Home / IAG / Determination 940592

Determination 940592

Partial decline of storm damage claim for roof (faulty workmanship exclusion), settlement amount for accepted repairs, and temporary accommodation

FirmIAG
Decided2023-09-08
ProductGeneral Insurance · Home building and contents
OutcomeFor the complainant in part
Amount awarded$48,419
Non-financial loss—
Amount claimed—
SourceAFCA PDF

Summary

Storm damaged the complainant's home; the insurer declined roof repairs under a faulty workmanship exclusion and stopped temporary accommodation payments. AFCA upheld the roof decline but ordered a cash settlement of $38,660.19 for the accepted repairs and a further $9,758.45 for accommodation.

The insurer showed on balance that faulty solar panel installation, an excluded cause, was the proximate cause of roof ingress, while the policy's temporary accommodation benefit was not exhausted and the son's needs justified further payment.

Issues

Subjects and remedies

broker or intermediarydisabilityhome or building damagenatural disasterpay claimpay compensation

Related

All IAG determinations · Find similar determinations

Text of the determination

Determination Case number 940592 Financial firm Insurance Australia Limited (insurer) Determination | Case number: 940592 Page 1 of 11 Case number: 940592 7 August 2023 1 Determination overview 1.1 Complaint The complainant holds a home insurance policy with the insurer for building and contents covering insured events. On 26 February 2022, a storm (an insured event) caused damage to the complainant‟s property. The complainant made a claim on the policy to have the damage rectified. Following inspections of the premises by a builder, Company J, and a plumber, Company D, the insurer partially accepted the claim, but declined to cover damage to the roof on the basis the damage was not caused by the storm. The complainant disputes this and says:  there have been delays in the finalisation of the claim  the insurer ‟s quote for works was insufficient when compared to a quote obtained by the complainant  the repair works for the accepted portion of the claim have not yet been agreed upon or commenced and  due to their house being unable to be lived in as a result of the storm, the complainant‟s family have had to seek alternate accommodation. The complainant wants the insurer to:  accept the claim for damage to the roof  finalise the repairs to the building or offer a cash settlement in line with the complainant ‟ s own quote and  compensate for temporary accommodation costs. The insurer says the damage to the roof falls within an exclusion relating to „faulty workmanship‟ and it ceased paying temporary accommodation costs due to unreasonable delays caused by the complainant. It has declined to pay any further benefits under the policy. 1.2 Issues and key findings Has the insurer correctly assessed the claim for the roof? Yes. The insurer is entitled, on balance, to rely on the „faulty workmanship‟ exclusion within the policy as the poor standard of installation of the solar panels in the affected area appears to be the proximate cause of the damage. Has the insurer correctly assessed the remainder of the claim? Yes. A cash settlement in line with the Company J quote for $33,617.55 (including GST), plus a 15% contingency, is fair in all the circumstances. Has temporary accommodation been assessed correctly? No. A further payment of $9,758.45 is payable for temporary accommodation. Determination | Case number: 940592 Page 2 of 11 Why is the outcome fair? The outcome is fair in all the circumstances because it would not be reasonable to require the insurer to pay aspects of the claim which are not covered by the policy. However, where aspects of the claim are covered, these should be paid in accordance with the policy terms and the insurer‟s obligation to act in the utmost good faith. 1.3 Determination This determination is partially in favour of the complainant. Within 14 days of the insurer being informed the complainant has accepted this determination, as full and final settlement of the claim, the insurer must pay:  $38,660.19 (including GST) for repairs and  $9,758.45 for temporary accommodation. Determination | Case number: 940592 Page 3 of 11 2 Reasons for determination 2.1 Has the insurer correctly assessed the claim for the roof? Yes. The insurer is entitled, on balance, to rely on the „faulty workmanship‟ exclusion within the policy as the poor standard of installation of the solar panels in the affected area appears to be the proximate cause of the damage. The complainant must establish a valid claim The policy is an „insured events‟ policy, meaning that not all loss and damage is a utomatically covered. Rather, only loss or damage caused by one or more of the insured events, and not subject to exclusions, is covered. The complainant is required to show, on the balance of probabilities (that it is more likely than not), that there is a claimable loss under the policy. This means the complainant must prove the loss or damage was caused by a risk that is covered under the policy. Once the complainant proves there is a claimable loss, the insurer is liable for the loss unless it shows an exclusion or limiting condition applies. The insurer has the onus of proving, on the balance of probabilities, the exclusion or condition applies. Relevant policy wording from the Produce Disclosure Statement (PDS) has been set out in section 3.2 of this determination. The complainant established a valid claim As the insurer accepted the claim for damage sustained at the property because of the 26 February 2022 storm event, I am satisfied the complainant has established a valid claim. If the insurer is to exclude any portion of the claim, it must meet the onus of proof and demonstrate the damage is otherwise excluded under the wording of the policy. The insurer relies on the policy exclusions In its partial denial letter dated 11 May 2022, the insurer relevantly said: The information we have considered in making this decision Following lodgement of the claim, we appointed [Company J] and [Company D] to provide a report, scope and quote on the cause and extent of damage (please refer to the attached reports). Upon review of the assessment reports, we note that there is water damage to your kitchen/living area and downstairs bedroom from storm water run-off through the lower level of your property. We also note that your upstairs bedroom sustained water damage. We note that there is a blocked downpipe above the affected area, screws were not sealed all the way down, potential ingress through the mounting brackets for the solar panels, large gaps in the flashing joining the lower section of the house Determination | Case number: 940592 Page 4 of 11 to the upper side, the solar conduit has not been sealed and the roof sheets around the affected area are unsecured/not screwed. In line with the above findings, we regrettably are unable to cover rectifications to your roof to make it watertight as the points of water entry are not storm or event related and falls under the exclusion faulty workmanship. However, we can cover the resulting rainwater damage to your property. This decision was based on the policy wording set out in the PDS, specifically: This policy does not cover: […] b) loss or damage resulting from or caused by:  […] inherent defects, structural defects, faulty workmanship, faulty design or any gradual process The insurer relied on the Company J report In order to determine the causes and extent of the damage sustained, the insurer engaged a builder from Company J to inspect the property on 1 March 2022. Company J provided a report of the same date which relevantly said:  several maintenance/defect related issues were directly responsible for, or a contributing factor to, the damages: > gaps in the flashing, where the lower roof meets the house > screws above affected areas not screwed all the way down > solar penetration unsealed and > un-secure roof sheets.  where the tenant had placed the buckets in the ceiling is directly below the middle of solar panels – the builder was unsure what was causing the ingress, but suspected an unsealed penetration or screw allowing water ingress into the ceiling below  the insured had maintenance responsibilities to: > ensure penetrations are sealed correctly, > secure roof sheets to standard and > secure flashings adequately. The repair estimate for maintenance works repairs was said to be $300. The insurer relied on the Company D report In addition, a Company D report, dated 2 March 2022, relevantly noted there were:  blocked downpipes above the affected area  roofing screws which were not sealed all the way down  solar panels above the affected area  large gaps in the flashing joining the lower section of the house to the upper side  no seal around the solar conduit  unsecured roof sheets around the affected area Company D suspected ingress through: Determination | Case number: 940592 Page 5 of 11  mounting brackets for the solar panels  the gaps in the flashing  the gap around the solar conduit and concluded where the complainant had placed buckets in the ceiling cavity was directly below the middle of the solar panels. While Company D was unsure what was causing the ingress, it suspected an unsealed penetration or screw allowed water ingress into the ceiling below. The complainant has not provided any contradictory reports The complainant has disputed the conclusions relied on by the insurer regarding the roof. However, she has not provided any additional evidence to support her contention the storm was the proximate cause of the roof damage. The onus is on the insurer As noted above, given there was a valid claim, the responsibility lies with the insurer to demonstrate the proximate cause of the water ingress was the faulty workmanship issues identified by the Company J and Company D reports, and not by the storm. While neither report was definitive on the conclusions made, this was, in part, due to the inability to inspect under the solar panels on the roof externally. It may have been (both reports were silent on this issue) the storm had lifted the roof sheets and loosened screws in the affected areas. Despite this, on balance, given the lack of sealant and gaps evident around the solar conduit and in the affected area, I am persuaded it is more likely than not the proximate cause of the ingress was a poor standard of installation of the solar panels, and not damage caused by the storm. I am therefore satisfied the insurer has correctly assessed the claim for the damage to the roof. It is entitled to decline this portion of the claim. 2.2 Has the insurer correctly assessed the remainder of the claim? Yes. A cash settlement in line with the Company J quote for $33,617.55 (including GST), plus a 15% contingency, is fair in all the circumstances. The insurer has provided an amended Scope of Works When it provided its report in March 2022, Company J also provided the insurer with a scope of works and quote for the accepted portion of the claim. Settlement of this part of the claim was delayed by the dispute regarding the roof claim. In July 2022, the insurer arranged for an updated scope of works to be compiled by Company J, dated 1 July 2022. A subsequent contract for repairs to commence was sent to the complainant in August 2022, however the complainant advised she was waiting on an outcome from the Queensland government Resilient Homes Fund before agreeing to the repairs. The Queensland government provided the complainant with a report under its Resilient Retrofit Program, confirming the complainant‟s eligibility and detailing a list of suitable strategies to improve the flood resilience of the complainant‟s home. Determination | Case number: 940592 Page 6 of 11 The insurer is not required to pay for improvements The PDS states that in response to an accepted claim for a building: At our option we replace the buildings to a condition substantially the same as, but not better than when new. Unfortunately, the suggested enhancements are considered to be improvements to the complainant‟s building , not rectification works. These improvements would be in excess of the condition of the property prior to the storm event in February 2022. I am satisfied the types of initiatives and strategies set out in the Resilient Retrofit Program report would not fall within the complainant‟s policy cover. The insurer attempted to compromise with the complainant The complainant did not provide any confirmation of whether they agreed to the repairs being carried out by Company J, despite the repairs being due to commence on 12 January 2023. The insurer provided two further scopes of works and quotes from Company J to cover two scenarios for the complainant dated 8 March 2023. These included a fully itemised list of works to be completed for the accepted portion of the claim. The higher of these quotes was $33,617.55 (including GST). The complainant was advised additional improvements were not covered On 19 March 2023, the complainant‟s broker advised her the comparative quote provided by the complainant (in response to the Company J quote of July 2022) did not reflect the level of reinstatement repairs covered as a result of the insured event. The broker noted the quote included additional home improvements not related to the policy coverage. The following day, the broker also advised the complainant she should liaise directly with the repairer seeking to commence repairs as other issues may not be relevant to the policy held. Subsequently, the complainant provided two separate quotes from Company P, dated 26 April 2023, for repairs. The quotes (both inclusive of GST) were $97,201.00 without flood prevention treatment and $112,415.00 including flood prevention treatment (as per the Queensland government program recommendations). These quotes were rejected by the insurer on the basis:  the quotes were insufficiently specific in respect of the area of the insured premises being worked on and the reason for the work being required  there was no evidence of damage to some of the itemised works and  the quotes included internal upgrades not covered by the policy. Fr om reviewing the quotes, I am satisfied the insurer‟s concerns in this regard are reasonable. The insurer’s offer is reasonable On balance, having reviewed the policy documentation and the quotes and scopes of works, I am satisfied the Company J quote for the higher amount is fair and reasonable in the circumstances. Determination | Case number: 940592 Page 7 of 11 This quote is fully itemised and covers the necessary repairs required for the insurer to meet its obligations under the policy. Under the terms of the policy, the insurer is liable to either:  complete the repairs for the damage or  provide a cash settlement for a reasonable sum to cover the costs of any repairs. Due to the particular circumstances of this complaint, the conduct of the parties and the extended amount of time this claim has taken to be resolved, a cash settlement would be more appropriate as it meets the insurer‟s obligations while providing the complainant the flexibility to vary the scope of works to include any upgrade work she may wish to have done at her own expense. As a cash settlement absolves the insurer of liability for any unforeseen damage and results in the complainant losing the insurer ‟ s lifetime guarantee on repairs, I am satisfied it would be fair in all the circumstances to include a further 15% uplift to the settlement amount. As a result, $38,660.19 (including GST) should be remitted to the complainant in cash settlement of the accepted portion of this claim. 2.3 Has temporary accommodation been assessed correctly? No. A further payment of $9,758.45 is payable for temporary accommodation. The policy provides compensation for temporary accommodation The complainant‟s policy includes an additional benefit for temporary accommodation if the insurer agrees the property cannot be lived in because of an insured event. Temporary accommodation is payable for the higher of $20,000 or 20% of the sum insured for the complainant‟s building. The policy schedule provided confirms that as at the date of the insured storm event in February 2022, the complainant‟s building was in sured for $243,100, with 20% being $48,620.00. The insurer accepted the claim for temporary accommodation costs As the claim for part of the damage was accepted by the insurer and the building has been deemed unable to be lived in, the insurer commenced providing compensation for temporary accommodation costs. In their response dated 29 March 2023, the insurer has confirmed that the complainant has been paid $38,861.55 for temporary accommodation between 31 May 2022 and 24 March 2023. After this point, the insurer has ceased providing accommodation costs, citing unreasonable delays by the complainant. The complainant is entitled to further compensation The complainant‟s family includes a son with special needs. This involves special requirements in his accommodation and have added to the costs incurred by the complainant in seeking reasonable temporary accommodation during the claims process. While I appreciate and accept some of the delay in this case has been caused, or contributed to, by the complainant herself, I note:  the amount provided for in the policy has not been exhausted. Determination | Case number: 940592 Page 8 of 11  the policy does not specifically state how many forms of temporary accommodation can be paid at one time  the policy refers to “additional cost of reasonable temporary accommod ation where the building is you r principal place of residence” I am satisfied t he complainant‟s son is a resident of the insured property, and it is his principle place of residence. Therefore, the “reasonable temporary accommodation” should be of a standard which reasonably meets his needs. It would therefore be fair for the increased accommodation costs to factor this in, given these circumstances. As a result, the insurer is required to pay an additional $9,758.45 for temporary accommodation costs incurred by the complainant. As this will exhaust the full sum insured payable under the policy, any further accommodation costs will fall to the complainant to meet. 2.4 Why is the outcome fair? The outcome is fair in all the circumstances because it would not be reasonable to require the insurer to pay aspects of the claim which are not covered by the policy. However, where aspects of the claim are covered, these should be paid in accordance with the policy terms and the insurer‟s obligation to act in the utmos t good faith. The outcome is fair As the accepted portion of the claim has been agreed to and the delays in progressing the claim have been contributed to by the complainant, it is fair for the insurer to cash settle the claim in order to reach a resolution. The complainant has demonstrated she has access to trades to complete any repairs. The Company J quote relied on in this determination was the most detailed quote provided by all parties for the accepted damage. A further 15% contingency compensates for any loss of guarantees from the insurer completing the repairs. In addition, as the policy allows for accommodation costs for all people residing at the property, it would be fair for the remainder of the temporary accommodation costs to be paid by the insurer up to the insured amount due to the special circumstances relating to the needs of the complainant‟s son. Determination | Case number: 940592 Page 9 of 11 3 Supporting information 3.1 The AFCA process AFCA’s approach is based on fairness AFCA has determined this complaint based on what is fair in all the circumstances, having regard to:  the legal principles  applicable industry codes or guidance  good industry practice  previous decisions of AFCA or its predecessor schemes (which are not binding). The respective parties have completed a full exchange of the relevant information, and each party has had the opportunity to address any issues raised. We have reviewed and considered all of the information the parties have provided. While the parties have raised a number of issues in their submissions, we have restricted this determination to the issues that are relevant to the outcome. We assess complaints on available information and circumstances AFCA is not a court of law. We do not have the power to take or test evidence on oath, or to require third parties to give evidence. When we assess complaints, we consider:  available documents  the recollections of the parties  all relevant circumstances. We give more weight to documents created at the time the events occurred. If there are no relevant documents, we will decide what most likely occurred based on the available information. If there are conflicting recollections and these are evenly weighted, we may find that a claim cannot be established. 3.2 Relevant information Extracts of policy wording How we will pay Buildings a) At our option we:  Repair the buildings, or  Replace the buildings to a condition substantially the same as, but not better than when new, or  Pay the reasonable cost of its repair or replacement to a condition substantially the same as when new, or  Pay up to the sum insured shown on your policy schedule Determination | Case number: 940592 Page 10 of 11 If your buildings are damaged beyond economic repair, we will pay no more than the reasonable cost of replacement when new even if you have insured for an amount greater that the reasonable cost of replacement when new. When we pay your claim for your buildings being damaged beyond economic repair, the policy is exhausted and comes to an end. b) You may choose to have the buildings replaced at another situation, but we do not pay more than for the insured situation. c) If your buildings are damaged beyond economic repair and you do not recommence rebuilding within six (6) months of the damage occurring, (or any other period which we agree with you in writing) you may have to pay any increase in cost caused by your delay. d) […] How we calculate the amount if we choose to “pay you” If your building is repairable, in some circumstances we will choose to settle your claim by deciding to pay you the reasonable costs of what it would cost us, provided that cost is available to or actionable by you. […] Additional Benefits We give you the following additional benefits. For any additional benefits to be payable, you must suffer or incur the relevant loss, liability or damage during the period of insurance. We pay additional benefits 1 to 31 in addition to your sum insured for buildings or contents, depending on the type of cover you have chosen. […] […] 19 Temporary accommodation We pay the following benefit if your buildings are damaged by an insured event and cannot be lived in. If this policy insures your buildings We pay up to $20,000 or 20% of the sum insured for your buildings, whichever is the higher, for additional cost of reasonable temporary accommodation where the building is your principal place of residence. Included in the above, we pay for the cost of temporary accommodation of you pets in a commercial boarding establishment when we have agreed to pay a claim for your temporary accommodation. […] Determination | Case number: 940592 Page 11 of 11 When You Are Not Covered Additional exclusions applying to this policy These additional exclusions apply to cover for your buildings, contents, additional benefits and valuables (if you have chosen that option). This policy does not cover: […] b) loss or damage resulting from or caused by:  […] inherent defects, structural defects, faulty workmanship, faulty design or any gradual process  wear, tear, rust, corrosion, depreciation or gradual deterioration […]

Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.