Home / Hollard / Determination 937978
Determination 937978
Scope of works and settlement amount for escape of liquid claim; dispute over adequacy of insurer's and complainant's scopes of works
Summary
The insurer accepted a burst pipe claim but the parties disputed the scope of works and cost. AFCA found neither scope fair and ordered the insurer to reassess with invasive testing and an updated scope, and the complainant to provide a detailed breakdown.
The complainant must show the claimed works relate to insured damage, while the insurer must investigate further and complete its scope before the claim can be fairly settled.
Issues
- Claim amount dispute primary · unclear“dispute over Scope of Works; Company M $119,801.01 versus insurer offer of $57,633.99; neither SOW found fair and reasonable”
- Inadequate claim investigation secondary · upheld“insurer required to engage independent specialist for invasive testing of mould and electrical issues before settling”
- Delay secondary · unclear“rectification works not commenced over a year later; more likely than not additional damage caused by delays”
- Repairs or contractors secondary · upheld“Company A SOWs out of date, omit rectification after mould remediation, acoustic treatments and yellow tongue flooring”
Subjects and remedies
home or building damageprovide documentsreassess claim
Related
Text of the determination
Determination
Case number 937978
Financial firm The Hollard Insurance Company Pty Ltd (insurer)
Determination | Case number: 937978 Page 1 of 12
Case number: 937978 26 September 2023
1 Determination overview
1.1 Complaint
Since 8 March 2022, the complainant has held a Home Building and Contents Insurance
policy issued by the insurer. On 6 April 2022, the complainant lodged a claim under the polic y
following an escape of liquid from a burst pipe in the upstairs bathroom of the insured
property (the insured event).
The insurer has accepted the claim, but a dispute has arisen over the Scope of Works (SOW)
required to rectify the damage caused by the insured event. On the basis of a quote from its
building contractor, Company A, the insurer has offered to either repair the damage, or cash
settle the claim for:
$17,661.19 to cover the building damages
$38,002.80 for mould remediation and
$2,000 ex-gratia payment and a waiver of the $1,000 excess payable due to the
complainant’s claims experience
for a total of $57,633.99. It has also offered to review the claim for yellow tongue flooring on
receipt of further information from the complainant.
The complainant says the amount for the building damages is inadequate, based on a quote
from his preferred building contractor, Company M, of $119,801.01. He has not accepted the
additional mould remediation amount on the basis the extent of the work required to deal with
the mould is unknown until the demolition is commenced.
1.2 Issues and key findings
Is the Company M SOW fair and reasonable?
No. The onus is on the complainant to demonstrate the damages covered by the Company M
SOW were caused by the burst pipe. The provided information does not establish this at the
present time.
Is the Company A SOW fair and reasonable?
No. The insurer has accepted it does not have sufficient information to fully settle this claim. It
is required to undertake further investigation and review the results prior to settling the claim.
Why is the outcome fair?
Neither side have presented sufficient evidence to demonstrate the claim can be resolved in
good faith on the available evidence. The outcome acknowledges this is a challenging claim
which requires further information from both parties before a fair outcome can be achieved.
1.3 Determination
This determination is partly in favour of the complainant.
Determination | Case number: 937978 Page 2 of 12
Within 14 days of the date the insurer is advised the complainant has accepted this
determination:
the complainant must provide the insurer:
> relevant measurements and details to allow the insurer to assess the claim for the
yellow tongue flooring
> a detailed breakdown of the Company M SOW including the detail requested by the
insurer, clearly identifying items being claimed for and
the insurer must:
> reassess the claim on the basis of the current state of the premises including:
‒ engaging an independent specialist to perform invasive testing to determine the
extent of mould and electrical issues caused by the burst pipe and cover all
associated costs and
‒ having Company A (or any other nominated contractor) include in the building SOW:
‒ relevant rectification works as a result of the mould remediation, including the
waterproofing and tiling of the bathroom, which is reasonably necessary to repair
the damage as it exists currently and
‒ the yellow tongue flooring and
> take all reasonable steps to resolve the claim as expediently as possible.
In the event:
the complainant does not provide a detailed breakdown of the Company M SOW within a
reasonable timeframe, the insurer may proceed with reassessing the claim on the basis of
the modified Company A SOWs and
there is a further dispute about the claim or settlement amount following the above steps
being taken, the complainant can refer the matter back to AFCA for a supplementary
determination subject to the above information being provided.
Determination | Case number: 937978 Page 3 of 12
2 Reasons for determination
2.1 Is the Company M SOW fair and reasonable?
No. The onus is on the complainant to demonstrate the damages covered by the Company M
SOW were caused by the burst pipe. The provided information does not establish this at the
present time.
The parties’ obligations are set out in the policy terms
The policy is set out in a Product Disclosure Statement (PDS) prepared by the insurer on 1
September 2021.
Policy terms which are relevant to this determination are set out in section 3.2 of this
determination.
It is clear from the policy wording the insurer is relevantly required to:
repair the damaged portions of the insured property to the same condition as when they
were new or
if this is not reasonably practicable, pay the insured the reasonable cost of repairing the
insured property to the same condition as when it was new.
The complainant has provided a Scope of Works
The complainant has provided a SOW, dated 29 November 2022, from Company M which he
relies on as the basis for his understanding of the remediation works which are necessary to
repair the insured property to the same condition as when it was new.
However, the complainant has also indicated there may be more work required as:
the extent of the mould behind the waterlogged plasterboard cannot be ascertained at this
time
there may be a need for replacement insulation in the walls and
there may be damage to electrical systems in the walls as evidenced by power socket
failures in parts of the house.
It is a generally accepted principle of insurance law the complainant is required initially to
show it is more likely than not the loss or damage was caused by a risk that is covered under
the policy, i.e. the escape of liquid from the burst pipe.
Once the complainant proves there is a claimable loss, the insurer is liable for the loss unless
it shows an exclusion or limiting condition applies. The insurer has the responsibility to show it
is more likely than not the exclusion or condition applies.
I am satisfied therefore it is fair in all the circumstances the obligation be on the complainant
to demonstrate the works covered by his SOW relate to damage caused by the burst pipe
and are reasonably necessary to repair the damaged portions of the insured property to the
same condition as when they were new.
The insurer disputed the complainant’s Scope of Works
The insurer refers to the Company M quote and notes it includes:
$33,460 for the main upper bathroom
$5,720 for the WC
$4,4445 for Bedroom 3
Determination | Case number: 937978 Page 4 of 12
$4,445 for Bedroom 4
$17,985 for the stairwell, landing and retreat
$11,440 for the formal dining area
$10,450 for the entry foyer
$4,620 for kitchen joinery and
$3,960 for the laundry / under stairs.
The insurer also notes this appears more extensive than the initial assessment conducted on
12 April 2022, which noted damage to:
landing
bathroom
toilet (WC)
bedroom 1
bedroom 2
lounge and
entrance.
To assist, the insurer had Company A review the Company M quote. Company A advised:
WATERPROOFING VICTORIA QUOTATION -$21529.20 – relates to
waterproofing and tiling of the bathroom which [Company A] would consider
maintenance and not claim related.
DESIGNER BATHWARE - $24,393.95 - relates to renovations of the bathroom
which [Company A] would consider maintenance and not claim related.
PAINTING QUOTE- $11,750.00 - paint walls, woodwork in upstairs bathroom,
hallway, bedroom, staircase, downstairs ceilings, walls, and woodwork in front
room, entrance & pillars – [Company A] has only allowed for the damages
section, we believe this quote allows for additional areas of painting which is not
claim related.
SKIRTING QUOTE- $ 12,376.00 – [Company A] has only allowed for the
damages section, we believe this quote allows for additional areas of skirting
replacement which is not claim related.
FLOORING- yellow tongue flooring – [Company A] have not quoted for this, could
you supply m2 and the rooms allowed for in the scope.
As noted by Company A, there appears to be additional items in the Company M quote which
are not part of the damage caused by the burst pipe.
The complainant accepts the Company M quote includes out of scope items
When asked about whether he asserted some of the items in the quotes he’d obtained were
damaged by the burst pipe, the complainant relevantly says:
No, they’re just added to the overall quote. The main are shower, bath, vanity,
mirror and respective tapware fit offs, tiles, flooring etc... They will be pulled off to
Determination | Case number: 937978 Page 5 of 12
change plaster. As I said to the insurer, they can’t be glued back or sticky taped
back. They’re porous from water and damaged goods now.
He did not clarify whether these items were being replaced or upgraded, merely saying
‘damaged items need to be replaced’.
The Company M SOW is not fair and reasonable
As it currently stands, there is insufficient detail in the Company M SOW for the insurer to
assess the proposal. This is on the basis the SOW does not include:
a line-by-line breakdown of the quantity and type of materials
a line-by-line breakdown of the trade costs
line-by-line details of the measurements and specific location of the work to be undertaken
and
clear identification of any works which are being included as enhancements or works
which the complainant is not claiming for.
I am satisfied these issues need to be rectified prior to a further consideration of the SOW.
2.2 Is the Company A SOW fair and reasonable?
No. The insurer has accepted it does not have sufficient information to fully settle this claim. It
is required to undertake further investigation and review the results prior to settling the claim.
The insurer has provided a Scope of Works
The insurer has engaged Company A to provide a SOW for the building works . It’s most
recent version was undated but included a line-by-line breakdown of work to be done by area,
labour and materials. This Company A SOW covered repairs including to:
bathroom (3 items)
stairwell landing and stairwell
toilet (7 items)
lounge room (7 items)
entry (2 items)
bedroom 3 (3 items)
bedroom 4 (2 items)
living area (2 items)
laundry (2 items)
kitchen / dining / lounge (2 items).
It is unclear when Company A reattended the property (or if it did) to come to the revised
SOW or whether this SOW was prepared on the basis of instructions from the insurer.
Regardless, I am satisfied, as it is labelled as a reattendance, it must have been prepared at
some point between the mould attendance on 16 May 2022 and the response to the
Company M SOW on 27 July 2022.
However, the rectification works have not been commenced, over a year later, due to the
present dispute. It is more likely than not additional damage has been caused as a result of
the delays.
The Company A SOWs are incomplete
It is also worth noting most of the works proposed under the Company A SOW were:
Determination | Case number: 937978 Page 6 of 12
remove and replace relevant skirting boards and repaint
prepare and repaint relevant walls and
remove and replace damaged sections of ceilings and cornices.
I note, in the context of Company A’s mould remediation SOW which covers removal of
significant amounts of the insured property’s ceilings, cornices, walls and insulation for
disposal prior to mould treatment, the quote does not include rectification of the items
disposed of.
I also do not see these replacements (plaster, insulation etc) in the Company A SOW for the
building works. Accordingly, I am not satisfied the two Company A SOWs cover the amount of
work required to rectify the damage which has been caused as a result of the burst pipe.
Acoustic treatments may be required
The complainant says, in part, the costs in the Company M SOW are increased due to the
existence of Airport Overlay laws which govern the building materials used due to the insured
premise’s proximity to M elbourne Airport. The complainant has provided a Melbourne Airport
Environs Overlay (MAEO) Fact Sheet which relevantly sets out:
it is a planning control introduced in 2007
the MAEO does not apply to homes which pre-existed its introduction.
The insurer sa ys the MAEO only applies to new buildings and implies the complainant’s
property pre-dated this compliance requirement. It also says there has been no evidence
presented which demonstrates:
the original items/areas damaged by the claimed event complied to said Airport overlay
laws, prior to the damages sustained
exactly which line items on the Company M SOW and quote are affected/governed by said
Airport overlay laws, and how (in relation to quality/pricing/costs) or
which items quoted by Company A in their detailed SOW would not comply with Airport
overlay laws.
The complainant has provided an extract of an acoustic specialist’s report dated 23
September 2002, purportedly for the insured premises which appears to set out requirements
for acoustic treatment of infill areas, roof/ceilings, external doors and external windows.
However, the report applies to a lot number, not a street address for the property. It is more
likely than not the acoustic report was prepared in preparation for the construction of the
insured premises around 2002-03. I am satisfied therefore it is more likely than not the
insured premises pre-existed the MAEO and therefore the MAEO does not apply.
While I am satisfied this is the case, it is not determinative of whether the repairs and
rebuilding can be undertaken to normal building standards and no additional measures need
to be taken.
In addition to the acoustic specialist’s report, the complainant has provided a single page
extract, purportedly from a Metricon Contract applicable to the insured premises, which
relevantly says:
Certificate of Compliance: Provide ‘Certificate of Compliance’ as per report
guidelines in relation to Australian Standard Acoustics – Aircraft Noise Intrusion.
This would suggest that, to restore the insured premises to the condition it was in prior to the
burst pipe, additional measures may need to be considered.
Determination | Case number: 937978 Page 7 of 12
Unfortunately, there is insufficient evidence to show this extract applies to the insured
premises. Despite this, I am satisfied there is sufficient prima facie evidence of a need for
specialist acoustic treatment to the insured premises.
For a proper consideration of the requirements, the complainant should provide the entire
acoustic specialist’s report to the insurer for consideration of any part icular requirements,
along with evidence the recommendations were actioned prior to the insured event.
The Company A SOWs are not fair and reasonable
As it currently stands, the Company A SOWs appear to:
be out of date
have omitted:
> rectifications works caused as a result of the mould remediation proposed
> the extent of the acoustic treatments which may be required and
> the proper assessment of the yellow tongue flooring.
I am satisfied these issues need to be rectified prior to a final decision on the claim.
2.3 Why is the outcome fair?
Neither side have presented sufficient evidence to demonstrate the claim can be resolved in
good faith on the available evidence. The outcome acknowledges this is a challenging claim
which requires further information from both parties before a fair outcome can be achieved.
The outcome is fair
The insurer has accepted liability to pay the claim, and so must honour that commitment to
the extent there is a need to rectify damage caused by the burst pipe.
However, the complainant must also properly identify for the insurer the extent of the damage
and specifically identify which items are said to be covered and which are upgrades or
modifications which are not being claimed for.
Determination
If this determination is accepted by the complainant, both parties are required to take specific
actions.
Within 14 days of the date the insurer is advised the complainant has accepted this
determination:
the complainant must provide the insurer:
> relevant measurements and details to allow the insurer to assess the claim for the
yellow tongue flooring
> a detailed breakdown of the Company M SOW including the detail requested by the
insurer, clearly identifying items being claimed for and
the insurer must:
> reassess the claim on the basis of the current state of the premises including:
‒ engaging an independent specialist to perform invasive testing to determine the
extent of mould and electrical issues caused by the burst pipe and cover all
associated costs and
‒ having Company A (or any other nominated contractor) include in the building SOW:
Determination | Case number: 937978 Page 8 of 12
‒ relevant rectification works as a result of the mould remediation, including the
waterproofing and tiling of the bathroom, which is reasonably necessary to repair
the damage as it exists currently and
‒ the yellow tongue flooring and
> take all reasonable steps to resolve the claim as expediently as possible.
In the event:
the complainant does not provide a detailed breakdown of the Company M SOW within a
reasonable timeframe, the insurer may proceed with reassessing the claim on the basis of
the modified Company A SOWs and
there is a further dispute about the claim or settlement amount following the above steps
being taken, the complainant can refer the matter back to AFCA for a supplementary
determination subject to the above information being provided.
Determination | Case number: 937978 Page 9 of 12
3 Supporting information
3.1 The AFCA process
AFCA’s approach is based on fairness
AFCA has determined this complaint based on what is fair in all the circumstances, having
regard to:
the legal principles
applicable industry codes or guidance
good industry practice
previous decisions of AFCA or its predecessor schemes (which are not binding).
The respective parties have completed a full exchange of the relevant information, and each
party has had the opportunity to address any issues raised. We have reviewed and
considered all of the information the parties have provided.
While the parties have raised a number of issues in their submissions, we have restricted this
determination to the issues that are relevant to the outcome.
We assess complaints on available information and circumstances
AFCA is not a court of law. We do not have the power to take or test evidence on oath, or to
require third parties to give evidence.
When we assess complaints, we consider:
available documents
the recollections of the parties
all relevant circumstances.
We give more weight to documents created at the time the events occurred. If there are no
relevant documents, we will decide what most likely occurred based on the available
information.
If there are conflicting recollections and these are evenly weighted, we may find that a claim
cannot be established.
3.2 Relevant policy wording
PDS, Page 17 - What is covered
The Listed Events
Your Buildings and/or Your Contents as set out on Your Policy Schedule are
covered if they are destroyed, lost or damaged as a result of a Listed Event. They
are covered only if You own them, or are liable for their destruction, loss or
damage.
[…] Your Buildings and Your Contents are covered while at the Situation. Cover
for Your Contents while away from the Situation is provided subject to the
conditions and limitations set out under ‘Cover for Your Contents away from the
Situation’.
Determination | Case number: 937978 Page 10 of 12
Unless expressly stated otherwise, cover only applies while You are living at the
Situation.
We will cover Your Buildings and/or Your Contents as set out on Your Policy
Schedule for destruction, loss or damage caused by the events occurring during
the period of insurance, listed below:
[…]
Liquid that escapes from:
- a fixed pipe or something attached to a pipe, fixed gutter, fixed tank or a
drain;
- […]
We will also cover the cost of finding where the liquid escaped from if there is
resultant damage, including the cost of repairing any damage that occurs while
looking for the cause. We will not however cover the cost of repairing the
defective item that caused the escape of liquid or liquid escaped from.
We do not cover loss caused by a gradual process of bursting, leaking, splashing,
dripping or overflowing over a period of time when You could have reasonably
been expected to be aware of this condition.
PDS, Page 19 - Additional things We will pay for when You have insured Your
Buildings
If You have insured Your Buildings under this Policy, the following will be paid in
addition to the Buildings sum insured listed on Your Policy Schedule. We will only
pay these costs when they relate to destruction, loss or damage to Your Buildings
from a Listed Event under ‘What is covered’ and covered by this Policy:
If You are unable to live in Your Building after the destruction, loss or
damage has occurred, We will pay for Your reasonable alternative
accommodation expenses for the period during which You are unable to
live in Your Building.
The most We will pay under this add itional cover is 10% of Your Building’s
sum insured, as listed on Your Policy Schedule. We will stop paying You
as of the date on which You no longer need to rent another property or are
able to live in Your Buildings.
We will pay the reasonable costs to locate the source of liquid escaping or
overflowing at the Situation and to repair and restore the damage to Your
Buildings caused by Our exploratory work if the escape of liquid first
happens during the period of insurance. We will not however cover the
Determination | Case number: 937978 Page 11 of 12
cost of repairing the defective item that caused the escape of liquid or that
liquid escaped from.
The most We will pay under this additional cover is $1,250.
PDS, Page 27 - How We pay a claim for Your Buildings
When destruction, loss or damage occurs to Your Buildings, if reasonably
practicable, We will do one of the following:
• We will rebuild Your Building to the same condition as when they were new;
• We will repair the damaged portions of Your Buildings to the same condition
as when they were new.
If this is not reasonably practicable We will pay You the reasonable cost of
rebuilding or repairing Your Buildings to the same condition as when they were
new.
Any delays in the repair or rebuild that were outside of Your control will be
disregarded in determining a reasonably practicable commencement date.
We will also pay any additional costs required for Your Buildings to comply with
government or local authority bylaws. We will not however pay these additional
costs if You were required to comply with these bylaws, and had not done so,
before the destruction, loss or damage occurred. The most that We will pay for
costs required for Your Buildings to comply with requirements of any authority in
any one period of insurance is $25,000.
Rebuilding or repairing Your Buildings must commence within 6 months of the
destruction, loss or damage occurring. If it does not commence within 6 months
(or any other period which We agree with You in writing) You may have to pay
any increase in cost caused by the delay.
We will pay for the damaged portion of fixed coverings to walls, floors and ceilings
only in the room, hall or passage where the damage occurred. We will not pay
any costs for replacing undamaged property. We will try to match any material
used to repair Your Buildings with the original materials. If We cannot, We will use
the nearest equivalent available to the original materials. However, if:
• it is impossible to acquire new material to replace the damaged material that
reasonably matches the undamaged portion to a similar extent as immediately
prior to the loss or damage occurring; and
• the amount of damaged material that cannot be matched to the undamaged
material is more than 40% of the total material that would have to be replaced
Determination | Case number: 937978 Page 12 of 12
if all the matching damaged and undamaged material was replaced, then We
will replace both the damaged and undamaged material.
In addition, see also ‘General terms and conditions’ on pages 33 -35.
Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.