Home / Suncorp Group / Determination 936905

Determination 936905

Denial of earthquake damage claim on the basis the complainant did not establish the damage was caused by the earthquake

FirmSuncorp Group
Decided2023-04-13
ProductGeneral Insurance · Home building and contents
OutcomeFor the firm
Amount awarded—
Non-financial loss—
Amount claimed—
SourceAFCA PDF

Summary

The complainant claimed for cracking damage to his home said to be caused by a September 2021 earthquake; the insurer denied it as pre-existing ground movement damage. AFCA found the complainant had not established a valid claim and decided in favour of the insurer.

The insured bears the onus of showing on the balance of probabilities that the earthquake caused the damage, and the competing engineer report and Geoscience Australia email did not meet that onus.

Issues

Subjects and remedies

home or building damagenatural disasterno remedy

Related

All Suncorp Group determinations · Find similar determinations

Text of the determination

Determination Case number 936905 Financial firm AAI Limited (the insurer) Determination | Case number: 936905 Page 2 of 7 Case number: 936905 13 April 2023 1 Determination overview 1.1 Complaint The complainant holds a home insurance policy issued by the insurer. The complainant says his home was damaged in an earthquake which affected Victoria on 22 September 2021 and he lodged a claim for damage on 23 November 2021. The insurer engaged an engineer to inspect the property. The engineer concluded the damage to the property was caused by ground movement over a long period of time and not by the earthquake. The insurer denied the claim on the basis the complainant had failed to establish a valid claim. The complainant subsequent ly provided a contrasting engineer’s report and seeks the claim to be accepted. 1.2 Issues and key findings Has the complainant established a valid claim? No. I am not satisfied the complainant has shown it is more likely than not the damage was caused by the 22 September 2021 earthquake. Why is the outcome fair? The complainant has the responsibility to establish a valid claim on the balance of probabilities and has not done so. Accordingly, the insurer is not required to accept the claim. 1.3 Determination This determination is in favour of the insurer. Determination | Case number: 936905 Page 3 of 7 2 Reasons for determination 2.1 Has the complainant established a valid claim? No. I am not satisfied the complainant has shown it is more likely than not the damage was caused by the 22 September 2021 earthquake. The complainant must show there has been a claimable loss The policy provides cover for listed insured events. This means the policy responds where one or more of the listed events causes damage to the property, including earthquake. When making a claim, an insured party has the onus of establishing they suffered a loss for which it is more likely than not their insurance policy provides cover. The policy provides qualified cover for earthquake The complainant says an earthquake event in September 2021 caused damage to their building. The complainant lodged a claim two months later on 23 November 2021. The insurer does not dispute the earthquake event occurred. The Product Disclosure Statement (PDS) relevantly says cover is available for ‘Loss or damage c aused by an earthquake or tsunami’. However, it also relevantly says the policy will not cover:  […]  loss or damage that occurs more than 72 hours after an earthquake or tsunami;  loss or damage caused by erosion, vibration, subsidence, landslip, landslide, mudslide, collapse, shrinkage or any other earth movement, but we will cover loss or damage caused by a landslide or subsidence proved to have occurred within 72 hours of, and directly because of, an earthquake or tsunami and not because of erosion, structural fault or design fault. The insurer says the building was not damaged by an earthquake event, but by earth movement over a period of time. It was on this basis the claim was denied. The complainant must therefore show the damage was directly caused by the earthquake to have a valid claim. The insurer says the damage was pre-existing This view was initially based on the following inspections and reports:  builder’s report, dated 30 December 2021, following inspection on 3 December 2021  engineer’s report, dated 3 May 2022, following inspection on 8 February 2022. Following these reports and the claim denial, the complainant engaged Company MS, another engineering firm, to inspect the property. This occurred on 23 August 2022 and a report was produced on 28 September 2022. Determination | Case number: 936905 Page 4 of 7 In response to the Company MS report, the insurer reviewed the available material again and the produced a building coordinator report, dated 11 January 2023, following desktop review. In summary, relevantly:  the builder’s report found: > pre-existing damage throughout the property, both internal and external, which appears to have been occurring for more than 3 months as at 3 December 2021 (i.e. predate 3 September 2021) > the damage was consistent with general footing movement > it was not clear the damage had been caused by earthquake movement  the engineer’s report found: > several instances of cracking appeared aged and worn, with built up grime and organic matter > the widespread internal and external cracking cannot be attributed to the earthquake event, although pre-existing cracking may have exacerbated by the earthquake  the building coordinator found: > the complainant’s challenges to the engineer’s photographic evidence were unsupported and unsubstantiated > the claim specifically only looked at the cracking and earthquake damage as there was (or was to be) a separate claim for water damage and mould in the timber framing > the property was poorly maintained, with long term damage to numerous areas. The complainant says the damage was caused by the earthquake In support of the position the earthquake was the cause of the damage, the complainant relies both on the Company MS report and an email he received from Geoscience Australia. The Geoscience Australia email relevantly says:  the author was not a structural engineer and cannot provide information about the nature of any damage  it is difficult for Geoscience Australia to accurately estimate the ground-shaking intensity at any given location and this can vary greatly over short distances  th e region where the complainant’s property is could be built on soft alluvial sediments which could amplify intensity of ground shaking  stronger shaking was observed north-south of the earthquake epicentre, not east-west where the complainant’s property lie s and  it is possible the intensities in the region of the complainant’s property could have reached a Modified Mercalli Intensity (MMI) level of 5. A MMI 5 level is ‘Moderate’ and is described as Felt by nearly everyone; many awakened. Some dishes, windows broken. Unstable objects overturned. Pendulum clocks may stop. If the cracking was caused by the earthquake and the property was well-built as the complainant says, it is not until MMI 7 that similar damage should occur: Determination | Case number: 936905 Page 5 of 7 Damage negligible in buildings of good design and construction; slight to moderate in well-built ordinary structures; considerable damage in poorly built or badly designed structures; some chimneys broken. I am satisfied the general information from Geoscience Australia, even taken at its most advantageous to the complainant, does not assist his position in establishing the damage was caused by the earthquake and was not pre-existing. The Company MS report is unconvincing Moving to the Company MS report, the report relevantly says:  there were multiple and varied internal and external cracks throughout the property, assessed at ‘slight’ to ‘moderate’ damage categories  bowing, leaning and differential floor levels were all broadly found to be within design tolerances, with limited exceptions  there were pronounced floor level difference in the upstairs master bedroom where the main support beam was found to be higher than the timber framing  there was at least a 4mm differential floor level attributable to ground movement, although this was within design tolerances. The location of this was not recorded however  soil saturation on the west side of the house was likely  expansive soil movement was not a cause of the cracking, given floor and wall levels were within structural tolerances and  the pattern of cracking and lack of floor level difference led to a conclusion the damage was caused by lateral movement as a result of the earthquake which had caused cracking and expanded the width of existing cracks. However, the inspection was conducted almost a year after than the earthquake and the report:  contains no analysis about the age of the cracking  makes no comment about the condition of the building prior to the earthquake  suggests, without evidence, lateral movement tends to create damage of the type present in the complainant’s property  presumes, without evidence, there was soil saturation present at the time of the earthquake  conflates the damage recorded in other areas of Victoria (including along the north-south axis cited by Geoscience Australia as being more intense) with the extent of damage at the complainant’s property without considering the variations in intensity in different areas. Overall, I am not satisfied the Company MS report provides anything other than suppositions about what may possibly have caused the damage. It does not provide any compelling evidence or analysis to demonstrate the cracking was not pre-existing and the damage was more likely than not caused by the earthquake. Having read the material on file, for the sake of completeness, I am satisfied the complainant’s challenges to the validity of the engineer’s report are not sustainable. The complainant’s issues with the choice of language by the engineer, and the selection of photographs, are insufficient to render the analysis invalid or fraudulent, as claimed. Further disputes based on what was allegedly said to the complainant, but are unrecorded, are similarly insufficient to set aside the written analysis and conclusions set out in the report. Determination | Case number: 936905 Page 6 of 7 The complainant has not established a valid claim As noted above, the complainant has the responsibility for showing the earthquake was more likely than not the cause of the damage to his property. While I sympathise with his position, I am not satisfied he has done so. The evidence he relies on does not demonstrate the cracking was absent prior to 22 September 2021, or that the intensity of the earthquake in his area was sufficient to cause the damage now seen. 2.2 Why is the outcome fair? The complainant has the responsibility to establish a valid claim on the balance of probabilities and has not done so. Accordingly, the insurer is not required to accept the claim. Determination | Case number: 936905 Page 7 of 7 3 Supporting information 3.1 The AFCA process AFCA’s approach is based on fairness AFCA has determined this complaint based on what is fair in all the circumstances, having regard to:  the legal principles  applicable industry codes or guidance  good industry practice  previous decisions of AFCA or its predecessor schemes (which are not binding). The respective parties have completed a full exchange of the relevant information, and each party has had the opportunity to address any issues raised. I have reviewed and considered all of the information the parties have provided. While the parties have raised a number of issues in their submissions, I have restricted this determination to the issues that are relevant to the outcome. We assess complaints on available information and circumstances AFCA is not a court of law. We do not have the power to take or test evidence on oath, or to require third parties to give evidence. When we assess complaints, we consider:  available documents  the recollections of the parties  all relevant circumstances. We give more weight to documents created at the time the events occurred. If there are no relevant documents, we will decide what most likely occurred based on the available information. If there are conflicting recollections and these are evenly weighted, we may find that a claim cannot be established.