Determination 936054
Insurer declined cost of re-painting hail-damaged concrete tile roof
Summary
The complainant's hail claim was accepted except for repainting the concrete tile roof, which the insurer said was wear and tear or betterment. AFCA found the hail damaged the painted roof and ordered a cash settlement of $19,223.27.
Undefined 'damage' includes harm that impairs value, and the policy requires repair to the pre-storm condition, which here meant repainting the roof.
Issues
- Claim denial primary · upheld“Insurer refused to pay cost of re-painting the roof; AFCA found the insurer was not entitled to deny the claim.”
- Claim amount dispute secondary · upheld“Insurer to cash settle $17,475.70 plus 10% uplift for contingencies and loss of guarantee, total $19,223.27.”
- Product terms interpretation secondary · upheld“Policy does not define 'damage'; hail impact impaired the value of the property, so repainting was covered.”
Subjects and remedies
home or building damagenatural disasterpay claim
Related
All Defence Service Homes Insurance Scheme determinations · Find similar determinations
Text of the determination
Determination
Case number 936054
Financial firm Defence Service Homes Insurance Scheme
Determination | Case number: 936054 Page 1 of 6
Case number: 936054 29 June 2023
1 Determination overview
1.1 Complaint
The complainant held a Building Policy with the financial firm (insurer). Following a hail and
storm event in October 2021, the complainant lodged a damage claim with the insurer. The
insurer investigated the claim and accepted the resultant damage for what it says was the hail
damage, including the repair of 30 concrete roof tiles. The complainant says that the insurer
should clean, re-seal and re-paint the entire tiled area due to the pitting from the hail.
This matter was the subject of a preliminary view which was in favour of the complainant.
The complainant and his spouse are listed on the policy and reference to complainant is a
reference to both parties.
The insurer rejects the preliminary view and the matter has been referred for determination.
1.2 Issues and key findings
Was the insurer entitled to deny the claim for re-painting the roof
On the information provided to me, on balance, I am satisfied as follows:
the complainant has established that he has a valid claim
the roof had been treated by a formal painting
the hail had interacted with a substantial part of the roof
the ‘hail splash’ did not have a detrimental effect on the performance or life expectancy of
the roof
the quality and appearance of the roof was detrimentally affected by the hail
the roof suffered damage because the hail impact impaired the roof and I consider it
damage
the policy covers loss or damage caused by storm including hail
the roof was in good condition prior to the storm
the policy covers ‘matching materials’ used in repairing or rebuilding…. but d oes not
promise to repair or re-build the home to exactly as it was before the loss or damage
occurred
the policy does not define ‘damage’
the insurer has carried out repairs to the house
I am satisfied that the hail impact has impaired the value of the property and that this can
only be repaired by the re-painting of the roof.
Why is the outcome fair?
The complainant and the insurer have been given the opportunity to address all issues raised.
The complainant has established that there was an impairment to the roof, being the damage
to the painting as a result of the hailstorm. In the circumstances, it is fair that the complainant
be entitled to re-paint the roof.
Determination | Case number: 936054 Page 2 of 6
1.3 Determination
This determination is substantially in favour of the complainant.
Upon acceptance of this determination, the insurer is to cash settle this claim by paying the
sum of $17,475.70 together with a 10% uplift to cover contingencies and loss of guarantee. A
total sum of $19,223.27. This amount must be paid within 14 days of acceptance of
determination.
The complainant is to confirm whether the solar system needs to be removed and refitted and
if so, the insurer is to further settle the claim as set out in clause 2 hereof
Determination | Case number: 936054 Page 3 of 6
2 Reasons for determination
The complainant held a Building Policy with the insurer. Following a storm, the complainant
lodged a claim for hail damage to his roof. The insurer dealt with the majority of the damage,
however refused to pay the cost of re-painting the roof on the basis that the roof tile condition
was due to age, wear and tear, and gradual deterioration requiring the complainant to
address this as a maintenance issue. Also, on the basis that the act of re-sealing and re-
painting the concrete roof tiles is considered an upgrade or ‘betterment’ which is outside th e
scope of the policy terms.
2.1 Was the insurer entitled to deny the claim for re-painting
the roof?
Reports
The insurer arranged for an assessment of the roof to be carried out by PG who provided a
report dated 4 April 2023. PG did not attend the premises but carried out a desktop
assessment using the information provided by the insurer together with photographs.
PG found as follows:
Hail ‘splash’ had removed the surface oxides and airborne pollution
This does not have detrimental effect on the performance or life expectancy of the
roof.
‘Splash’ marks will fade and weather in the short term as further airborne
pollutants and oxides build up concealing their appearance
There is no need to repaint the surface tiles
‘Markings’ have not had a detrimental effect o n the performance or life
expectancy of the concrete tile cladding, as such it is not considered damage.
The complainant obtained a report from a roofing tradesperson CM. CM provided a report
which was undated which stated as follows:
Upon inspection, it was noted that there is a large number of pitted tiles. This is
consistent with being directly hit with by hail. The surface of the tiles has now
been compromised.
Product Disclosure Statement (PDS)
The insurer referred to the PDS as follows:
Determination | Case number: 936054 Page 4 of 6
The insurer also stated that the policy also excludes:
any loss or damage caused by or related to ‘atmospheric or climatic conditions,
(other than those we say we will insure in the events section), condensation,
evaporation
…
…
…
Insurer was not entitled to deny the claim
The insurer says 30 hail damage roof tiles have been replaced as part of the repairs carried
out as a result of the hailstorm. The insurer says the rest of the roof has not been damaged
by a defined event including the storm event in October 2021.
They say the overall condition of the concrete roof tiles is due to age, wear and tear and
gradual deterioration by the complainant to address as maintenance.
Further the active resealing and repainting of the concrete roof is considered an upgrade or
‘a betterment’ which is outside the scope of the policy terms.
The complainant says that when they purchased the property, the roof was rich in
presentation and colour. The roof had been painted when they purchased the property and
they say that that is part of the reason they purchased the property, due to its appearance.
The complainant says that the roof was in good repair prior to the storm and that now the
paint on the roof has been impacted and damaged by the hail.
I accept that the policy does not allow the complainant to have the premises restored to
‘better than new’.
There is no definition for damage in the PDS however, the Macquarie definition defines
‘damage’ as ‘injury or harm that impairs value or usefulness’.
Determination | Case number: 936054 Page 5 of 6
I am satisfied that the damage to the painted roof impaired the value of the property. I am
also satisfied that the condition of the roof did not exhibit a lack of maintenance by the
complainant. The PDS states that the insurer will pay the reasonable costs of repairing or
rebuilding t he home on a ‘new for all’ basis to a condition substantially the same as but not
better than when new.
I am satisfied that the policy requires the insurer to repair the damage, to as it was before the
storm. As an aside, I consider the painted roof as no different to a wall where the painting had
been damaged by the hail. In such circumstances, I am satisfied that the policy would require
the repainting of the damaged area.
The complainant has a quotation for repairs for $17,475.70. This is an appropriate matter to
cash settle and the insurer is to pay this sum together with a 10% uplift to cover contingencies
and loss of guarantee being a total sum of $19,223.27.
The complainant is to further request a statement from CM, the repairer, whether the solar
panels require removing and refitting for their work to be carried out. If they do, and it is not
part of this quote, the complainant is to obtain a quotation for the removal and refitting of the
solar panels. The complainant is to submit this quotation to the insurer and the insurer is to
pay the sum within 14 days of its receipt, provided this determination has been accepted.
Determination | Case number: 936054 Page 6 of 6
3 Supporting information
3.1 The AFCA process
AFCA’s a pproach is based on fairness
AFCA has determined this complaint based on what is fair in all the circumstances, having
regard to:
the legal principles
applicable industry codes or guidance
good industry practice
previous decisions of AFCA or its predecessor schemes (which are not binding).
The respective parties have completed a full exchange of the relevant information, and each
party has had the opportunity to address any issues raised. We have reviewed and
considered all of the information the parties have provided.
While the parties have raised a number of issues in their submissions, we have restricted this
determination to the issues that are relevant to the outcome.
We assess complaints on available information and circumstances
AFCA is not a court of law. We do not have the power to take or test evidence on oath, or to
require third parties to give evidence.
When we assess complaints, we consider:
available documents
the recollections of the parties
all relevant circumstances.
We give more weight to documents created at the time the events occurred. If there are no
relevant documents, we will decide what most likely occurred based on the available
information.
If there are conflicting recollections and these are evenly weighted, we may find that a claim
cannot be established.