Insurer declined part of a flood claim (subfloor and timber flooring damage) as excluded ground movement, and repairs were delayed
Text of the determination
Determination
Case number 938497
Financial firm AAI Limited
Determination | Case number: 938497
Page 2 of 15
Case number: 938497 16 October 2023
1 Determination overview
1.1 Complaint
The complainant holds a home and contents insurance policy with the financial firm (insurer).
On 22 March 2021, he lodged a claim for flood damage to his property. The claim was
accepted, and the insurer authorised the repairs. However, the complainant raised issues
regarding further damage in September 2021 and issues with the repairs carried out to the
timber flooring in February 2022.
The complainant says the floor is not level due to ground movement, which was caused by
the flood. The insurer says the flood was not the proximate cause of the ground movement.
Rather, it was caused gradually over time and is therefore excluded under the policy.
The complainant disagrees w ith the insurer’s decision. He seeks that the insurer cover all of
the damage including the cost of restumping the house and the damaged new timber floor.
1.2 Issues and key findings
Is the insurer entitled to decline part of the claim?
No. On balance, the complainant has established a claimable loss for the disputed damage
and the insurer has not established an exclusion applied. Given this, the insurer is required to
cover the disputed damage and attend to the other issues outstanding at the property.
Is the complainant entitled to compensation?
Yes. The insurer is required to pay the complainant $3,000 in compensation.
Why is the outcome fair?
The complainant has established a claimable loss for the disputed damage. It is fair in the
circumstances that the insurer is required to cover the disputed damage, attend to the other
issues at the property and pay non-financial loss compensation.
1.3 Determination
This determination is in favour of the complainant.
Within 14 days of being advised of the complainant’s acceptance of this determination , the
insurer is required to pay the complainant $3,000 in non-financial loss compensation.
Within 21 days of being advised of the complainant’s acceptance of this determination, the
insurer must engage a relevantly qualified expert to prepare a scope of works for the disputed
damage. This includes the subfloor, timber flooring, old yellow tongue flooring and any other
items such as doors, windows, fixtures and fittings which may have been impacted by ground
movement. The insurer is required to carry out these repairs in a timely manner.
Determination | Case number: 938497
Page 3 of 15
Within 28 days, the insurer is required to arrange an inspection of the property to assess any
other issues which are outstanding. It is required to attend to these and replace the air-
conditioning unit in a timely manner.
Determination | Case number: 938497
Page 4 of 15
2 Reasons for determination
2.1 Is the insurer entitled to decline part of the claim?
No. On balance, the complainant has established a claimable loss for the disputed damage
and the insurer has not established an exclusion applied. Given this, the insurer is required to
cover the disputed damage and attend to the other issues outstanding at the property.
Complainant must establish a claimable loss under the policy
The complainant is required to show, on the balance of probabilities (that it is more likely than
not), that there is a claimable loss under the policy. This means the complainant must prove
the loss or damage was caused by a risk that is covered under the policy.
Once the complainant proves there is a claimable loss, the insurer is liable for the loss unless
it shows an exclusion or limiting condition applies. The insurer has the onus of proving, on the
balance of probabilities, that the exclusion or condition applies.
It is not in dispute that the complainant’s home and contents were damaged during a flood
event on or about 16 March 2021. The insurer has accepted and settled the contents claim
and the majority of the building claim (accepted damage). However, the insurer says the
damage to the home’s piers and stumps was pre -existing and the result of excluded ground
movement (subfloor damage). Therefore, it says the damage to the newly replaced timber
floors, fixtures and fittings, which also relates to ground movement, and the subfloor damage
is not covered (collectively, the disputed damage). The complainant disagrees and says the
ground movement was caused by the flood.
Policy covers flood subject to certain exclusions
The policy consists of the policy schedule and product disclosure statement (PDS). It is not in
dispute the insurer provided the policy documents to the complainant.
The policy is an ‘insured events’ policy. This means not all loss and damage is automatically
covered. Rather, only loss or damage caused by an insured event, and not subject to an
exclusion, is covered. The insured events are set out in the PDS and include flood. However,
the flood cover excludes:
loss or damage caused by erosion, vibration, subsidence, landslip, landslide,
mudslide, collapse, shrinkage or any other earth movement, but we will cover
damage caused by a landslide or subsidence that occurs within 72 hours of, and
directly because of, flood and not because of erosion over time, structural fault or
design fault;
The policy also generally excludes cover for damage caused by ground movement including:
Erosion, vibration, subsidence, landslip, landslide, mudslide, collapse, shrinkage
or any other earth movement, but we will cover landslide or subsidence damage
that is specifically covered under the following insured events : … ‘Flood’…
Determination | Case number: 938497
Page 5 of 15
Parties disagree on the cause of the ground movement at the property
Various reports have been exchanged by the parties in relation to the property, including
reports from a number of engineers. The relevant extracts are set out in section 3.2 of this
determination.
The insurer does not dispute the policy responds to ground movement caused by flood.
However, it says the ground movement predates the flood event and was likely caused by a
lack of suitable drainage measures and gradual settlement. It submits:
the evidence on hand demonstrates that the proximate and dominant cause of the
disputed damage is not the flood event, but the long-term settlement and ground
movement. This is further exacerbated by damage to the sub-flooring from inadequate
drainage of surface water run-off;
one of the insurer’s engineer’s, MCS, says the massive flow of undrained water which
flooded the house during March 2021 has saturated the subfloor soil and further
deteriorated the timber subfloor structure and particle boards. This has contributed to
bowing of the timber flooring;
however, the flood event did not cause the disputed damage at the property. The
proximate and dominant cause is long term ground movement;
MT says the settlement that has occurred predates the flood and also predates the
installation of the French doors and white screen door. The uncontrolled water from the
down pipes should be redirected and footings excavated deeper into more stable ground;
RGS concluded, based on its geotechnical assessment, that the damage is not a result of
settlement or ground related movements since the flood;
MCS says the timber flooring damage is related to long-term/seasonal building
movement/settlement/heave and is not related to a single event; and
therefore, the insurer says the flood event did not contribute to the timber flooring damage.
No single insured event under the policy has caused the disputed damage. Therefore, the
policy does not respond.
The complainant says disputed damage has been caused by the flood. In September 2021,
the complainant raised concerns about the scope of repairs. He told the insurer the repairs
should include the kitchen benchtop which had separated days after the flood. He also noted
the kitchen door was catching on the floor and could not be fully opened. The complainant
also raised issues in February 2022 about damage to the new timber flooring. He says the
floor is not level and that this is causing issues with doors, skirtings, fixtures and fittings.
The complainant says the home was previously in good condition. It was renovated internally
in 2017 and there have been no prior issues regarding ground movement. Therefore, the
disputed damage must have arisen because of the flood. The complainant further says:
the stone bench in the kitchen had separated within 3 days of the flood waters entering the
home. He was concerned there had been damage to the pier structure under the house
from the intensity of the flood waters and was causing movement in the back corner of the
kitchen. The door on the eastern side of the kitchen was also catching;
the insurer appointed an engineer, MT, to provide a report in October 2021. MT said the
damage to the flooring was caused by settlement of the ground over time and predates the
flood event. The complainant asked various questions about the report, but no clear
answers were provided;
the new timber flooring was laid on 4 November 2021. A t no time did the insurer’s builder,
AB, or its contractor, discuss the floor level issues with the complainant prior to doing so;
Determination | Case number: 938497
Page 6 of 15
on 13 February 2022, one of the trades had left the back door to the home open. A storm
overnight resulted in rain entering the home and damaging part of the new timber flooring.
The backdoor was unable to be opened fully due to it catching on the floor. The timber
floor had also swelled in the hallway and storage areas;
on inspection , the insurer’s builder, AB, also identified there was a bow in the middle of the
kitchen floor and a subsequent rise of the flooring in the pantry area which was in a
different area to where the rain had entered;
MT was again engaged and reiterated the findings of its previous report. The second MT
report concludes moisture in the particle board flooring would induce settlement and
deterioration of the timber floor component. However, the only section of flooring not
removed in the back section of the house was the particle board under the hallway to the
office nook, the large storage cupboards, laundry and pantry (unreplaced area);
MT concludes the cause of the subfloor moisture is open roof drain pipes to the ground.
Even if this was the case for the perimeter, it does not explain the moisture in the central
areas of the subfloor (where the flooring is distorted). Therefore, any movement occurring
in the central portion of the house has been directly caused by the flood;
the force of water that surrounded the house and therefore passed under it was sufficient
to transport large furniture and other items several hundred metres from their original
location;
hydrological experts are reporting that after this flood event, properties may need to be
allowed up to 12 months to properly dry out prior to rectification. So, it is possible the
repairs to the accepted damage may have been carried out before the subfloor had
adequately dried out; and
a carpenter removed the timber flooring and yellow tongue flooring in the back entrance
hallway to assess the distortion in the joists and bearers. Repairs were then carried out by
the insurer but only to those joists and bearers which had been evaluated.
Proximate cause of the damage must be established
The complainant needs to show the proximate cause of the disputed damage being was, on
balance, the flood event.
The proximate cause of a loss is the dominant, effective or operative cause. It does not have
to be the first, the last or the sole cause. This is a question of fact depending on the
circumstances.
If there are several causes, each needs to be examined for qualities of reality, predominance
and efficiency to identify the proximate cause. For example, if one cause would have caused
the loss in any case, and the other one would not have done so without the first, then the first
is the proximate cause.
On balance, the ground movement was caused by the flood
Having reviewed the exchanged information, the panel is satisfied, on balance, that the
complainant has established a claimable loss and the insurer has not established that an
exclusion applies.
The panel notes in this regard that the home was inundated to over 1 metre. The force of
water that surrounded the house, and therefore passed under it, was sufficient to transport
large furniture and other items several hundred metres from their original location. Therefore,
the panel accepts there was a significant inundation and that the force and weight of the
water was substantial.
Determination | Case number: 938497
Page 7 of 15
The panel accepts that there is also evidence of movement damage immediately after the
flood. That is, the complainant has provided photographs of the kitchen benchtop immediately
before the flood and in the days afterward. The images show a sizeable separation of the
kitchen benchtop, which the panel considers has been caused by the flood.
Further, while MCS says the damage is related to long term/seasonal ground movement and
not a single event, it also says that:
there was a massive flow of undrained water which flooded the house during March 2021;
the flood saturated the subfloor soil and further deteriorated the timber subfloor structure
and particle boards; and
this has contributed to bowing of the timber flooring.
The panel acknowledges RGS’s comments that the damage is not caused by settlement and
the reports from MT and MCS which otherwise say the damage is caused by long term
ground movement. However, taking into account the significant inundation, the comments of
MCS above and the evidence of movement after the flood, the panel is persuaded that, on
balance, the proximate cause of the disputed damage is flood. Therefore, the panel does not
consider that the insurer has established the claim is excluded.
The panel acknowledges the insurer’s comments regarding inadequate drainage. However, it
considers that this issue has been occurring for some time and would only affect the moisture
around the perimeter of the house. The panel also accepts that there may have been
previous movement at the property and that there is some packing of the piers. However, this
is to be expected in a property of this age and considering the alluvial soil in which the stumps
are (at least in part) founded. Nevertheless, the panel does not consider that this, on balance,
changes the proximate cause of the damage.
The panel otherwise accepts the evidence of the complainant that there have been no issues
with movement at the property and that the property was in good condition following the
internal renovation in 2017.
Therefore, the panel does not consider than an exclusion applies. Accordingly, the insurer is
required to cover the disputed damage at the property.
Insurer has not properly assessed the disputed damage at the property
The panel notes that while most other flooring was removed from the property, not all yellow
tongue flooring was removed and disposed of. Therefore, the new timber flooring was
installed on top of the existing yellow tongue flooring. The panel refers to the comments of MT
in March 2022 that ‘ [i]t was again noticed on this site visit that the subfloor ground was very
moist. This will induce settlement and deteriorations of the timber floor components,
especially the particle board flooring from the underside of the floor’. The panel considers all
the old yellow tongue flooring ought to be removed before the new timber flooring which has
since been damaged is replaced.
Further, based on the exchanged reports, it does not appear that the extent of damage to the
subfloor was ever fully assessed. The panel also notes that even after the complainant raised
his concerns, only a section of yellow tongue flooring was removed and only that particular
area of the subfloor was assessed. This appears to have been after the additional storm
damage caused by the door being left open. On assessment, repairs were carried out to this
section of the subfloor only.
Determination | Case number: 938497
Page 8 of 15
The panel notes the insurer has agreed to carry out and warrant the repairs to the property. If
for any reason the insurer was not able to properly assess the property, it should not have
warranted the repairs. In the circumstances, the panel considers a full assessment of the
subfloor is required. This ought to be completed when all the yellow tongue flooring is
removed.
Insurer to carry out repair of disputed damage
The insurer is required to appoint a relevantly qualified expert to prepare a scope of works for
the repair of the disputed damage. This includes the entire subfloor, all areas of timber
flooring and any other items such as doors, windows, fixtures and fittings which may have
been impacted by ground movement. All yellow tongue flooring in place at the time of the
flood should also be removed in order to avoid any further damage.
The scope of work should ensure that the internal floor is relevelled as necessary.
Insurer is required to resolve other issues at the property
The complainant says there have been a few issues at the property relating to the accepted
damage (other issues). For example, in relation to the new air-conditioning system, two sets
of repairs have already been carried out. In the circumstances, and bearing in mind the unit is
likely to still be under warranty, the insurer is required to replace the air-conditioning unit.
The insurer is also required to undertake an assessment of any other outstanding repairs at
the property which relate to the accepted damage. The insurer is to attend to these
outstanding matters as soon as possible and in a timely manner.
2.2 Is the complainant entitled to compensation?
Yes. The insurer is required to pay the complainant $3,000 in compensation.
AFCA can award compensation for poor claim handling
Under our Rules, AFCA can award up to $5,400 compensation for non-financial loss. This
must relate to poor claims handling or other actions of the insurer which causes:
an unusual degree of stress, delay, or inconvenience, and/or
interference with a person’s expectation of enjoyment and/or peace of mind.
We expect complainants to be moderately robust, and we will not award compensation for the
ordinary degree of inconvenience involved in making a claim.
Complainant is entitled to non-financial loss compensation
The complainant says AB did not complete the remediation works in a timely manner and
within the estimated work duration time. The scope of work provided an estimated work
duration of 60 days and a lead time of 15 days. However, the work has been in progress for
well over 24 months.
The complainant says the ‘ whole experience has been extremely stressful, frustrating and
disappointing. This has been punctuated by false information, false timeline and lack of
communication ’ .
Based on the significant delays in the handling of the complaint and carrying out the approved
repairs over the last two and a half years, the panel is satisfied that the complainant is entitled
Determination | Case number: 938497
Page 9 of 15
to compensation. The complainant has also had to live in temporary accommodation for over
24 months. Accordingly, the insurer is required to pay the complainant $3,000 in non-financial
loss compensation.
2.3 Why is the outcome fair?
The complainant has established a claimable loss for the disputed damage. It is fair in the
circumstances that the insurer is required to cover the disputed damage, attend to the other
issues at the property and pay non-financial loss compensation.
Determination | Case number: 938497
Page 10 of 15
3 Supporting information
3.1 The AFCA process
AFCA’s approach is based on fairness
AFCA has determined this complaint based on what is fair in all the circumstances, having
regard to:
the legal principles
applicable industry codes or guidance
good industry practice
previous decisions of AFCA or its predecessor schemes (which are not binding).
The respective parties have completed a full exchange of the relevant information, and each
party has had the opportunity to address any issues raised. We have reviewed and
considered all of the information the parties have provided.
While the parties have raised a number of issues in their submissions, we have restricted this
determination to the issues that are relevant to the outcome.
A panel determined this matter
Due to the nature of this complaint, we referred it to a panel for determination. The panel
includes:
an ombudsman
a member with significant experience in consumer and small business advocacy
a member with extensive experience as an insurance professional.
We assess complaints on available information and circumstances
AFCA is not a court of law. We do not have the power to take or test evidence on oath, or to
require third parties to give evidence.
When we assess complaints, we consider:
available documents
the recollections of the parties
all relevant circumstances.
We give more weight to documents created at the time the events occurred. If there are no
relevant documents, we will decide what most likely occurred based on the available
information.
If there are conflicting recollections and these are evenly weighted, we may find that a claim
cannot be established.
3.2 Relevant expert report extracts
Record Key points
Insurer’s expert
AB Report
Moisture is almost at ceiling level…
Most doors to home are fowling and catching to frames and on floor due to wat er
Determination | Case number: 938497
Page 11 of 15
March 2021 damage to home…
Damage to home wides pread, with all areas of home impacted. Flood water is
heavily dirty, wit h high leve ls of remaining dirt / sludge present to home.
Insurer’s expert
SE Report
April 2021
Commencing on the 16th of March 2021, a severe low - pressure system comprising
torrential rain occurred over a seven - day period along the Eastern Australian
Seaboard. The event deposited extreme volumes of rain across the Australian East
Coast from the Gold Coast QLD to Wollongong NSW. In some cases, the rainfall
exceeded 250mm in a single 24 - hour period resulting in widespread flood and
water damage to properties.
In the case of the insured, the covering of normally dry land by water, the origin
believed t o be water from the L River situated approximat ely 300 meters
South/East of the risk premises, resulted in the inundation of their home building
and cont ents up to a depth of 1047mm...
The building, inundated in flood water, is subject of significant wat er damage.
The built - in cabinetry, k itchen appliances, wall linings, doors, electrical services,
wet area tiling, sanitaryware, hardwood timber flooring and external deck ing are all
subject of damage.
Under these circumstances it will be necessary to perfo rm a full strip out to expose
the timber stud work to sanitise and dry the structure. This activity is critical to
mitigate risk of bacterial growt h.
Insurer’s expert
ESP Report
April 2021
The scope of works of the current investigation includes the following areas only:
• All internal mould affected rooms of the house.
• Sub floor space and external balconies.
The report found mould in the ‘ walls/timbers and ceilings of the house …t he internal
damage was due to the flooding of the complete area up to 1m up the house
walls … Subfloor space should be treated with an anti - microbial agent ’ .
Insurer’s expert
ESP Report
June 2021
Successful remediation res ults have been achieved on all surfaces throughout the
internals of the hous e…
• Stop water penetration into, or leak s within, the building roof and wall areas,
completed.
• Remove mould impacted, porous and water damaged flooring and walls materials
by a controlled process that does not generate airborne mould spores, completed.
• Maintain interior surfa ces in dry condition while replacing removed materials,
completed.
• Improve ventilation of the site, completed.
• Re - test interior building areas to confirm it is safe to re - occupy at completion of
remediation of the Internals. Completed.
Insurer’s expert
MT Report
October 2021
3. External Drainage
The ground slopes gently down to the nort hwest, thus any of the unc onnected
downpipes on the high side of the building will affect the foundations, as the wat er
saturates the ground under the home causing settlement of the piers, as seen in
figure 5.
The down pipes on the carport are also uncont rolled and will have an impact on the
footings. Even the downpipes that are not connected on the downside of the
building will locally affect the piers on th e edge of the building.
Determination | Case number: 938497
Page 12 of 15
In figure 5 the second pier from the right of picture is directly adjacent and 400 mm
to the left of wooden door seen in figure 2 or to the right of figure 3. It has
previously settled 20 mm and has been compensated with a timber pa ck er.
There are a few other piers under the cent ral section of the dwelling that also have
settled and timber pack ers have been inserted.
4. Small holes in loungeroom
The small patch of random 7 mm holes drilled in the northeast corner of the lounge
room appear on close inspection to be drilled prior to the glue being placed for the
floating floor. The inner surface of the holes is weathered and not freshly drilled.
The holes could have been for ventilation of a pantry cupboard or to drain water
from a pre vious flood, because prior to the timber pack ers on the piers below being
in place, this could have been the lowest point in the room.
5. Conclusion
The building presents no immediate safet y issues and the defects can be repaired.
The settlement that has occurred predates the rec ent floods and also predates the
installation of the French doors and white screen door.
Any remediation of the building would be better served if all uncontrolled wat er was
redirected and the footing were excavated deeper into mor e stable ground to s
depth to be determined…
Insurer’s expert
MT Report
March 2022
…Overall, the highest part of the building is the northern corner, some 900mm to
the underside of the floor, which gives sufficient ventilation to the under - floor area.
The lowest section is the southern corner… it is as low as 380mm to the sub floor
ground and 200mm to the surrounding ground level. Well below code for a timber
floor, which ask s for 400mm under the bearers…
the hallway slopes down to the lounge room at the left of picture 5mm. This is as a
result of settlement…
The source of water may be from the side hallway, but the reason why it did not
swell more or at all under the shelving on the hallway side, cannot be explained.
The water may be from an alter native source…
The source of the moisture and the swelling to the flooring in the kitchen was also
not able to be det ermined.
3. Conclusions
Since the last site visit inspection from MT, no attempts have been made to control
surface water from entering the subfloor area. It was again noticed on this site visit
that the subfloor ground was very moist. This will induce settlement and
deteriorations of the timber floor components, especially the particle board flooring
from the underside of the floor.
It is feasible that water entered the open side door and damaged the side hallway
and pantry floors. However, it is less lik ely that this same water source affected the
k itchen and k itchen verandah door areas. The cross hallway bowing was not
caused by the wate r ingress. The damage to the k itchen and hallway areas are
more lik ely to be settlement related and link ed to subfloor moisture.
As there is no weather protection over the side door, this issue of water entering
the building will continue even if the door is shut. This should be corrected to avoid
further damage.
Determination | Case number: 938497
Page 13 of 15
Insurer’s expert
MCS Report
28 July 2022
It is the opinion of MCS that the damage is related to long - term/seasonal building
movement/settlement/heave and is not related to one single event. However, the
massive flow of undrained water which flooded the house during March 2021 has
saturated the subfloor soil and further deteriorated the timber subfloor structure and
particle boards. This has contributed to bowing of the timber flooring .
Signs of differential settlement in the stumps was clear in the house. This damage
is not directly related to the March 2021 flood event and is related to poor drainage
system and long - term/seas onal ground movement/heave…
After the rear ent ry hall was bowed ou t of level…carpent ers were engaged to pull
up all the new flooring in that area as well as the yellow tongue flooring to expose
the sub floor, joists and bearers. They discovered the joists and bearers out of level
but subsequently re - pack ed and levelled o nly the pier they had exposed – they did
suggest the whole rear section of the house needed the same process – relevelling
and check ing of piers.
Conclusion and Documents Relied Upon
7.1. My instructions were to inspect and report on the following:
Damage description, Cause of damage and Potential Hazards
7.2. The following findings are based upon the evidence presented and these
should be read in conjunction with the preceding comments in the body of this
report:
7.2.1. The subject propert y was flooded wi th water during March 2021 flood event
on the Mid Nort h Coast on NSW. Repair work was conducted after the event and
timber flooring and plasterboard walls were replaced.
7.2.2. After installation of new timber flooring, insured noticed that the timber
flooring was unlevel and bowed in different parts of the house and the k itchen
door was catching on the floor and unable to be opened fully.
7.2.3. After review of the provided assessment reports and site inspection, it is
the opinion of MCS that the damag es are related to the long - term ground
movement and differential settlement bet ween the stumps. Poor drainage also
exacerbated the ground movement and gradual movement of the building over
years. It is therefore highly recommended to engage a geotechnical engineer to
carry out geotechnic al investigations of the subfloor soil and stump conditions as
well as water reactivity of the founding soil.
7.3. Proximate Cause and Effect
7.3.1. Long - term ground movement.
7.3.2. Drainage issues.
7.4. Pre - existing Issues
7.4.1. Differential settlement of stumps …
Insurer’s expert
RGS Report
24 - 10 - 2022
… The underfloor area was too shallow for intrusive investigations beneath the
building to be undertak en without pulling up the building floor …
The ground is gently undulating and wit hin and around the house site it slopes
generally to the northwest at 2 . 5 degrees, but over the southern third of the building
area slopes to the southwest at up to 4 degrees …
Determination | Case number: 938497
Page 14 of 15
The levelling of the piers and stumps below the house is irre gular, lik ely due to
differential movements below the structure over the 100 years or more since the
majorit y of the building was constructed. There were gaps and some pack ing of
previous gaps bet ween th e piers and the bearers in some locations…
It is estimated that ground movement due to shrink - swell effects at the site would
be of the order of 30 - 40mm…It is noted, however, that the differential movements
would occur due to shrink age under prolonged dry conditions. The weather
conditions since the floo d event that affected the site have been a prolonged period
of above average rainfall. Extreme drying of the profile since the flood event
occurred is not feasible. Ground movements due to foundation shrink age is
theref ore not considered to be the cause of the differential movements in the floor
of the dwelling…
4.1 Settl ement
The geological setting and the nature of the materials encountered in the boreholes
and penetrometer tests is indicative of a heavily over - consolidat ed alluvial profile.
The structur e has been in place for many decades and recent additions have been
in place for five years. With regard to movements in the building being caus ed by
settlement of the ground beneath the dwelling:
Cons olidation settlements associated with drawdown after i nundation are not
expected to occur in an over consolidated clay profile of this nature;
Cons olidation due to the load of the original dwelling and consolidation under the
additional loading of the 2017 additions would be expected to be complet e given
the age of the dwelling and the extensions. Some minor creep may be ongoing
but would constitute imperceptible movements over a long time frame and it is
not feasible that they would have caused the movement that has been
encountered in the flooring since the flood and/or subsequent repairs;
Elastic settlements due to foundation load would have occurred in a very short
time frame after construction of either the dwelling or the extensions and would
not be ongoing given the time frame of the multiple stages of construction;
Hydro - consolidation can occur upon inundation of loos e material or cohesionless
materials such as loose sands. There is a layer of sand below t he dwelling at
approximately 2m depth, however, the mat erial is medium dense to dense and
theref or e not susceptible to hydroconsolidation res ulting from inundation.
Further, the layer is at a generally consistent dept h below the surface and
theref ore, in the unlik ely event that some hydroconsolidation did occur, it would
not be expected to cause local ised variable settlement at the ground surface. It
is therefore not considered to be the cause of the localised floor movement within
the structure.
Based on the above, ground settlement is not the cause of movement that has
occurred in the floor of the d welling…
4.4 Conclusion
Based on the findings of the investigation and the discussion pres ented in Sections
4.1 to 4.3 above, settlements or other ground related movements occurring in the
period since the 2021 flood event is not considered a plausible reason for the
apparent uneven movement in the floor of the dwelling.
Determination | Case number: 938497
Page 15 of 15
Insurer’s expert
MCS Report
26 October 2022
2.2.3.2. It is noted, however, that the differential movements would occur due to
shrink age under prolonged dry conditions. The weather condi tions since the flood
event that affected the site have been a prolonged period of above average
rainfall. Extreme drying of the profile since the flood event occurred is not
feasible.
2.2.3.3. Ground movements due to foundation shrink age is therefore not
considered to be the cause of the differential movements in the floor of the
dwelling.
2.3. Conclusion:…
2.3.1. As per the preliminary geotechnical assessment report, the damage to the
property are not direct result of settlement or other ground related mo vements
(i.e. consolidation, shrink - s well and bearing capacity failure) occurring in the
period since 2021 flood event.
2.3.2. The damage is hence related to long - term ground movement which
occurred gradually over time.
Complainant’s
expert
JK report
13 March 2023
It is this office opinion as professional engineers the movement of the piers from
flood water inundation over the property and dwelling is the cause of the floor no
longer being of an acceptable levelness for a habitable dwelling as referenced by;
1. New South Wales Fair Trading Guide to Standards and Tolerances 2017 part
15.8 “levelness of timber flooring”
2. AS2791. 1 table C3 – s welling of particle board floor of 1mm per 100mm is a
defect.
3. AS1684 – residential timber, framed construction
4. AS1860. 2 – particle board flooring – installation
5. AS2796. 1 timber, hardwood – sawn and milled products.
Complainant’s
expert
CFS report
19 March 2023
The rear hallway and Kitchen floors do not comply with Australian standards, the
lounge dining and hallway were difficult to tell due to the furniture in the rooms the
areas I check ed were borderline the rooms would need to be empty so a 3 met re
straight edge can be placed over the entire floor, I don’t recall the floor being that
far out of plane when I sanded the Kitchen and dining room floors. The lounge,
Dining and front Hallway floors did comply to Australian standards at the time of
installation in June 2020.
In my opinion the possible causes for the floor being out of plane are the piers have
moved, particle b oard has expanded and buck led, or Bearers and Joists have
twisted due to flooding.