Claim declined for pool frame damage under exclusions; pool liner damage from insurer delay; claim handling delay

FirmAllianz Australia
Decided2024-01-04
ProductGeneral Insurance · Home building and contents
OutcomeFor the complainant in part
Amount awarded—
Non-financial loss$2,500
Amount claimed—
SourceAFCA PDF

Summary

The insurer declined a storm claim for a pool, relying on soil movement, wear and rust exclusions. AFCA upheld the decline for the frame and rust but required payment for the pool liner damaged by delay, plus $2,500 non-financial loss.

Expert evidence showed soil movement and rust exclusions applied to the frame, but the liner loss arose from the insurer's claim delay rather than storm, so storm exclusions did not apply.

Issues

Subjects and remedies

home or building damagenatural disasterpay compensationpay non financial loss

Related

All Allianz Australia determinations · Find similar determinations

Text of the determination

Determination Case number 934605 Financial firm Allianz Australia Insurance Limited Determination | Case number: 934605 Page 1 of 7 Case number: 934605 19 December 2023 1 Determination overview 1.1 Complaint The complainant holds a home building and contents insurance policy underwritten by the financial firm (insurer). The policy provides cover for listed events, subject to exclusions. On 29 January 2022, the complainant lodged a claim for damage to a swimming pool. The complainant stated the cause of damage was a storm which had caused the pool walls to buckle. On 11 October 2022, the insurer declined the claim on the basis that the damage arose from gradual deterioration, defects in design, structure, materials, workmanship or construction, earth or soil movement. The policy excludes cover for damage from those causes. The complainant disputes the claim declinature and also says the pool liner was damaged from following instructions of the insurer and/or delay by the insurer. She further says the insurer’s claim delays caused her stress and seeks compensation to be awarded. 1.2 Issues and key findings Was the insurer entitled to decline the claim? Yes. The insurer was entitled to decline the claim which related to the pool frame and rust. However, the insurer is responsible for the cost of repairing or replacing the pool liner. Were there delays in the claim handling? Yes. There were substantial unexplained delays by the insurer. It is required to pay the complainant $2,500 in non-financial loss compensation. Why is the outcome fair? The outcome is fair as it is based on the law, evidence and the terms of the insurance policy. 1.3 Determination This determination is partially in favour of the complainant. Within 21 days from the complainant’s acceptance of this determination the insurer is required to pay her:  the reasonable cost for repair or replacement of the pool liner  $2,500 in non-financial loss compensation Determination | Case number: 934605 Page 2 of 7 2 Reasons for determination 2.1 Was the insurer entitled to decline the claim? Yes. The insurer was entitled to decline the claim which related to the pool frame and rust. However, the insurer is responsible for the cost of repairing or replacing the pool liner. The parties do not dispute a storm occurred in the locale of the building The evidence provided confirms that a storm occurred in the locale of the insured building on 28 January 2022. Accordingly, I accept that a storm occurred on 28 January 2022 and the insured building was in the path of the storm. The parties do not dispute the insurance policy covers storm damage The policy is an insured events policy which expressly states that it covers loss or damage caused by storm, subject to relevant terms and conditions. There is no dispute that the policy definition of building includes pools. Given the above, I accept that the policy covers the pool under storm cover. The complainant must establish the damage was caused by the event The complainant has the onus of establishing she suffered a loss from an event covered by the policy. If a claimable loss is established, the insurer then has the onus of establishing the application of any exclusion or condition it relies on to deny or reduce its liability. For both the complainant and the insurer, the onus of proof is the balance of probabilities (that is, it is more likely than not). The proximate cause of damage must be caused by storm to be covered That a storm occurred in the area is not sufficient of itself to demonstrate that the insured pool was damaged by the storm. It is well established in insurance law that the insured has the onus of demonstrating that the damage claimed arose from an insured event. The proximate cause of the loss or damage must be due to the insured event of storm to be covered. Damage can have more than one cause. The proximate cause is not necessarily the first or last or the sole cause of the loss. It is the effective, dominant or operative cause of the loss. The policy includes several general exclusions of cover The policy includes several event specific exclusions as well as general exclusions which apply to all insured events. The relevant provisions relied on by the insurer are: General Exclusions .. …yo ur policy does not cover any loss or damage that is caused by or arises from: Wear and tear, and environmental conditions. • wear and tear, gradual deterioration, or fading, • rust, corrosion, oxidisation, mould, mildew or atmospheric conditions, Determination | Case number: 934605 Page 3 of 7 • earth o r soil movement (other than earthquake) including landslide, subsidence, erosion or heave, • settling, expansion, shrinkage or vibration, .. Storm [insured event] .. Not Covered .. Loss or damage to: .. • plastic liners or covers for swimming pools or spas, • water in swimming pools or spas, or • external paint or coatings caused by rain. Loss or damage caused by or resulting from: • gradual deterioration from rain, .. • water seeping or running through or down the sides of earth or earth fill that is up against your building. Accordingly, if the insurer establishes that the loss is caused by a storm specific or a general exclusion, such as wear and tear or gradual deterioration, then the loss will not be covered. The evidence does not establish the storm caused pool frame damage or rust There were three expert reports provided by the insurer in relation to the cause of loss to the insured pool. The first report from AJ, builder, stated the cause of the loss was due to increased weight from the pool being fuller due to rainfall. This was disputed by the complainant on the basis the pool had mechanisms to prevent it becoming full due to rainfall. AJ also listed other contributing factors such as the age of the pool which contributed to the side wall failure. The second report was provided by GE. GE ’s qualifications are not stated but AJ recommended engaging a pool specialist, after which the GE report was received. GE provided an opinion that the sodden ground around the support post footings allowed some subsidence which combined with the effect of high winds, caused the side wall to be pushed inwards resulting in a tilting upwards force on the base of the support post footings. It is unknown if GE has the expertise to provide an opinion on ground movement. The third report was provided by L, a structural engineer. L determined the founding soils were inadequate to support the vertical and diagonal columns resulting in movement of the frame. L also considered there was inadequate and non-compliant construction of the pool frame to resist design actions resulting in deformation under normal design actions. L also reviewed the effects of wind force on the pool shell and determined that whether the pool was full or empty the pool shell could resist the lateral force imposed by wind pressure. The complainant has not put forward any expert reports or other material which could substantially contradict the findings of the experts engaged by the insurer. Based on the evidence provided, both experts GE and L have considered the soil movement around the post to be a contributing factor of the damage rather than wind or rainfall by itself. Given this, the insurer has made out the general exclusion of earth or soil movement Determination | Case number: 934605 Page 4 of 7 including subsidence or heave. The exclusion does apply to exclude any loss or damage caused to the pool frame. I have considered the submissions in relation to rust and whether the storm or the emptied pool liner (no longer being pressed against the pool walls) could be covered. The complainant notes there was a small 4mm x 4mm area of rust prior to the claim. The expert, L, states long term corrosion of the metal frame members below ground were reducing structural capacity of the members. The evidence of the complainant indicates the rust did pre-exist the storm event and therefore was not caused by the storm. Further, taking into account L’s observations, it appears the rust was more widespread but not visible due to its position. In addition to this, there is no expert evidence or material in s upport of the complainant’s position that the effect of the emptied pool exacerbated the pre-existing rust. In any event the general exclusion covers rust, corrosion and oxidisation and accordingly the rust would be excluded from cover. The pool liner was damaged by delay and exposure to the elements The complainant has stated that she was told by the insurer and/or its trades to empty the pool to prevent it collapsing. As a result, the pool remained empty between January 2022 and the initial claim denial in October 2022. The complainant alleges that the pool liner became deteriorated as a result of the pool being emptied for a prolonged period . The complainant’s position was supported by GE who stated the pool liner is now brittle due to exposure to the elements. I note that L stated there was no damage to the pool liner, but it is unclear why L’s observations differed markedly to GE and the complainant, or if L considered a ‘brittle’ liner as damaged or not. In the circumstances, the weight of the evidence supports the complainant’s position that the exposure of the pool liner to the elements caused it to become brittle or deteriorated. I am satisfied for the reasons outlined below that the pool liner was damaged due to the insur er’s delays in claims handling which caused the pool lining to be exposed for a prolonged period. The complainant had emptied the pool at the insurer’s direction , but no claim resolution was provided for 9 months. Given this, the insurer should pay for the repair or replacement cost of the pool liner. I accept that the insurer has an exclusion for damage to pool linings under the storm insured event. However, the loss does not arise from storm but from the manner in which the claim was handled. This means that the storm specific exclusions do not apply to exclude this loss and nor does the excess apply. I acknowledge the complainant has also sought the cost of refilling the pool and servicing of the pool pump because it was kept idle for a long period of time. I note that the repairs to the pool frame and liner would have required the pool to be emptied and refilled regardless of the insurer’s delay. Given this, I cannot find such a cost is the direct and sole result of the insurer’s claims handling delay . Additionally, the complainant has not alleged any damage to the pool pump due to it being idle during the period of delay. A servicing of the pool pump would be part of ordinary maintenance and should not form part of the claimable loss for delay caused by the insurer. Determination | Case number: 934605 Page 5 of 7 2.2 Were there delays in the claim handling? Yes. There were substantial unexplained delays by the insurer. It is required to pay the complainant $2,500 in non-financial loss compensation. AFCA’s jurisdiction to award non -financial loss Under our Rules, the Australian Financial Complaints Authority (AFCA) may award compensation for non-financial loss (capped at $5,400) where there has been an unusual amount of:  physical inconvenience  time taken to resolve the situation  interference with a complainant’s expectation of enjoyment or peace of mind. AFCA takes a conservative approach to compensation and expects a complainant to bear a normal degree of inconvenience during the course of a claim. There was an unexplained delay to resolving the complaint A review of the claims file notes provides the following chronology:  the claim is added to the event history on 29 January 2022  there is no notation indicating when AJ was appointed. AJ being the party sent out to do make safe works and provide an assessment report  the insurer receives the invoices for the make safe and assessment reports on 16 March 2022  on 16 May 2022, the claim file notes record a review of the AJ Report and a recommendation to appoint a pool specialist. On this date, the insurer emails AJ to appoint a specialist. The AJ report lists the date of attendance as 9 March 2022 and it is unknown why the report is not considered until 16 May 2022. This is a significant delay given the invoices were also paid shortly after receipt  on 14 July 2022, the insurer follows up for the report from GE  on 22 August 2022, over three months after the initial request, the insurer receives the report from GE which is dated 29 July 2022 . The insurer’s technical team were dissatisfied with the report and suggested another specialist report be obtained  on 11 October 2022, the claim file notes record the insurer reviewing the report from L. Whilst I accept that the insurer has a right to properly investigate a claim, under the General Insurance Code of Practice it must do so within a timely manner. The above chronology demonstrates there are multiple unexplained delays of significant periods of time. These delays are not properly explained. The claims decision has taken a period of 9 months to finalise rather than the general guide of 4 months provided under the General Insurance Code of Practice. The issue to be determined was limited to the above ground pool structure and was not particularly complex. There is no explanation for why the claim took so long to resolve. The complainant has expressed the delay has caused stress and that she has not been able to enjoy the use of the pool. Compensation for non-financial loss should be awarded I note the insurer has indicated it was willing to provide compensation of $2,000 to the complainant. Determination | Case number: 934605 Page 6 of 7 Due to the unusual length of time taken to resolve the matter, the stress caused to the complainant and the interference with the complaina nt’s expectation of enjoyment of the pool, I consider that an award of compensation in the amount of $2,500 is fair and appropriate. 2.3 Why is the outcome fair? The outcome is fair as it is based on the law, evidence and the terms of the insurance policy. Determination | Case number: 934605 Page 7 of 7 3 Supporting information 3.1 The AFCA process AFCA’s approach is based on fairness AFCA has determined this complaint based on what is fair in all the circumstances, having regard to:  the legal principles  applicable industry codes or guidance  good industry practice  previous decisions of AFCA or its predecessor schemes (which are not binding). The respective parties have completed a full exchange of the relevant information, and each party has had the opportunity to address any issues raised. We have reviewed and considered all of the information the parties have provided. While the parties have raised a number of issues in their submissions, we have restricted this determination to the issues that are relevant to the outcome. We assess complaints on available information and circumstances AFCA is not a court of law. We do not have the power to take or test evidence on oath, or to require third parties to give evidence. When we assess complaints, we consider:  available documents  the recollections of the parties  all relevant circumstances. We give more weight to documents created at the time the events occurred. If there are no relevant documents, we will decide what most likely occurred based on the available information. If there are conflicting recollections and these are evenly weighted, we may find that a claim cannot be established.