The panel is satisfied the insurer used the correct policy wording when it assessed its liability
to the complainant. The PDS in place at the time the complainant‟s policy began, and
applicable at the time of the loss, is the one effective 20 August 2021.
The panel notes the image of the PDS sent to the complainant following the fire is a later
version and accepts this was an error made by the insurer. However, this does not mean the
insurer is bound to use the incorrect PDS. Further, given the nature of the complaint, the
panel is not satisfied it has substantially affected the outcome of the claim or caused
substantial additional disturbance to the complainant.
Evidence does not show the policy wording is unclear
The panel is not satisfied the wording of the policy is confusing. The complainant believes the
use of the word additional in “additional benefit” is confusing as not all benefits are payable in
addition to the building sum insured.
The policy documents make no representation that all additional benefits are paid or apply in
addition to the building sum insured. The PDS clearly identifies (in table form) those which do
apply in addition to the sum insured (such as the sum insured safety net, and the demolition
and removal of debris) and it clearly separately sets out those which are paid as part of the
sum insured (for example, loss of rental income).
The panel is satisfied the insurer can rely on the policy wording when settling the claim.
Insurer has correctly identified benefits exceeding sum insured limit
The insurer cash settled the claim as a total loss by paying the building sum insured
($200,000) less policy excess of $5,000. The policy provided the following additional benefits
in addition to the building sum insured: the „sum insured safety net‟ (being $40,000, that is
20% of the sum insured) and cost of demolition and removal of debris ($20,000, which is 10%
of the sum insured). These have also been paid to the complainant, less the hire cost of the
fence ($261.80), since emergency repairs and protection are included in the sum insured
amount. The total settlement paid was $254,738.20.
Determination | Case number: 941426 Page 7 of 9
Having reviewed the policy documents, the panel is satisfied all the additional benefits, except
the sum insured safety net and the demolition and removal of debris, are limited to being
payable within the building sum insured.
Accordingly, the panel is satisfied the insurer is entitled to limit its liability to the maximum of
the building sum insured, and these two additional benefits.
As the complainant holds the quality care level of cover, this means she is entitled to up to
20% additional to the sum insured for the sum insured safety net, and up to 10% additional to
the sum insured for demolition and remove of debris.
The insurer has settled the full value of these liabilities to the complainant, less deductions it
is entitled to make.
For completeness, the panel notes any entitlement to loss of rent under the policy is payable
as part of the building sum insured. As the full building sum insured has been paid, the
insurer is not required to pay anything further for loss of rent.
Evidence shows insurer’s settlement has met its liability
The panel is satisfied the insurer‟s assessment of its liability is thorou gh, has taken
appropriate account of the relevant facts, and that the insurer has attempted to work with the
complainant‟s requests in a difficult under-insurance situation.
In summary, the panel is satisfied:
the complainant had the onus to ensure she was properly insured for her investment asset
on balance, the insurer did not mislead her about the building sum insured
on balance, the insurer did not cause additional loss due to claim mishandling
the insurer assessed the claim based on the correct policy wording
the policy wording is clear
the insurer‟s assessment of its liability is accurate
the insurer has appropriately settled its liability to the complainant.
The panel recognises the difficulties faced by the complainant. It is clear there is a substantial
financial loss as a result of the fire and circumstances outside her control.
However, t he complainant‟s various submissions about alleged misleading information, policy
vagueness, claim mishandling, make safe error, claim decision delay, incorrect assessment,
and policy misinterpretation have not been substantiated based on the evidence provided.
As the insurer has already settled the full value of the claim, no further action is required of it
in these circumstances.
Granny flat also damaged
The complainant has also said the damage to the granny flat on the property has not been
assessed. She says that damage was not from the fire, but was from malicious damage by
the tenants.
It is not in dispute that the fire which damaged the main residence was attributed to the
tenants using the property as a 'grow house' for the cultivation of marijuana. The insurer
refers to the policy exclusion which applies to loss or damage caused by or arising from
„m alicious acts of a person who is at the insured site with your consent or the consent of
someone who lives at the insured site „. That exclusion applies unless the o ptional Landlord
Extras cover was taken out, in which case cover up to $30,000 for the malicious damage
Determination | Case number: 941426 Page 8 of 9
would have been payable. However, the complainant had not purchased that optional extra
cover.
The insurer says that on the basis of that exclusion, it was open to it to decline the claim in its
entirety. The panel agrees.
The panel is satisfied the insurer has no further liability for the damage to the granny flat.
2.4 Why is the outcome fair?
The events the complainant has described are unfortunate.
However, the available evidence does not establish the insurer acted unreasonably in its
handling of the claim or other than within the policy terms.
It would not be fair to require the insurer to pay more for the claim than the amounts for which
it is liable under the terms of the policy.
Determination | Case number: 941426 Page 9 of 9
3 Supporting information
3.1 The AFCA process
AFCA’s approach is based on fairness
AFCA has determined this complaint based on what is fair in all the circumstances, having
regard to:
the legal principles
applicable industry codes or guidance
good industry practice
previous decisions of AFCA or its predecessor schemes (which are not binding).
The respective parties have completed a full exchange of the relevant information, and each
party has had the opportunity to address any issues raised. We have reviewed and
considered all of the information the parties have provided.
While the parties have raised a number of issues in their submissions, we have restricted this
determination to the issues that are relevant to the outcome.
A panel determined this matter
Due to the nature of this complaint, we referred it to a panel for determination. The panel
includes:
an ombudsman
a member with significant experience in consumer and small business advocacy
a member with extensive experience in the insurance industry.
We assess complaints on available information and circumstances
AFCA is not a court of law. We do not have the power to take or test evidence on oath, or to
require third parties to give evidence.
When we assess complaints, we consider:
available documents
the recollections of the parties
all relevant circumstances.
We give more weight to documents created at the time the events occurred. If there are no
relevant documents, we will decide what most likely occurred based on the available
information.
If there are conflicting recollections and these are evenly weighted, we may find that a claim
cannot be established.