Home / IAG / Determination 940966

Determination 940966

Partial denial of storm damage claim on exclusions, cash settlement amount, mould, temporary accommodation and non-financial loss

FirmIAG
Decided2023-11-30
ProductGeneral Insurance · Home building and contents
OutcomeFor the complainant in part
Amount awarded—
Non-financial loss—
Amount claimed—
SourceAFCA PDF

Summary

The insurer partly accepted a storm damage claim and offered a $14,921.02 cash settlement, declining roof, patio and laundry damage as excluded. AFCA upheld the exclusions but required the insurer to cash settle on an updated quote from the second builder plus a 20% uplift, with no non-financial loss.

The insurer proved the disputed damage came from excluded causes (deterioration, faulty workmanship, lack of maintenance), but its cash settlement was based on an outdated, less detailed scope of works.

Issues

Subjects and remedies

home or building damagenatural disasterpay claim

Related

All IAG determinations · Find similar determinations

Text of the determination

Determination Case number 940966 Financial firm Insurance Australia Limited Determination | Case number: 940966 Page 1 of 8 Case number: 940966 28 November 2023 1 Determination overview 1.1 Complaint The complainant and FH hold home building and contents insurance with the financial firm (insurer). On 1 September 2022, the complainant lodged a claim for damage to her recently built home. She said that the damage had been caused by a storm on 16 February 2022. The insurer partially accepted the claim and in July 2023 offered a $14,921.02 cash settlement for the resultant water ingress damage. However, it says that the damage to the roof, patio and laundry door jamb was not due to the storm. Rather, that damage was from excluded causes, including gradual deterioration, faulty workmanship and lack of maintenance. The complainant says the storm caused all the damage, and that the insurer failed to remediate mould. She wants the insurer to attend to repairs or pay a higher cash settlement. She also seeks temporary accommodation (TA) costs and non-financial loss compensation. 1.2 Issues and key findings Is the insurer entitled to partially deny the claim? Yes. The insurer has established the disputed damage was due to excluded causes. I am not satisfied that the insurer is responsible for the mould growth. Accordingly, the insurer is not required to pay for further TA either. Is the insurer required to pay a higher cash settlement? Yes. The insurer ’s offer was based on a scope of works (SOW) dated 14 November 2022 and included a 20% contingencies uplift. However, it obtained a more detailed SOW in January 2023, which appears to have quoted a higher amount. It is to cash settle based on a new quote from the second builder and pay a 20% uplift to allow for price increases. Is non-financial loss compensation payable? No. Overall, the insurer has handled the claim reasonably and without undue delay. Why is the outcome fair? It would not be fair to require the insurer to accept more of the claim, as it has established the disputed damage is the result of excluded causes. It is fair that the insurer cash settles by reference to an updated retail quote, plus a 20% uplift. As the insurer handled the claim reasonably overall, it would be unfair to require it to pay compensation. 1.3 Determination This determination is substantially in favour of the insurer. If the complainant provides written notice she accepts this determination, the insurer is to pay her a cash settlement in accordance with section 2.2 of this determination. Determination | Case number: 940966 Page 2 of 8 2 Reasons for determination 2.1 Is the insurer entitled to partially deny the claim? Yes. The insurer has established the disputed damage was due to excluded causes. I am not satisfied that the insurer is responsible for the mould growth. Accordingly, the insurer is not required to pay for further TA either. Complainant must show a claimable loss under the policy The complainant is required to show on the balance of probabilities (that it is more likely than not), that she suffered a claimable loss under the policy. This means she must show the loss was caused by a risk for which she is insured. Subject to the terms and conditions set out in the product disclosure statement (PDS), the policy covers damage to the complainant’s home caused by a listed insured event. Those events include ‘Storm’. The policy also includes accidental damage cover, meaning the complainant’s home is insured against ‘ damage that is caused unintentionally ’. On 1 September 2022, the complainant notified the insurer that during a storm on 16 February 2022, she had noticed her hallway ceiling was sagging. She appointed her own trade, which identified and rectified a leak where the TV antenna was fixed to the roof. More recently, she had noticed her bedroom ceiling was sagging so she lodged the claim. The insurer accepts that the complainant has shown a claimable loss under the policy for water ingress damage to bedroom one and the living room. However, it says other damage to the home, including its roof, is excluded from cover. Once the complainant proves the existence of a claimable loss, the insurer is liable for the loss unless it shows an exclusion or limiting condition applies. The insurer has the onus of proving on the balance of probabilities the application of the exclusion or condition. Insurer says it is entitled to partially deny the claim The insurer says that when the complainant notified it of the claim, she advised that she would be overseas for five weeks. After inspecting the home’s roof on 26 September 2022, roofer NM identified the following concerns:  the roof sheets had insufficient turn down, which was enabling water ingress  silicone around the TV antenna had failed, leading to water ingress  loose screws on the barge towards the rear of the home was allowing water ingress into the rear room (bedroom one)  the rain head needed overflows installed at the correct height to prevent water ingress. On 12 October 2022, the insurer’s electrician, TR, undertook a make safe assessment. TR said a leak in bedroom one’s ceiling had resulted in water travelling into the power feed and curtain motors. TR isolated the motors and re-energised the upstairs power circuit. On the same day, restorer CD attended as the complainant was concerned about mould growth. CD found high moisture levels in bedroom one's ceiling and walls, and the ceiling was water stained. However, no mould was found. CD sprayed antimicrobial product into the ceiling cavity as a preventative measure. Driers were not installed as the leak was ongoing. Determination | Case number: 940966 Page 3 of 8 On 26 October 2022, roofer BR provided a roof inspection report. BR said the home’s builder had resealed parts of the box gutter which had split. BR said splits in the seal should not have occurred so soon after construction. It also found a split in the outlet which it resealed. Restorer CR attended the same day, seemingly in relation to the contents claim (which is not the subject of this complaint). CR identified elevated moistur e readings in bedroom one’s floating timber floor. There was no visible mould, but CR applied an antimicrobial spray. CR recommended that a builder be appointed to undertake further investigations. Restorer LF provided a contents assessment report in October 2022. LF also said no mould growth was visible. Builder EC inspected the home on 17 November 2022. It noted bedroom one and the living room had water damage from the storm. EC said the issues NM had identified were maintenance related. TA was not required and would not be required during repairs. As the complainant was dissatisfied with EC, the insurer engaged builder JL. On 17 January 2023, JL reported that water had breached the ceiling cavity due to the flashing being improperly installed. JL also said TA was not needed. JL reattended the home on 30 March 2023. JL advised the water damage to the patio’s plasterboard ceiling was due to faulty workmanship, not the storm. JL also said water damage to the laundry door appeared to be from rising damp, possibly due to failed waterproofing. The complainant subsequently said she did not want JL to be further involved in the claim. The insurer also relies on a causation report dated 29 June 2023 by SE, engineer. SE said:  the wall and ceiling lining within bedroom one did not have an elevated moisture reading  the damage to bedroom one ceiling, wall and floor was caused by defective workmanship: > loose fixing of the roof flashing > defectively sealed joint and junction of the parapet capping, flashing and box gutter  the damage to the living room ceiling was caused by: > long-term deterioration of sealant around the antenna penetration > defective workmanship – inadequate sealant details on pan flashings and inadequate flashing around roof penetration flashings  the damage to the laundry door jamb was caused by defective design/workmanship: > possible inadequate cavity flashings to the external wall and/or window openings > likely failed waterproofing membrane to the tiled area above the laundry  the damage to the patio soffit lining was caused by: > likely unsealed and/or deteriorated sealant around the bay window > likely failed waterproofing membrane to the balcony above the patio  as the home was built in 2019, the defects may be within the statutory warranty period. SE provided a report dated 31 July 2023, responding to the report dated 22 July 2023 by the complainant’s builder, FT. SE maintained that the flashing/box gutter had been originally defectively installed. It conceded that its opinion on the laundry door jamb had not been confirmed by spray testing and noted it had recommended such testing in its first report. The insurer says that the disputed damage is not covered because the PDS contains general exclusions for damage arising from:  gradual deterioration, wear or tear  faulty design or workmanship  not maintaining the home in good repair and condition. The insurer also says:  make safe repairs were delayed due to the complainant being overseas Determination | Case number: 940966 Page 4 of 8  it is not responsible for mould remediation given its experts did not identify any mould. Further, to the extent mould may be present, it is due to building defects  there is no need for TA due to claim related damage. Its earlier payment for six weeks of TA was a goodwill gesture as the complainant had disclosed she had a medical condition. Complainant says the insurer is liable for all the damage The home was built by builder FT. In a report dated 22 July 2023, FT said:  contrary to SE’s report, the roof’s installer (CH) had confirmed all joints had been sealed to, and in some areas beyond, Australian Standard requirements  after the roof had been fixed nearly a year ago, there had been no more leaks  SE’s opinion regarding the laundry door jamb was speculative as water testing had not been undertaken. Further, it was unlikely there was a problem with the waterproofing or flashing. If there was, the damage would be more widespread. The complainant has also submitted a $53,700 quote FT provided on 3 December 2022 for repairs to bedroom one, the living room, the laundry and the patio. FT stated on the quote that water had penetrated through a loose screw at the box gutter, and around the antenna. Also, the patio had some damage ‘around the gutter for the motorized roof’. The complainant has provided an email dated 13 October 2023, from CH. According to CH:  the roof was completed in July 2018 with no defects or issues (CH attached the roof compliance certificate he had issued on 10 July 2022)  in February 2022, the complainant identified a leak in the living room. He attended and repaired a problem with the antenna penetration sealing, after which there were no issues  in September 2022, the complainant reported an issue in bedroom one. He attended on 4 October 2022 and found a screw had come loose meaning the neo rubber seal was not in full contact. He retightened the screw, and as a precaution, did some resealing of the box gutter joints. Since then, no further issues were reported  he had originally installed the box guttering and had corrected sealed all joints at the time. In addition, the complainant has provided a copy of the occupation certificate for the home dated 23 February 2022. The complainant has provided a quote dated 5 January 2023 from SS, mould cleaner. SS quoted $12,100 for extensive mould remediation work, which it estimated would take five days to complete. She has also provided the results of environmental testing undertaken by HL in September 2023. The results show elevated levels of active mould growth in the wall below the leak area in bedroom one. A second mould cleaner, MF, has provided a quote dated 4 October 2023, totalling $2,915.90. MF said mould was evident in the ‘Upstairs ceiling, cavity, insulation, wall, ceiling and wall studs and frames, below and under floor boards’. The complainant says the home was in good condition until the storm, when the leaks started. She also says the insurer delayed make safe repairs, even though her adult daughter occupied the home while she was overseas. Further, the make safe repairs did not stop the leaking. She says the insurer is therefore responsible for the mould growth. She submits that in the circumstances, the insurer should cover all the damage. the insurer should provide TA until repairs are completed, including complete mould remediation. Determination | Case number: 940966 Page 5 of 8 Insurer is entitled to partially deny the claim Based on the exchanged information, I am satisfied that the insurer has established the disputed damage was due to excluded causes. This is because:  NM, BR, EC, JL and SE each expressed opinions strongly in support of the insurer’s position. NM, BR and SE also provided images of the deterioration, defects and faulty workmanship they had identified  SE’s first report contains detailed analysis, including by reference to applicable Australian Standards and the Building Code of Australia, supported by images and diagrams. I find it persuasive  FT’s quote and CH’s email support a finding that the water ingress was due to issues that (at least) amounted to maintenance concerns  FT and CH were both involved in the home’s construc tion and were aware before they provided their opinions that the insurer considered there were building defects and faulty workmanship. I am not satisfied their views can be regarded as completely independent  the occupation certificate confirmed that following completion of the building work, the home was suitable for occupation. However, it was not a guarantee the home was free from defects. I acknowledge that the parties disagree on whether the home could have been accessed earlier than late September 2022 to undertake make safe repairs. However, the insurer’s claim notes indicate the complainant was told on 30 September 2022 of NM’s findings and that they involved maintenance issues. On 12 and 26 October 2022, the insurer’s trades (CR and CD) sprayed antimicrobial product in bedroom one despite finding no mould. LF also said there was no visible mould. I accept that mould growth was later identified by SS, HL and MF. However, I am not satisfied the insurer is responsible for the mould growth. It took reasonable precautionary steps at a relatively early stage. Further, the causes of the water ingress are excluded. I am also satisfied that the insurer is not required to pay for further TA. It is not responsible for the mould growth and its two builders have both confirmed TA is not required due to the claim related damage. Accordingly, the insurer is not required to accept more of the claim. 2.2 Is the insurer required to pay a higher cash settlement? Yes. The insurer’s offer was based on a scope of works (SOW) da ted 14 November 2022 and included a 20% contingencies uplift. However, it obtained a more detailed SOW in January 2023, which appears to have quoted a higher amount. It is to cash settle based on a new quote from the second builder and pay a 20% uplift to allow for price increases. Insurer has offered a cash settlement EC provided an SOW dated 14 November 2022 for the claim related repairs, totalling $12,434.19. The pricing for individual items has been redacted. On 17 January 2023, JL provided an SOW and quote for the claim related repairs. The total on the version the insurer has submitted to AFCA is redacted. There are some individually priced items. After adding plus the stated 19% builder’s margin and GST, those items amount to $12,361.99. There are also numerous items priced a $0. Determination | Case number: 940966 Page 6 of 8 The insurer was initially prepared to attend to the claim related repairs. However, after receiving SE’s report dated 29 June 2023, it became concerned about whether those repairs would be warrantable given the identified building defects. The insurer sent SE’s report to EC and asked it to revisit its SOW. The insurer did not send SE’s report to JL. On 7 July 2023, EC advised its SOW/quote remained accurate, but it would not be able to warrant the repairs. On 13 July 2023, the insurer offered the complainant $11,684.19 as a cash settlement. That figure was EC’s quoted amount less the $750 policy excess. Later, it offered the full $12,434.19 quoted by EC. On 25 July 2023, the insurer increased its offer to $14,921.02 by appl ying a 20% uplift to EC’s quoted price. Complainant says insurer’s offer is inadequate The complainant says the insurer’s cash settlement offer is manifestly inadequate. She relies on FT’s $53,700 quote dated 3 December 2022 for repairs to bedroom one, the living room, the laundry and the patio. She also says that on 5 March 2023, she signed a contract with JL for it to undertake claim related repairs. She says JL told her the work would cost approximately $22,000. The contract form JL provided to the complainant relates to domestic building works over $20,000. Insurer is required to pay a higher cash settlement I am satisfied that it is reasonable for the complainant’s claim to be cash settled because of the excluded damage identified by SE (and other experts). A cash settlement must be based on a reasonable quote for claim related repairs, as payable by a consumer. An uplift is then typically applied to the quoted amount to allow for contingencies and the loss of the lifetime guarantee that applies to insurer approved repairs. After the excluded aspects are deducted from FT’s quote, the figure is reduced to $41,621.80 ($6,080.80 for the living room and $35,541 for bedroom one). That is more than three times what EC has quoted for the claim repairs and nearly double what the complainant said JL told her the claim related repairs would cost. Having regard to the various expert reports and the images of the damage, I am not satisfied that FT’s reduced quo te is reasonable. The insurer has not expla ined why it relies on EC’s SOW rather than JL’s SOW. Both SOW only concern repairs to bedroom one an d to the living room. JL’s SOW is more detailed and more recent . I am satisfied that JL’s SOW better represents the reasonable the claim related repairs. However, I am not satisfied that JL has provided a quote that reasonably reflects the cost of claim related repairs payable by a consumer such as the complainant. The items JL has priced at $0 include the cost of demolition, insurance and scaffolding. Further, the total is redacted (although there are indications reasonably suggesting it was over $20,000). Finally, the quote is now over nine months old, and prices are likely to have increased. If the complainant provides written notice that she accepts this determination (notice), the insurer is required to take the following steps: Determination | Case number: 940966 Page 7 of 8  within 14 days of receiving the notice, the insurer is to request JL to provide an updated desktop quote for claim related repairs based on its 17 January 2023 and current retail prices  within 14 days of receiving JL’s updated quote, the insurer is to provide the complainant with a copy of it and pay her the quoted amount plus a 20% contingencies uplift. The insurer is entitled to deduct the $750 policy excess if it is yet to be collected. 2.3 Is non-financial loss compensation payable? No. Overall, the insurer has handled the claim reasonably and without undue delay. AFCA can award compensation for poor claim handling Under paragraph D.3 of the AFCA Rules, we may award compensation for non-financial loss (capped at $5,400 per claim) where the insurer’s actions have caused an unusual amount of:  physical inconvenience  time taken to resolve the situation  interference with the complainant’s expectation of enjoyment or peace of mind. Insurer is not required to pay non-financial loss compensation The complainant says the insurer handled the claim poorly and caused delays. She says her home had no electricity for a month. She submits the insurer has caused her to experience considerable stress and inconvenience. It is apparent from the insurer’s claim notes that the complainant often expressed her dissatisfaction to the insurer. However, I am overall satisfied that the insurer handled the claim reasonably and without undue delay. It endeavoured to address the complainant’s many concerns, including by appointing multiple experts. I acknowledge that the home, or at least some of it, was without power for a period. However, when the complainant identified that was the case when she returned from overseas, the insurer rectified the problem promptly. It also provided her with TA costs for a reasonable period. In the circumstances, I am not satisfied that it would be reasonable to require the insurer to pay non-financial loss compensation. 2.4 Why is the outcome fair? Yes. The insurer’s offer was based on a scope of works (SOW) dated 14 November 2022 and included a 20% contingencies uplift. However, it obtained a more detailed SOW in January 2023, which appears to have quoted a higher amount. It is to cash settle based on a new quote from the second builder and pay a 20% uplift to allow for price increases. Determination | Case number: 940966 Page 8 of 8 3 Supporting information 3.1 The AFCA process AFCA’s approach is bas ed on fairness AFCA has determined this complaint based on what is fair in all the circumstances, having regard to:  the legal principles  applicable industry codes or guidance  good industry practice  previous decisions of AFCA or its predecessor schemes (which are not binding). The respective parties have completed a full exchange of the relevant information, and each party has had the opportunity to address any issues raised. We have reviewed and considered all the information the parties have provided. While the parties have raised several issues in their submissions, we have restricted this determination to the issues that are relevant to the outcome. We assess complaints on available information and circumstances AFCA is not a court of law. We do not have the power to take or test evidence on oath, or to require third parties to give evidence. When we assess complaints, we consider:  available documents  the recollections of the parties  all relevant circumstances. We give more weight to documents created at the time the events occurred. If there are no relevant documents, we will decide what most likely occurred based on the available information. If there are conflicting recollections and these are evenly weighted, we may find that a claim cannot be established.

Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.