Home / IAG / Determination 939103

Determination 939103

Denial of storm-related movement damage claim, missing contingencies uplift on cash settlement, and claim delay

FirmIAG
Decided2023-12-04
ProductGeneral Insurance · Home building and contents
OutcomeFor the complainant in part
Amount awarded$3,861
Non-financial loss$1,000
Amount claimed—
SourceAFCA PDF

Summary

The insurer paid a cash settlement for storm water damage to a granny flat but denied movement damage to the main building as excluded. AFCA upheld the denial but required a 20% uplift with interest, $1,000 non-financial loss, and a further mould assessment.

The insurer showed the movement damage resulted from excluded causes (long-term ground movement and defective footings), but should have added a contingencies uplift to the cash settlement and delayed its decision beyond the Code period.

Issues

Subjects and remedies

home or building damagenatural disasterpay claimpay interestpay non financial lossreassess claim

Related

All IAG determinations · Find similar determinations

Text of the determination

Determination Case number 939103 Financial firm Insurance Australia Limited Determination | Case number: 939103 Page 1 of 7 Case number: 939103 21 November 2023 1 Determination overview 1.1 Complaint The complainant holds home building insurance with the financial firm (insurer). He lodged a claim for damage following a storm event on 8 March 2022. The insurer partially accepted the claim and paid the complainant $18,853.03 as a cash settlement for the water damage to his granny flat. However, the insurer has denied the claim for movement damage to the main building. It says that damage is due to ground movement over time and the result of construction defects, so excluded under the policy terms. The complainant maintains that the movement damage should be covered. He is also dissatisfied with the insurer’s claim handling. 1.2 Issues and key findings Is the insurer entitled to deny the movement damage claim? Yes. On the exchanged information, the insurer has on balance shown the movement damage is the result of excluded causes. Is the insurer required to pay any additional amounts? Yes. When it paid the cash settlement in late August 2022, the insurer did not include a contingencies uplift. It should have done so. It is required to pay a further $3,840.61 (20% of the quoted amount) as an uplift, as well as interest on that amount. Is non-financial loss compensation payable? Yes. The insurer’s claim handling involved delays which caused the complainant stress and inconvenience. It is to pay him $1,000 in compensation. Why is the outcome fair? It would not be fair to require the insurer to pay for the movement damage as it from excluded causes. However, it is fair that the insurer pays a contingencies uplift on the cash settlement for the granny flat and pays compensation for stress and inconvenience its delays caused. Determination | Case number: 939103 Page 2 of 7 1.3 Determination This determination is partially in favour of the complainant. Within 14 days of the complainant providing written notice he accepts this determination the insurer is required to pay him:  $3,860.61 (20% of $19,203.03)  interest pursuant to section 57 of the Insurance Contracts Act, 1984 (Cth ) on $3,860.61 from the date it paid the cash settlement until the date it pays the $3,860.61, and  $1,000 in non-financial loss compensation. Within 14 days, the insurer is also to request that restorer CR reassess the property to determine if there is event related mould present requiring treatment beyond that allowed for in the cash settlement. If there is, the insurer is to as soon as is reasonably possible obtain a quote for the additional work required based on current retail prices. The insurer is to pay the complainant the quoted amount plus a 20% uplift. Determination | Case number: 939103 Page 3 of 7 2 Reasons for determination 2.1 Is the insurer entitled to deny the movement damage claim? Yes. On the exchanged information, the insurer has on balance shown the movement damage is the result of excluded causes. Complainant must show a claimable loss under the policy terms The complainant is required to show, on the balance of probabilities (that it is more likely than not), that he suffered a claimable loss under the policy he holds. This means he must show the loss was caused by a risk for which he is insured. Subject to the terms and conditions set out in the product disclosure statement (PDS), the policy covers d amage to the complainant’s home caused by a listed insured event. Those events include ‘Storm, flood, rainwater or wind’ (Storm). In addition, the complainant purchased optional accidental damage cover. This means the policy also covers: damage to, loss or destruction of the buildings that make up your home, or your contents and valuable items, when it is caused by an unintentional act, or an unforeseen and uncontrollable incident. The claim was lodged on 11 March 2022. The complainant told the insurer that during a storm on 8 March 2022, water had entered the garage which had been converted into a granny flat. In addition to the resultant water damage, the complainant was concerned about internal cracks that had subsequently appeared in the rest of the house. Once the complainant proves the existence of a claimable loss, the insurer is liable for the loss unless it shows an exclusion or limiting condition applies. The insurer has the onus of proving on the balance of probabilities the application of the exclusion or condition. Insurer says it is entitled to deny the movement damage claim The insurer arranged for builder MC to inspect the home on 26 May 2022. MC concluded: I am of the opinion that sudden and excessive rainwater run-off during storms on the 8th March 2022, has inundated the granny flat kitchen and bedroom affecting the laminate floating floor, low-level walls and kitchen areas. I am also of the opinion that the cracking to the concrete ceiling, plasterboard ceiling, cornices and wall linings located within the lower lounge room, stairwell, upper lounge room, formal lounge room and entry to the main building are consistent with building movement over an extended period of time… On 29 June 2022, engineer SE inspected the home. It provided a report dated 12 July 2022 which contained errors. SE provided a corrected version of the report, dated 22 August 2022. According to SE:  the foundation soil is Class (A) stable sandy material, which does not experience volumetric changes from exposure to rainfall or flooding  there is no evidence of foundation erosion  there is evidence of prior patching of internal cracking, suggesting ongoing movement over an extended period, pre-dating the claim event Determination | Case number: 939103 Page 4 of 7  t he sandstone block footings’ depth (190mm below ground level) was too shallow to meet the applicable building code requirement (230mm below ground level)  ‘sandstone footings founded in shallow sands are prone to long -term differential foundation settlement which occurs over a period of time’  the cracking is unrelated to the claim event; rather, it is due to long term foundation settlement in combination with defective footing depths contrary to applicable building code. SE provided a supplementary report dated 30 March 2023. SE confirmed that in assessing the footings’ depth, it had dug a test pit at the front left of the home. It acknowledged that area of the home is an extension, but noted the original building footprint had not changed, and the original sandstone footings were retained. SE maintained its previously expressed opinion. The insurer says that the complainant has not established a claimable loss for the movement damage. Further, it says that damage is excluded because the PDS confirms on page 10 that the policy does not cover loss or damage as a result of, or caused by:  settling, shrinkage or any earth movement  gradual deterioration, wear or tear  structural defects, or faulty workmanship or design. The insurer notes that it informed the complainant on several occasions that it was prepared to revisit its coverage decision if he provided expert reports that countered its own, but he did not do so. Complainant says insurer should accept movement damage claim The complainant maintains that the movement damage should be accepted by the insurer. He says that the cracking was not present before the claim event. He also says: All cracking is mirrored down the middle of the home upstairs and downstairs indicating this was a one-off mov ement due to the severe flooding that occurred… The complainant submits that the insurer’s expert reports are unreliable because:  both experts referred to items for which he was not claiming  SE’s report contains errors, even after it provided the amen ded version. He has provided development application (DA) documents submitted to council for the construction of the veranda in the mid-1980s. Council approved the DA. The DA documents specify 500mm as the depth for concrete footings. Insurer is entitled to deny the movement damage claim I do not agree with the insurer that the complainant has failed to show a claimable loss under the policy terms. The complainant added accidental damage cover to the policy. There is no reasonable basis to conclude that the movement damage was the result of an intentional act, or a foreseen or controllable incident. However, based on the exchanged information, I am satisfied that the insurer has on balance shown the movement damage is the result of excluded causes. This is because:  MC and SE both conclude that the movement damage is the result of long term ground movement, pre-dating the claim event  MC and SE have included in their reports images showing prior patching repairs Determination | Case number: 939103 Page 5 of 7  SE’s testing showed the sandstone footing at the fr ont left of the home was too shallow, and non-compliant with the applicable building code. It is reasonable to assume that the rest of the sandstone footings were more likely than not founded at the same depth  the DA documents note the veranda extension was to be built over the existing footings  no expert opinion contrary to the opinions of MC and SE has been provided  I am not satisfied there are reasonable grounds to dismiss the conclusions of MC and SE. As the insurer has shown the movement damage is the result of excluded causes, it is entitled to deny coverage for that damage. 2.2 Is the insurer required to pay any additional amounts? Yes. When it paid the cash settlement in late August 2022, the insurer did not include a contingencies uplift. It should have done so. It is required to pay a further $3,840.61 (20% of the quoted amount) as an uplift, as well as interest on that amount. Insurer has paid a cash settlement for the granny flat damage MC provided to the insurer a scope of works (SOW) dated 28 May 2022 for the cost to repair the water damage to the granny flat. The quoted price for the repairs was $19,203.03. On or about 22 August 2022, the insurer paid the complainant $18,853.03 as a cash settlement for the water damage to the granny flat. That was the amount quoted by MC less the $350 policy excess. The complainant accepted the cash settlement. Insurer should have included a contingencies uplift A cash settlement must be based on a reasonable quote for claim related repairs, actionable by a retail customer. An uplift is then to be applied to the quoted amount to allow for contingencies and the loss of the lifetime guarantee that applies to insurer approved repairs. The only SOW/quote for the granny flat repairs submitted to AFCA is that of MC dated 28 May 2022. On the exchanged information, the SOW appears to adequately cover the claim related repairs, and the quoted price does not appear to have been discounted for the insurer. However, the insurer did not include a contingencies uplift. Including an uplift is a standard expectation when an insurer pays a cash settlement. The insurer has not explained why it did not do so in this case. I am satisfied that a 20% uplift should reasonably have been added by the insurer when it paid the cash settlement amount to the complainant in late August 2022. Accordingly, the insurer is required to pay the complainant $3,860.61 (20% of $19,203.03), plus interest on that amount from the date it paid the cash settlement until the date it pays the $3,860.61. Insurer is to arrange a further mould assessment The complainant has expressed continuing concern about mould in the main building and in the granny flat. MC’s SOW/qu ote for $19,203.03, which was the basis of the insurer’s cash settlement payment in late August 2022, included allowances for antimicrobial treatments to the granny flat. In a response to AFCA dated 28 March 2023, the insurer stated: Determination | Case number: 939103 Page 6 of 7 The report [dated 15 July 2022] completed by [restorer CR] acknowledged that the Complainant had removed the skirtings and any mould affected items . [MC] noted the same. No further mould concerns were noted by the trades that attended site. [The insurer] can engage [CR] to reattend to determine if there are event related mould issues at the property. Give n the complainant’s continui ng concerns, I am satisfied it is reasonable for the insurer to arrange for CR to reassess the property (as a whole) to determine if there is event related mould present requiring treatment beyond that allowed for in the cash settlement paid. If there is, the insurer is to obtain a quote for the additional work required based on current retail prices. The insurer is to pay the complainant the quoted amount plus a 20% uplift. This determination does not preclude the complainant from pursuing a complaint concerning the insurer’s decision on the additional event related mould (if any). 2.3 Is non-financial loss compensation payable? Yes. The insurer’s claim handling involved delays which caused the complainant stress and inconvenience. It is to pay him $1,000 in compensation. AFCA can award compensation for poor claim handling Under paragraph D.3 of the AFCA Rules, we may award compensation for non-financial loss (capped at $5,400) where the insurer’s actions have caused an unusual amoun t of:  physical inconvenience  time taken to resolve the situation  interference with the complainant’s expectation of enjoyment or peace of mind. Insurer has caused stress and inconvenience The claim was lodged on 11 March 2022. From the insurer’s claim n otes, a claim decision was not communicated to the complainant until some five months later, in early August 2022. That is outside the standard four-month decision period referred to in the General Insurance Code of Practice. I accept that the insurer’s d elay has caused the complainant stress and inconvenience. The insurer is required to pay him $1,000 in non-financial loss compensation. 2.4 Why is the outcome fair? It would not be fair to require the insurer to pay for the movement damage as it from excluded causes. However, it is fair that the insurer pays a contingencies uplift on the cash settlement for the granny flat and pays compensation for stress and inconvenience its delays caused. Determination | Case number: 939103 Page 7 of 7 3 Supporting information 3.1 The AFCA process AFCA’s approach is based on fairness AFCA has determined this complaint based on what is fair in all the circumstances, having regard to:  the legal principles  applicable industry codes or guidance  good industry practice  previous decisions of AFCA or its predecessor schemes (which are not binding). The respective parties have completed a full exchange of the relevant information, and each party has had the opportunity to address any issues raised. We have reviewed and considered all the information the parties have provided. While the parties have raised several issues in their submissions, we have restricted this determination to the issues that are relevant to the outcome. We assess complaints on available information and circumstances AFCA is not a court of law. We do not have the power to take or test evidence on oath, or to require third parties to give evidence. When we assess complaints, we consider:  available documents  the recollections of the parties  all relevant circumstances. We give more weight to documents created at the time the events occurred. If there are no relevant documents, we will decide what most likely occurred based on the available information. If there are conflicting recollections and these are evenly weighted, we may find that a claim cannot be established.

Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.