Home / Allianz Australia / Determination 937642

Determination 937642

Defective storm damage repairs by insurer's contractor; adequacy of proposed cash settlement of $19,593 and non-financial loss

FirmAllianz Australia
Decided2023-06-16
ProductGeneral Insurance · Home building and contents
OutcomeFor the complainant
Amount awarded—
Non-financial loss$2,000
Amount claimed—
SourceAFCA PDF

Summary

After a 2019 storm claim, the insurer accepted its contractor's repairs were defective and offered a $19,593 cash settlement. AFCA found the insurer could cash settle but the estimates were unreliable, ordering a fresh quote with a 20% allowance and $2,000 non-financial loss.

The insurer may cash settle given the broken-down relationship, but its uninspected desktop estimates did not establish reasonable repair costs, so a new assessment plus 20% contingency is fair.

Issues

Subjects and remedies

home or building damagepay claimpay non financial lossreassess claim

Related

All Allianz Australia determinations · Find similar determinations

Text of the determination

Determination Case number 937642 Financial firm Allianz Australia Insurance Limited Determination | Case number: 937642 Page 2 of 9 Case number: 937642 31 May 2023 1 Determination overview 1.1 Complaint The complainant holds a home building and contents insurance policy with the financial firm (insurer). Following a storm event on 11 August 2019 the complainant lodged a claim for damage to his property. The insurer accepted the claim and appointed its trades to complete repairs which were carried out in 2019. The complainant raised concerns with the quality of the repairs before the work was finished. In 2023 the insurer accepted the work was defective and obtained quotes for the whole scope of works to be redone and has offered a cash settlement of $19,593. The complainant says the amount is inadequate and wants the insurer to undertake the repairs. Alternatively, the complainant says the insurer should increase its proposed cash settlement. 1.2 Issues and key findings Is the insurer entitled to cash settle the complainant? Yes. This case is best resolved by way of a cash settlement due to the relations between the parties and due also to the underlying seasonal foundation movement. Does the proposed cash settlement represent the reasonable costs of repairs? No, the proposed cash settlement amount does not represent the reasonable costs of repairs. Is the complainant entitled to non-financial loss compensation? Yes. The complainant is entitled to $2000 compensation for non-financial loss. Why is the outcome fair? The outcome is fair because the insurer’s existing estimates could not be relied on and accordingly a fresh assessment is required. 1.3 Determination This determination is substantially in favour of the complainant. Within 21 days of the Determination being accepted:  the complainant is to nominate two building companies, able to service his home.  the insurer to select one of these companies to prepare a quote to carry out rectification in respect of the whole of the 2019 scope of work by RR.  The contractor is to be provided a copy of the report of EE and is to give consideration to whether there has been degradation or other changes resulting from the defective work which require variation to achieve full rectification of the 2019 scope of work by RR.  the insurer is then to cash settle the complainant the amount of the assessment plus an allowance of 20%.  the insurer is to pay $2,000 in non-financial loss compensation. Determination | Case number: 937642 Page 3 of 9 2 Reasons for determination 2.1 Is the insurer entitled to cash settle the complainant? Yes. This case is best resolved by way of a cash settlement due to the fraught relations between the parties and due also to the underlying seasonal foundation movement. Insurer is entitled to cash settle the claim The insurer’s obligations are set out i n the Product Disclosure Statement (PDS) or policy. The promise made in the policy, in the event of a claim, is that the insurer will pay the reasonable costs to repair or rebuild the damaged part of the property (see 3.2 below). The policy further states the insurer has a discretion to appoint a builder to repair the home or pay an insured the cost of repairing. When exercising that discretion a n insurer’s decision must be fair, reasonable and consistent with good faith. In the present case where the insurer has already engaged a contractor to undertake repairs it is accepted by the insurer that it is responsible to rectify any defective repair work by its contractor. The defects are mainly internal, cracking in plaster and so on to a bathroom and open plan area. The insurer says it now wishes to cash settle rather than appoint new contractors to re-do the repair work. The insurer says it has elected to offer a cash settlement because the relationship between its trades and the complainant have broken down. The insurer accepts one of its tradespersons was rude and aggressive with the complainant. The insurer says its trades have expressed concern to return to the property due to conduct of the complainant. The complainant, who is an engineer, reports suffering considerable distress due to the now conceded poor workmanship. Nevertheless, the complainant is concerned a cash settlement could leave him financially exposed if the quotes are inadequate. The insurer also relies on the report (see 3.3 below) by the engineer (EE) that states there is ongoing seasonal foundation movement. The insurer says the rectification work is unable to be warranted unless this movement is addressed. The communications between the parties amply demonstrate that their relationship has broken down. Ongoing dealings between the parties are likely to be fraught. For these reasons I accept that this is an appropriate case that is best resolved by way of a cash settlement. 2.2 Does the proposed cash settlement represent the reasonable costs of repairs? No, the insurer has not established that its proposed cash settlement amount represents the reasonable costs of repairs and a new assessment is required. The insurer has agreed to pay for rectification of original scope of works Builder RR was engaged by the insurer in 2019 to complete the repairs to the complainant’s property. RR completed repairs based on a scope of works it prepared. The scope of works outlined the following areas to be repaired:  Bathroom  open plan area (kitchen, lounge and dining room). Determination | Case number: 937642 Page 4 of 9 As early as October 2019 the complainant was raising issues with the quality of RR ’s work. The Complainant became frustrated with the lack of response from the insurer. In February 2020 the complainant experienced further damage from another storm event. The outcome of that claim is the subject of AFCA case number 890960. In particular the complainant says the poor workmanship by the insurer’s trades in 2019 was a contributor to the damage (mainly external) sustained in the 2020 claim. This issue is dealt with in the Determination in 890960. January 2023 e ngineer’s report shows repair work was defective After numerous communications by the complainant the insurer agreed to obtain a report from an engineer as to the defects raised. It was not until receipt of E E’s report on 23 January 2023 that the insurer accepted its liability for the poor workmanship. The defective work had resulted in cracks in throughout plastering and trims, cornices, architraves, cracking in grout, paint discolouration and the presence of mould. Insurer obtained new estimates of repair costs In February 2023 the insurer obtained an updated desktop scope of works and estimate in the sum of $15,876 from a builder MS. Essentially this was to completely redo the work by RR. The updated scope of works was to take into account the increased costs in materials and labour since 2019. The insurer obtained a second and slightly higher estimate from AB in the sum of $17,812. These documents do not purport to be quotations. MS is in North Queensland and AB is in western Sydney. The subject property is in Victoria. Neither builder attended to inspect the property. The insurer has allowed a 10% uplift for contingencies on the higher quote ($17,812) making a proposed total cash settlement of $19,593.28. The complainant has raised a number of concerns as to the proposed amount. Complainant seeks cover for matters not in Scope of Work In addition to the matters itemised in the RR and MS scope of works, the complainant says the following items are also damaged or were missed out from the original scope of works:  roof (gaps in tiles)  master bedroom  second bedroom laundry and toilet  storm water pipe.  Cracked tiles and deformation of timber floor coverings in the open plan area Further the complainant has:  produced photographic evidence of large areas of building rubbish and materials left by the insurer’s contractors.  Raised the presence of mould caused by the failure of the repairs. It is difficult to find a basis for the complainant at this stage to add new matters that were not contained in the original 2019 scope of works. The insurer submits the complainant at that time did not advise any such items prior to the scope being resolved and the work being undertaken. There is no satisfactory evidence before me of damage from the 2019 storm that was not included in the scope of works or which was otherwise repaired. The bedroom, laundry and toilet are quite separate areas and any work required is different in nature to the task of rectifying RR ’s work. Further there is no evidence before me that the new items were specifically caused by the defective works (other than the mould). Determination | Case number: 937642 Page 5 of 9 The complainant has said that he was pressured by the original assessor/builder RR not to include items because they would exceed his approval authority. Notwithstanding whatever conversations occurred at that time, the scope of works was in effect approved and the work proceeded. I am unable to add those items to the scope of rectification. There is evidence of the complainant engaging a contractor to fix a blockage to the stormwater pipe. The complainant says the blockage was caused by building debris left by the insurer’s trade s and accordingly this cost should be reimbursed. However, the plumber who inspected the damage refers to the gutters and pipes being blocked by plant material. I am not satisfied the insurer is responsible for this item. EE refers to the presence of mould due to the defective work. This problem is not contained in the estimates and needs to be provided for. Similarly, I am not satisfied the estimates have taken account of the need to first deal with the actual clean-up required as a result of the previous defective work. Complainant concerned the estimates relied on by the insurer are inadequate The complainant is concerned that the MS scope of works and the two estimates are only desktop assessments prepared without a personal inspection to properly assess the full extent of faulty workmanship and damage. The complainant submits they are a significant underestimate of the actual repair costs. He says that the insurer has without explanation obtained one quote from a builder in North Queensland and one from a builder in western Sydney, neither of which had any prospect of being awarded the work. The complainant submits that the 10% uplift allowed by the insurer is also too low. On balance I am unable to be satisfied that the cash settlement amount offered by the insurer represents the reasonable costs of repairs. In particular, I am not satisfied the estimates can be relied upon. They were prepared without any inspections and are not formal quotations that can be accepted. Further, due to the passage of time since the original damage in 2019 there is substantial potential that the repair work as envisaged in 2019 may now be more onerous. I also regard the 10% uplift as inadequate considering the potential for building issues to arise and the complainant will not have the benefit of the insurer’s guarantee as to the quality of the work. I regard 20% as a reasonable uplift. A new assessment of rectification work is required Having reached the above conclusions, it is necessary for a new assessment of the rectification work to be obtained. I propose to direct the complainant nominate two building companies, able to service his property, for the insurer to select one of these, which company is to then prepare a quote to carry out rectification in respect of the whole of the 2019 scope of work by RR. The contractor is to be provided a copy of the report of EE and is to give consideration to whether there has been degradation or other changes resulting from the defective work which may require variation to achieve full rectification of the 2019 scope of work by RR. This would include matters such as mould removal and clean-up costs. The insurer is then to cash settle the complainant the amount of the assessment plus an allowance of 20% for contingencies. Determination | Case number: 937642 Page 6 of 9 2.3 Is the insurer liable to pay non-financial loss compensation? Yes. The complainant has endured a long claim process which has caused him and his wife undue stress and interruption in their lives while their home remained in a damaged state. Complainant has suffered from delay in repair of his home AFCA may award compensation (capped at $5,400) for non-financial loss where a complainant has suffered an unusual degree or extent of physical inconvenience, time taken to resolve the situation or interference with their expectation of enjoyment or peace of mind. AFCA adopts a conservative approach to award compensation for non-financial loss. Complainants are expected to be moderately robust and bear the usual stress and inconvenience associated with an insurance claim. The complainant says the claim has caused an unusual degree of stress to him and his wife. At one stage, his home and contents were inadvertently covered in fibreglass dust. The complainant and his wife had to move in with friends. The insurer agrees one of its tradesmen was rude and aggressive. The complainant has been living for over three years in a deteriorated home. I consider it fair for the insurer to pay $2,000 for non-financial loss. 2.4 Why is the outcome fair? The outcome is fair because the insurer’s existing estimates co uld not be relied on and accordingly a fresh assessment is required. Determination | Case number: 937642 Page 7 of 9 3 Supporting information 3.1 The AFCA process AFCA’s approach is based on fairness AFCA has determined this complaint based on what is fair in all the circumstances, having regard to:  the legal principles  applicable industry codes or guidance  good industry practice  previous decisions of AFCA or its predecessor schemes (which are not binding). The respective parties have completed a full exchange of the relevant information, and each party has had the opportunity to address any issues raised. We have reviewed and considered all of the information the parties have provided. While the parties have raised a number of issues in their submissions, we have restricted this determination to the issues that are relevant to the outcome. We assess complaints on available information and circumstances AFCA is not a court of law. We do not have the power to take or test evidence on oath, or to require third parties to give evidence. When we assess complaints, we consider:  available documents  the recollections of the parties  all relevant circumstances. We give more weight to documents created at the time the events occurred. If there are no relevant documents, we will decide what most likely occurred based on the available information. If there are conflicting recollections and these are evenly weighted, we may find that a claim cannot be established. Determination | Case number: 937642 Page 8 of 9 Policy terms and conditions How we settle your claims Page 59 3.2 Evidence CE Engineers Report 23 January 2023 Determination | Case number: 937642 Page 9 of 9

Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.