Text of the determination
Determination
Case number 938908
Financial firm AAI Limited
Determination | Case number: 938908 Page 1 of 9
Case number: 938908 21 December 2023
1 Determination overview
1.1 Complaint
The complainant holds a home building insurance policy, underwritten by the financial firm
(insurer). The complainant lodged a claim for damage to his property following a storm.
The insurer partially accepted liability for the claim and offered to cash settle the building
repairs for $26,509.34. This offer is based on a quote from its builder, DWC.
The complainant disputes the insurer’s settlement offer. He says the cash settlement is
inadequate and does not cover all the damaged areas.
The complainant seeks a cash settlement based on a quote from his preferred builder (IDC)
for $215,880.89.
1.2 Issues and key findings
How should the claim be settled?
Neither party’s SOW or quotes are fair. Given this, the panel considers the fairest way to
resolve this complaint is to appoint an expert to do a full SOW and base a cash settlement on
that. The process to be followed is set out in section 2.1.
1.3 Determination
This determination is in favour of the insurer.
The claim should be resolved in the manner set out in section 2.1.
Determination | Case number: 938908 Page 2 of 9
2 Reasons for determination
2.1 How should the claim be settled?
Valid claim established
There is no dispute the complainant’s property suffered damage because of a storm event, to
which the policy responds.
Both parties supplied a Scope of Works (SOW).
The SOWs use the same format with the same headings for each damaged area. The
dimensions are the same. The description of the work is the same.
The differences between the two SOWs include several key areas. These include the
following:
insurer’s cost/rate versus complainant’ s costs/rate
quantities of material used
disputed areas of damage included in the complainant’s SOW.
Policy provides the insurer with the discretion as to how to settle a claim
The policy provides the insurer with the discretion to settle a claim by:
repairing the damage; or
rebuilding the property; or
paying the complainant the reasonable cost to repair or reinstate the building to the
condition it was in just before the loss or damage occurred (cash settlement).
The insurer must exercise its discretion fairly, reasonably and consistent with the principles of
utmost good faith.
Flooring is not covered
The complainant’s quote and SOW include areas of damage that the exchanged information
does not show is claim related damage. This includes the flooring.
The complainant relies on a floor report from FLC. The report states the floor was damaged
by water over an extended time. The report is not persuasive as it does not identify which
areas are damaged and why storm damage is the most likely cause rather than other
reasons, such as wear and tear. The report does not include photographs, measurements or
diagrams of the damage.
The insurer relies on a report from ATF. This is an extensive report with diagrams,
photographs and moisture readings. ATF states the kitchen area was extensively worn with
dark marks where the top coating had worn away. ATF found normal moisture readings (8-
11%) at various locations except for the master bedroom. This area was due to an
undisclosed active water source, unrelated to the storm damage. The panel notes the ATF
report was done by an accredited Inspector from the Australian Timber Flooring Association
(ATFA).
The ATF report also determined the slope of the floor would have directed any water away
from the damaged area. The report concluded the floor damage resulted from general wear
and tear. Further the report concluded the complainant’s use of a steam mop to clean the
floor is considered inappropriate as it can soften and degrade floor coatings.
Determination | Case number: 938908 Page 3 of 9
This report is compelling and persuasive.
Based on this report, the panel does not consider the floor damage is related to the storm
damage and should be excluded from the SOW.
Roof damage is not as extensive as claimed
The roof damage is in dispute.
The complainant relies on a roof report from ICS. ICS said the roof damage was a direct
result of storm damage. ICS estimated the storm related roof damage at 70-75% of the total
roof area.
The panel notes there are no photographs and no discussions of the type of damage. There
is no analysis on why the damage is more likely to have been caused by a storm as opposed
to other events, such as normal wear and tear.
The insurer relies on two roof reports. The first report from KBG states there were numerous
maintenance issues, including but not limited to, rusted valleys, cracked tiles, tiles with
silicone repairs and cracked pointing. KBG concludes the tiles are old concrete tiles toward
the end of their life span. These conclusions are supported by numerous photographs.
The insurer’s second roof report from OPC identified 48 damaged tiles but concluded only
one had been damaged as a direct result of storm/hail damage.
OPC confirmed there are fractures and cracking throughout the bedding mortar due to
structural movement and large tears/openings in the lead flashing along the gables allowing
water to enter. OPC concluded these are maintenance issues and not storm related.
The panel is not persuaded the complainant’s report to be thorough or compelling. The
insu rer’s reports are more detailed and supported by photos. Therefore, the panel does not
accept all the roof damage the complainant is claiming is storm related.
Complainant’s SOW includes works/damage that do not appear claim related
The complainant’s SOW includes other areas that do not appear claim related. These are:
box gutter and fascia
rendering/cracking
site foreman
silica dust prevention.
For example, the complainant’s SOW includes $17,940 for sanding and painting the entire
box gutter and fascia. The insurer states this damage was not sighted during the assessment
phase nor has it been approved by them as being storm related.
The complainant has not provided any evidence showing these damages are storm related.
As the onus is upon the complainant, the panel does not consider this cost is justified on the
limited information.
Given all this, the panel does not agree the complainant has shown his quote or SOW is fair.
Pool damage agreed upon.
The panel notes for completeness, the pool damage has been agreed upon.
Determination | Case number: 938908 Page 4 of 9
Insurer’s quote and SOW not shown to be reasonable either
All of IDC’s rates are higher than the insured’s builder, DWC. There are also discrepancies in
the quantities for the agreed scope of works.
However, of the two quotes, the only one actionable is IDC. The insurer has not provided any
information to show DWC’s quotes and rates are available to the complainant in the
marketplace.
Therefore, the panel does not accept the rates set out in DWC’s quote are fair.
The insurer provided an assessment report dated 6 June 2023. This reviewed the
complainant’s quote and SOW. The assessor identified various discrepancies, some of which
has been supported. However, he also recommended an engineer or building consultant be
appointed to ensure an accura te SOW is put together. The assessor raised concerns DWC’s
SOW was not complete. The assessor recommended some areas be reviewed (e.g.
rendering).
Given all this, the panel does not accept the insurer’s SOW or quote is fair.
Insurer to appoint an engineer to assess the remaining disputed areas.
In circumstances when neither party has been able to substantiate their quote or SOW is fair,
the panel considers it fair the matter be resolved in the following way.
The parties are to engage an independent building consultant or structural engineer (expert)
to inspect the property and provide a full SOW for all the required repairs. In doing so, the
expert is to take into consideration the areas the insurer has accepted liability for and should
exclude the flooring. For all other areas, the expert is to use their judgement as to whether it
should be included in the SOW or not.
The expert should be one agreed to by the parties. This can be done by the insurer providing
a list of three experts that the complainant can choose one from. The expert should be
appropriately licenced and qualified to do this. The expert should be one who has not been
involved in the claim.
The expert’s costs are to be borne by the insurer. The expert should be appointed within 14
days after one is agreed on.
Once this expert has been engaged and has completed the SOW, each party can obtain at
least one, and no more than two, quotes based on that scope of works. Any quotes obtained
should be submitted within 45 days of the scope of works being provided to the parties.
If only one quote is obtained in total, then the insurer is to cash settle the claim based on that
quote plus a 15% contingency. If more than one quote is obtained, then the insurer is to cash
settle the claim based on the average of those quotations with a 15% contingency.
The contingency is to address the fact the risks of the works are passing to the complainant
and the likely possibility that there may be variations required during the works.
The panel acknowledges that during the dispute process, the complainant has refused to
allow an expert to do a SOW given his claims experience and mistrust with the insurer.
However, in circumstances when neither party have provided a SOW or quote that is
reasonable, the panel considers the above process is the fairest way to resolve the
complainant. It also allows the complainant a say in the expert appointed to do the SOW.
Determination | Case number: 938908 Page 5 of 9
2.2 Why is the outcome fair?
Neither party’s SOW or quote is fair. In such circumstances, the panel accepts It is fair that an
expert be appointed to do a full SOW and a settlement be based on that.
Determination | Case number: 938908 Page 6 of 9
3 Supporting information
3.1 The AFCA process
AFCA’s approach is based on fairness
AFCA has determined this complaint based on what is fair in all the circumstances, having
regard to:
the legal principles
applicable industry codes or guidance
good industry practice
previous decisions of AFCA or its predecessor schemes (which are not binding).
The respective parties have completed a full exchange of the relevant information, and each
party has had the opportunity to address any issues raised. We have reviewed and
considered all the information the parties have provided.
While the parties have raised a number of issues in their submissions, we have restricted this
determination to the issues that are relevant to the outcome.
A panel determined this matter
Due to the nature of this complaint, we referred it to a panel for determination. The panel
includes:
an ombudsman
a member with significant experience in consumer and small business advocacy
a member with extensive experience in the insurance industry.
We assess complaints on available information and circumstances
AFCA is not a court of law. We do not have the power to take or test evidence on oath, or to
require third parties to give evidence.
When we assess complaints, we consider:
available documents
the recollections of the parties
all relevant circumstances.
We give more weight to documents created at the time the events occurred. If there are no
relevant documents, we will decide what most likely occurred based on the available
information.
If there are conflicting recollections and these are evenly weighted, we may find that a claim
cannot be established.
Determination | Case number: 938908 Page 7 of 9
3.2 Product Disclosure Statement (PDS)
Page Text
Page 45 How we settle building claims
If we agree to pay a claim for loss, theft or damage to the building,
we will decide if we will:
• repair damage to the building;
• rebuild the building;
• pay you what it would cost us to repair or rebuild the building
Page 39 What we do not cover - general exclusions
You are not covered under any section of your policy for damage,
loss, cost or le gal liability that is caused by, arises from or involves:
Wear, tear and gradual deterioration
wear, tear, rust, fading, rising damp, mould, mildew, corrosion, rot,
action of light, atmospheric or climatic conditions or gradual
deterioration such as, but not limited to:
• tiles and their adhesive or grouting breaking down;
• weathering of roof tiles or roof ridge capping;
• gradual weathering and breakdown of bricks, mortar or concret e
3.3 Expert reports
REPORT KEY POI NTS
ATF Floor Report
20 June 2022
Page 3
Page 10
When walking through the dwelling, the timber flooring in the kitchen
area was observed to b e extensively worn, with dark marks, areas
where the coating has worn away and some discolouration at board
ends apparent.
On this floor, measurements over ten boards were taken in areas
within close vicinity to the wall where the leak originated and also
away from these areas for comparison (refer to the sketch), with
minimal variation between measurements observed. Moisture met er
readings ranged from 8 - 11% throughout the floor, with these
readings within the expected range, except for in the master
bedroom doorway, where readings up to 32% were observed.
Determination | Case number: 938908 Page 8 of 9
Page 12
The owner also indicated that a steam mop is occasionally used to
clean the floor, with this cleaning method considered inappropriate
for timber floors, as it can soften and degrade floor coatings, making
the floor more susceptible to premature wear and discolouration.
During the inspection, the condition of the floor s urrounding the wall
where the leak originated was considered to be unaffected by
moisture, with meter readings within the expected range, individual
boards exhibiting a flat surface and the general appearanc e of these
flooring areas similar to that of the rest of the floor, with significant
wear to the floor present in the kitchen and meals area attributed to
general usage over time and possibly influenced by maintenance
practises.
OCS
26 January 2023
Pages 1 - 3
The ridge cap bedding and pointing is in poor condition.
Fractures/cracking was found throughout the bedding mortar due to
structure movement, which is noted as maintenance related
damages.
No weep holes are present to the associated bedding mortar.
Slipped roof tiles were found to the gables loc ated to both sides of
the property.
Large tears/openings were found to the lead flashing along the
gables, which is creating a large opening for water ingress. This is
also noted as maintenance related damage
Whilst inspecting the roof surface area above, 1x damaged roof tile
was identified along a valley tray. Due to the location of the fracture,
water had entered the ceiling cavity in wet weather conditions.
Maintenance : Approximately 47x of the above tiles are noted as
maintenance related damages and are not event related.
Hail Damages : Approximately 1x roof tile has been damaged as a
direct result of a previous hail event.
AAMI Asse ssment report
7 June 2023
Page 7
DWC have advised that they are unable to complete repairs to the
property due to the following:
If this claim is accepted, D WC recommend cash settlement due to
the following:
- Kitchen/Dining room ceiling has pre - existing areas where paint is
flaking. This is consistent with paint adhesive issues
which will be worsened with the next coat of paint.
- Bedroom 4 ceiling has pre - existing areas where paint is flaking.
Determination | Case number: 938908 Page 9 of 9
- Roof is under 20* and does not have sarking installed, therefore
the roof does not comply w it h current standards.
I also accept that DWC have missed items in their scope of works.
As per the above I believe that the scope of works provided by the
customer is not acceptable and requires amendments It also
contains the items that have been previo usly excluded .
Based on review of the scopes of works I can confirm the D WC
Scope of works requires amendments to reflect the following:
External:
Allowance for roof tile removal and reinstatement to facilitate event
related repairs for the trusses.
Allowance for roof rail to facilitate event related repairs only .