Home / IAG / Determination 936058

Determination 936058

Partial denial of storm claim for floorboard damage on basis of atmospheric conditions exclusion, and delay in assessment

FirmIAG
Decided2023-07-26
ProductGeneral Insurance · Home building and contents
OutcomeFor the complainant
Amount awarded—
Non-financial loss$1,500
Amount claimed—
SourceAFCA PDF

Summary

The insurer accepted some storm damage but denied the floorboard damage as caused by atmospheric conditions. AFCA found the storm was the proximate cause, ordered the insurer to cash settle the repair costs with interest, and awarded $1,500 non-financial loss for delay.

The insurer failed to prove the atmospheric conditions exclusion applied, the storm was the proximate cause, and its delayed and inadequate assessment warranted non-financial loss compensation.

Issues

Subjects and remedies

home or building damagenatural disasterpay claimpay interestpay non financial loss

Related

All IAG determinations · Find similar determinations

Text of the determination

Determination Case number 936058 Financial firm Insurance Australia Limited Determination | Case number: 936058 Page 1 of 6 Case number: 936058 24 May 2023 1 Determination overview 1.1 Complaint The complainants hold a building and contents insurance policy (the policy) with the financial firm (insurer) for their property. On 10 April 2022, they lodged a claim for storm damage. The insurer accepted the damage to the bedroom and hallway. However, it denied the damage to the floorboards as it believes it was caused by atmospheric conditions rather than a storm, which is excluded under the policy. The complainants disagree with the insurer’s decision to partially deny the claim and want the insurer to accept the damage to the floorboards. They have completed repairs. 1.2 Issues and key findings Is the insurer liable for damage to the floorboards? Yes. The available information indicates the floorboards were damaged during the storm. The insurer has not adequately established the policy exclusion for atmospheric conditions applies. Are the complainants entitled to compensation? Yes. I consider the insurer has failed in its duty to adequately assess the damage in a timely manner and must compensate the complainants. Why is the outcome fair? The outcome is fair because the insurer did not conduct an adequate assessment in the first instance. The insurer relied on the complainants providing their own damage report and it then appointed another expert to assess the damage a second time. The expert did not investigate the floorboards around the bi-fold doors which was the primary location of water ingress. 1.3 Determination This determination is in favour of the complainants. The insurer must indemnify the complainants for the costs incurred to repair the damage. The insurer is to pay interest on any invoiced amount, pursuant to section 57 of the Insurance Contracts Act 1984 (the Act). Interest is payable from the date complainants made payment, until the date of settlement. The complainants are awarded $1,500 in non-financial loss compensation. Determination | Case number: 936058 Page 2 of 6 2 Reasons for determination 2.1 Is the insurer liable for damage to the floorboards? Yes. The available information indicates the floorboards were damaged due to the storm. Therefore, the complainants have a valid claim for damage to the floorboards. The insurer has not adequately established the policy exclusion for atmospheric conditions applies. Policy provides cover for insured events subject to exclusions It is accepted insurance law that the complainants have the initial onus to prove on the balance of probabilities (that is more likely than not) that the loss or damage claimed falls within the terms of the policy. Once established, the onus then shifts to the insurer should it seek to refuse payment of the claim, to prove on the balance of probabilities that an exclusion applies to defeat the claim. The policy provides cover for a series of listed events including storm. Storm is defined to mean rain, thunderstorm, hail, snow, violent wind, cyclone and tornado. Under the insured event storm, the policy also outlines what is not covered which includes damage caused by:  erosion, deterioration, collapse, shrinkage or any other earth movement  water which enters the home through any tarpaulins or fixings set up while the home is being renovated or altered. The policy limits the extent of repairs and matching for floorboards in that the insurer will only repair or replace the damaged sections of the floorboards. The policy does not provide for extra costs of repairing undamaged areas to achieve a matching appearance. The policy also includes several general exclusions, one of which relates to loss, damage or liability caused directly or indirectly by, or in connection with, atmospheric conditions or extreme temperature. The onus is therefore on the complainants to establish that the proximate cause, that is, the dominant or effective cause of the damage, was the storm. Circumstances of the claim The complainants say that on or around 6 March 2022, there was heavy rain and wind which led to rain water seeping through the skylight in the ceiling of the hallway and a bedroom and partially inundated the sub floor area of the building. The complainants pumped out the water in the subfloor themselves, however, they were unable to keep up with the volume of rain being swept in. The insurer accepted the damage to the other areas of the building but denied the damage to the floorboards and said that the damage stemmed from atmospheric conditions rather than the storm. The complainants believe the rainfall during this time was responsible for the floorboards buckling. They provide photographs to show the floorboards had no damage or deterioration prior to the storm. Complainants’ evidence shows water damage to floorboards The complainants appointed their own expert, IC, who assessed the damaged floorboards and reported: Determination | Case number: 936058 Page 3 of 6  water has entered the property at the base of the bi-fold doors on the right-hand side  this is supported by the water staining on the underside of the floorboards fanning out from the bottom corner  high probability that rainfall of the like experienced in the area in early 2022 has resulted in rainwater entering from that spot and settling on the underside of the floorboards causing the tenting  rainfall (of the magnitude experience by the complainants) would have resulted in copious amounts of water entering the recessed floor guide track. IC believes the floorboards have been damaged by rainwater being driven by the winds under the floorboards, which has caused tenting and buckling in the dining area. Insurer assessed the cause of damage The insurer appointed BBS to inspect the damage to the building. BBS attended the property on 25 May 2022. In its report of 1 June 2022, it noted:  buckled flooring in the dining area  water damage to the ceiling in the hallway  water damage to the wall in a bedroom. BBS reasoned the water entered the property due to overflowing gutters and a skylight which was not water tight. It considered this damage to be caused by a single storm event. BBS also reported the buckling to the flooring was caused by high moisture content in the air and considered this to be excluded from the insurer’s liability as it was not storm related. The insurer also appointed a flooring specialist, CFT, to ascertain whether the floorboards were damaged due to storm or atmospheric conditions. CFT inspected the floorboards on 30 September 2022 and found:  obvious and widespread cupping to the boards  high moisture levels to the sub-floor space  poor ventilation in the subfloor area  inadequate fixing of the boards to the subframe CFT concluded the cause of the floorboard tenting was a combination of factors – insufficient ventilation allowing atmospheric conditions, faulty design of the sub-floor area and high relative humidity at the time of loss. Insurer is liable for the damaged floorboards Having reviewed the information provided by the parties, I am more persuaded by the complainants’ information. There is clear indication a storm event has occurred. The insurer has not disputed this as it has also accepted the remainder of the damage to the property. The report from IC also shows water ingress under the floorboards which is adjacent to the area of damage being claimed. I am satisfied that if the storm had not occurred, the sub-floor area would not have flooded, nor would there have been water ingress under the floorboards which would have led to increased levels of moisture under the floor. The insurer denied the claim relying on the policy exclusions relating to atmospheric conditions and not due to fault in design of the sub-floor area. Determination | Case number: 936058 Page 4 of 6 In my view the insurer has not been able to provide any conclusive expert opinion to confirm that the atmospheric conditions on the day of the event have caused the floor boards to buckle and tent. The policy does not define the term atmospheric conditions. Neither IC, BBS or CFT have explained this term, however, CFT has indicated it considers this to be the relative humidity in the atmosphere. The insurer has not explained how atmospheric conditions have caused the damage to the floorboards had the storm not occurred. Therefore, I consider the storm to be the proximate cause of damage. The insurer is required to cash settle the complainant for the repairs to the damaged area only. The insurer is to pay interest on any invoiced amount, pursuant to section 57 of the Act. Interest is payable from the date the complainants made payment, until the date of settlement. 2.2 Are the complainants entitled to compensation? Yes. The insurer delayed the assessment by its expert when it could have appointed one earlier. It has led to further deterioration of the floorboards. AFCA can award compensation in certain circumstances AFCA’s Rules enable it to award compensation of up to $5,400 to a complainant for nonfinancial loss where because of the claim ’ s handling there has been:  an unusual amount of physical inconvenience;  time taken to resolve a situation; or  in terference with the complainants’ expectation of enjoyment or peace of mind. AFCA takes a conservative approach to compensation for non-financial loss and expects the complainants to be moderately robust and bear the usual degree of inconvenience when managing an insurance claim. Insurer delayed the assessment of the claim The complainants lodged the claim on 10 April 2022. The insurer conducted its initial assessment of the damage on 25 May 2022. The report from BBS did not elaborate on how it determined the cause of damage to be from atmospheric conditions, nor did it indicate whether there was any further assessment required as to the cause of damage to the floorboards, at that stage. This was despite the complainants indicating there was water entering at the bi-fold door. The complainants provided their own expert report and quotes for repairs. The insurer then appointed CFT to provide an expert opinion regarding the damage to the floorboards. CFT attended the property on 30 September 2022, six months after the claim was lodged. By this time, the damage worsened. I consider the insurer did not act promptly to identify and address the cause of damage to the floorboards. The complainants eventually repaired the damage at their own expense as they were not safe. The complainants advised that the delay was placing pressure on changed life plans that they had put in place. Determination | Case number: 936058 Page 5 of 6 I agree that this would have caused the complainants an unusual amount stress and inconvenience. The insurer must pay the complainants $1,500 in non-financial loss compensation. 2.3 Why is the outcome fair? The outcome is fair in the circumstances because I am satisfied the proximate cause of the damage to the floorboards was the storm. The insurer did not conduct an adequate assessment in the first instance. It relied on the complainants providing their own damage report and then appointed another expert to assess the damage a second time, six months after the complainants lodged their claim. I consider the insurer has failed in its duty to adequately assess the damage in a timely manner and must accept the claim and compensate the complainants. It is fair the insurer covers the costs of repairing the damage and compensate the complainants for the stress and inconvenience caused.. Determination | Case number: 936058 Page 6 of 6 3 Supporting information 3.1 The AFCA process AFCA’s approach is based on fairness AFCA has determined this complaint based on what is fair in all the circumstances, having regard to:  the legal principles  applicable industry codes or guidance  good industry practice  previous decisions of AFCA or its predecessor schemes (which are not binding). The respective parties have completed a full exchange of the relevant information, and each party has had the opportunity to address any issues raised. We have reviewed and considered all the information the parties have provided. While the parties have raised several issues in their submissions, we have restricted this determination to the issues that are relevant to the outcome. We assess complaints on available information and circumstances AFCA is not a court of law. We do not have the power to take or test evidence on oath, or to require third parties to give evidence. When we assess complaints, we consider:  available documents  the recollections of the parties  all relevant circumstances. We give more weight to documents created at the time the events occurred. If there are no relevant documents, we will decide what most likely occurred based on the available information. If there are conflicting recollections and these are evenly weighted, we may find that a claim cannot be established.

Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.