Home / Youi / Determination 940329
Determination 940329
Defective storm damage repairs and inadequate investigation of the damage
Summary
The complainant's storm damage repairs arranged by the insurer were defective and the insurer said a second storm caused the current damage. AFCA found the repairs faulty, required an independent report and cash settlement of the revised scope with a 20% uplift, and awarded $1,500 non-financial loss, but rejected refunds of premiums and excess and payment for damp-proof coursing.
The insurer guaranteed the quality of repairs it arranged under its PDS and the General Insurance Code of Practice, and there was no cogent evidence of a second storm event.
Issues
- Repairs or contractors primary · upheld
“The weight of the evidence shows the repairs were unsatisfactory. The insurer has not adequately assessed or repaired the damage.”
- Claim denial secondary · upheld
“Insurer denied it must rectify the current damage, saying a second storm caused it; AFCA found no cogent evidence of a second storm.”
- Poor claim handling secondary · upheld
“$1,500 to compensate her for its poor claim handling and the resultant stress and inconvenience.”
- Inadequate claim investigation secondary · upheld
“I am not satisfied the insurer has adequately investigated the damage or the complainant's concerns.”
- Incorrect fees or charges secondary · not upheld
“Defective repairs do not justify refunding two years' premiums; the policy required an excess for the March 2022 claim.”
Subjects and remedies
home or building damagenatural disasterpay claimpay non financial lossreassess claimrepair or rectify
Text of the determination
Determination
Case number 940329
Financial firm Youi Pty Ltd
Determination | Case number: 940329 Page 2 of 8
Case number: 940329 30 June 2023
1 Determination overview
1.1 Complaint
The complainant held a home and contents insurance policy with the financial firm (insurer).
The home was damaged in a storm in February 2022 and the complainant lodged a claim for
damage to the home. The claim was accepted and the insurer says it repaired the damage.
The complainant says the repairs were unsatisfactory and that the insurer failed to properly
investigate and repair the damage. She seeks refund of two years ’ premiums and the excess
she paid to the insurer and/or payment of her tradesman’s un -itemised quote for repairs that
includes damp coursing the damaged area.
The insurer says the damage was caused by a second insured event. It says it will repair the
damage as a second claim and will waive the excess for the second claim.
1.2 Issues and key findings
Were the insurer’s repairs defective?
Yes. The complainant advised that the repairs were unsatisfactory shortly after they were
carried out and consistently thereafter. The insurer failed to properly investigate the damage,
dry the walls or properly repair the damage. It is attend to rectification.
Is non-financial loss compensation payable?
Yes. The insurer is required to pay the complainant $1,500 for non-financial loss, to
compensate her for its poor claim handling and the resultant stress and inconvenience.
Why is the outcome fair?
The outcome is fair as the policy requires the insurer to repair the damage caused by an
insured event. The weight of evidence shows the repairs were defective. There is no cogent
evidence of a second storm event. A payment of $1,500 compensation for non-financial loss
is warranted for the unnecessary stress and inconvenience the complainant experienced.
Is the complainant entitled to the outcome sought
The defective repairs do not justify the insurer refunding two years ’ premiums as the insurer
remained on risk. The policy terms required the payment of an excess for the March 2022
claim. The insurer is not required to pay for damp-proof coursing as that is an improvement
and outside the scope of their repair obligations.
1.3 Determination
The determination is partly in favour of the complainant. The insurer must pay the reasonable
cost of assessing and repairing the damage from the March 2022 claim, including rectifying
the repairs to date. The process to be followed is set out in section 2.1 below.
Determination | Case number: 940329 Page 2 of 8
The insurer must pay the complainant $1,500 compensation for non-financial loss.
Determination | Case number: 940329 Page 3 of 8
2 Reasons for determination
2.1 Were the insurers repairs defective?
Yes. The complainant advised that the repairs were unsatisfactory shortly after they were
carried out and consistently thereafter. The insurer failed to properly investigate the damage,
dry the walls or properly repair the damage. It is to attend to rectification.
The damage and 2022 repairs
The complainant claimed on her policy in March 2022 following a storm in late February 2022.
In mid- April 2022 the insurer’s preferred repairer (JL) attended the property to assess the
damage. JL provided its report to the insurer around 4 July 2022. The complainant
expressed her concern in July 2022 that the assessment was rushed and some damage was
missed.
The insurer accepted the claim and arranged for JL to repair. JL subcontracted the repairs to
a home maintenance service (PS). In August 2022 the complainant notified JL that the walls
were still wet.
In September 2022 PS attended the property and conducted repairs. In response to AFCA’s
questions the insurer provided a record from ‘the provider’ recording that, while at the
property, PS noted water damage and mould growing in an area of the wall (under the
window) that had not been identifi ed in JL’s July 2022 repor t. The insurer’s supervisor
advised PS to do the repairs and submit costings.
The parties dispute what work was done by PS. JL’s quote is for plastering and painting. The
complainant says only painting was done. The complainant says no effort was made to dry
the walls nor was she told to do this prior to repairs or at any other time.
Almost immediately after they were completed the complainant told JL the repairs were
unsatisfactory and that it had failed to thoroughly investigate the damage. She reported that
the plaster was soft and the new paint had bubbled. She told JL she would not sign the
Statement of Satisfaction. Around 28 October 2022 the complainant contacted the insurer
raising further concerns about the repairs.
Around 4 October 2022 JL submitted a revised scope of works for damage that was ‘missed’
in their initial scope of work. No further repairs were carried out on the property by the
insurer.
From the evidence presented by the complainant and the insurer, I am satisfied that the
insurer’s repairs were unsatisfactory. The insurer has not rectified the unsatisfactory repairs.
The insurer did not adequately investigate the damage
The insurer’s claim notes entry of 3 November 2022 records JL saying ‘it is possible there
might still be moisture in the ceiling space. Until then we are not able to rectify the plaster
and paint work as the damage will continue to re- occur’. Given this evidence and the failure
of the repairs done I am not satisfied the insurer has adequately investigated the damage or
the complainant’s concerns.
Determination | Case number: 940329 Page 4 of 8
The current damage was not caused by a second storm event
The insurer denies that it is required to rectify the current damage saying it was caused by
another storm event. The insurer has provided no substantial evidence of a second storm
event.
The insurer relies on JL’s undated reattendance report which records the writer ’ s recollection
that the ‘ insured advised that the wall in hallway had been damaged again after we completed
repairs in the area ’. I find that to be, at best, a misunderstanding of the complainant’s
position. The complainant had reported the failure of the repairs almost immediately after
they were carried out and consistently thereafter.
The reattendance report is of limited value. It repeats the July 2022 report about the cause of
the damage and says JL ‘believes’ water e ntered (again) in the same way. The report
provides no evidence to substantiate this belief. The photos of the inside walls and front of
the property do not shed any light on the issue.
The insurer also refers to rainfall data between March and October 2022 to say another storm
incident could have occurred. The complainant reported JL’s repair work in September 2022
as unsatisfactory almost immediately. The rainfall chart shows minimal rain experienced in
the complainant’s location between the September 2022 repairs and JL’s reference to a
second storm event.
I am satisfied, on the weight of the evidence, that the current damage was not caused by a
second storm event.
Insurer is required to guarantee their repairs
The insurer is required to guarantee their repairs. There is no dispute that the insurer
selected, arranged and paid for the repairs. The insurer’s produ ct disclosure statement
(PDS) states:
Quality guarantee
Where we arrange, authorise and pay a service provider for repairs, we will guarantee
the quality of the repairs for as long as you are the owner of the insured property.
The insurer is a subscriber to the General Insurance Code of Practice which states:
If we have selected and directly authorised a repairer to repair your damaged
property, then we will accept responsibility for the quality of their work and the
materials they use.
The insurer is required to cover rectification of the faulty repairs
The weight of the evidence shows the repairs were unsatisfactory. The insurer has not
adequately assessed or repaired the damage. The insurer must cover the cost of assessing
and repairing the damage as part of the March 2022 claim.
The insurer must cash settle the claim
The complainant says she wants the insurer to cash settle the claim and allow her to arrange
her own repairs. This is a fair outcome in the circumstances.
The insurer is required to engage a qualified independent expert with no prior involvement in
the claim to complete a report on the damage. The report must:
Determination | Case number: 940329 Page 5 of 8
detail the extent of damage from the February 2022 storm including water entering
through the vent and weep holes and investigating moisture in the property and wall
cavities
if applicable, detail maintenance issues required to be attended to
provide a revised scope of work to rectify the claim related damage, and to rectify the
prior faulty repairs
provide an actionable quote for the scope of works.
The insurer is required to cash settle on the revised scope of works with an uplift of 20%. This
work is not to be regarded as a second claim. If it is determined maintenance work is
required, the complainant is required to cover these costs.
2.2 Is complainant entitled non-financial loss compensation?
Yes. The insurer is required to pay the complainant $1,500 for non-financial loss, to
compensate her for its poor claim handling and the resultant stress and inconvenience.
AFCA can award compensation for poor claim handling
Under our Rules, AFCA may award compensation for non-financial loss (capped at $5,400)
where there has been an unusual amount of physical inconvenience, time taken to resolve
the situation or interference with a complaint’s expect ation of enjoyment or peace of mind.
AFCA takes a conservative approach to compensation and expects a complainant to bear a
normal degree of inconvenience during a claim.
Insurer has caused stress and inconvenience
The complainant repeatedly expressed her concerns about the failure of the repairs. The
time taken with no resolution to her situation in circumstances where she is living with
unrectified damage has negatively impacted her peace of mind. The complainant is awarded
$1,500 non-financial loss.
2.3 Why is the outcome fair?
The outcome is fair as the policy requires the insurer to repair the damage caused by an
insured event. The weight of evidence shows the repairs were defective. There is no cogent
evidence of a second storm event. A payment of $1,500 compensation for non-financial loss
is warranted for the unnecessary stress and inconvenience the complainant experienced.
Determination | Case number: 940329 Page 6 of 8
3 Supporting information
3.1 The AFCA process
AFCA’s approach is based on fairness
AFCA has determined this complaint based on what is fair in all the circumstances, having
regard to:
the legal principles
applicable industry codes or guidance
good industry practice
previous decisions of AFCA or its predecessor schemes (which are not binding).
The respective parties have completed a full exchange of the relevant information, and each
party has had the opportunity to address any issues raised. We have reviewed and
considered all of the information the parties have provided.
While the parties have raised a number of issues in their submissions, we have restricted this
determination to the issues that are relevant to the outcome.
We assess complaints on available information and circumstances
AFCA is not a court of law. We do not have the power to take or test evidence on oath, or to
require third parties to give evidence.
When we assess complaints, we consider:
available documents
the recollections of the parties
all relevant circumstances.
We give more weight to documents created at the time the events occurred. If there are no
relevant documents, we will decide what most likely occurred based on the available
information.
If there are conflicting recollections and these are evenly weighted, we may find that a claim
cannot be established.
3.2 Relevant policy terms
Product Disclosure Statement (page 12)
Sum insured and replacement value
Your buildings and contents are covered on a new - for - old basis. This
means:
• for your buildings – we rebuild, replace or repair using the same
materials if they are readily available in Australia or equivalent materials in
terms of purpose, quality and specifications; and/ or
• for your contents – where we replace a damaged item, we give you a
brand new item which may be the current replacement model if the same
one is no longer readily available in Australia.
Determination | Case number: 940329 Page 7 of 8
Also refer to the What If You Need to Claim? section for how we handle your
claim.
You select your sums insured . The contents sum insured is made up of a
number of components which are shown on your policy sc hedule .
Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.