Home / Suncorp Group / Determination 938055

Determination 938055

Insurer declined earthquake damage claim as damage was due to long-term settlement and ground movement

FirmSuncorp Group
Decided2023-11-21
ProductGeneral Insurance · Home building and contents
OutcomeFor the firm
Amount awarded—
Non-financial loss—
Amount claimed—
SourceAFCA PDF

Summary

Complainants claimed for home damage after the September 2021 Victorian earthquake; the insurer declined, citing long-term settlement and ground movement. AFCA found in favour of the insurer and ordered nothing further.

The complainants did not prove the earthquake was the proximate cause of damage, and in any event the ground movement and gradual deterioration exclusions applied.

Issues

Subjects and remedies

health or medicalhome or building damagenatural disasterno remedy

Related

All Suncorp Group determinations · Find similar determinations

Text of the determination

Determination Case number 938055 Financial firm AAI Limited Determination | Case number: 938055 Page 2 of 9 Case number: 938055 21 November 2023 1 Determination overview 1.1 Complaint The complainants hold a home and contents insurance policy with the financial firm (insurer). On 24 September 2021, they lodged a claim for damage to their property following the Victorian earthquake on 22 September 2021. The insurer denied the claim saying the damage is not consistent with the earthquake or any other insured event. The insurer also says the damage is due to long-term pre-existing settlement, differential ground movement and gradual deterioration. Therefore, it is excluded from cover. The complainants disagree with the insurer’s decision and say the insurer should cover the claim and repair the damage. The complainants further say that a make safe was not conducted by the insurer to secure the property. 1.2 Issues and key findings Is the insurer entitled to decline the claim? Yes. The complainants have not established a claimable loss. Therefore, the insurer is entitled to decline the claim. Even if a claimable loss was established, on balance, the cause of the damage is long-term pre-existing settlement and ground movement. Such damage is excluded from cover. Accordingly, the insurer is entitled to decline the claim. Has insurer acted appropriately in relation to make safe? Yes. The insurer offered to perform make safe works and subsequently cash settled the complainant based on BB’s scope of works. The insurer has acted fairly and reasonably in relation to the make safe. Are the complainants entitled to further compensation? No. The insurer has already paid the complainants $1,000. Further compensation is not warranted in the circumstances. Why is the outcome fair? The complainants have not established a claimable loss. It would not be fair, in the circumstances, to require the insurer to cover the claim. The insurer has also acted fairly and reasonably in cash settling the complainants for the value of the make safe repairs even though the claim was declined. 1.3 Determination This determination is in favour of the insurer. The insurer is not required to take any further action in relation to the claim or complaint. Determination | Case number: 938055 Page 3 of 9 2 Reasons for determination 2.1 Is the insurer entitled to decline the claim? Yes. The complainants have not established a claimable loss. Therefore, the insurer is entitled to decline the claim. Even if a claimable loss was established, on balance, the cause of the damage is long-term pre-existing settlement and ground movement. Such damage is excluded from cover. Accordingly, the insurer is entitled to decline the claim. Onus on complainants to establish a valid claim The complainants are required to show, on the balance of probabilities (that it is more likely than not), that there is a claimable loss under the policy. This means the complainants must prove the loss or damage was caused by a risk that is covered under the policy. Once the complainants prove there is a claimable loss, the insurer is liable for the loss unless it shows an exclusion or limiting condition applies. The insurer has the onus of proving, on the balance of probabilities, that the exclusion or condition applies. Policy covers earthquake subject to exclusion The insurer’s policy is made up of the policy schedule and the product disclosure statement (PDS). There is no dispute the insurer sent these documents to the complainants. The policy is an ‘insured events’ policy. This means not all loss and damage is automatically covered. Rather, only loss or damage caused by one or more of the insured events, and not subject to exclusions, is covered. Earthquake is an insured event. The policy also contains the following general exclusions: Defect, structural fault or design fault a defect, structural fault or design fault that you knew about (or should reasonably have known about) and did not fix before the loss or damage occurred (e.g. if there are signs that a defect previously caused damage, we will not pay a later claim for further damage from this defect)… Ground movement erosion, vibration, subsidence, landslip, landslide, mudslide, collapse, shrinkage or any other earth movement, but we will cover landslide or subsidence that is specifically covered under the following insured events: …Earthquake and Tsunami… Wear, tear and gradual deterioration wear, tear, rust, fading, rising damp, mould, mildew, corrosion, rot, action of light, atmospheric or climatic conditions or gradual deterioration such as, but not limited to: Determination | Case number: 938055 Page 4 of 9 • tiles and their adhesive or grouting breaking down ; • weathering of roof tiles or roof ridge capping; • gradual weathering and breakdown of bricks, mortar or concrete. Complainants say an earthquake caused damage to the property The complainants have provided a chronology of the damage to the property and say:  they have owned the property since 2002;  in 2005 strong winds uprooted many trees and dislodged the roof of the house impacting the walls, window and door frames;  in 2007 a claim was made as there was several trees on the neighbour side collapsing on the joint fence;  in relation to the 2011 earthquake event, they felt a strong shake and the roof seemed to be lifted or shifted in the process. The gaps in the house’s corners became much greater and foam was used as temporary sealant;  in 2013 there was a tornado like storm bringing down trees and which blocked the main driveway. However, no damage was sustained to the property; and  on 22 September 2021, the house was structurally damaged by the earthquake event. In support of their claim, the complainants appointed a building consultant, BM, to provide a report on the damage. BM says:  the roof and walls are falling down;  the fire access track is blocked by a fallen tree;  there is movement in the walls due to the earthquake;  there are many building defects due to the movement in the walls such as holes, gaps, cracks, windows/doors not working, damaged fascia and trims;  there is a lack of expansion joints in bricks/blocks;  the earthquake has caused the wall on the right side to fall/lean over approximately 65mm. The footings and wall have now been compromised as well;  the dwelling is not safe. It recommends the house is now fully rebuilt; and  the poor maintenance is due to there being no access to the dwelling as the insurer has said it is not safe to enter. Further, the complainants say that since the insurer continued to insure their property and they continually paid premiums, the insurer should now be responsible for the damage and repairs. Insurer provided reports commenting on the cause of damage The insurer appointed a builder, PB, to attend the property. It engaged a structural engineer, HC, to report on the cause of the damage. HC inspected the property on 1 November 2021 and says:  the complainant believes some of the damage was pre-existing however the severity of building/masonry movement has worsened after the earthquake;  the outwards movement of the north eastern wall has resulted in a 60mm loss of bearing to the ridge beam it supports. The ridge beam is severely rotten at this connection from the ongoing presence of moisture. The moisture has entered the building from an ineffective roof flashing around the chimney. The damage is classified as severe;  upon excavating a footing probe on the south west wall, tree roots were present. However, the severity of defects in the south western wall is classified as slight; Determination | Case number: 938055 Page 5 of 9  the loss of bearing and extensive rot of the ridge beam could lead to total collapse of the roof structure;  historic foam filler was observed within the joint opening at the northern corner of the building. This suggests the damage is historic and has been repaired in the past. However, the further opening of the joint indicates that movement has occurred in another more recent event. It is possible that some movement occurred because of the September 2021 earthquake;  the raft slab foundations were observed to ‘sag’ at the ends of the building, and ‘hog’ in the centre of the building near the entrance. The fall/sag is 0.7-0.8 degrees down towards each end of the building. The sagging/hogging action causes a rotation of the foundations, and subsequent outwards rotation of the two end walls;  there are numerous cracks in the slab approximately 1mm in width. The cracks appear to be old/historic, evident by dirt, debris and discolouration of the crack on close inspection. The orientation, location and size of cracks in the slab are consistent with the effects of the ridge beam curving upwards (hogging slab);  the cause of the building defects is attributed to the sagging of the foundations from drying of the underlying clay soils. This in turn is due to the fact that the footings are constructed to 400mm, less than the 500mm minimum required by the code in place at the time of construction, and the proximity of trees to the building’s foundations causing drying and shrinkage of the surrounding soils;  it is possible the September 2021 earthquake has caused these defects to worsen, however it is not the underlying cause of the building damage observed;  the options for repair are partial demolition and reconstruction with underpinning or ful l demolition and reconstruction; and  the property is located 110km away from the epicentre and is within intensity level IV – Light as per the Modified Mercalli Intensities scale. The level IV intensity is described as ‘ felt by nearly everyone, many awakened. Some dishes, windows broken. Unstable objects overturned. Pendulum clocks may stop ’. In its opinion, the recorded earthquake was not of sufficient magnitude to cause the damage to the building had the pre-existing damage not been present. Based on its reports, the insurer says the defects identified may have been exacerbated by the earthquake event of 22 September 2022. However, the damage occurred before the earthquake. Therefore, the insurer maintains the damage is due to long-term settlement, ground movement, and gradual deterioration, which are excluded from cover. Proximate cause of the damage must be established The complainant needs to show the proximate cause of the damage being claimed was, on balance, the earthquake event. The proximate cause of a loss is the dominant, effective or operative cause. It does not have to be the first, the last or the sole cause. This is a question of fact depending on the circumstances. If there are several causes, each needs to be examined for qualities of reality, predominance and efficiency to identify the proximate cause. For example, if one cause would have caused the loss in any case, and the other one would not have done so without the first, then the first is the proximate cause. Determination | Case number: 938055 Page 6 of 9 Exchanged information does not show damage due to earthquake It is not disputed that the complainants’ home has been damaged by earth movement. However, having reviewed the exchanged information, the panel is not satisfied that the earthquake is the proximate cause of the damage. The complainants say the movement was caused by the earthquake but also accept that there was pre-existing damage to the property. The insurer accepts that the earthquake may have exacerbated the pre-existing damage but says it was not of sufficient magnitude to cause the damage observed if not for the fact that there was pre-existing damage. Further, the insurer says the movement occurred over a long period of time and was not caused by any single event. The panel acknowledges the report from BM. However, the report does not provide any explanation as to why it says the earthquake caused the damage observed. It also does not address the fact that there was pre-existing damage at the property or the other weather events that transpired prior to September 2021. On balance, the panel is more persuaded by the evidence of HC. The panel considers HC is suitably qualified to comment on the cause of damage. It considers the views expressed in its reports are detailed and persuasive. HC has provided plausible explanations and reasoning for their findings. In particular, the panel notes that there is evidence of previous movement and damage at the property, which has been (at least in part) repaired. This is not disputed by the complainants. The panel refers to the images of damage and the evidence of pre-existing cracks and filler used on the building. The panel also notes the distance of the property from the epicentre and the magnitude of the earthquake. On balance, the panel considers the dominant and effective cause of the damage is the sagging foundations from drying of the underlying clay soils. In the absence of any evidence to the contrary, it accepts HC’s conclusions that this is due to the footings not being constructed to sufficient depth (in accordance with the building code in place at the time of construction) and the proximity of trees to th e building’s foundations causing drying and shrinkage of the surrounding soils. In the circumstances, the panel does not consider that the complainants have established the damage was caused by a single insured event as required by the policy. Therefore, they have failed to establish a claimable loss under the policy. Even if a claimable loss was established, the panel is satisfied that the insurer has shown the damage has been caused by long-term pre-existing settlement and ground movement. Such damage is excluded from cover. Accordingly, the insurer is entitled to decline the claim. 2.2 Has insurer acted appropriately in relation to make safe? Yes. The insurer offered to perform make safe works and subsequently cash settled the complainant based on BB’s scope of works. The insurer has acted fairly and reasonably in relation to the make safe. Insurer was not required to carry out a make safe and has acted reasonably The insurer declined the claim on 24 December 2021. T he insurer’s IDR team reviewed and agreed with the declinature. However, they offered to prop the ridge beam, by way of a make safe, and to pay the complainants $1,000 in compensation. The insurer had already obtained a quote from a builder, BB, to complete a make safe on the ridge beam. The quote, dated 25 October 2021, was for $3,272.50. Determination | Case number: 938055 Page 7 of 9 BB says it was unable to contact the complainants to arrange the make safe works. The complainants say they did not receive any communications from BB. In any event, the insurer sought to cash settle the complainant for the make safe repairs. The panel refers to the claim notes which show that multiple attempts were made to contact the complainants in relation to the make safe. Email correspondence from the insurer shows it wrote to the complainants to advise that if they did arrange with BB for them to attend the property to perform the make safe, that the insurer would cash settle the cost of the BB make safe quote. The complainants have not disputed the amount offered, nor have they provided any alternate scope of works for the make safe repairs. It is an additional feature of the complainants’ policy that ‘when [the insurer is] repairing damaged parts of the building [that it] will pay the reasonable and necessary costs…of any temporary work required to make the damaged…building…safe’. That is, if the claim is accepted, the policy also covers the make safe repairs. In this instance, the panel considers the insurer is entitled to decline the claim. Therefore, the insurer is not required to cover any make safe repairs. Nevertheless, the insurer did offer to carry out the make safe repairs and subsequently to cash settle the complainants for the value of the repairs. There is no evidence to suggest the scope of works proposed by way of make safe, or the cash settlement amount, is inadequate. Therefore, the panel is satisfied that the insurer has acted fairly and reasonably in relation to the make safe. The insurer is therefore not required to take any further action in relation to the make safe. 2.3 Are the complainants entitled to further compensation? No. The insurer has already paid the complainants $1,000. Further compensation is not warranted in the circumstances. AFCA can award compensation for poor claim handling Under our Rules, AFCA can award up to $5,400 compensation for non-financial loss. This must relate to poor claims handling or other actions of the insurer which causes:  an unusual degree of stress, delay, or inconvenience, and/or  interference with a pers on’s expectation of enjoyment and/or peace of mind. We expect complainants to be moderately robust, and we will not award compensation for the ordinary degree of inconvenience involved in making a claim. Further the compensation is not warranted in the circumstances The complainants say the claims process has caused a high level of stress and anxiety, with the insurer showing minimal duty of care in relation to their claim. This resulted in the complainants not vacating a rental property on time, which is now being litigated through VCAT. The panel acknowledges that the complainants were dissatisfied with the insurer’s declinature of the claim and the decision to cash settle the make safe. The panel also acknowledges the complainants ’ concerns includes the complainants’ serious health issues, living situation and general circumstances. The panel sympathises with the complainants and their circumstances. Determination | Case number: 938055 Page 8 of 9 However, AFCA is only able to award compensation for poor claims handling or based on the insurer’s conduct. The panel does not consider the insurer has acted inappropriately. Specifically, the panel notes that:  the claim response was issued in December 2021, within a reasonable time after the claim was lodged;  the $1,000 compensation was paid in January 2022;  the insurer attempted to arrange the make safe repairs to the property for several months. The complainants initially advised they did not wish for any make safe works to be done until they had sought legal advice. They then wanted the make safe works to be done, however this was never arranged by the complainants and BB. The complainants were advised in August 2022 that if they did not liaise with BB in the next 30 days about the make safe that a cash settlement would be paid; and  the cash settlement was paid in September 2022. Given this, there is no evidence to suggest that the insurer has acted unreasonably or that it should pay further compensation in addition to the $1,000 it has already paid. 2.4 Why is the outcome fair? The complainants have not established a claimable loss. It would not be fair, in the circumstances, to require the insurer to cover the claim. The insurer has also acted fairly and reasonably in cash settling the complainants for the value of the make safe repairs even though the claim was declined. Determination | Case number: 938055 Page 9 of 9 3 Supporting information 3.1 The AFCA processes AFCA’s approach is based on fairness AFCA has determined this complaint based on what is fair in all the circumstances, having regard to:  the legal principles  applicable industry codes or guidance  good industry practice  previous decisions of AFCA or its predecessor schemes (which are not binding). The respective parties have completed a full exchange of the relevant information, and each party has had the opportunity to address any issues raised. We have reviewed and considered all the information the parties have provided. While the parties have raised a number of issues in their submissions, we have restricted this determination to the issues that are relevant to the outcome. A panel determined this matter Due to the nature of this complaint, we referred it to a panel for determination. The panel includes:  an ombudsman  a member with significant experience in consumer and small business advocacy  a member with extensive experience in the insurance sector. We assess complaints on available information and circumstances AFCA is not a court of law. We do not have the power to take or test evidence on oath, or to require third parties to give evidence. When we assess complaints, we consider:  available documents  the recollections of the parties  all relevant circumstances. We give more weight to documents created at the time the events occurred. If there are no relevant documents, we will decide what most likely occurred based on the available information. If there are conflicting recollections and these are evenly weighted, we may find that a claim cannot be established.

Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.