Insurer declined home claim for water damage, saying it was gradual deterioration/defects rather than storm
Summary
The insurer declined a home claim for water ingress after heavy rain, saying the damage was from a failed waterproofing membrane and gradual deterioration. AFCA found in favour of the complainants and required the insurer to obtain a scope of works and either cash settle with a 15% uplift or arrange repairs.
The complainants showed sudden accidental damage, and the insurer did not prove on balance that the defects, deterioration or underground water exclusions were the proximate cause.
Subjects and remedies
home or building damagenatural disasterpay claimrepair or rectify
Text of the determination
Determination
Case number 941006
Financial firm Hollard Insurance Partners Limited
Determination | Case number: 941006 Page 1 of 5
Case number: 941006 11 September 2023
1 Determination overview
1.1 Complaint
The complainants hold a home insurance policy with the financial firm (insurer). They lodged
a claim on 2 February 2022 for damage to the property which they say was due to a storm.
The insurer declined the claim and says the damage is not consistent with a storm event or
any other insured event. It says the complainants have not established a claimable loss under
the policy. Further, it says the damage is due to water seeping through the retaining wall. This
is because the waterproofing membrane is inadequate or has failed. Therefore, the cause of
the damage is gradual deterioration.
The complainants disagree with the insurer’s decision and seek that the claim is accepted.
They also say that section 46 of the Insurance Contracts Act 1984 (Cth) applies and that they
could not reasonably have known about the leak.
1.2 Issues and key findings
Is the insurer entitled to decline the claim?
No. The claim is covered under the accidental damage clause in the policy. On balance, the
insurer has not established that an exclusion applies. Accordingly, the insurer is not entitled to
decline the claim.
Why is the outcome fair?
I am not satisfied the insurer is entitled to decline the claim because it has not established
that any exclusions apply. In the circumstances, it is fair that the insurer is required to cover
the claim.
1.3 Determination
This determination is in favour of the complainant.
On being notified of the complainant’s acceptance, the insurer must within 14 days engage a
builder to provide an actionable scope of works and quote. Within 14 days of receiving this,
the insurer must either:
cash settle the complainant with a 15% uplift for contingencies and the loss of a lifetime
guarantee on repairs; or
confirm arrangements with the complainant to carry out the repairs in a reasonable time
frame and subject to the builder’s availability.
Determination | Case number: 941006 Page 2 of 5
2 Reasons for determination
2.1 Is the insurer entitled to decline the claim?
No. The claim is covered under the accidental damage clause in the policy. On balance, the
insurer has not established that an exclusion applies. Accordingly, the insurer is not entitled to
decline the claim.
Policy covers accidental loss or damage
The complainant is required to show, on the balance of probabilities (that it is more likely than
not), that there is a claimable loss under the policy. This means the complainant must prove
the loss or damage was caused by a risk that is covered under the policy.
Once the complainant proves there is a claimable loss, the insurer is liable for the loss unless
it shows an exclusion or limiting condition applies. The insurer has the onus of proving, on the
balance of probabilities, that the exclusion or condition applies.
The policy covers accidental loss or damage. The product disclosure statement (PDS) does
not define accident. However, the Macquarie Dictionary defines accident as ‘… anything that
happens unexpectedly, without designed or by chance’.
Insurer must show the proximate cause of the damage is excluded
I am satisfied the complainant has established a claimable loss under the policy because
there was damage to the property which was sudden and unexpected. The onus therefore
shifts to the insurer to show it is entitled to decline the claim.
The insurer refers to exclusions specific to the storm insured event. However, I do not
consider they are relevant since the complainant holds accidental damage cover.
However, the insurer also refers to the following general exclusions for loss or damage
caused directly or indirectly by or in any way connected with:
1. defects, structural or design faults, faulty workmanship or faulty design…
4. wear and tear, rust, corrosion and/or deterioration (except in some instances
relating to 'Sudden escape of liquid' and 'Legal liability' claims), but we will only
apply this exclusion if the loss or damage is directly caused by one or more of
these factors…
6. water/rainwater beneath surface of the land…
To deny the claim, the insurer must show the proximate cause of the damage falls within an
exclusion clause it is relying upon. This is a question of fact depending on the circumstances.
The proximate cause is not necessarily the first or last or the sole cause of the loss. It is the
effective, dominant or operative cause of the loss.
Complainants say a storm caused damage to the property
The complainant says the damage has been caused by storm. It has provided data from the
Bureau of Meteorology website which shows significant rainfall of 185mm in the three days
Determination | Case number: 941006 Page 3 of 5
prior to the damage occurring and an almost 80mm downpour (within only three hours) on the
date of loss. It also says the water entered the property with such significant force and over
3000L flowed through the property. Further, in the last significant storm in November 2021
(shortly after the complainant purchased the property) there was no water ingress at the
property.
The complainant has provided various reports, including a pre-purchase inspection report
dated 7 September 2021. The report from KS identifies various minor defects. It says the
property is otherwise in good condition subject to certain unapproved building works relating
to two retaining walls. There was no issue with the ceilings, no dampness or damp damage to
internal walls, no staining or corrosion to windows or doors and no water damage to the
property. The drainage effectiveness of surface water was said to be ‘OK’.
The complaint has also provided a plumbing report dated 7 September 2021 from CP which
lists most items in the home as being in good condition and the balance as being in fair
condition (excluding a couple of items related to the gas reticulation which are listed as poor
condition).
The complainant’s builder, BS, has provided a letter dated 28 March 2023 which states:
there is no evidence of failure of building practices or procedures with regard to
waterproofing and drainage. In my opinion the rain event that occurred was not
common and the large amount of rain in a short period would overwhelm any
building in this situation, therefore could not be deemed as a defect.
A letter has been provided by a mechanical engineer, VD, as well. It says:
an engineering assessment was conducted to determine the quality and condition of the
waterproofing system and drainage at the property;
the data from the Australian Government Bureau of Meteorology last updated on 23-MAR-
23, the mean rainfall in February was, 41.5 mm and on the 2nd of February 2022, 86.4 mm
of rainfall was recorded with winds at 46 km/h in a SE direction;
on surveying and inspecting the property, he concluded that the waterproofing system and
drainage of the property are sufficient for the average rain events in Alice Springs but
would be unable to stand against significant rain events; and
additional testing of the waterproofing system referencing AS4654.1 could further
determine the durability and condition of the design and materials present within the
property.
Insurer provided reports commenting on the cause of damage
The insurer appointed an assessor, CC, to attend the property and report on the cause of the
damage. CC states:
the complainant advised that due to the heavy rains a large amount of water was seeping
through the back of the retaining wall and running into the internal areas of the home;
the damage has been caused by water that has seeped through the retaining wall at the
split level of the home;
they suggest the damage has been caused due to the failure of the waterproofing
membrane at the back of the split level retaining wall or the waterproofing membrane is
inadequate;
given the amount of water, it is likely the waterproofing membrane has split allowing water
to run through the wall;
Determination | Case number: 941006 Page 4 of 5
they suggest there has been a previous issue with water entry through the wall that was
not disclosed by the previous owners;
no water entry has occurred through the roof and the roof is in good condition;
if clarification is required, a structural engineer should be appointed; and
the complainants should engage a contractor to seal the retaining wall to prevent further
water seepage through the wall.
The insurer also relies on a report from a plumber, JJ, who states:
after the storm water drain exits the building, the drain steps up creating a pooling area
before discharging at the current outlet height. The current outlet is also blocked which
would cause the drain to hold water behind the lounge room retaining wall;
this can be rectified by renewing and re-falling a section of the drainage on the left-hand
side of the property;
in its opinion, ‘the water proofing of the retaining wall is not up to standard and the
contributing factor causing water ingress during rain fall and leaking into the living room of
the dwelling’.
Information does show damage due to storm
To deny the claim, the insurer must show the proximate cause of the damage falls within an
exclusion in the policy. When deciding whether the exclusion applies, I need to be satisfied
the proximate cause of the damage is, in broad terms, defects, deterioration or rainwater
under the surface of the land (exclusions 1, 4 and 6 respectively). This is a question of fact
depending on the circumstances.
I acknowledge the comments of CC and JJ regarding the damage and cause of the damage
to the property. However, having reviewed all the available information, I am not satisfied, on
balance, that the insurer has established that any of the exclusions apply. As to the defects
exclusion, I cannot be satisfied that this is triggered based on the limited information provided
by the insurer. There is no reference to the relevant Australian Standards or any other
information which establishes, on balance, a defect or faulty workmanship or design. I also do
not consider, on balance, there is sufficient evidence to establish that the deterioration
exclusion applies. I accept there may be some deterioration and that it may have contribute d
to the damage. However, I do not consider it to be the effective or dominant cause. I
otherwise do not consider there is any evidence of water beneath the surface of the land.
Based on the insurer’s own evidence, t he damage has been caused by water that has
seeped through the retaining wall at the split level of the home.
On balance, I consider that there was significant rainfall as evidenced from the data provided.
Therefore, it is more probable than not that the storm is the cause of the damage. The onus is
on the insurer to establish that the exclusion applies in light of the complainant’s accidental
damage cover. However, I do not consider the insurer has established that an exclusion
applies. Accordingly, the insurer must accept and settle the claim in accordance with the
terms and conditions of the policy.
2.2 Why is the outcome fair?
I am not satisfied the insurer is entitled to decline the claim because it has not established
that any exclusions apply. In the circumstances, it is fair that the insurer is required to cover
the claim.
Determination | Case number: 941006 Page 5 of 5
3 Supporting information
3.1 The AFCA process
AFCA’s approach is based on fairness
AFCA has determined this complaint based on what is fair in all the circumstances, having
regard to:
the legal principles
applicable industry codes or guidance
good industry practice
previous decisions of AFCA or its predecessor schemes (which are not binding).
The respective parties have completed a full exchange of the relevant information, and each
party has had the opportunity to address any issues raised. We have reviewed and
considered all of the information the parties have provided.
While the parties have raised a number of issues in their submissions, we have restricted this
determination to the issues that are relevant to the outcome.
AFCA is not a court of law. We do not have the power to take or test evidence on oath, or to
require third parties to give evidence.
When we assess complaints, we consider:
available documents
the recollections of the parties
all relevant circumstances.
We give more weight to documents created at the time the events occurred. If there are no
relevant documents, we will decide what most likely occurred based on the available
information.
If there are conflicting recollections and these are evenly weighted, we may find that a claim
cannot be established.