Insurer declined earthquake damage claim as damage was due to long-term settlement and ground movement
Summary
Complainants claimed for home damage after the September 2021 Victorian earthquake; the insurer declined, citing long-term settlement and ground movement. AFCA found in favour of the insurer and ordered nothing further.
The complainants did not prove the earthquake was the proximate cause of damage, and in any event the ground movement and gradual deterioration exclusions applied.
Issues
- Claim denial primary · not upheld“The complainants have not established a claimable loss. Therefore, the insurer is entitled to decline the claim.”
- Poor claim handling secondary · not upheld“The panel does not consider the insurer has acted inappropriately; further compensation not warranted beyond the $1,000 already paid.”
- Repairs or contractors secondary · not upheld“The insurer offered to perform make safe works and subsequently cash settled the complainant based on BB's scope of works.”
Subjects and remedies
health or medicalhome or building damagenatural disasterno remedy
Related
All Suncorp Group determinations · Find similar determinations
Text of the determination
Determination
Case number 938055
Financial firm AAI Limited
Determination | Case number: 938055 Page 2 of 9
Case number: 938055 21 November 2023
1 Determination overview
1.1 Complaint
The complainants hold a home and contents insurance policy with the financial firm (insurer).
On 24 September 2021, they lodged a claim for damage to their property following the
Victorian earthquake on 22 September 2021.
The insurer denied the claim saying the damage is not consistent with the earthquake or any
other insured event. The insurer also says the damage is due to long-term pre-existing
settlement, differential ground movement and gradual deterioration. Therefore, it is excluded
from cover.
The complainants disagree with the insurer’s decision and say the insurer should cover the
claim and repair the damage. The complainants further say that a make safe was not
conducted by the insurer to secure the property.
1.2 Issues and key findings
Is the insurer entitled to decline the claim?
Yes. The complainants have not established a claimable loss. Therefore, the insurer is
entitled to decline the claim. Even if a claimable loss was established, on balance, the cause
of the damage is long-term pre-existing settlement and ground movement. Such damage is
excluded from cover. Accordingly, the insurer is entitled to decline the claim.
Has insurer acted appropriately in relation to make safe?
Yes. The insurer offered to perform make safe works and subsequently cash settled the
complainant based on BB’s scope of works. The insurer has acted fairly and reasonably in
relation to the make safe.
Are the complainants entitled to further compensation?
No. The insurer has already paid the complainants $1,000. Further compensation is not
warranted in the circumstances.
Why is the outcome fair?
The complainants have not established a claimable loss. It would not be fair, in the
circumstances, to require the insurer to cover the claim. The insurer has also acted fairly and
reasonably in cash settling the complainants for the value of the make safe repairs even
though the claim was declined.
1.3 Determination
This determination is in favour of the insurer.
The insurer is not required to take any further action in relation to the claim or complaint.
Determination | Case number: 938055 Page 3 of 9
2 Reasons for determination
2.1 Is the insurer entitled to decline the claim?
Yes. The complainants have not established a claimable loss. Therefore, the insurer is
entitled to decline the claim. Even if a claimable loss was established, on balance, the cause
of the damage is long-term pre-existing settlement and ground movement. Such damage is
excluded from cover. Accordingly, the insurer is entitled to decline the claim.
Onus on complainants to establish a valid claim
The complainants are required to show, on the balance of probabilities (that it is more likely
than not), that there is a claimable loss under the policy. This means the complainants must
prove the loss or damage was caused by a risk that is covered under the policy.
Once the complainants prove there is a claimable loss, the insurer is liable for the loss unless
it shows an exclusion or limiting condition applies. The insurer has the onus of proving, on the
balance of probabilities, that the exclusion or condition applies.
Policy covers earthquake subject to exclusion
The insurer’s policy is made up of the policy schedule and the product disclosure statement
(PDS). There is no dispute the insurer sent these documents to the complainants.
The policy is an ‘insured events’ policy. This means not all loss and damage is automatically
covered. Rather, only loss or damage caused by one or more of the insured events, and not
subject to exclusions, is covered. Earthquake is an insured event.
The policy also contains the following general exclusions:
Defect, structural fault or design fault
a defect, structural fault or design fault that you knew about (or should reasonably
have known about) and did not fix before the loss or damage occurred (e.g. if
there are signs that a defect previously caused damage, we will not pay a later
claim for further damage from this defect)…
Ground movement
erosion, vibration, subsidence, landslip, landslide, mudslide, collapse, shrinkage
or any other earth movement, but we will cover landslide or subsidence that is
specifically covered under the following insured events:
…Earthquake and Tsunami…
Wear, tear and gradual deterioration
wear, tear, rust, fading, rising damp, mould, mildew, corrosion, rot, action of light,
atmospheric or climatic conditions or gradual deterioration such as, but not limited
to:
Determination | Case number: 938055 Page 4 of 9
• tiles and their adhesive or grouting breaking down ;
• weathering of roof tiles or roof ridge capping;
• gradual weathering and breakdown of bricks, mortar or concrete.
Complainants say an earthquake caused damage to the property
The complainants have provided a chronology of the damage to the property and say:
they have owned the property since 2002;
in 2005 strong winds uprooted many trees and dislodged the roof of the house impacting
the walls, window and door frames;
in 2007 a claim was made as there was several trees on the neighbour side collapsing on
the joint fence;
in relation to the 2011 earthquake event, they felt a strong shake and the roof seemed to
be lifted or shifted in the process. The gaps in the house’s corners became much greater
and foam was used as temporary sealant;
in 2013 there was a tornado like storm bringing down trees and which blocked the main
driveway. However, no damage was sustained to the property; and
on 22 September 2021, the house was structurally damaged by the earthquake event.
In support of their claim, the complainants appointed a building consultant, BM, to provide a
report on the damage. BM says:
the roof and walls are falling down;
the fire access track is blocked by a fallen tree;
there is movement in the walls due to the earthquake;
there are many building defects due to the movement in the walls such as holes, gaps,
cracks, windows/doors not working, damaged fascia and trims;
there is a lack of expansion joints in bricks/blocks;
the earthquake has caused the wall on the right side to fall/lean over approximately 65mm.
The footings and wall have now been compromised as well;
the dwelling is not safe. It recommends the house is now fully rebuilt; and
the poor maintenance is due to there being no access to the dwelling as the insurer has
said it is not safe to enter.
Further, the complainants say that since the insurer continued to insure their property and
they continually paid premiums, the insurer should now be responsible for the damage and
repairs.
Insurer provided reports commenting on the cause of damage
The insurer appointed a builder, PB, to attend the property. It engaged a structural engineer,
HC, to report on the cause of the damage. HC inspected the property on 1 November 2021
and says:
the complainant believes some of the damage was pre-existing however the severity of
building/masonry movement has worsened after the earthquake;
the outwards movement of the north eastern wall has resulted in a 60mm loss of bearing to
the ridge beam it supports. The ridge beam is severely rotten at this connection from the
ongoing presence of moisture. The moisture has entered the building from an ineffective
roof flashing around the chimney. The damage is classified as severe;
upon excavating a footing probe on the south west wall, tree roots were present. However,
the severity of defects in the south western wall is classified as slight;
Determination | Case number: 938055 Page 5 of 9
the loss of bearing and extensive rot of the ridge beam could lead to total collapse of the
roof structure;
historic foam filler was observed within the joint opening at the northern corner of the
building. This suggests the damage is historic and has been repaired in the past. However,
the further opening of the joint indicates that movement has occurred in another more
recent event. It is possible that some movement occurred because of the September 2021
earthquake;
the raft slab foundations were observed to ‘sag’ at the ends of the building, and ‘hog’ in the
centre of the building near the entrance. The fall/sag is 0.7-0.8 degrees down towards
each end of the building. The sagging/hogging action causes a rotation of the foundations,
and subsequent outwards rotation of the two end walls;
there are numerous cracks in the slab approximately 1mm in width. The cracks appear to
be old/historic, evident by dirt, debris and discolouration of the crack on close inspection.
The orientation, location and size of cracks in the slab are consistent with the effects of the
ridge beam curving upwards (hogging slab);
the cause of the building defects is attributed to the sagging of the foundations from drying
of the underlying clay soils. This in turn is due to the fact that the footings are constructed
to 400mm, less than the 500mm minimum required by the code in place at the time of
construction, and the proximity of trees to the building’s foundations causing drying and
shrinkage of the surrounding soils;
it is possible the September 2021 earthquake has caused these defects to worsen,
however it is not the underlying cause of the building damage observed;
the options for repair are partial demolition and reconstruction with underpinning or ful l
demolition and reconstruction; and
the property is located 110km away from the epicentre and is within intensity level IV –
Light as per the Modified Mercalli Intensities scale. The level IV intensity is described as
‘ felt by nearly everyone, many awakened. Some dishes, windows broken. Unstable objects
overturned. Pendulum clocks may stop ’. In its opinion, the recorded earthquake was not of
sufficient magnitude to cause the damage to the building had the pre-existing damage not
been present.
Based on its reports, the insurer says the defects identified may have been exacerbated by
the earthquake event of 22 September 2022. However, the damage occurred before the
earthquake. Therefore, the insurer maintains the damage is due to long-term settlement,
ground movement, and gradual deterioration, which are excluded from cover.
Proximate cause of the damage must be established
The complainant needs to show the proximate cause of the damage being claimed was, on
balance, the earthquake event.
The proximate cause of a loss is the dominant, effective or operative cause. It does not have
to be the first, the last or the sole cause. This is a question of fact depending on the
circumstances.
If there are several causes, each needs to be examined for qualities of reality, predominance
and efficiency to identify the proximate cause. For example, if one cause would have caused
the loss in any case, and the other one would not have done so without the first, then the first
is the proximate cause.
Determination | Case number: 938055 Page 6 of 9
Exchanged information does not show damage due to earthquake
It is not disputed that the complainants’ home has been damaged by earth movement.
However, having reviewed the exchanged information, the panel is not satisfied that the
earthquake is the proximate cause of the damage.
The complainants say the movement was caused by the earthquake but also accept that
there was pre-existing damage to the property. The insurer accepts that the earthquake may
have exacerbated the pre-existing damage but says it was not of sufficient magnitude to
cause the damage observed if not for the fact that there was pre-existing damage. Further,
the insurer says the movement occurred over a long period of time and was not caused by
any single event.
The panel acknowledges the report from BM. However, the report does not provide any
explanation as to why it says the earthquake caused the damage observed. It also does not
address the fact that there was pre-existing damage at the property or the other weather
events that transpired prior to September 2021.
On balance, the panel is more persuaded by the evidence of HC. The panel considers HC is
suitably qualified to comment on the cause of damage. It considers the views expressed in its
reports are detailed and persuasive. HC has provided plausible explanations and reasoning
for their findings. In particular, the panel notes that there is evidence of previous movement
and damage at the property, which has been (at least in part) repaired. This is not disputed by
the complainants. The panel refers to the images of damage and the evidence of pre-existing
cracks and filler used on the building. The panel also notes the distance of the property from
the epicentre and the magnitude of the earthquake. On balance, the panel considers the
dominant and effective cause of the damage is the sagging foundations from drying of the
underlying clay soils. In the absence of any evidence to the contrary, it accepts HC’s
conclusions that this is due to the footings not being constructed to sufficient depth (in
accordance with the building code in place at the time of construction) and the proximity of
trees to th e building’s foundations causing drying and shrinkage of the surrounding soils.
In the circumstances, the panel does not consider that the complainants have established the
damage was caused by a single insured event as required by the policy. Therefore, they have
failed to establish a claimable loss under the policy. Even if a claimable loss was established,
the panel is satisfied that the insurer has shown the damage has been caused by long-term
pre-existing settlement and ground movement. Such damage is excluded from cover.
Accordingly, the insurer is entitled to decline the claim.
2.2 Has insurer acted appropriately in relation to make safe?
Yes. The insurer offered to perform make safe works and subsequently cash settled the
complainant based on BB’s scope of works. The insurer has acted fairly and reasonably in
relation to the make safe.
Insurer was not required to carry out a make safe and has acted reasonably
The insurer declined the claim on 24 December 2021. T he insurer’s IDR team reviewed and
agreed with the declinature. However, they offered to prop the ridge beam, by way of a make
safe, and to pay the complainants $1,000 in compensation.
The insurer had already obtained a quote from a builder, BB, to complete a make safe on the
ridge beam. The quote, dated 25 October 2021, was for $3,272.50.
Determination | Case number: 938055 Page 7 of 9
BB says it was unable to contact the complainants to arrange the make safe works. The
complainants say they did not receive any communications from BB. In any event, the insurer
sought to cash settle the complainant for the make safe repairs.
The panel refers to the claim notes which show that multiple attempts were made to contact
the complainants in relation to the make safe. Email correspondence from the insurer shows
it wrote to the complainants to advise that if they did arrange with BB for them to attend the
property to perform the make safe, that the insurer would cash settle the cost of the BB make
safe quote. The complainants have not disputed the amount offered, nor have they provided
any alternate scope of works for the make safe repairs.
It is an additional feature of the complainants’ policy that ‘when [the insurer is] repairing
damaged parts of the building [that it] will pay the reasonable and necessary costs…of any
temporary work required to make the damaged…building…safe’. That is, if the claim is
accepted, the policy also covers the make safe repairs.
In this instance, the panel considers the insurer is entitled to decline the claim. Therefore, the
insurer is not required to cover any make safe repairs. Nevertheless, the insurer did offer to
carry out the make safe repairs and subsequently to cash settle the complainants for the
value of the repairs.
There is no evidence to suggest the scope of works proposed by way of make safe, or the
cash settlement amount, is inadequate. Therefore, the panel is satisfied that the insurer has
acted fairly and reasonably in relation to the make safe. The insurer is therefore not required
to take any further action in relation to the make safe.
2.3 Are the complainants entitled to further compensation?
No. The insurer has already paid the complainants $1,000. Further compensation is not
warranted in the circumstances.
AFCA can award compensation for poor claim handling
Under our Rules, AFCA can award up to $5,400 compensation for non-financial loss. This
must relate to poor claims handling or other actions of the insurer which causes:
an unusual degree of stress, delay, or inconvenience, and/or
interference with a pers on’s expectation of enjoyment and/or peace of mind.
We expect complainants to be moderately robust, and we will not award compensation for the
ordinary degree of inconvenience involved in making a claim.
Further the compensation is not warranted in the circumstances
The complainants say the claims process has caused a high level of stress and anxiety, with
the insurer showing minimal duty of care in relation to their claim. This resulted in the
complainants not vacating a rental property on time, which is now being litigated through
VCAT.
The panel acknowledges that the complainants were dissatisfied with the insurer’s declinature
of the claim and the decision to cash settle the make safe. The panel also acknowledges the
complainants ’ concerns includes the complainants’ serious health issues, living situation and
general circumstances. The panel sympathises with the complainants and their
circumstances.
Determination | Case number: 938055 Page 8 of 9
However, AFCA is only able to award compensation for poor claims handling or based on the
insurer’s conduct. The panel does not consider the insurer has acted inappropriately.
Specifically, the panel notes that:
the claim response was issued in December 2021, within a reasonable time after the claim
was lodged;
the $1,000 compensation was paid in January 2022;
the insurer attempted to arrange the make safe repairs to the property for several months.
The complainants initially advised they did not wish for any make safe works to be done
until they had sought legal advice. They then wanted the make safe works to be done,
however this was never arranged by the complainants and BB. The complainants were
advised in August 2022 that if they did not liaise with BB in the next 30 days about the
make safe that a cash settlement would be paid; and
the cash settlement was paid in September 2022.
Given this, there is no evidence to suggest that the insurer has acted unreasonably or that it
should pay further compensation in addition to the $1,000 it has already paid.
2.4 Why is the outcome fair?
The complainants have not established a claimable loss. It would not be fair, in the
circumstances, to require the insurer to cover the claim. The insurer has also acted fairly and
reasonably in cash settling the complainants for the value of the make safe repairs even
though the claim was declined.
Determination | Case number: 938055 Page 9 of 9
3 Supporting information
3.1 The AFCA processes
AFCA’s approach is based on fairness
AFCA has determined this complaint based on what is fair in all the circumstances, having
regard to:
the legal principles
applicable industry codes or guidance
good industry practice
previous decisions of AFCA or its predecessor schemes (which are not binding).
The respective parties have completed a full exchange of the relevant information, and each
party has had the opportunity to address any issues raised. We have reviewed and
considered all the information the parties have provided.
While the parties have raised a number of issues in their submissions, we have restricted this
determination to the issues that are relevant to the outcome.
A panel determined this matter
Due to the nature of this complaint, we referred it to a panel for determination. The panel
includes:
an ombudsman
a member with significant experience in consumer and small business advocacy
a member with extensive experience in the insurance sector.
We assess complaints on available information and circumstances
AFCA is not a court of law. We do not have the power to take or test evidence on oath, or to
require third parties to give evidence.
When we assess complaints, we consider:
available documents
the recollections of the parties
all relevant circumstances.
We give more weight to documents created at the time the events occurred. If there are no
relevant documents, we will decide what most likely occurred based on the available
information.
If there are conflicting recollections and these are evenly weighted, we may find that a claim
cannot be established.
Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.