Determination 940840

Insurer denied cracking and movement damage after storm as excluded; disputed cash settlement, professional costs and non-financial loss

FirmHollard
Decided2023-08-30
ProductGeneral Insurance · Home building and contents
OutcomeFor the complainant in part
Amount awarded—
Non-financial loss$4,998
Amount claimed—
SourceAFCA PDF

Summary

Complainant claimed storm damage to his home; the insurer accepted water ingress damage but denied cracking and movement damage as excluded. AFCA upheld the denial except for the veranda door, required a fresh desktop quote plus 30% uplift, and ordered $4,997.50 non-financial loss compensation.

The insurer showed on the balance of probabilities that the proximate cause of the movement damage was excluded long-term subsidence and construction defects, but its cash settlement was inadequate and its claim handling caused stress.

Issues

Subjects and remedies

home or building damagenatural disasterthird party authoritypay claimpay non financial loss

Related

All Hollard determinations · Find similar determinations

Text of the determination

Determination Case number 940840 Financial firm The Hollard Insurance Company Pty Ltd Determination | Case number: 940840 Page 1 of 9 Case number: 940840 29 August 2023 1 Determination overview 1.1 Complaint The complainant holds home and contents insurance with the financial firm (insurer). On 24 March 2022, he lodged a claim for water ingress damage to his home following a storm. The insurer partially accepted the claim and has offered a cash settlement for the resultant internal water damage. However, the insurer denies it is liable for cracking and movement damage to the home. It says that damage was due to long term subsidence, gradual deterioration and construction defects so is excluded from cover under the policy terms. The complainant maintains that the storm caused all the damage claimed. He wants the insurer to cover all the damage. He also seeks reimbursement of professional costs he incurred and compensation for stress caused by his poor claim experience. 1.2 Issues and key findings Is the insurer required to cover the disputed damage? No, except for the veranda door damage. The insurer has otherwise established it is more likely than not that the disputed damage is due to causes excluded under the policy terms. Is the insurer required to pay more as a cash settlement? Yes. The insurer’s offer is not based on a current retail quote and does not include the veranda door damage or a contingencies uplift. The insurer is to obtain a desktop quote actionable by a retail customer and pay the complainant the quoted amount plus a 30% uplift. Is the insurer to reimburse professional costs? No. The report b y the complainant’s engineer, RK , did not assist him in establishing an entitlement to have more of the claim covered. Is non-financial loss compensation payable? Yes. The insurer caused delays and at times communicated poorly with the complainant, who experienced stress as a result. The insurer is to pay the $4,997.50 in compensation it offered. Why is the outcome fair? The insurer has shown most of the disputed damage is from excluded causes. Other than the veranda door damage, it would be unfair to require it to cover more of the claim or reimburse RK ’s fees. However, the insurer must pay a fair cash settlement and pay compensation. 1.3 Determination This determination is partially in favour of the complainant. If the complainant provides written notice he accepts this determination, the insurer is required to:  cash settle the covered aspects of the claim in accordance with section 2.2 below, and  within 14 days of receiving the notice, pay the complainant $4,997.50 in compensation. Determination | Case number: 940840 Page 2 of 9 2 Reasons for determination The complainant is represented by his partner, SL. In this determination, the complainant and SL are referred to as ‘the complainant’, unless context requires otherwise . The parties provided several submissions to AFCA. While this determination does not refer to each submission, I have taken them all into account in reaching my decision. 2.1 Is the insurer required to cover the disputed damage? No, except for the veranda door. The insurer has otherwise established it is more likely than not that the disputed damage is due to causes excluded under the policy terms. Complainant has shown a claimable loss under the policy The complainant is required to show, on the balance of probabilities (that it is more likely than not), that he suffered a claimable loss under the policy. This means he must show the loss was caused by a risk for which he is insured. Subject to the terms and conditions set out in the product disclosure statement (PDS), the policy covers d amage to the complainant’s home caused by a listed insured event. One of those events is ‘Storm, rainwater and flood’. The insured home was a single storey timber framed house on brick piers built in the late 1800s. In 2007, the complainant added a two-storey extension. The complainant chose to build in and around a historic lean for heritage purposes. On 24 March 2022, the complainant lodged the claim. He said his home had sustained water ingress damage following torrential rain on 2 March 2022. The claim form stated ‘ We have experienced leaking through the roof and damage to cornices and ceiling areas that has not occurred before. There is now mould on some of these areas ’ . It is not in dispute that there were major storms with intense rainfall in early March 2022, or that the home was damaged. The insurer accepts that water ingress occurred during the storm, causing internal damage to the home. It has offered a cash settlement for related repair costs. Once the complainant proves the existence of a claimable loss, the insurer is liable for the loss unless it shows an exclusion or limiting condition applies. The insurer has the onus of proving on the balance of probabilities the application of the exclusion or condition. The insurer says the cracking and movement damage to the home is from excluded causes. Where a loss may have more than one cause, it is necessary to determine the proximate cause. The proximate cause is the dominant, efficient or operative cause of the loss. It is not required to be last in time or the sole cause. It is a question of fact that depends on the circumstances of each case. Insurer says the disputed damage is excluded Following claim lodgement, the insurer appointed builder BB to assist it with assessment. On 4 April 2022, BB inspected the complainant’s property and reported that:  the damage mostly involved structural movement cracks, which BB presumed related to rainwater inundation of foundation soils  pre-existing cracking was also present, which could indicate prior movement issues Determination | Case number: 940840 Page 3 of 9  several doorway entrances were out of plumb, resulting in doors ‘sticking’. This would likely mostly resolve once the foundations were stabilised  a veranda door facing south had been pushed slightly inward by strong winds  there was rising damp in the laundry, indicating ‘long term exposure to the consistent wet soil level of the foundation soils’  the laundry ceiling directly below the veranda door was water damaged, with water ingress through the shifted door frame. This had resulted in minor microbial growth on the ceiling  fibre cement external sheeting had been blown off the underside of the decking and had damaged an air conditioning unit [the insurer has paid for repair of the sheeting and unit]  the water ingress damage was very minor compared with the structural movement damage. BB had engaged a roofer (HC) to report on the cause of the water ingress, and recommended an engineer be engaged to comment on the movement damage’s cause  ‘ the damages sustained to the property would be considered to be consistent with having been sustained by a singular insurable event. The report provided is only a preliminary report, with a request for engi neering to be conducted to the home’. On 8 April 2022, HC inspected the property. HC said that there were numerous areas of water ingress. The metal roof showed signs of wear and tear, including multiple silicone seal failures. HC also noted guttering inadequacies and installation errors, resulting in leaks. BB engaged engineer SC. After an inspection on 16 August 2022, SC reported that:  noting the cracking patterns, previous patch repairs, extensive subfloor joist and bearer packing, and likely subsoil conditions, the cracking and movement was consistent with: > ongoing long-term consolidation and subsidence (rather than wet soil swelling) > defective design/workmanship of the internal pad footing, namely inadequate founding depths noting Building Ordinance 71 published in the 1920’s  there was no erosion/washout to suggest storm related undermining or damage  the building movement and cracking was not consistent with storm related damage. The insurer says that due to a misunderstanding, its claims team also engaged an engineer, SW, to report on causation. SW inspected the property on 10 November 2022 and said that:  the internal cracking and movement damage was consistent with the following factors: > long-term age-related wear, tear and deterioration > long-term thermal movement damage due to thermal expansion and contraction within the differing dwelling fabrics > long-term differential settlement, subsidence, and footing movement due to foundation reactivity > inherent defect - omission of joints to accommodate thermal and foundation movement  the observed cracking to the external render and brickwork was consistent with omission/inadequate articulation provision to the brickwork  ‘ despite the pre-existing damp condition of the subfloor and rotated piers, we did not note any evidence of sudden and abrupt movement of the footing of the brick piers and timber piers to indicate any recent damage to the dwelling fabrics from claimed Storm event’  if the storm had exacerbated the movement and settlement of the dwelling, SW would have expected fresh cracking and movement to the slender piers, and there was none  ‘ the observed damage within the dwelling is attributable to a combination of inherent construction defects and long-term building and thermal movement, unrelated to the one- off Storm event or any other Insurable event ’ . The insurer has accepted it is liable under the policy for painting, plastering and cleaning of water damage in two bedrooms, kitchen, lounge room, dining room, bathroom and laundry. However, it says the disputed movement/cracking damage is excluded because: Determination | Case number: 940840 Page 4 of 9  t he ‘Storm’ insur ed event does not cover damage caused by earth movement (including erosion, subsidence, landslide, settling, shrinkage and expansion) that does not occur within 72 hours of the storm or rainwater (PDS, page 15)  the policy has general exclusions for damage caused by or resulting from: > gradual deterioration, including wear and tear (PDS, page 46) > inherent defects, structural faults, faulty design or workmanship (PDS, page 47) > earth movement (including erosion, subsidence, landslide, settling, shrinkage and expansion) not directly caused by storm or rainwater (PDS, page 47). Complainant says the storm caused the disputed damage The complainant maintains that the storm caused all the damage claimed. He relies on a letter dated 19 November 2022 from his neighbour, builder PG. PG says he is confident the current movement damage is due to severe rain events in February 2022 and June 2022. He acknowledges there was pre-existing movement but says it was rectified decades ago, with no evidence any current cracking is attributable to the earlier movement. In addition, the complainant relies on a report by engineer RK. On 28 September 2021, RK had inspected the property to advise on aesthetic remediation. RK reinspected the property on 19 December 2022 and reported the following:  since its first inspection there had been: > significant movement in the timber framed structures, resulting in cracking to wall and ceiling linings > rainwater damage to the wall and ceiling linings > significant overland waterflows around and under the house > land slippage at the south east corner of the block [SW also noted the slippage, and recorded it w as outside the boundary line of the complainant’s property] > further movement of the subfloor brickwork  ‘In our opinion the damage…is consistent with damage from extreme winds and water ingress from abnormal rain and overland flow’ between 28 February and 9 March 2022. Further, the complainant and SL (who is a former licensed builder) have raised numerous criticisms of the insurer’s expert reports . These include that:  they are contradictory. For example: > BB concluded unequivocally that all the damage was due to the storm, but SC and SW found the movement damage was not storm related > SC referred to subsidence, but SW referred to swelling and contracting > SC said there was no erosion/washout, but SW confirmed there was  the home was built decades before the Building Ordinance SE referred to was published  SW recognised there had been a landslide immediately behind the home but failed to acknowledge this proved the storm caused ‘ catastrophic and sudden land movements …w ith a direct and dramatic effect on our home ’  H C fails to mention that the home was watertight prior to the storm or that prior to HC’s inspection gutters and downpipes that had been torn off by the storm had been repaired  The reports of SE and SW contain errors, unsubstantiated opinions, and are unreliable. The complainant submits that his expert reports should be preferred. He notes PG was aware of the impact the storm had on the immediate area and very familiar with the home. Also, that RK was the only expert who had inspected the home before and after the storm. The complainant wants the insurer to cover: Determination | Case number: 940840 Page 5 of 9  the cost of r oofing repairs completed by their roofer, AR. They have provided AR’s invoices dated 19 July 2022 for $4,977.50 (which includes reference to work on sagging/fallen gutters) and 25 July 2022 for $4,442.50  internal water damage and mould to ceilings, walls and cornices in both bathrooms, two bedrooms, the dining room, kitchen, laundry and near the stairway  internal damage to the southern upstairs windows and frames and downstairs veranda door and frame  cracking to the tile floor and wall in the upstairs bathroom and staining caused by water entering through walls and windows, moving under tiles and leaching through the grout  new cracks that appeared in walls, floors and ceiling. On 4 May 2023, the complainant advised: we've just spent $45,000 underpinning the house to avoid further subsidence. We've never expected insurance to cover that, only damage caused by storm related subsidence. Insurer is entitled to deny most of the disputed damage Based on the exchanged information, I am on balance satisfied that the storm caused the damage to the veranda door and its architraves. This is because:  BB identified that the veranda door had been pushed in by strong winds during the storm, and that water ingress was occurring through the shifted door frame  SC provided photos showing ‘reported water leak around the sliding door within the Lounge area. Water damaged and delam inated door architraves were observed’  SC’s listed storm repairs included removal, replacement and painting of those architraves. However, I am also satisfied that the insurer has otherwise established that the disputed damage is from excluded causes because:  HC’s report following a roof inspection on 8 April 2022 is the only expert report on the roofing. HC identified widespread wear and tear and defects  while the complainant says he had storm damaged downpipes and gutters repaired before HC inspected the roof , AR’s invoices were issued in July 2022. Also, while AR ’s invoice dated 19 July 2022 refers to sagging/fallen gutters, it does not comment on causation  BB did not unequivocally conclude that all the damage was due to the storm. BB’s conclusions were preliminary only and BB recommended an engineer be engaged to investigate and comment on the cause of the movement and cracking damage  SC’s incorrect estimate of the home’s age and resulting reference to a n incorrect Building Ordinance does not invalidate its entire report  I am not satisfied that the reports of SC and SW are fundamentally contradictory overall. To the contrary, they both concluded that the movement and cracking damage was due to construction defects and long-term subsidence, not related to the storm  their reports are detailed and include reference to scientific data, testing results and numerous images. I find them persuasive  SC identified that the tile and grout damage in the upper bathroom was from differential and foundation movement  there is no expert report confirming that the storm caused tile staining  PG’s comments do not carry as much weight as the reports of SC and SW given that they are set out in a single page letter and do not refer to storm activity in March 2022  While I acknowledge that RK was the only engineer who inspected the home before and after the storm, his report is much less detailed than those of SC and SW Determination | Case number: 940840 Page 6 of 9  RK’s report includes two sets of ‘before and after images’ said to show new movement damage affecting brickwork to the subfloor south wall and external south wall. The photos show widening of pre-existing cracking already present in September 2021  RK’s report also includes a demolition plan it prepared on 3 November 2021 as part of proposed remediation works. The plan included replacement of all subfloor walls and piers under the home’s original section. The remediation works did not occur before the storm  when the complainant lodged the claim on 24 March 2022, he said the claim event occurred on 2 March 2022, with water ingress damage noticed the next day. He did not refer to any cracking or movement damage  I consider it more likely than not that the complainant would have advised the insurer of that damage at the time he lodged the claim, if it had been present then  the policy does not cover damage caused by earth movement that occurs 72 hours or more after a storm. In the circumstances, I am satisfied that the roof damage was due to wear and tear and construction defects. Further, while the storm event may have exacerbated the movement and cracking damage, the storm was not the proximate cause. Rather, the operative cause of that damage was longer term earth movement and construction issues. 2.2 Is the insurer required to pay more as a cash settlement? Yes. The insurer’s offer is not based on a current retail quote and does not include the veranda door damage or a contingencies uplift. The insurer is to obtain a desktop quote actionable by a retail customer and pay the complainant the quoted amount plus a 30% uplift. Insurer has offered a cash settlement On or about 2 December 2022, the insurer received a scope of works (SOW) from its builder JL, quoting $5,543.46 for the cost to repair the damage the insurer had accepted. On 3 December 2022, the insurer offered the complainant a cash settlement of $4,453.46, being JL’s quoted amount less the $1,000 policy excess. The complainant rejected the offer. Insurer must take further steps then pay a higher cash settlement amount A cash settlement must be based on a reasonable quote for claim related repairs, actionable by a retail customer. An uplift is then to be applied to the quoted amount to allow for contingencies and the loss of the lifetime guarantee that applies to insurer approved repairs. I am not satisfi ed that the insurer’s $4,543.46 cash settlement offer is sufficient because:  JL’s SOW does not include repairs to the veranda door and its architraves  while the work items it has included otherwise appears reas onable, JL’s SOW was prepared solely for cash settlement purposes rather than as an actionable retail quote  the SOW includes items that would be payable by a consumer but has costed them at $0  the SOW does not specify a builder’s margin  the SOW is now over nine months old so is unlikely to reflect current prices  the insurer has not included a contingencies uplift. The relationship between the parties has significantly deteriorated. I am satisfied that it is in their best interests to resolve the matters between them as soon as is reasonably possible. In the circumstances, if the complainant provides written notice he accepts this determination, the insurer is to take the following steps: Determination | Case number: 940840 Page 7 of 9  within 14 days of the notice, the insurer is to engage a builder not previously involved in the claim to prepare a desktop quote for the covered repairs reflecting current retail prices. The quote is to be based on JL’s SOW but is to also include the veranda door and architraves  within 14 days of receiving the quote, the insurer is to provide the complainant with a copy of it and pay him the quoted amount plus a 30% contingencies uplift, less the excess. I have assumed that the builder will be able to provide a quote on the repairs to veranda door and its architraves based on the information the insurer holds on file (including the reports of BB and SC). However, if the builder notifies the insurer it is unable to do so, the insurer is to:  cash settle the remainder of the covered claim in accordance with the above process  within seven days of receiving the builder’s notification, organise a time convenient to the complainant for the builder to inspect the veranda door and architraves  within seven days of the builder providing its quote for repair of the veranda door and architraves, provide the complainant with a copy of the quote and pay him the quoted amount plus a 30% uplift. Despite maintaining it is not required to cover the window and tile damage and that there is insufficient information on the mould, the insurer has offered to arrange a further assessment. On the provided information, the insurer’s coverage position on those items appears reasonable . Noting the parties’ poor relationship, I am also concerned a further extensive inspection/assessment will result in more delay and further disputes. In the circumstances, and in an effort to promptly finalise the dispute, I have allowed a higher uplift than would typically be applied where a current actionable quote is (to be) available. The higher uplift is payable instead of the further assessment previously offered by the insurer taking place. 2.3 Is the insurer to reimburse professional costs? No. The report b y the complainant’s engineer, RK , did not assist him in establishing an entitlement to have more of the claim covered. AF CA may require insurer to contribute to a complainant’s professional costs The AFCA Rules enable AFCA to require an insurer to contribute to the professional costs incurred by the complainant. These costs are, however, usually capped at a total of $5,000, unless special circumstances apply. When considering whether to require an insurer to make a costs contribution, AFCA takes into account the complexity of the complaint and whether the particular complainant needed to incur costs to understand or establish their claim. Insurer is not required to reimburse professional costs The complainant submits that the insurer should reimburse him for the cost of RK ’s report. RM’s report has not persuaded me that the insurer is obliged to cover more of the claim. Accordingly, the report has not assisted the complainant in establishing an entitlement to cover for damage beyond that the insurer previously agreed to provide. I am also not satisfied that the complainant needed RK ’s ass istance to understand his claim, noting SL’s background and experience as a former licensed builder . Determination | Case number: 940840 Page 8 of 9 In the circumstances, the insurer is not required to reimburse professional costs. 2.4 Is non-financial loss compensation payable? Yes. The insurer caused delays and at times communicated poorly with the complainant, who experienced stress as a result. The insurer is to pay the $4,997.50 in compensation it offered. AFCA can award compensation for poor claim handling Under paragraph D.3 of the AFCA Rules, we may award compensation for non-financial loss (capped at $5,400) where the insurer’s actions have caused an unusual amount of:  physical inconvenience  time taken to resolve the situation  interference with the complainant’s expectation of enjoyment or peace of mind. Insurer has unreasonably caused stress and inconvenience The complainant says the insurer has caused him immense stress and inconvenience through extensive delays, missing deadlines and poor communication. The insurer accepts that it did not meet the claim handling timeframes specified in the General Insurance Code of Practice. It previously offered to pay the complainant $4,997.50 in compensation, based on what the complainant described as AR’s roof maintenance work (and despite AR’s invoice dated 19 July 2022 amounting to $4,977.50) . I am satisfied that the insurer did cause delay and at times communicated poorly with the complainant. I am also satisfied that these issues have unreasonably caused the complainant significant stress. Noting the maximum amount AFCA may award for non-financial loss compensation, I consider the insurer prior compensation offer fair and reasonable. The insurer is to pay the complainant $4,997.50 in non-financial loss compensation. 2.5 Why is the outcome fair? The insurer has shown most of the disputed damage is from excluded causes. Other than the veranda door damage, it would be unfair to require it to cover more of the claim or reimburse RK ’s fees. However, the insurer must pay a fair cash settlement and pay compensation. Determination | Case number: 940840 Page 9 of 9 3 Supporting information 3.1 The AFCA process AFCA’s approach is based on fairness AFCA has determined this complaint based on what is fair in all the circumstances, having regard to:  the legal principles  applicable industry codes or guidance  good industry practice  previous decisions of AFCA or its predecessor schemes (which are not binding). The respective parties have completed a full exchange of the relevant information, and each party has had the opportunity to address any issues raised. I have reviewed and considered all the information the parties have provided. While the parties have raised several issues in their submissions, I have restricted this determination to the issues that are relevant to the outcome. We assess complaints on available information and circumstances AFCA is not a court of law. We do not have the power to take or test evidence on oath, or to require third parties to give evidence. When we assess complaints, we consider:  available documents  the recollections of the parties  all relevant circumstances. We give more weight to documents created at the time the events occurred. If there are no relevant documents, we will decide what most likely occurred based on the available information. If there are conflicting recollections and these are evenly weighted, we may find that a claim cannot be established.