Home / IAG / Determination 939337
Determination 939337
Partial decline of storm water runoff claim and cash settlement offer; loss of rent rate and duration
Summary
The complainant's landlord insurance storm claim was partly accepted by the insurer, which offered a cash settlement. AFCA upheld the declines for stumps, bathroom, retaining wall and air conditioners, but required a 20% increase for variations, interest from 1 February 2023 and eight more weeks of loss of rent.
The complainant did not show the declined damage was caused by the storm rather than long-term deterioration or excluded, but the insurer delayed settlement and the repair period required more loss of rent.
Issues
- Claim denial primary · not upheld
“The insurer is entitled to decline parts for the damage which were not caused by the storm event including stumps, retaining wall, bathroom and air conditioners.”
- Claim amount dispute secondary · upheld
“The settlement should be increased by 20% to allow for variations and the insurer should also pay interest on the settlement.”
- Poor claim handling secondary · upheld
“The complainant is entitled to compensation for the insurer's service and claim handling; insurer offered $5,400.”
- Delay secondary · upheld
“The claim settlement should have been released to the complainant as soon as parts of the claim were accepted.”
- Product terms interpretation secondary · upheld
“The insurer should pay an additional eight weeks of rent from 31 October 2023; not obliged to increase rate from $550 to $800.”
Subjects and remedies
home or building damagenatural disasterpay claimpay interest
Text of the determination
Determination
Case number 939337
Financial firm Insurance Manufacturers of Australia Pty Ltd
Determination | Case number: 939337 Page 1 of 11
Case number: 939337 16 November 2023
1 Determination overview
1.1 Complaint
The complainant lodged a claim with the financial firm (insurer) under his landlord insurance
policy for damage sustained to the property by storm/storm water runoff on 7 October 2022.
The insurer partially accepted the claim. It offered a cash settlement, based on its builder ’s
(U) scope of works, to resolve the complaint. Several items of damage that were in dispute
were accepted by the insurer and resolved during the AFCA complaint process. This includes
the insurer offering $5,400 non-financial loss compensation for its claim handling and service.
The insurer refuses to repair the accepted claim damage because it says the building did not
meet the building codes and standards. It paid loss of rent until 31 October 2023.
The complainant disputes the insurer’s decision . He seeks the insurer to accept and settle all
the damage caused by the storm event. He expects the insurer to also increase the weekly
loss of rent offered from $550 to $800.
1.2 Issues and key findings
Is the insurer’s settlement offer fai r?
No. The insurer is entitled to decline parts for the damage which were not caused by the
storm event including stumps, retaining wall, bathroom and air conditioners. However, it
should increase the settlement offered as detailed under section 2.1 of this determination.
The settlement should be increased by 20% to allow for variations and the insurer should also
pay interest on the settlement.
Is the insurer required to increase payment for loss of rent?
Yes. The insurer is not obliged to increase the rate of loss of rent from $550 to $800. It should
however pay an additional eight weeks of loss of rent from 31 October 2023, for the period of
repairs and mould remediation.
Why is the outcome fair?
The insurer is obliged to accept claim related damage and loss of rent for the period of
assessment and repair. It would be unfair to request the insurer to accept damage which pre-
existed the policy inception and not covered under the terms of the policy. The complainant is
entitled to compensation for the ins urer’s service and claim handling .
1.3 Determination
This determination is substantially in favour of the complainant.
The insurer is entitled to partly decline the claim.
If the complainant accepts this determination, the insurer should settle the remaining part of
the claim as explained in sections 2.1 and 2.2 of this determination.
Determination | Case number: 939337 Page 2 of 11
Determination | Case number: 939337 Page 3 of 11
2 Reasons for determination
2.1 Is the insurer’s settlement offer fair?
Onus on the complainant to establish a valid claim
The complainant is required to show, on the balance of probabilities (that it is more likely than
not), that he suffered a claimable loss under the policy. This means he must show the loss
was caused by a risk for which he is insured. This is referred to as a valid claim.
Once the complainant proves the existence of a claimable loss, the insurer is liable for the
loss unless it shows an exclusion or limiting condition applies. The insurer has the onus of
proving on the balance of probabilities the application of the exclusion or condition.
Policy cover is subject to terms, conditions, and exclusions
There is no dispute among the parties the complainant received a copy of the policy
documents. The insurer is therefore entitled to rely on the terms of the policy in assessing the
subject claim.
The complainant incepted the policy on 26 August 2022. The date of the loss was recorded
as 7 October 2022. I accept the insurer’s view the responsibility remains with the complainant
to show that all damages to the property claimed were caused by the insured event after the
date of the loss.
The insurer says some of the damages are not consistent with the claimed event but rather
maintenance and wear and tear issues. It says the quotations provided by the complainant do
not provide breakdown itemising costs for materials, labour or measurements. Neither do they
describe the proximate (dominant, effective or operative) cause of the damage.
The insurer partially accepted the claim and offered a cash settlement. The complainant says
the insurer had presented unprofessional reports and that its assessors/experts had failed to
completely assess the damage sustained to the property.
He says it would cost approximately $149,300 to reinstate the property but he is willing to
accept $110,000 to resolve the complaint. The insurer does not accept the complainant’s
proposal and the following items remain in dispute.
Stumps
The complainant says the stumps under the building were damaged by the stormwater runoff
and were not assessed during U’s initial visits. The cost to reinstate the stumps would be
approximately $25,000-$28,000. The insurer says the complainant did not discuss the
damage to the stumps earlier in the claims process. U revisited the property on 7 July 2023
and suggested that a specialist be appointed to assess this damage.
The insurer appointed an engineer (IE) to assess the damaged stumps. IE assessed the
property on 25 September 2023 and concluded the damage was long term and due to the
following factors:
Floor level surveys confirmed footing movement had occurred.
Long-term footing movement due to long term and ongoing moisture content variations
within the underlying reactive clay soils.
> Seasonal moisture content variations.
Determination | Case number: 939337 Page 4 of 11
> Long term climate variations and climate change.
> Differential permeability of the ground surface and upper (top) soil layers causing non-
uniform penetration of moisture across the site and therefore non-uniform moisture
content variations.
> Tree root drying effect.
The magnitude of surface movements is expected to be much higher in the presence of
‘abnormal’ soil moisture conditions, thereby increasing the probability of building
movement- related damage occurring. Factors that can contribute to ‘abnormal’ moisture
conditions include, but not limited to the following:
> Tree root drying effects of trees in the vicinity of the structure.
> Removal of existing trees in the vicinity of the structure.
> Failure to maintain appropriate site drainage.
> Failure to repair plumbing leaks.
> Inadequate ventilation to the subfloor area.
The absence of concrete paving and natural ground sloping towards the building is
enabling water ingress into the subfloor. As a result, the subfloor is wet. In addition,
absence of subfloor ventilation has further exacerbated the current moist/wet conditions in
the subfloor.
The complainant has not presented any expert evidence to rebut the above findings but says
the damage was caused by the storm runoff event. The onus also remains on the
complainant to show the stumps were damaged after the policy was incepted on 26 August
2022.
Based on the available evidence, I am not satisfied the complainant has shown the damage
to the stumps was caused by the storm runoff event. The damage on the balance of
probabilities occurred due to long term footing movement from ongoing moisture condition
variations within reactive clay soils.
The insurer is entitled to deny this part of the claim.
Motor pumps
The insurer assessed the damage to the water pumps and approved cover for two water
supply pumps.
The complainant says he claimed for four in total, including two fuel water supply pumps and
two electric water supply pumps . He says the insurer’s representative did not see the other
pumps during their assessment.
He seeks cover for two pumps approximately $1,500-$1,800.
The insurer has recently accepted liability for the remaining two motor pumps which should
be added to its settlement offer. I consider this part of the complaint resolved.
Bathroom
The insurer says the damage sustained to the bathroom and ensuite was as a result of
gradual deterioration, depreciation, wear or tear for which there is no cover under the policy. It
also says there is lack of evidence to show this damage occurred within six weeks of the
policy commencing in August 2022.
The complainant provided a quote from HHT dated 5 August 2023 in the amount of $10,500.
The insurer says the quote is not itemised and does not provide the breakdown for labour and
Determination | Case number: 939337 Page 5 of 11
material costs. Further, the ABN number provided by the supplier was not registered to HHT
but to a sole trader HB. The insurer records HHT has not been active since 2016.
The quote heading states flood damage to bathroom and lists the following works:
Remove and/or repair/Rebuilding of bathroom walls
Remove and/or repair/rebuild of floor
Waterproofing
Screeding
Remove and supply/install shower screen
Supply tiles
Labour
Silicone
Bin hire
The shower screen did not sustain damage by storm water runoff as suggested by HHT as it
had a crack.
U reattended the property on 7 July 2023:
Ensuite
On inspection of the ensuite shower, it is evident that tiles have started to come
off walls. On close inspection, a section of temporarily bogging/sealing has been
completed by the customer to the side of the shower, and all the caulking has
completely worn away at the floor to shower base junction. There is also a large
crack to the shower screen to the right hand side of the shower. We believe with
this evidence (caulking completely missing, large crack in shower screen) that the
damages to the tiles are consistent with long term water ingress into the shower
wall cavity.
Main bathroom
On inspection of the wall lining in the main bathroom - next to the spa bath - there
is slight wall damages present. There is caulking missing around bath hob, and
we have also attached real estate photos of property before claimed event that
shows pre existing wall damage next to the spa bath. This we believe is damaged
due to long term water ingress into wall cavity/wall linings.
The complainant says the insurer’s assessors had lifted the vinyl in the bathroom and the
expert who assessed the moisture afterwards had taken tiles off the bathroom to check and
assess the damage. He does not accept the damage was caused by wear and tear.
Based on the evidence presented by the parties, I am satisfied the proximate cause of the
damage to the bathroom was not the stormwater runoff but the issues with missing caulking
and pre-existing condition of the bathroom. I am also of the view one would expect the
bathroom flooring to tolerate water travelling over it considering its general purpose and
usage.
The insurer is entitled to deny this part of the claim.
Determination | Case number: 939337 Page 6 of 11
Doors
The complainant requested that the insurer should replace the two damaged doors and not
repair it. The insurer agrees to review and settle this part of the claim based on a quote to be
submitted by the complainant.
I consider this part of the complaint to be resolved.
Kitchen
The complainant says the kitchen cabinets were water damaged and require replacement,
including the bench top. He presented a quote from TL amounting to $15,000.70.
The insurer says the overhead kitchen cupboards, doors and benchtops and taps were not
affected by the storm event as the storm water did not reach this level. This was reconfirmed
by U during its attendance in July 2023.
The insurer should cover the storm water damaged kitchen cabinetry. It is not required to pay
for undamaged cabinetry and bench top.
This is because the information does not show the repair and mould removal process of the
kitchen cabinetry, which requires the removal and refitting of these items, may cause damage
to them during this process. Further, the insurer agreed to accept any additional costs
involved in reinstating the kitchen cabinetry and bench top if it is accompanied with
photographs and a report from the builder (if these are damaged during the repair/mould
remediation process).
I consider this offer to be fair and reasonable.
Fence
The complainant provided photos of the fence and expects the insurer to accept his claim for
approximately over 300 m of fence. He says the insurer’s assessor failed to thoroughly assess
the damage sustained to the fence.
U reported that 50m of the fence was damaged by falling tree(s) during the storm event.
The insurer’s experts who visited the property say the fence was in poor /dilapidated condition
and this issue was pre-existing. The damage caused by the insured event was localised.
The complainant says IE was engaged to check stumps at the property. When IE arrived,
they had checked the fences which were 10m away from the building and had not assessed
the fencing in the entire property.
The complainant seeks the insurer to accept the remaining fence around 250m -300m at a
cost of $15,000 to $18,000. He says the fence was washed away by the stormwater runoff.
Upon reviewing the photos and the assessment by the insurer’s experts, I accept the fence
requires replacement. However, I am satisfied the insurer’s liability is limited to the damage
caused by falling trees (50m).
Retaining wall
The complainant seeks the insurer accept his claim for the damaged retaining walls and says
he is willing to accept 50% of the cost of repairing this damage.
Determination | Case number: 939337 Page 7 of 11
The insurer says one of the retaining walls had no damage and the other had deviated out of
alignment consistent with deterioration and long-term damage. It says this damage was not
caused within six weeks of incepting the policy.
The policy also excludes cover for storm damage to retaining walls. The insurer is therefore
entitled to deny liability for this part of the claim.
Covered
• rainwater run -off
• landslide or subsidence that happens immediately as a direct result of rainwater
run- off.
Not covered
• loss or damage to:
- retaining walls
Air conditioners
The complainant says the air-conditioning specialist had attended earlier than the pre-booked
appointment, inspected the air conditioners, spoken to the tenant and left.
The assessment report states two outdoor air conditioners were tested and were in working
condition with no reported damage:
Inspection Found:
- Water from the recent floods has entered the bottom section of the condensers
for two split systems.
- Test ran the systems and both were in good working condition.
- The water did not get high enough to cause any damage to the units.
The complainant has not provided any other expert evidence to show these units were
damaged by the storm event. The insurer is therefore entitled to deny this part of the claim.
Trees
The insurer agreed to reimburse the cost of removing the trees which fell after the storm
event. The insurer agreed to settle the quote to appoint an Arborist for the fallen trees in the
total amount of $15,472.38 including GST and 19% builder’s margin.
The complainant accepts this part of the claim settlement and I consider this matter resolved.
Determination | Case number: 939337 Page 8 of 11
Allowance for variations
The insurer has accepted several parts of the claim during the claim and complaint process.
Some of the accepted repair works, especially mould remediation at the property, could result
in variations considering the work currently estimated and additional work that may be
required once the repair/remediation process starts.
It is therefore fair in all the circumstances the insurer’s settlement offer is increased by 20% to
accommodate the standard variations which may arise during the repair process. This
however does include the additional damage that may be caused to the kitchen cabinetry and
bench top, which the insurer has agreed that it would assess separately if such damage
occurs.
Insurer should pay interest on the settlement
The claim and complaint process has been lengthy, and the insurer offered $5,400
compensation in recognition of its service and delays.
The policy allows the insurer to repair the damage or cash settle the complainant for his loss.
The insurer chose to cash settle the complainant as its builder raised concerns regarding the
insured property not meeting certain building codes and standards.
The insurer is entitled to cash settle the complainant for the loss as long as its offer of
settlement is fair.
The claim settlement should have been released to the complainant as soon as parts of the
claim were accepted. This would have enabled the complainant to commence repair works at
the property at an earlier time.
The insurer should therefore pay interest on the settlement in line with section 57 of the
Insurance Contracts Act 1984 from 1 February 2023 until the date of settlement.
The mould remediation specialist report is dated 10 January 2023. The insurer should have
made the cash settlement to the complainant by 1 February 2023. This allows U two weeks
after receiving the mould specialist report to revise and finalise its scope of works and for the
insurer to arrange settlement.
2.2 Is the insurer required to increase payment for loss of rent?
Insurer not obliged to increase weekly rent
The complainant remains dissatisfied with the rental rate of $550/week offered by the insurer.
He says the tenants had agreed for an increase before the subject storm event occurred. He
says the insurer should pay $600/week from for the initial period of the loss and $800/week
from the date of the rental appraisal.
The complainant says he took over the management of rental and from September 2022, the
tenant had paid $600/week at the time. He submitted a bank statement which confirms
$2,600 was paid on 25 October 2022. He provided text messages shared between him and
the tenant to support his view. As the rental properties are in demand, the complainant
believes the rental in their area had also increased.
The insurer confirmed that it had paid loss of rent at the rate of $550/week until 31 October
2023.
Determination | Case number: 939337 Page 9 of 11
The insurer says the text messages with tenants shows they were able to agree to a rent
increase after they settled their car loan. It says the complainant had not provided any written
form of rental increase confirming the new rental amount and the date of increase. It says he
had also not provided a copy of the rental ledger to support his position. The insurer believes
its loss of rent offer of $550 is fair and relies on the following:
Loss of rent during repairs
Conditions
you must have a rental agreement that states the:
term of the rental period, and
amount of rent and bond your tenant needs to pay.
I acknowledge the rental deposit received on 25 October 2022 was $2,600. However, I am
not satisfied the text messages and the single transaction in the bank statement clearly show
the rent was indeed increased to $600 before the loss event.
The insurer is therefore not requied to increase the weekly rent offered.
Insurer required to pay rent for repair/mould remediation period
The complainant is entitled to receive rent until the repairs including mould remediation is
completed:
Covered under Buildings Insurance
the rent you lose during the reasonable time it should take to re pair or rebuild
your rental property, for up to 12 months from when the listed event took place.
The insurer should pay an additional eight weeks of rent from 31 October 2023 for the
complainant to attend to repairs accepted by the insurer and related to the insured event. The
insurer is not required to pay interest on this settlement amount as it has reimbursed this part
of the claim until 31 October 2023.
I note the policy allows up to 12 months of loss of rent. However, in this case, the insurer has
contributed to several delays in assessing and finalising the settlement offer for claim related
damage. It is therefore fair in all the circumstances the insurer pays the additional loss of rent.
2.3 Why is the outcome fair?
Outcome is fair
The insurer is obliged to accept claim related damage and loss of rent for during the period of
assessment and repair. It would be unfair to request the insurer to accept damage which pre-
existed the policy inception and not covered under the terms of the policy. The complainant is
entitled to compensation for the insurer’s service and claim handling.
Determination | Case number: 939337 Page 10 of 11
3 Supporting information
3.1 The AFCA process
AFCA’s approach is based on fairness
AFCA has determined this complaint based on what is fair in all the circumstances, having
regard to:
the legal principles
applicable industry codes or guidance
good industry practice
previous decisions of AFCA or its predecessor schemes (which are not binding).
The respective parties have completed a full exchange of the relevant information, and each
party has had the opportunity to address any issues raised. We have reviewed and
considered all of the information the parties have provided.
While the parties have raised a number of issues in their submissions, we have restricted this
determination to the issues that are relevant to the outcome.
We assess complaints on available information and circumstances
AFCA is not a court of law. We do not have the power to take or test evidence on oath, or to
require third parties to give evidence.
When we assess complaints, we consider:
available documents
the recollections of the parties
all relevant circumstances.
We give more weight to documents created at the time the events occurred. If there are no
relevant documents, we will decide what most likely occurred based on the available
information.
If there are conflicting recollections and these are evenly weighted, we may find that a claim
cannot be established.
3.2 PDS
What we don't cover
Loss, damage, injury or death a rising from:
rust, corrosion , gradual deterioration, depreciation, wear or tear
…
Maintaining and occupying your rental property
We don’t cover loss, damage, injury or death arising from:
Determination | Case number: 939337 Page 11 of 11
• faulty design or workmanship that you knew about or should have reasonably
known about.
Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.