Partial decline of two water damage claims (balcony and framework) and failure to disclose or consider the insurer's 2017 report
Text of the determination
Determination
Case number 938507
Financial firm AAI Limited
Determination | Case number: 938507 Page 1 of 15
Case number: 938507 22 February 2024
1 Determination overview
1.1 Complaint
The complainant holds a home and contents insurance policy with the financial firm (insurer).
Following heavy rain in 2016 and 2020, the complainant lodged two claims with the insurer for
water damage to her home. On each occasion, the insurer concluded the cause of damage
was failed balcony waterproofing and a failed balcony downpipe seal. It accepted liability for
internal damage to the complainant’s garage but declined to cover damage to other areas of
the complainant’s home including the balcony.
The complainant says her repairer has since advised the damage was caused by rain leaking
from the box gutter drain above the balcony, not failed waterproofing or seals. She says the
insurer held a 2017 report saying rain had overwhelmed the drainage capacity of the box
gutter drain and leaked into internal areas of her home but did not disclose it. She says the
insurer has acted in bad faith and should reimburse her 2017 and 2022 repair costs.
1.2 Issues and key findings
Should the insurer reimburse the 2017 and 2022 repair costs?
Yes. A 2017 report obtained by the insurer concluded the balcony was damaged by a storm
when rain overwhelmed the overhead box gutter drain. The insurer did not engage properly
with this report or disclose it. The available information showed a valid claim under the policy
and the insurer did not meet its onus to show the cause of the damage was excluded.
In the years after the 2017 claim, rain overwhelming the box gutter drain continued to cause
water damage to the complainant’s external framework and balcony. Had the insurer acted
fairly, by addressing and disclosing its 2017 repor t, the further damage to the complainant’s
home would likely have been avoided. The complainant’s situation was made worse by the
insurer’s inadequate review of her claims in 2020, 2021 and 2022.
What is a fair outcome?
The insurer should reimburse the complainant’s 2017 and 2022 repair costs and pay non -
financial loss compensation as set out in section 1.3. This outcome is fair because it balances
the consequences of the insurer’s conduct with the complainant’s policy entitlements.
1.3 Determination
This determination is in favour of the complainant. If the complainant accepts this
determination then, within 14 days of the insurer being notified of her acceptance, the insurer
should pay her the following amounts:
$4,792 for 2017 balcony repair costs
$57,701.50 for 2022 repair costs ($60,843.23 less the cash settlement of $3,141.73)
$3,500 non-financial loss compensation for stress and inconvenience
interest pursuant to section 57 of the Insurance Contracts Act 1984 (Cth) from the date the
complainant paid the amounts referred to above until the date of reimbursement.
Determination | Case number: 938507 Page 2 of 15
2 Reasons for determination
2.1 Should the insurer reimburse the 2017 and 2022 repair
costs?
Yes. A 2017 report obtained by the insurer concluded the balcony was damaged by a storm
when rain overwhelmed the overhead box gutter drain. The insurer did not engage properly
with this report or disclose it. The available information showed a valid claim under the policy
and the insurer did not meet its onus to show the cause of the damage was excluded.
In the years after the 2017 claim, rain overwhelming the box gutter drain continued to cause
water damage to the complainant’s external framework and balcony. Had the insurer acted
fairly, by addressing and disclosing its 2017 report, the further damage to the c omplainant’s
home would likely have been avoided. The complainant’s situation was made worse by the
insurer’s inadequate review of her claims in 2020, 2021 and 2022.
Background to the complaint
The complainant holds a home building and contents policy with the insurer. She lodged two
claims with the insurer for water damage to her home following heavy rain in 2016 and 2020.
The complainant says the insurer has improperly declined part of each claim. She says a
2017 report obtained by the insurer, and a report from her own expert in 2022, show the
cause of the damage was rain overwhelming a box gutter drain above the balcony. She says
this means the damage is covered under the storm or escape of liquid sections of the policy
and the policy exclusions relied on by the insurer do not apply.
She also says the insurer:
has acted egregiously with bad faith, bias and a single minded intent to deny her claim
failed to act on or disclose a 2017 report it had obtained which showed the damage to her
home was covered under the policy
has refused to recognise the findings set out in her repairer’s 2022 report, which also show
the damage is covered by the policy
has refused to properly engage with the question of whether various provisions or
exclusions of the policy ap ply, in particular the policy’s escape of liquid provisions
has breached sections 13 and 14 of the Insurance Contracts Act 1984 (Cth)
She says the insurer’s conduct has led to it wrongly denying cover for repairs to her home in
2017 and 2020 and grossly under compensating her for resultant damage to the garage when
it cash settled her claim in 2021. She says the insurer should have covered all damage to her
home from the box gutter down to the garage, including the balcony. She wants the insurer to
reimburse her for her 2017 and 2022 costs of repair of $62,493.50 as follows:
2017 balcony repair costs of $4,792
2022 repair costs of $57,701.50 ($60,843.23 less the 2021 cash settlement of $3,141.73).
She says these costs should either have been covered by the policy and/or arose as a direct
result of the insurer withholding its expert’s view on the box gutter drain in 2017. Further
background to the claims and the complaint is set out below.
The insurer maintains its denial of the claims
The insurer maintains its denial of the complainant’s claims. It says:
Determination | Case number: 938507 Page 3 of 15
the box gutter drain was not damaged by an insurable event, but is a maintenance/defect
issue for which the insurer is not liable
the damage to the box gutter drain and the balcony was not caused by a single insured
event, rather by
> multiple events over time to which the policy does not respond; and
> wear, tear or gradual deterioration
the 2017 damage occurred because the balcony was not waterproofed
the 2020 damage occurred because the balcony had not been rebuilt or waterproofed
correctly after the 2017 claim
deterioration of the balcony was exacerbated by the design of the balcony and the use of
particleboard which, according to Australian Standards, is not suitable for external decking
the complainant did not give the insurer the opportunity to inspect the damage before
repairs were completed in 2022, so the terms of the policy allow the insurer to decline the
claim.
The complainant lodged her first claim in 2017
The complainant lodged her first claim in 2017. The insurer accepted liability for resultant
damage to the complainant’s garage but denied the claim for damage to the balcony itself on
the basis the balcony damage was the result of failed balcony waterproofing and a failed
balcony downpipe seal.
The insurer said these were maintenance issues for which the complainant was responsible
and that, as a result, they were excluded from cover. It also said the policy’s escape of liquid
provisions excluded cover for repairing and replacing the ‘ item from which the liquid escaped ’,
which in this case was the balcony.
The insurer obtained three expert reports in 2017
The available information shows the insurer retained three consultants in 2017 to assess the
complainant’s claim, each of which prepared a report. The insurer’s roofing contractor (IR)
visited the complainant’s home in January 2017. It said it could not find any clear issues with
the roof and recommended a hole be cut in the plaster and a water test completed.
A builder retained by the insurer (HR) inspected the damage and prepared a report in
February 2017. HR classified the damage as ‘ Cause of Damage – Insured Event Storm ’ and
concluded:
During our repair assessment we noted no indication of storm damage to the roof,
however the large volume of rainwater has overwhelmed the drainage capacity of
the box gutter, allowing rainwater to seep over the edge of the box gutter and then
on to the internal areas below.
A plumber retained by the insurer (ALD) was then asked to conduct a leak detection test. In
its February 2017 report, ALD reported on its thermal and spray detection testing. It
concluded that:
water was tracking from the area surrounding the exposed balcony downpipe to the
garage ceiling indicating the area around the balcony downpipe was not water tight
the balcony tiles adjacent to the balcony drainage grate were lifting and the area below
rotting. A spray test showed water was tracking to the damaged area in the garage below
the faults indicated that if a waterproof membrane had been installed on the balcony it had
failed
Determination | Case number: 938507 Page 4 of 15
a licensed builder should attend and determine repairs required to the damaged ceiling
and the timbers above
it was likely the balcony would need to be completely renovated to current Australian
Standards so it was watertight.
ALD’s report made no reference to HR’s findings about a volume of rain overwhelming the
capacity of the box gutter drain.
The balcony was rebuilt but a second claim was made in 2020
After the denial of part of her 2017 claim, the complainant says she had the balcony rebuilt at
a cost of $4,792. Once this was complete, she says the insurer arranged for the damage to
the garage to be repaired and cash settled the estimated garage painting costs.
The complainant made her second claim in 2020. When she made this claim, she says the
damage to her home appeared to be identical to the damage she had claimed in 2017 and
she told the insurer this.
The insurer obtained further reports in 2020 and 2021
After the complainant’s second claim, the insurer obtained several further reports in 2020 and
2021. One of the insurer’s assessor also completed a desk top review in 2021.
The insurer arranged for a plumber (LS) to carry out a further leak detection test and prepare
a report. LS cut a hole in the garage ceiling to allow an inspection of the ceiling internals.
While a spray test of the balcony downpipe above the garage plaster ceiling showed no
failure of the internal section of the downpipe, the report concludes that a spray test to
surrounding areas of the downpipe showed ‘ water pouring out ’.
HR prepared a further report in November 2020. It noted the LS leak detection findings and
observed that an inspection of the garage showed water damage had occurred to the
ceiling/wall plaster and skirting directly beneath the upstairs balcony down-pipe. HR
concluded:
Leak detection test has concluded that area of the balcony surrounding the
downpipe has failed and the policy holder is required to have a suitably qualified
trade rectify the issues relating to the water proofing.
…
The damage to the home is the result of an insured event and we recommend
that the claim is accepted, however the customer will need to carry out
maintenance repairs prior to the commencement of repairs.
The insurer prepared a desktop assessment report in February 2021 which concluded the
downpipe had not been sealed correctly and had caused damage. The insurer also took the
view the balcony had not been built correctly in 2017 causing it to deteriorate quickly when
the waterproofing failed.
HR prepared a further report following another inspection of the complainant’s home in
August 2021 after the complainant reported rotten timber supporting the balcony. This report
observed that:
Determination | Case number: 938507 Page 5 of 15
the particleboard flooring and timber beams supporting the balcony had rotted out and
needed replacing
the rotten timber had been caused by:
> long-term water ingress from failed waterproofing of the balcony and the sealing of the
downpipe penetration into the floor of the balcony
> gradual deterioration, wear and tear from long term water ingress and not from one
single insurable event
the customer needed to carry out further maintenance to the home prior to completion of
the insurable repairs so a cash settlement was suggested.
None of the insurer’s 2020 or 2021 reports referred to HR’s 2017 findings about water leaking
from the box gutter drain, including the two reports prepared by HR itself.
The insurer declined part of the 2020 claim
In response to the 2020 claim, the insurer again accepted liability for resultant damage to the
garage but denied the claim for damage to the balcony. As for the 2017 claim, the insurer
took the position the complainant was responsible for completion of repairs to the balcony,
after which it said it would address the damage to the garage.
The complainant says the work to rebuild the balcony for a second time was delayed due to
difficulties securing tradespeople during COVID19 lockdowns then delayed again when
further leaks were discovered. When the rebuilding work had not been completed, the insurer
cash settled the complainant for resultant damage to the garage in the amount of $3,141.73,
its then estimated cost of garage repairs.
The complainant engaged a carpenter in 2022
After the cash settlement, the complainant says she engaged a carpenter, QC, to complete
the second rebuild of her balcony. QC completed the repairs then prepared a report dated 26
August 2022 which included the following findings:
You have asked me to provide a report as to the source of the water ingress and
the damage it caused, as well as what rectification work I had to undertake. As
you know I took a number of photographs which I have provided to you.
When I commenced repairs, I started from the lowest point of damage in the
garage and worked my way up. I removed the plaster to expose the frame, both
on the walls and the ceiling. I replaced various water damaged sections of
framework. I also had to brace some sections of the frame with steel girders for
support.
I noted the balcony had also been affected and I removed the tiles and waterproof
membrane to expose the timber underneath. This had also been water damaged
and needed to be replaced. The waterproofing membrane was intact so I
determined the source had to be from a higher point.
I then inspected the roof line and found the flashing near the box gutter was
compromised. It would appear that during heavy rain/storm events the box gutter
overflowed allowing water to enter behind the flashing. This caused an expansion
of the timber frame creating more gaps that allowed the water to enter behind the
Determination | Case number: 938507 Page 6 of 15
cladding. The water then flowed down along the internal timber frame to the
balcony as well as the garage.
As a result I had to remove cladding from the box gutter down to the balcony and
replaced sections of framework which had sustained water damage. This included
rebuilding the balcony. I replaced the waterproof membrane and retiled the
balcony.
I understand you have had prior insurance claims going back 12 years for water
damage in these affected areas. In my opinion the proximate cause that led to all
subsequent damage was after water had got in behind the flashing when the box
gutter couldn’t cope during heavy rain events.
Later, in January 2023, in response to questions put by the complainant as part of the
information provided to AFCA in this complaint, QC gave some further views. These included
that the:
damage QC had repaired was consistent with water having flowed from the box gutter
drain to the garage
water tracking down the frame of the house from the box gutter into the balcony likely
caused damage to the balcony frame which in turn allowed movement affecting the sealing
around the downpipe and the balcony waterproofing membrane.
I note there d oes not appear to be any dispute between the parties that QC’s reference to
claims for water damage going back twelve years is not correct. While there was a 2010 claim
for water damage made by the complainant, the parties agree this was not related to the
claims in and after 2017.
The insurer reviewed the claim in 2022 and confirmed its decline
In 2022, after she had received QC’s view, the complainant says she approached the insurer
and asked it to reconsider her claim in light of QC’s August 2022 report.
After the insurer received QC’s report, the available information shows it completed four
internal assessments on 5 October 2022, 26 October 2022, 31 October 2022 and 9
November 2022. The insurer also obtained a fourth report from HR.
Each of the four internal assessments are expressed to be reviews of the history of the
complainant’s claims. Three of the four internal assessments mention the box gutter in the
context of QC’s findings but only one refers to the findings in HR’s 2017 report. Each report
concludes the insurer has correctly declined the complainant’s claims.
HR’s fourth report is dated 24 October 2022 and mirrors its August 2021 report. It does not
refer to HR’s 2017 findings about the box gutter drain or engage with QC’s findings on that
issue.
After its 2022 review, the insurer confirmed its denial of the claim on 7 December 2022. In the
meantime, the complainant had arranged and paid for her own repairs to the garage, balcony,
framework and render at the front of her home, at a cost of $60,843.23. When the claim
denial was confirmed, the complainant brought this complaint to AFCA.
Determination | Case number: 938507 Page 7 of 15
Complainant must establish a valid claim
It is established insurance law that the complainant carries the initial onus to show the terms
and conditions of the relevant policy cover the loss. This is known as a valid claim. Once the
complainant has established a valid claim, the onus shifts to the insurer to show the loss is
not covered, either by one of the policy exclusions or on some other basis.
The complainant holds a home building and contents policy with the insurer. The policy terms
are set out in the Policy Schedule and Product Disclosure Statement (PDS). The policy is an
‘insured events’ policy. This means not all loss and damage is covered. Rat her, the policy
only covers loss or damage caused by one or more of the listed insured events, subject to
exclusions.
The insured events are set out in the PDS and include damage caused by storm and escape
of liquid. The policy also contains exclusions for all cover. The relevant sections of the PDS
are set out in section 3.2 of this determination.
The available information shows damage in 2017 by storm and escape of liquid
In 2017 the insurer held a report from HR which concluded the complainant’s home ha d been
damaged by a storm when a large volume of rainwater overwhelmed the drainage capacity of
the box gutter, allowing rainwater to seep over the edge of the box gutter onto the internal
areas below. However, the insurer appears to have based its decline of the claim on ALD’s
later report which it says shows the damage was caused by failed balcony waterproofing or a
failed balcony seal.
I have carefully reviewed HR’s report and ALD’s report including the results of ALD’s water
spray and thermal testing. Although I accept that both reports show water leaking from
different places, in my view the information from the insurer’s experts more compellingly
supports the conclusion that the damage to the complainant’s balcony in 2017 was caused by
storm or escape of liquid from the overhead box gutter drain rather than because of the
balcony waterproofing or downpipe seal.
This is because:
I accept HR’s finding that rain overwhelmed the box gutter drain above the balcony and
seeped into the internal areas of the co mplainant’s home. I note that no other report or
expert has engaged with or contradicted HR’s findings about this
I give less weight to the ALD report because:
> even though it was prepared after HR’s report (on the face of it on HR’s instructions) it
does not take into account HR’s findings about water seeping into internal areas of the
complainant’s home from the box gutter drain, a point situated well above the balcony.
This significantly undermines ALD’s conclusions
> the water tests and thermal images on which ALD relies show that water was tracking to
the damaged areas in the complainant’s garage ceiling – the thermal images appear to
align directly with the areas of garage ceiling damage. This is damage the insurer
ultimately covered when it accepted the complainant’s claim for resultant storm
damage. The report does not show or explain how these leaks caused damage to the
entire balcony requiring it to be rebuilt
HR’s report describes a large volume of rainwater as overwhelming the drainage capacity
of the box gutter, allowing rainwater to seep over the edge of the box gutter and then on to
the internal areas below. There is no reference to a defect or maintenan ce issue and HR’s
report is the only available report about water entering the complainant’s home from above
the balcony.
Determination | Case number: 938507 Page 8 of 15
I am satisfied the available information shows the damage to the complainants’ balcony likely
occurred due to a storm or escape of liquid event when rainwater overwhelmed the drainage
capacity of the box gutter drain. In my view, the ALD report is not sufficient for the insurer to
meet its onus to show the balcony damage was excluded from the policy in 2017 because the
complainant had not properly maintained the balcony waterproofing or balcony downpipe
seal. Nor do I think the insurer could properly say or establish the claim was excluded
because the balcony was the item from which the liquid escaped.
In my view the complainant established a valid claim in 2017 and the insurer did not meet its
onus to show the loss was excluded or not otherwise covered by the complainant’s policy.
The insurer should reimburse the complainant’s 2017 repair costs
The insurer was not entitled to decline th e complainant’s 2017 claim. The insurer should
reimburse the complainant $4,792, her costs of rebuilding the balcony in 2017. It should also
pay interest pursuant to section 57 of the Insurance Contracts Act 1984 (Cth) from the date
the complainant paid the repair costs until the date of reimbursement.
The insurer did not address HR’s report or tell the complainant about it
There is nothing in the available information to show the insurer engaged with or considered
HR’s findings when reaching its decision to decline the complainant’s claim in 2017. Once
ALD’s testing found issues with the balcony, the insurer does not appear to have done
anything further with the HR report. It did not ask either of its consultants to reconcile their
views or investigate further, nor did it try to do this itself.
Similarly, there is nothing to show the insurer gave HR’s 2017 report to the complainant or
told her about it. I accept what the complainant says about this. I am satisfied the complainant
did not become aware of HR ’s report until late in 2022 when it was mentioned in a report from
the insurer’s assessor which was later provided to the complainant. I am also satisfied she did
not receive a copy of HR’s report until January 2023, more than two months after this
complaint had been lodged and only then after her representative made several requests for
its production.
In my view the insurer did not act fairly or reasonably when assessing, and then declining, the
2017 claim. Nor did it act fairly and reasonably in its dealings with the complainant throughout
the 2017 claims process. The insurer should have told the complainant about HR’s report or
given the complainant a copy of it in 2017. Had the insurer engaged appropriately with the
report or told the complainant about it, this matter might have ended in 2017 with a dispute
about liability for the $4,792 balcony rebuild. Unfortunately for the complainant, the insurer did
neither.
The complainant says these omissions were deliberate, egregious, an act of bad faith and
evidence of single minded intent to deny her claim. She says they amount to breaches of the
insurer’s duty to act with utmost good faith as set out in sections 13 and 14 of the Insurance
Contracts Acts 1984 (Cth). While I empathise with the complainant’s fr ustration I do not think
these claims are made out. The available information does not show the insurer intentionally
withheld the information from the complainant in 2017. I accept what occurred was more likely
an oversight or process failure on the insur er’s behalf. However, it was an oversight which
carried a significant consequence. The error was not discovered until many years later and
the complainant’s home sustained significant further damage in that time.
Determination | Case number: 938507 Page 9 of 15
The insurer’s 2020, 2021 and 2022 reviews w ere not adequate
This brings me to the complainant’s second claim in 2020, and her requests for a review of
the insurer’s position in 2021 and 2022.
The complainant made her second claim in 2020. While the insurer obtained further reports
from HR and a leak and thermal imaging test from its plumber, LS, neither of these reports
revisited or referred to HR’s 2017 findings about the overwhelmed box gutter even though the
complainant had reported the damage to her home was very similar to that for which she had
claimed in 2017.
In response to the 2020 claim, the insurer again accepted it was responsible for resultant
damage to the garage ceiling but repeated its views about maintenance issues with the
balcony and declined to cover balcony repairs. It also added several other reasons why the
claim for balcony repairs was declined. But it still did not try to retrieve or review its 2017
records nor did it engage with HR’s findings about the box gutter drain. While I accept the LS
report showed water was tracking to the garage ceiling from the area around the balcony
downpipe, in my view this discovery would have taken on a different significance (and
warranted further investigation) had the insurer also engaged with HR’s findings about the
box gutter. Particularly since the balcony had been fully rebuilt in 2017.
The insurer’s approach to the 2020 claim was not fair or reasonable. Given the damage
described by the complainant, its similarity to what was discovered in 2017 and the
intervening balcony rebuild, in my view the insurer should have investigated further including
conducting a review of its 2017 records. Had it done so properly, HR’s findings would have
come to light. Unfortunately, neither it nor HR (who was still then retained by the insurer) did
this and the claim for damage to the balcony was once again declined.
The insurer appears to have adopted a similar approach throughout 2021 when the
complainant asked the insurer to re-assess the claim based on further damage her repairer
had identified to the timber underneath the balcony. While a further report was obtained from
HR in 2021, it made no reference to its 2017 findings and once again there is nothing to show
the insurer revisited the earlier claim. Instead, it again attributed the damage to balcony
waterproofing.
There was no change to the insurer’s approach in 2022, despite repeated requests from the
complainant for a review after she had received QC’s views which linked the box gutter drain
to the damage to her home.
The first sign of the insurer taking steps to retrieve information held about the 2017 claim
came in October 2022. A report from one of the insurer’s assessors in early October 2022
says the assessor will not express a final view about the complainant’s claims until
information about the 2017 claim has been retrieved and reviewed. His later report of 26
October 2022 contains the first reference by the insurer, since 2017, to HR’s 2017 report.
But, having finally retrieved and reviewed what HR had said (which aligned with what QC had
said) there is nothing in the available information to show either report, or the photographs
attached to it, was referred to the insurer’s experts HR or LS.
Notwithstanding this, the insurer concluded no correlation could be identified between the box
gutter drain and the balcony and maintained its position the decline of the complainant’s claim
was correct. This was the case even though, perhaps most importantly, QC’s photographs
show damage to the home’s framework which extends well above the balcony and cannot be
explained by issues with the balcony waterproofing or downpipe seal. Even without the
Determination | Case number: 938507 Page 10 of 15
retrieval and review of HR’s 2017 report, those photographs should have triggered further
investigation. They did not.
In my view, the insurer did not at any s tage engage appropriately with HR’s report or QC’s
conclusions and photographs. This includes during the period in which this complaint has
been with AFCA. There is nothing in the insurer’s submissions or responses to AFCA which
properly addresses QC’s fin dings, or the photographs QC and the complainant have
provided. I am satisfied the insurer’s review of the complainant’s claims in 2020, 2021 and
2022 was not adequate.
It would not be fair for the insurer to rely on some of the policy exclusions
There does not appear to be any dispute between the parties that by 2020 (and indeed 2022),
the damage the complainant was dealing with had been occurring over some time and that
this had occurred as a result of several rain events, not one. This has led to disagreement
between the parties as to whether the policy responds. I have not given these points further
consideration in this determination because I am satisfied that, given the insurer’s conduct, it
would not be fair to allow it to rely on them to decline the claim. Nor, for the same reason,
would it be fair for it to rely on any argument the damage to the complainant’s home occurred
due to wear, tear or gradual deterioration.
Equally, it would not be fair for the insurer to rely on the exclusions in the policy relating to
maintenance or defects. I have already found that HR’s 2017 report showed the box gutter
drain overflowed because rainwater overwhelmed its capacity and the p olicy’s storm and
escape of liquid provisions respond. The available information does not show a maintenance
or defect issue in 2017. Even if QC’s later reference to ‘compromised flashing’ behind the box
gutter means by 2022 the flashing was damaged or defective in some way (and I do not think
this is clear) this can only be shown to be the case over five years later after further weather
events. I accept the complainant was not (and could not reasonably be expected to be) aware
of the issues with the box gutter. If the insurer had told the complainant about HR’s findings or
given it a copy of its report, it is likely the complainant would have addressed the capacity of
the box gutter drain and further damage would likely have been avoided (including to the box
gutter drain itself or the flashing behind it) particularly given the complainant had a
tradesperson on site rebuilding the balcony in 2017.
I take the same view of the insurer’s attempt to rely on clauses in the policy that say it may
decline to cover damage under the policy if an insured does not allow the insurer to inspect
damage before repairing it. The insurer was given several opportunities over many years to
inspect the damage and assess the leaks. It chose not to take them. It also told the
complainant she must arrange her own repairs. I do not think the complainant acted
unreasonably when she went ahead with repairs in those circumstances.
There are other exclusions the insurer has not made out
The insurer has made other submissions about its right to exclude the claim because of
defects in the way the balcony was rebuilt in 2017, Australian Standards not being met and
relevant permits not being obtained. In my view, these claims have not been made out and
are not a basis for declining the comp lainant’s claims.
The insurer should reimburse the complainant’s 2022 repair costs
Having reviewed the available information for the period after 2017 up until 2022, I am
satisfied there is nothing to show the insurer acted deliberately, improperly or in bad faith in
the period after 2017. However, as set out previously, it did not act fairly or reasonably.
Determination | Case number: 938507 Page 11 of 15
I am satisfied that, in the years after the 2017 claim, rain overwhelming the box gutter drain
continued to cause water damage to the complainant’s ex ternal framework and balcony. Had
the insurer acted fairly, by addressing and disclosing its 2017 report, the further damage to
the complainant’s home would likely have been avoided. The complainant’s situation was
made worse by the insurer’s inadequate review of the complainant’s claims in 2020, 2021 and
2022.
Balancing the consequences of the insurer’s conduct with the complainant’s policy
entitlements, I am satisfied that a fair outcome is the insurer compensate the complainant for
her 2022 repair costs. The insurer should reimburse the complainant $57,701.50 for her 2022
invoiced repair costs ($60,843.23 less the cash settlement of $3,141.73). It should also pay
interest pursuant to section 57 of the Insurance Contracts Act 1984 (Cth) from the date the
complainant paid these amounts until the date of reimbursement.
The insurer should also pay non-financial loss compensation
The complainant is understandably upset and frustrated about the way her claims and
subsequent complaints have been handled. I am sat isfied the insurer’s conduct since 2017
has led to a prolonged period of stress and inconvenience for the complainant including
because she has had to access superannuation funds to pay for the 2022 repairs when the
insurer declined her claim.
If the complainant accepts this determination, the insurer must pay $3,500 non-financial loss
compensation to the complainant’s nominated account for the stress and inconvenience
caused by its conduct.
2.2 What is a fair outcome?
The insurer should reimburse the complain ant’s 2017 and 2022 repair costs and pay non -
financial loss compensation as set out in section 1.3. This outcome is fair because it balances
the consequences of the insurer’s conduct with the complainant’s policy entitlements.
Determination | Case number: 938507 Page 12 of 15
3 Supporting information
3.1 The AFCA process
AFCA’s approach is based on fairness
AFCA has determined this complaint based on what is fair in all the circumstances, having
regard to:
the relevant legal principles
applicable industry codes or guidance
good industry practice
previous decisions of AFCA or its predecessor schemes (which are not binding).
Each party has had the opportunity to address any issues raised and all relevant information
has been exchanged between the parties. I have reviewed and considered all relevant
information the parties have provided.
While the parties have raised several issues in their submissions, I have kept commentary in
this determination to the issues that are relevant to the outcome.
We assess complaints on available information and circumstances
AFCA is not a court of law. We do not have the power to take or test evidence on oath, or to
require third parties to give evidence.
When we assess complaints, we consider:
available documents
the recollections of the parties
all relevant circumstances.
We give more weight to documents created at the time the events occurred. If there are no
relevant documents, we will decide what most likely occurred based on the available
information.
If there are conflicting recollections and these are evenly weighted, we may find that a claim
cannot be established.
AFCA’s approach to non -financial loss
While AFCA can require a financial firm to compensate a complainant for non-financial loss
caused by the financial firm’s conduct, it takes a conservative approach to non-financial loss
compensation. Any compensation awarded for non-financial loss will generally be in the
hundreds, not thousands of dollars. At the time this complaint was lodged, a compensation
cap of $5,400 applied. AFCA will look at all the circumstances of a complaint to assess the
severity and impact of a financial firm’s conduct on a complainant.
Determination | Case number: 938507 Page 13 of 15
3.2 Relevant parts of the PDS
Page 11: Your responsibilities
You must :
keep your home and contents well maintained and in good condition. For what
we mean b y ‘well maintained and in good condition’, see ‘Words with special
meanings’ on pages 97 to 101;
…
Page 20: What you are covered for - Insured Events
… w e cover your home and contents when covered under this policy for loss or damage
at the insured address caused by an insured event during the period of insurance.
There are some things we do not cover and these are shown in the ‘We do not cover’
section of the following tables on pages 20 to 29 and in the ‘General Exclusions’ on
pages 73 to 79.
…
Storm
We cover Loss or damage caused by a storm.
Escape of Liquid
We cover Loss or damage caused by liquid leaking, overflowing or bursting from
any of the following:
…
any drain, fixed pipes, roof gutters or guttering and rainwater
downpipes, drainage and sewage systems
…
We do not cover
wear and tear, or loss or damage by the escape of liquid occurring as a result of a
gradual process of leaking, splashing, dripping or overflowing over a period of time
when you could reasonably be expected to be aware of this condition;
the cost of repairing or replacing the item from which the liquid escaped;
…
costs if you repair or renovate a damaged area of your home before we can
inspect it and find the cause
…
loss or damage caused by wear, tear, rust, fading, rising damp, mould, mildew,
corrosion, rot
…
Determination | Case number: 938507 Page 14 of 15
Page 73: General exclusions
You are not covered under any section of this policy for damage, loss, cost or legal
liability that is caused by, arises from or involves:
…
Defect, structural fault or design fault
a defect, structural fault or design fault that you knew about (or should reasonably have
known about) and did not fix before the loss or damage occurred (e.g. if there are signs
that a defect previously caused damage, we will not pay a later claim for further damage
from this defect).
…
Failing to take care of your home or contents
your failure to:
take reasonable care of your home or unit and contents;
keep your home or unit and contents well maintained and in good condition. For the
meaning of ‘well maintained and in good condition’ see the ‘Words with special
meanings’ section on pages 97 to 101;
fix faults and defects as soon as you become aware of them.
…
Not complying with building regulations
your home or unit not complying with building laws or regulations, except those laws or
regulations introduced after your home or unit was originally built or last altered which
you were not required to comply with.
…
Wear, tear and gradual deterioration
wear, tear, rust, fading, rising damp, mould, mildew, corrosion, rot, action of light,
atmospheric or climatic conditions or gradual deterioration such as but not limited to:
tiles and their adhesive or grouting breaking down;
weathering of roof tiles or roof ridge capping;
gradual weathering and breakdown of bricks, mortar or concrete
Page 97: Words with special meanings
Event or incident
means a single event, accident or occurrence which you did not intend or expect to
happen.
Insured event
means:
the insured events on pages 20 to 29; and
…
Determination | Case number: 938507 Page 15 of 15
In addition, an insured event is always a single event, accident or occurrence which you
did not intend or expect to happen.
Storm
means a storm, cyclone or severe atmospheric disturbance. It can be
accompanied by strong winds, rain, lightning, hail, snow or dust.
Well maintained and in good condition
means your home or unit and contents do not have any faults or defects that
might cause loss or damage to your home and contents, loss or damage to
property of others or injury to people. This includes but is not limited to the
following:
the roof does not leak when it rains
…
Page 80 : Claims
Making a claim
…
To process the claim you must :
allow us to inspect the damaged home and/or contents;
allow us to arrange for experts to assess the damaged home and/or contents and to
quote on repair or replacement;
…
What you must not do
do not dispose of any damaged parts or items of your home or contents without
our consent;
do not carry out or authorise any repairs without our consent unless you cannot
contact us and need to make emergency repairs to protect your home or contents;
…
If you do not comply
If you do not comply with ‘What you must do’ and ‘What you must not do’ we can
reduce or refuse your claim and/or recover costs from you or cancel your policy.