Insurer failed to repair leaking window per approved scope of works and caused delay and inconvenience
Text of the determination
Determination
Case number 939657
Financial firm AAI Limited
Determination | Case number: 939657 Page 1 of 8
Case number: 939657 29 February 2024
1 Determination overview
1.1 Complaint
The complainant is the owner of a unit insured under a strata insurance policy issued by the
financial firm (insurer). She is represented by the insured body corporate’s manager.
The complainant claimed for water damage to her unit following a storm on 14 October 2021.
The insurer acc epted the claim and engaged builder ‘BBS’ to repair the unit. BBS applied
sealant to a leaking window ‘externally’ as part of the unit’s repair. However, the relevant
window continued to leak despite this.
The insurer declined to repair the leak after further investigation. It says the window continues
to leak because of poor construction and maintenance issues, which the policy excludes.
The complainant says the window still leaks because BBS did not repair it according to the
approved scope of works to start with. She also says the insurer must pay compensation for:
causing her to incur maintenance costs that were unnecessary
the delay, inconvenience and interference caused by its failure to repair the window.
1.2 Issues and key findings
Must the insurer rec tify the unit’s window leak?
Yes. The insurer failed to repair, and must repair, the leaking window according to the scope
of works it approved. Save for this, the insurer is not responsible for any other issues that
may be contributing to water entry into the unit, if at all.
Must the insurer pay any other compensation?
Yes. The insurer’s failure to repair the unit’s window according to its approved scope of works
caused unusual delay, inconvenience and interference. It is fair the insurer pays some
compensation for this. Save for this, the insurer is not required to reimburse the complainant
for costs incurred to attend to the unit’s maintenance.
Why is the outcome fair?
The insurer failed to repair the unit’s window to date despite approving repairs to do so. This
failure also caused unusual delay, inconvenience and interference. Given this, it is fair to
compel the insurer to repair the relevant window and pay compensation for its failure to do so.
1.3 Determination
This determination is in favour of the complainant. Within 14 days of being informed of the
complainants’ acceptance of this determination, the insurer is to:
take steps to repair the unit’s window according to the scope of works it approved, as
outlined in section 2.2 of this determination
pay the complainant $1,000 as compensation for non-financial loss.
Determination | Case number: 939657 Page 2 of 8
2 Reasons for determination
2.1 Must the insurer rectify the unit’s window leak ?
Yes. The insurer failed to repair, and must repair, the leaking window according to the scope
of works it approved. Save for this, the insurer is not responsible for any other issues that
may be contributing to water entry into the unit, if at all.
Insurer authorised BBS to seal window or replace window if it cannot be sealed
There is no dispute rainwater entered th e unit’s front window and damaged the unit during a
storm on 14 October 2021. The insurer engaged BBS to assess the matter, which then
engaged plumber ‘PPS’ to assist. PPS and BBS’s findings are summarised in section 3.2 of
this determination. Collectively, they say:
the unit sustained water damage to the window reveal, some architraves and ceiling
the relevant window failed a spray test because of deteriorated and poor sealing
there were also issues with the unit’s box and valley gutters above the window, which were
general wear, tear and maintenance issues and the cause of the ceiling’s water stain.
Following these findings, the insurer accepted liability for the unit’s resultant damage, asked
the complainant to attend to the identified maintenance issues, and engaged BBS to repair
the unit’s resultant damage.
While resealing of the leaking window was originally identified as maintenance work for the
complainants to complete, the insurer decided to do this work. It also agreed to replace the
window if it cannot be sealed. The scope of works (SOW) it approved shows BBS was to:
Remove, supply and install window reveal and architraves…
…Seal around aluminium window NOTE: If window cannot be sealed a
replacement of the entire window will be allowed for…
Complainant says window still leaks because BBS did not repair it properly
The complainant says BBS did not remove the relevant window to properly seal the area as
required by the SOW. It says the window continues to leak because BBS only applied sealant
without removing the window. It also says the other maintenance issues identified by the
insurer had nothing to do with the leak, as the window still leaked after these were addressed.
Insurer says window still leaks due to construction and maintenance issues
The insurer says further investigation revealed that the leak was not due to BBS’s repair but
due to defective construction and maintenance issues. It says the window passed a spray test
after BBS’s sealing work and engineer ‘C’ confirmed the window was po orly constructed and
had maintenance issues.
The insurer also says it was never liable for the window leak to start with, as it had no
obligation to repair a leak caused by deteriorated seals or poorly applied sealant. However, it
considered this to be a minor issue at the time, so it authorised BBS to seal the window.
Determination | Case number: 939657 Page 3 of 8
Complainant’s video shows window still leaks at areas BBS sealed
The exchanged information shows BBS sought to ‘externally’ seal the relevant window by
merely caulking it with silicone. I acknowledge BBS says it spray tested the window after such
work to ensure there were no leaks. I also acknowledge plumber ‘TP’ says it conducted a
spray test on the window after BBS’s work and found no leak.
However, the complainant has provided a video showing water was still entering the unit
through areas BBS said it sealed. This video shows a person directly spray testing areas that
were supposedly sealed, and water was still entering the unit. This video was also recorded
after BBS’s sealing work, so it contradicts its and TP’s spray test findings.
The insurer has not disputed or responded to this video.
BBS was meant to replace window’s seal and did not do so
Even if I accept the window no longer leaks because of BBS’s sealing work, which I do not,
such work was unacceptable in any event. This is because BBS essentially only carried out a
temporary ‘make safe’ repair when it was meant to remove the window and replace its seal.
The exchanged information shows BBS sought specialist advice if the window’s se al could be
repaired or should be replaced. It was probably advised it should be replaced, and BBS then
decided to attempt this first. These facts are clear from the insurer’s 20 January 2022 claim
note and its 23 December 2021 and 20 January 2022 emails t o the complainant’s
representative. The 20 January 2022 claim note relevantly states:
Called window trade to follow up repair dates. Trade advised they will be
attending in the next 2 weeks to replace the seals on the window. If seals [don’t]
work, a new window will be required . Trade thinks re-sealing should work. Once
this is complete we can book in other repairs … [Emphasis added]
The information also shows the insurer was aware BBS did not replace the window’s seal in
the manner intended by the approved SOW. Its 10 May 2022 claim note states:
Confirmed window should have been taken out to re-seal correctly, this was
authorised on the October SOW.
However [BBS] have completed temp repairs as 'make safe' with application of
silicone.
BBS failed to properly repair leaking window and it still leaks because of this
Considering these matters, I accept the complainant’s submissions that:
BBS did not actually repair the window in the manner it was supposed to
the window continues to leak from the areas that were supposedly sealed by it.
Fair to compel insurer to comply with its approved SOW without further delay
I acknowledge the insurer’s contention that it was not obliged to cover the window leak from
the outset.
However, the insurer accepted and approved a SOW to seal the window (or to replace the
window if it cannot be sealed) knowing this from the outset. It also secured the complainant’s
Determination | Case number: 939657 Page 4 of 8
agreement to resolve the first AFCA complaint by confirming it would, amongst others,
‘assess and rectify the leaking window’ (see insurer’s 11 May 2022 letter).
Having made such promises, I am not satisfied it is fair or consistent with an obligation to act
with utmost good faith for the insurer to now impose a different claim outcome on the
complainant. Her leaking window claim was effectively left unresolved to date because:
BBS failed to do what it was meant to do from the beginning
the insurer went back on its promise to fix the window leak several times.
Given this, I am satisfied it is fair in all the circumstances to compel the insurer to comply with
the SOW it approved without further delay.
Insurer is not required to attend to other issues that may be causing water entry
I acknowledge the insurer supplied other reports suggesting there are construction or
maintenance related issues that may be contributing to water entry around the relevant
window. These reports are also summarised in section 3.2 of this determination.
These reports confirm some, but not all, issues identified have been persuasively shown to be
contributing to water entry into the unit.
TP’s spray test with dyed water supports water was entering the unit through some loose or
unsealed cladding and flashing above the relevant window. However, while engineer C raised
concerns about the condition or build of several other items near or around the window, I find
no evidence these areas or items were ever tested for water entry.
In any case, I accept the insurer would not be required to rectify these issues or items
whether they are causing water entry or not. These would be construction or maintenance
related matters which the policy does not cover. The insurer is only required to attend to the
leaking window in accordance with its approved SOW, for the reasons outlined earlier.
Insurer is to act within 14 days of being notified of complainant’s acceptance
Within 14 days of being notified of the complainant’s acceptance of this determination, the
insurer must take steps to repair the unit’s wi ndow according to its approved SOW. The
insurer is to either replace the window’s seal or replace the whole window if it cannot be
sealed, as indicated in the SOW.
2.2 Must the insurer pay any other compensation?
Yes. The insurer’s failure to repair the unit’ s window according to its approved scope of works
caused unusual delay, inconvenience and interference. It is fair the insurer pays some
compensation for this. Save for this, the insurer is not required to reimburse the complainant
for costs incurred to at tend to the unit’s maintenance.
Complainant says insurer must pay compensation for poor claims handling
The complainant says the insurer asked her attend to several maintenance issues, which was
attended to, but did not resolve the window leak. She says the insurer caused her to incur
such costs unnecessarily, so it must compensate her for such costs.
For this purpose, the complainant seeks some $642 for plumbing, sealing and inspection
works done to the unit’s roof area above the relevant window.
Determination | Case number: 939657 Page 5 of 8
The complainant also says the insurer delayed the claim, so it must pay compensation for this
and for her time spent in dealing with the claim.
Insurer denies mishandling or delaying the claim
The insurer denies having to pay the complainant any compensation. It says it can ask the
complainant to attend to the maintenance issues it identified as she has a policy obligation to
keep the unit in good repair. It also says the policy does not cover the complainant’s time in
pursuing their claim.
AFCA can award indirect financial and no-financial loss under its rules
Under its rules, AFCA can award a complainant compensation for indirect financial loss
where an insurer has caused them to incur a financial loss they should not have had to incur.
AFCA can also award a complainant compensation for non-financial loss where an insurer
takes an unusual amount of time to resolve their situation, causes them unusual
inconvenience or unusually interferes with their expectation of enjoyment or peace of mind.
AFCA takes a conservative approach when assessing compensation for non-financial loss.
AFCA generally expects complainants to be moderately robust and bear the usual degree of
stress and inconvenience experienced during an insurance claim or in ordinary dealings with
an insurer.
Insurer is not responsible for complainant’s maintenance costs
The relevant invoice shows the complainant incurred the claimed $642 for works to rectify
defects PPS had identified as being the cause of the water staining to the unit’s ceiling. I am
satisfied such defects are maintenance matters which the unit owner is responsible for.
Given this, I am satisfied the insurer is not required to reimburse such costs.
Fair for insurer to pay compensation for poor and unfair claims handling
However, I am satisfied the complainant entitled to compensation for non-financial loss. As
noted earlier, her claim was effectively and unfairly left unresolved to date because:
BBS failed to do what it was meant to do from the beginning
the insurer sought to back track on its promise to fix the window leak several times.
Further, the insurer did not attend to the complainant’s complaint about mould developing
around the window area until more than a month later, by which time she appeared to have
attended to the matter on her own.
I accept these matters not only caused the complainant unusual inconvenience and
interference. I also accept they caused her claim to be unfairly left unresolved for more than
two years now.
Given this, I am satisfied it is fair the insurer pays the complainant $1,000 for her poor claim
experience in this instance.
2.3 Why is the outcome fair?
The insurer failed to repair the unit’s window to date despite approving repairs to do so. This
failure also caused unusual delay, inconvenience and interference. Given this, it is fair to
compel the insurer to repair the relevant window and pay compensation for its failure to do so.
Determination | Case number: 939657 Page 6 of 8
3 Supporting information
3.1 The AFCA process
AFCA’s approach is based on fairness
AFCA has determined this complaint based on what is fair in all the circumstances, having
regard to:
the legal principles
applicable industry codes or guidance
good industry practice
previous decisions of AFCA or its predecessor schemes (which are not binding).
The respective parties have completed a full exchange of the relevant information, and each
party has had the opportunity to address any issues raised. I have reviewed and considered
all information the parties have provided.
While the parties have raised several issues in their submissions, I have restricted this
determination to the issues that are relevant to the outcome.
3.2 Relevant reports
Record Key points
BBS’ s plumber ( PPS )
Roof r eport
21 - 10 - 2021
Inspected unit on 21 October 2021
Observed water damage to window and architraves in unit’s front
office caused by water ingress
Window failed spray test, and this was due to det eriorated sealant
and poor workmans hip on existing sealant
Observed ‘lipping flashing’ on and cracked silicone in a join in a
box gutter and unseale d rivets on the valley gutter above the
window, which were all due to general wear and tear
Window damage is due to deteriorated or poor sealing, whereas
minor water staining to ceiling is due to the issues seen with the
unit’s box and valley gutters
Recom mended unit owner engages:
> window specialist to seal window
> roof plumber to attend to issues with flashing and gutters
Report supplemented by photos
Determination | Case number: 939657 Page 7 of 8
Record Key points
Insurer’s builder ( BBS )
Report
23 - 10 - 2021
BBS refers to PPS’s report and concludes:
damage to unit’s front window frame has occurred due to
deteriorated/poorly sealed window frame that has failed a splash
test indicating it is allowing water to intrude via the seal
minor water staining to unit’s ceiling has occurred due to water
ingress from lipping flas hing o n the box gutter allowing wind driven
rain to enter, uns ealed rivets on the valley gutter and cracked
silicone on the join in the box gutter , which are all due to wear and
tear.
these matters are maint enance issues.
Insurer’s plumber ( TP )
Leak investigation r eport
16 - 05 - 2022
Noticed water on the inside of window ledge on arrival
Window passed spray test
Found unsealed cladding, conducted spray test to cladding and
flashing in the area with dye
Cladding and flas hing failed spray test and dye wat er was found to
have leak ed through the window
Report supplemented by photos, which included a photo showing
entry of dye coloured water near the affected window
Insurer’s plumber ( TP )
Roof r eport
16 - 05 - 2022
Box gutter did not cause water ingress but is non - compliant as it
does not discharge into a sump or rain head, but into roof valley
Unit’s damage is due to unsealed cladding and loose and
unsealed flashing
Damage has been occurring for an extended period and is due to
poor workmanship, but insured wou ld not have known this
Report supplemented by photos showing the identified defects
Insurer’s engineer ( C )
Report
02 - 12 - 2022
Inspected unit on 4 November 2022
Observed:
> sealant to wall panel joins have deteriorated in multiple areas
> metal wall flashing was installed as ‘pressure flashing’ and was
non - compliant
> recent silicone that was applied to the flashing has since
detached bec ause of poor pressuris ed fixing of the flashing
> the unit’s window head was prot ruding and was not covered by a
window head fla shing
Water entry to unit is due to:
> inadequate installation of wall panels above the window head
> non - compliant wall flashing
> deteriorated sealant along wall panel joins
Complainant would not have been reasonably aware of the non -
compliant construction alt hough application of sealant to wall
panel joins is considered a maintenance issue
Report supplemented by several photos
Insurer’s builder ( BBS )
Building assessment r eport
28 - 12 - 2022
Inspected unit on 23 December 2022
Water was noted to be leaking from window reveals internally, but
no result ant damage was found internally or externally
Determination | Case number: 939657 Page 8 of 8
Record Key points
Window or external cladding have not sustained any storm
damage externally
Did not find any storm damage to the roof when it was initially
inspected, and there appears to be a defect with the original
installation of the unit’s window and cladding
Report supplemented by several photos
Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.