Cash settlement amount for hail storm damage to granny flat, including concrete slab replacement
Summary
Insurer accepted a hail claim but offered a cash settlement excluding the concrete slab. AFCA found the complainants' quote was the only actionable one and ordered settlement on that basis plus interest and $1,500 non-financial loss.
The insurer's builder would not do the work and the insurer did not show the slab was improperly built under standards at construction, so the complainants' quote was the fairest cost of repair.
Issues
- Claim amount dispute primary · upheld
“fairest cost of repairs is set out in EC's quote... the only actionable way to repair the claim related damage”
- Poor claim handling secondary · upheld
“significant changes in the insurer's scope of works after the complainants submitted their quote”
- Delay secondary · upheld
“The insurer has not justified why it did take so long to finalise the claim.”
Subjects and remedies
home or building damagenatural disasterpay claimpay interestpay non financial loss
Text of the determination
Determination
Case number 935986
Financial firm AAI Limited
Determination | Case number: 935986 Page 2 of 5
Case number: 935986 7 July 2023
1 Determination overview
1.1 Complaint
The complainants held a home and contents insurance policy with the financial firm (insurer).
On 20 October 2021, they lodged a claim for damage following a hail storm. This included
damage to their granny flat.
The insurer accepted liability for the storm related damage but declined cover to the concrete
slab as it was not damaged by the insured event. The insurer offered a cash settlement of
$64,313.30, plus a 10% uplift, totalling $70,744.63 to pay for the damage.
The complainants say this amount is not representative of the loss. They seek $83,428
corresponding to their quote, which includes the replacement of the concrete slab. The
complainants also seek non-financial loss compensation for the stress and delays they say
the insurer caused.
1.2 Issues and key findings
Is the insurer required to increase the cash settlement?
Yes. The available evidence establishes it is fair to rely on the complainants ’ quote given it is
the only actionable one. Therefore, the insurer should settle the claim on this basis.
Are the complainants entitled to non-financial loss compensation?
Yes. Considering the time taken to resolve the matter, the insurer’s handling of the claim
caused an unusual amount of stress and inconvenience for the complainants. It is fair that the
insurer pay non-financial loss compensation of $1,500.
Why is the outcome fair?
The exchanged information shows the complainants’ quote is the fairest as it is the only
actionable one. Therefore, the insurer should settle the claim based on this quote.
1.3 Determination
This determination is in favour of the complainants.
Within 14 days of receiving notice the complainants accept this determination, the insurer
must pay:
$91,770.80, minus any outstanding policy deductions (e.g. excess), plus interest as set out
in section 2.1
$1,500 compensation for non-financial loss.
Determination | Case number: 935986 Page 3 of 5
2 Reasons for determination
2.1 Is the insurer required to increase the cash settlement?
Yes. The available evidence establishes it is fair to rely on the complainants’ quote given it is
the only actionable one. Therefore, the insurer should settle the claim on this basis.
Complainant has the onus to establish claim falls within terms of policy
It is established insurance law that an insured has the initial onus to establish on the balance
of probabilities (that is more likely than not) a claim falls within the terms of the policy.
The complainants’ policy is an insured events policy that provid es cover for several insured
events including storm damage. This is subject to conditions and exclusions.
The insurer accepted the claim
The complainants lodged a claim after a hail storm damaged the insured address. The insurer
accepted the claim for the damaged parts of the granny flat. However, it says the insured
event did not damage the concrete slab.
Following lodgement of the claim, the insurer assessed the damage. It confirmed that its
repairer could not complete the repairs due to pre-existing issues with the granny flat
foundation.
The insurer has offered $64,313.30 to settle the claim
The key dispute in this complaint is that the complainants consider the insurer’s cash
settlement is insufficient to bring them back to the same position they were in prior to the
claimed event.
Based on assessment reports and scope of works, the insurer offered $64,313.30 to settle
the claim. The key reason why the complainants say this is insufficient is because they are of
the view the insurer should pay for the replacement or rectification of the concrete slab to
bring it up to current building standards. This is because the builders engaged (by both
parties) have refused to rebuild the granny flat without the concrete slab being brought up to
current standards as they would not be able to provide a warranty for the works.
The insurer says it is not required to pay for the concrete slab costs because the insured
event did not damage it and therefore it is not covered by the policy.
Insurer to settle c laim based on complainants’ quote
There is no information to show the slab has been damaged by the storm and requires
replacement on this basis. Instead, the issue is whether the slab needs to be replaced to
repair the claim related damage.
The insurer’s experts say there are issues with the slab not being built to current standards.
This is mainly to do with its drainage. Therefore, the insurer’s builder is not prepared to do the
works.
However, as the complainants correctly point out, the insurer is relying on 2019 standards.
The granny flat was built in 1992. The insurer has not referred to any standards, regulations
or code to show the slab or granny flat was improperly built at the time of construction.
Determination | Case number: 935986 Page 4 of 5
There is no dispute the complainants’ builder is the only one prepared to repair the claim
related damage. The insurer’s builder will not do it due to the issues with the slab. Therefore, I
do not accept the insurer’s quotes are actionable .
There is no information to suggest another builder would be prepared to repair the claim
related damage based on the insurer’s scope of works or without replacing or rectifying the
slab.
Accordingly, based on the exchanged information, I am satisfied the fairest cost of repairs is
set out in EC’s quote. This is because it is the only actionable way to repair the claim related
damage. Further, if the slab needs to be replaced to be built to current standards in order to
fix the claim related damage, then this would form part of the cost of repairing the claim
related damage. The insurer has not referred to any policy provision that would enable it to
exclude these costs in circumstances when it has not shown the slab or granny flat was
improperly built based on the standards at the time.
Given this, the insurer is to ca sh settle the complainants’ claim based on EC’s quote, with a
10% contingency to allow for unforeseen variations, for a total of $91,770.80. The insurer can
reduce this by any outstanding policy deductions (e.g. excess). The insurer should also pay
interest on the final amount pursuant to section 57 of the Insurance Contracts Act 1984 (the
Act). Interest applies from 21 May 2022, being one month after EC’s quote was issued, until
payment is made.
2.2 Should the insurer pay non-financial loss?
Yes. I consider t he time taken to resolve the matter and the insurer’s handling of the claim
caused an unusual amount of stress and inconvenience for the complainants. It is fair that the
insurer should pay non-financial loss compensation of $1,500.
AFCA can award compensation for non-financial loss
Under AFCA’s Rules, we may award compensation (capped at $5,400) for non -financial loss
where a complainant has suffered an unusual degree or extent of physical inconvenience,
time taken to resolve the situation or interference with their expectation of enjoyment or peace
of mind.
However, we adopt a conservative approach to the award of compensation for non-financial
loss. We expect the complainant to be moderately robust and bear the usual stress and
inconvenience associated with an insurance claim.
The insurer must pay non-financial loss compensation of $1,500
The insurer could have handled the claim better. These aspects caused an unusual amount
of stress and inconvenience:
time taken to resolve the claim,
the signi ficant changes in the insurer’s scope of works after the complainants submitted
their quote, and
the consequent change in the cash settlement amount during the claim process.
The insurer has not justified why it did take so long to finalise the claim. Therefore, in these
circumstances, I accept the insurer should pay non-financial loss compensation of $1,500.
Determination | Case number: 935986 Page 5 of 5
3 Supporting information
3.1 The AFCA processes
AFCA’s approach is based on fairness
AFCA has determined this complaint based on what is fair in all the circumstances, having
regard to:
the legal principles
applicable industry codes or guidance
good industry practice
previous decisions of AFCA or its predecessor schemes (which are not binding).
The respective parties have completed a full exchange of the relevant information, and each
party has had the opportunity to address any issues raised. We have reviewed and
considered all the information the parties have provided.
While the parties have raised a number of issues in their submissions, we have restricted this
determination to the issues that are relevant to the outcome.
We assess complaints on available information and circumstances
AFCA is not a court of law. We do not have the power to take or test evidence on oath, or to
require third parties to give evidence.
When we assess complaints, we consider:
available documents
the recollections of the parties
all relevant circumstances.
We give more weight to documents created at the time the events occurred. If there are no
relevant documents, we will decide what most likely occurred based on the available
information.
If there are conflicting recollections and these are evenly weighted, we may find that a claim
cannot be established.
Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.