Home / Allianz Australia / Determination 935862

Determination 935862

Insurer failed to comply with prior AFCA settlement, did not properly reassess claim, and sought to cash settle part-way through repairs

FirmAllianz Australia
Decided2023-10-16
ProductGeneral Insurance · Landlord
OutcomeFor the complainant
Amount awarded$28,800
Non-financial loss—
Amount claimed—
SourceAFCA PDF

Summary

A landlord complained the insurer failed to properly reassess his storm damage claim after a prior AFCA settlement and tried to cash settle after contractors withdrew. AFCA found for the complainant, requiring the insurer to complete the repairs with warranty and pay $28,800 for lost rent.

Having commenced repairs, the insurer breached its duty of utmost good faith by not properly reassessing and trying to cash settle, so delay-caused direct loss of rent is compensable.

Issues

Subjects and remedies

home or building damagenatural disasterpay compensationreassess claimrepair or rectify

Related

All Allianz Australia determinations · Find similar determinations

Text of the determination

Determination Case number 935862 Financial firm Allianz Australia General Insurance Limited (insurer) Determination | Case number: 935862 Page 1 of 9 Case number: 935862 3 October 2023 1 Determination overview 1.1 Complaint The complainant holds a landlord insurance policy issued by the insurer. Following a dispute over a claim for water damage arising from a storm event in February 2020, the complainant lodged Complaint 846821 with AFCA. Complaint 846821 resolved by agreement between the parties in March 2022 and relevantly required the insurer to:  reassess the laundry door lock and the electric gate and  following completion of repairs to the waterproofing by the complainant, re-assess whether it was possible to repair the floor/warrant the works. The complainant says he repaired the waterproof membrane and sought to have the insurer attend the insured premises to reassess the claim in accordance with the agreement. The insurer performed a desktop review of the claim instead and attempted to cash settle the claim. The complainant is dissatisfied with the outcome and seeks the insurer perform its reassessment properly, as well as pay compensation for lost rent and non-financial loss. The insurer says it tried to engage two different contractors, Company E and Company U, but neither are willing to complete the repairs. It says this requires it to cash settle the claim as it is unable to source trades to complete the works. 1.2 Issues and key findings Has the insurer complied with the AFCA settlement? No. By not attending the site since the AFCA settlement and in particular, since the complainant completed the waterproof remediation works, the insurer has not completed a proper re-assessment of the claim as previously agreed. Is the insurer required to complete the works? Yes. Having commenced the repairs, it would be a breach of the duty of utmost good faith for the insurer to refuse to complete the works and provide appropriate warranties. Is the complainant entitled to compensation? Yes. The works should be completed, in full, by the insurer and additional compensation of $5,400 paid to the complainant as a result of indirect loss caused by the insurer’s actions. Why is the outcome fair? The insurer has failed to comply with a previous agreed outcome through AFCA and, through this decision, has caused this second complaint to be lodged. More importantly, the consequence of the insurer failing to handle the claim appropriately has led to the complainant unfairly incurring further financial loss which needs to be remedied. Determination | Case number: 935862 Page 2 of 9 1.3 Determination This determination is in favour of the complainant. Within 14 days of the date the insurer is advised the complainant has accepted this determination, the insurer must:  engage an appropriately qualified contractor to attend the insured premises and provide an appropriate Scope of Works to rectify all relevant damage and restore the property to its prior condition  ensure the appointed contractor is willing to complete the works and warranty the repairs and  pay the complainant $28,800 in direct financial loss compensation for the delays which have impacted the complainant’s rental income. Determination | Case number: 935862 Page 3 of 9 2 Reasons for determination 2.1 Has the insurer complied with the AFCA settlement? No. By not attending the site since the AFCA settlement, and in particular, since the complainant completed the waterproof remediation works, the insurer has not completed a proper re-assessment of the claim as previously agreed. The AFCA settlement required specific actions of the parties The settlement in Complaint 846821 relevantly required the insurer to:  reassess the laundry door lock and the electric gate and  following completion of repairs to the waterproofing by the complainant, re-assess whether it was possible to repair the floor/warrant the works. I accept the insurer has accepted the claims for the laundry door lock and electric gate following re-assessment and therefore this aspect of the settlement has been complied with. In addition, the complainant says he completed the required repairs to the waterproofing of the balcony above the alfresco area in November 2022. There appears to be no dispute this was done. The insurer did not properly re-assess the claim On 11 April 2022, Company E advised the insurer it was unwilling to complete the works it had commenced on the complainant’s property. On 7 May 2022, the insurer arranged for Company U to attend the insured premises and provide a quote for the remaining works. While a quote, dated 21 July 2022, was provided, the insurer accepted in a submission dated 31 May 2023 Company U provided the quote based on a desktop assessment and did not re-attend the site. Further, the re-assessment by the insurer was due to be undertaken after the complainant’s remediation works to the waterproofing, so the relevant quotes could include a warranty to the works being undertaken. This was not done. The insurer has not complied with its obligations under 846821 I am satisfied the insurer has not properly complied with the settlement arrangements agreed to in Complaint 846821 by not properly re-assessing the insured property. This is important as:  the works undertaken by the complainant will have necessarily affected the Scope of Works required to be attended to by the insurer and  there has been a significant passage of time since the insurer and its representatives last attended the insured property and ongoing issues may have changed the extent of damage which is required to be remediated under the policy. 2.2 Is the insurer required to complete the works? Yes. Having commenced the repairs, it would be a breach of the duty of utmost good faith for the insurer to refuse to complete the works and provide appropriate warranties. Determination | Case number: 935862 Page 4 of 9 The insurer says it is entitled to cash settle the claim The insurer relies on two grounds to support its entitlement to cash settle this claim:  the wording of the Product Disclosure Statement (PDS) and  an email from AFCA, dated 26 October 2022, advising a cash settlement would be appropriate. Relevant wording from the PDS is set out in section 3.2 of this determination. The basis for a cash settlement is unsubstantiated Unfortunately, difficulty arises from the repairs already having been commenced by Company E in 2022, and by their subsequent refusal in April 2022 to complete the works. The insurer says both Company E and Company U are unwilling to complete the works on the basis there were ongoing legal issues between the complainant and another builder, Company M, in respect of the property. While there were some other issues raised about inappropriate conduct by the complainant in other respects, none have been evidenced by the insurer despite it apparently accepting these allegations and relying on them, in par t, to support Company E’s decision not to finish the work. Setting aside the complainant says the legal proceedings have been resolved and Company M accepted liability for defective works, the insurer has not indicated any reasonable basis why it is in the utmost good faith to:  commence works  cease works partway due to repairs which fell to the complainant  not recommence works after the defect has been rectified and  leave the complainant with trying to find a tradesperson who will warranty Company E’s part-completion of the repairs without needing to re-do work. The complainant provided a copy of a NSW Fair Trading Rectification Order dated 30 May 2019 ordering Company M to rectify defective waterproofing work at the rear terrace and undertake remedial works. I note this Order pre-dates the insured event, but I accept a dispute about the rectification works continued through the relevant time period and is now resolved. Further, there appears to be no reason why:  Company E or Company U cannot complete the works given their concern (the legal proceedings) w as resolved in the complainant’s favour or  another contractor cannot be sourced. The insurer elected to settle the claim by repairing the damage. It engaged relevant trades to do so. Once it made the decision to commence the repairs using its own trades and not cash settle, I am satisfied it is fair in all the circumstances for the insurer to be prohibited from changing its mind partway through the repairs and cash settling the remainder of the claim. The insurer has made assumptions about the appropriate scope of works The insurer’s proposal to cash settle the claim is based on the Company U quote. As noted above, I am not satisfied this quote was reasonably formulated as the site was not attended by Company U and the current state of the insured premises has not been reviewed. Determination | Case number: 935862 Page 5 of 9 The complainant has provided his own quotes based on trades who have attended the insured premises. Following review by Company U, these have been rejected by the insurer on the basis:  replacement flooring had already been sourced, paid for, and delivered to the site and  the kitchen works quoted were not a like-for-like replacement and upgrades have been incorporated into the complainant’s scope of works. In respect of these two issues, firstly, the complainant says the flooring which was obtained by Company E and delivered is incorrect and a different width to the rest of the flooring in the property. He has provided photographs in support and I accept there is a difference in the width of the boards. The PDS relevantly says the insurer will:  pay to match materials with those that existed before the damage or  where that is not possible, pay up to $1,000 to match pre-existing undamaged floor coverings in areas where the damage occurred to create a uniform appearance, where it is necessary to match with the nearest similar materials. The insurer has not shown matching flooring was not available or why the incorrect sizing was ordered by Company E. It is fair in all the circumstances, if the proper flooring is available, for the insurer to arrange the replacement using the matching materials and obtain a refund for the incorrect flooring purchased. Secondly, with regard to the kitchen, the complainant says the Company U quote is based on an incorrect scope of works. He relevantly says the Company U quote does not include re- installation of items removed from the kitchen by Company E, including:  cabinets  roller-door appliance cabinet  Caesar stone benchtops  stove and over  dishwasher and  internal vacuum. The complainant also says the contractors he has spoken to have refused to reinstall the pre- existing kitchen: […] as it was left as a puzzle and they do not want to take responsibility for any breakages such as the Caesar Stone He says the only option is to install a new kitchen, unless Company E (or another of the insurer’s contractors) return to re -install the kitchen back to its original state and provide a warranty for the works. Without the insurer re-attending the site since the works were ceased, I am satisfied the insurer has no reasonable basis to properly assess which work is reasonable and which is not. The insurer has not properly assessed the claim Despite two complaints brought to AFCA, I am satisfied the insurer has not properly assessed the claim. Determination | Case number: 935862 Page 6 of 9 The insurer has not undertaken actions which it said it would in properly re-assessing the damage at the insured premises and has failed to engage in the claims process in accordance with its obligation to act in the utmost good faith. The insurer has further failed to provide any compelling evidence about why the repairs cannot be completed, and relevant warranties provided, instead relying on hearsay and unfounded fears of legal proceedings to have this claim drag on for an unreasonable amount of time. 2.3 Is the complainant entitled to compensation? Yes. The works should be completed, in full, by the insurer and additional compensation of $5,400 paid to the complainant as a result of indirect loss caused by the insurer’s actions. The claim should be accepted and repairs completed For the reasons set out above, I am not satisfied the insurer has established it is entitled, partway through repairs, to cash settle the remainder of the claim. It is required to complete the works in accordance with its obligations under the policy. The complainant is not entitled to loss of rent under the policy The complainant says he has been unable to tenant the property due to the insurer’s failure to properly manage the claim as outlined above. However, the property was not tenanted at the time of the insured event. The PDS says loss of rent will only be paid if the property is leased at the time of the insured event. I am satisfied therefore the insurer is not liable for payment of the loss of rent cover. The policy excludes consequential loss The policy contains a general exclusion for consequential loss following an incident covered by the policy. This excludes cover for consequential loss of any kind. Therefore, in normal circumstances, the insurer is not required to compensate the complainant for any consequential loss caused by the circumstances of the claim, or the reasonable claim process. The complainant is entitled to direct loss caused by the delays However, in the circumstances of this complaint:  the policy is a landlord’s insurance policy, so loss of rent is a reasonably foreseeable damage which could be considered a direct loss  the insurer has acted inappropriately in the way it handled the claim through: > failing to properly action its obligations under the previous AFCA settlement > not properly engaging with its contractors and > appearing to accept allegations of inappropriate conduct by the complainant without reasonable proof. On the basis of the insurer’s inappropriate handling of the co mplaint and claim delays caused by its actions, I am satisfied there is a direct loss which arises from the manner in which the insurer has handled this claim. This accords with AFCA’s previous determinations in similar circumstances, such as in Complaint 802400. Determination | Case number: 935862 Page 7 of 9 Had the insurer properly re-assessed the claim in November 2022 after the waterproofing remediation works were complete, it is more likely than not the works could have been completed over the next three months (given the festive season). On this basis, I am satisfied it is likely the complainant could have re-tenanted the property by April 2023 at the latest. This means, but for the insurer’s conduct, the complainant could reasonably have expected 6 months of rent to the date of this determination. The complainant has provided evidence showing the property was leased at $1,850 per week in 2014 and the rent was reduced to $1,200 per week in 2017. This equates to a nominal foregone rent of approximately $28,800. Accordingly, I am satisfied it is fair in all the circumstances to award this direct financial loss of $28,800. 2.4 Why is the outcome fair? The insurer has failed to comply with a previous agreed outcome through AFCA and, through this decision, has caused this second complaint to be lodged. More importantly, the consequence of the insurer failing to handle the claim appropriately has led to the complainant unfairly incurring further financial loss which needs to be remedied. Determination | Case number: 935862 Page 8 of 9 3 Supporting information 3.1 The AFCA process AFCA’s approach is based on fairness AFCA has determined this complaint based on what is fair in all the circumstances, having regard to:  the legal principles  applicable industry codes or guidance  good industry practice  previous decisions of AFCA or its predecessor schemes (which are not binding). The respective parties have completed a full exchange of the relevant information, and each party has had the opportunity to address any issues raised. We have reviewed and considered all of the information the parties have provided. While the parties have raised a number of issues in their submissions, we have restricted this determination to the issues that are relevant to the outcome. We assess complaints on available information and circumstances AFCA is not a court of law. We do not have the power to take or test evidence on oath, or to require third parties to give evidence. When we assess complaints, we consider:  available documents  the recollections of the parties  all relevant circumstances. We give more weight to documents created at the time the events occurred. If there are no relevant documents, we will decide what most likely occurred based on the available information. If there are conflicting recollections and these are evenly weighted, we may find that a claim cannot be established. 3.2 Relevant policy terms Product Disclosure Statement, prepared 7 May 2019 7.3 How we settle your claim. Repairing or replacing. When we agree to pay a claim for loss or damage: We may choose to pay: • the reasonable cost of repair, or Determination | Case number: 935862 Page 9 of 9 • the reasonable costs of replacement to new condition with property of the same size and specification or with items as near to original as is currently possible, or • a cash amount. If we agree to pay cash, we ’ ll pay the amount it would reasonably cost to repair or replace the property. Where a building is not being replaced the amount we ’ ll pay will be less a reasonable deduction for depreciation due to wear and tear and age of the property. We will pay: • to match materials, items or construction with those that existed before the loss or damage occurred, or where that is not possible, with the nearest similar materials, items or construction, and • only those costs that directly apply to the part of your property that has suffered the loss or damage. […] If the loss or damage: • involves wall coverings, floor coverings or window coverings that are present in more than one room of the home, we ’ ll only repair or replace those wall coverings, floor coverings or window coverings in the room or rooms, hall or passageway where the damage occurred. However, if such loss or damage involves tiled or timber floor or wall coverings, we ’ ll only pay up to a maximum of $1,000 to match undamaged tiled or timber wall or floor coverings in the room or rooms, hall or passageway where the damage occurred to create a uniform appearance.

Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.