Home / Defence Service Homes Insurance Scheme / Determination 936054

Determination 936054

Insurer declined cost of re-painting hail-damaged concrete tile roof

FirmDefence Service Homes Insurance Scheme
Decided2023-07-10
ProductGeneral Insurance · Home building and contents
OutcomeFor the complainant
Amount awarded$19,223
Non-financial loss—
Amount claimed$17,476
SourceAFCA PDF

Summary

The complainant's hail claim was accepted except for repainting the concrete tile roof, which the insurer said was wear and tear or betterment. AFCA found the hail damaged the painted roof and ordered a cash settlement of $19,223.27.

Undefined 'damage' includes harm that impairs value, and the policy requires repair to the pre-storm condition, which here meant repainting the roof.

Issues

Subjects and remedies

home or building damagenatural disasterpay claim

Related

All Defence Service Homes Insurance Scheme determinations · Find similar determinations

Text of the determination

Determination Case number 936054 Financial firm Defence Service Homes Insurance Scheme Determination | Case number: 936054 Page 1 of 6 Case number: 936054 29 June 2023 1 Determination overview 1.1 Complaint The complainant held a Building Policy with the financial firm (insurer). Following a hail and storm event in October 2021, the complainant lodged a damage claim with the insurer. The insurer investigated the claim and accepted the resultant damage for what it says was the hail damage, including the repair of 30 concrete roof tiles. The complainant says that the insurer should clean, re-seal and re-paint the entire tiled area due to the pitting from the hail. This matter was the subject of a preliminary view which was in favour of the complainant. The complainant and his spouse are listed on the policy and reference to complainant is a reference to both parties. The insurer rejects the preliminary view and the matter has been referred for determination. 1.2 Issues and key findings Was the insurer entitled to deny the claim for re-painting the roof On the information provided to me, on balance, I am satisfied as follows:  the complainant has established that he has a valid claim  the roof had been treated by a formal painting  the hail had interacted with a substantial part of the roof  the ‘hail splash’ did not have a detrimental effect on the performance or life expectancy of the roof  the quality and appearance of the roof was detrimentally affected by the hail  the roof suffered damage because the hail impact impaired the roof and I consider it damage  the policy covers loss or damage caused by storm including hail  the roof was in good condition prior to the storm  the policy covers ‘matching materials’ used in repairing or rebuilding…. but d oes not promise to repair or re-build the home to exactly as it was before the loss or damage occurred  the policy does not define ‘damage’  the insurer has carried out repairs to the house  I am satisfied that the hail impact has impaired the value of the property and that this can only be repaired by the re-painting of the roof. Why is the outcome fair? The complainant and the insurer have been given the opportunity to address all issues raised. The complainant has established that there was an impairment to the roof, being the damage to the painting as a result of the hailstorm. In the circumstances, it is fair that the complainant be entitled to re-paint the roof. Determination | Case number: 936054 Page 2 of 6 1.3 Determination This determination is substantially in favour of the complainant. Upon acceptance of this determination, the insurer is to cash settle this claim by paying the sum of $17,475.70 together with a 10% uplift to cover contingencies and loss of guarantee. A total sum of $19,223.27. This amount must be paid within 14 days of acceptance of determination. The complainant is to confirm whether the solar system needs to be removed and refitted and if so, the insurer is to further settle the claim as set out in clause 2 hereof Determination | Case number: 936054 Page 3 of 6 2 Reasons for determination The complainant held a Building Policy with the insurer. Following a storm, the complainant lodged a claim for hail damage to his roof. The insurer dealt with the majority of the damage, however refused to pay the cost of re-painting the roof on the basis that the roof tile condition was due to age, wear and tear, and gradual deterioration requiring the complainant to address this as a maintenance issue. Also, on the basis that the act of re-sealing and re- painting the concrete roof tiles is considered an upgrade or ‘betterment’ which is outside th e scope of the policy terms. 2.1 Was the insurer entitled to deny the claim for re-painting the roof? Reports The insurer arranged for an assessment of the roof to be carried out by PG who provided a report dated 4 April 2023. PG did not attend the premises but carried out a desktop assessment using the information provided by the insurer together with photographs. PG found as follows: Hail ‘splash’ had removed the surface oxides and airborne pollution This does not have detrimental effect on the performance or life expectancy of the roof. ‘Splash’ marks will fade and weather in the short term as further airborne pollutants and oxides build up concealing their appearance There is no need to repaint the surface tiles ‘Markings’ have not had a detrimental effect o n the performance or life expectancy of the concrete tile cladding, as such it is not considered damage. The complainant obtained a report from a roofing tradesperson CM. CM provided a report which was undated which stated as follows: Upon inspection, it was noted that there is a large number of pitted tiles. This is consistent with being directly hit with by hail. The surface of the tiles has now been compromised. Product Disclosure Statement (PDS) The insurer referred to the PDS as follows: Determination | Case number: 936054 Page 4 of 6 The insurer also stated that the policy also excludes: any loss or damage caused by or related to ‘atmospheric or climatic conditions, (other than those we say we will insure in the events section), condensation, evaporation … … … Insurer was not entitled to deny the claim The insurer says 30 hail damage roof tiles have been replaced as part of the repairs carried out as a result of the hailstorm. The insurer says the rest of the roof has not been damaged by a defined event including the storm event in October 2021. They say the overall condition of the concrete roof tiles is due to age, wear and tear and gradual deterioration by the complainant to address as maintenance. Further the active resealing and repainting of the concrete roof is considered an upgrade or ‘a betterment’ which is outside the scope of the policy terms. The complainant says that when they purchased the property, the roof was rich in presentation and colour. The roof had been painted when they purchased the property and they say that that is part of the reason they purchased the property, due to its appearance. The complainant says that the roof was in good repair prior to the storm and that now the paint on the roof has been impacted and damaged by the hail. I accept that the policy does not allow the complainant to have the premises restored to ‘better than new’. There is no definition for damage in the PDS however, the Macquarie definition defines ‘damage’ as ‘injury or harm that impairs value or usefulness’. Determination | Case number: 936054 Page 5 of 6 I am satisfied that the damage to the painted roof impaired the value of the property. I am also satisfied that the condition of the roof did not exhibit a lack of maintenance by the complainant. The PDS states that the insurer will pay the reasonable costs of repairing or rebuilding t he home on a ‘new for all’ basis to a condition substantially the same as but not better than when new. I am satisfied that the policy requires the insurer to repair the damage, to as it was before the storm. As an aside, I consider the painted roof as no different to a wall where the painting had been damaged by the hail. In such circumstances, I am satisfied that the policy would require the repainting of the damaged area. The complainant has a quotation for repairs for $17,475.70. This is an appropriate matter to cash settle and the insurer is to pay this sum together with a 10% uplift to cover contingencies and loss of guarantee being a total sum of $19,223.27. The complainant is to further request a statement from CM, the repairer, whether the solar panels require removing and refitting for their work to be carried out. If they do, and it is not part of this quote, the complainant is to obtain a quotation for the removal and refitting of the solar panels. The complainant is to submit this quotation to the insurer and the insurer is to pay the sum within 14 days of its receipt, provided this determination has been accepted. Determination | Case number: 936054 Page 6 of 6 3 Supporting information 3.1 The AFCA process AFCA’s a pproach is based on fairness AFCA has determined this complaint based on what is fair in all the circumstances, having regard to:  the legal principles  applicable industry codes or guidance  good industry practice  previous decisions of AFCA or its predecessor schemes (which are not binding). The respective parties have completed a full exchange of the relevant information, and each party has had the opportunity to address any issues raised. We have reviewed and considered all of the information the parties have provided. While the parties have raised a number of issues in their submissions, we have restricted this determination to the issues that are relevant to the outcome. We assess complaints on available information and circumstances AFCA is not a court of law. We do not have the power to take or test evidence on oath, or to require third parties to give evidence. When we assess complaints, we consider:  available documents  the recollections of the parties  all relevant circumstances. We give more weight to documents created at the time the events occurred. If there are no relevant documents, we will decide what most likely occurred based on the available information. If there are conflicting recollections and these are evenly weighted, we may find that a claim cannot be established.

Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.