Home / IAG / Determination 934518
Determination 934518
Insurer declined storm damage claim for pool relying on hydrostatic pressure, structural failure and poor workmanship exclusions
Summary
The insurer declined a storm damage claim for a swimming pool based on an engineer's report citing exclusions. AFCA found the exclusions were not proved and ordered a cash settlement based on the complainant's quotes with a 15% uplift plus $2,000 for non-financial loss.
The insurer bore the onus of proving exclusions and failed to do so; the proximate cause was the storm and rainwater runoff.
Issues
- Claim denial primary · upheld“The insurer has not proved the policy exclusions it relied on to deny the claim applied.”
- Poor claim handling secondary · upheld“The insurer has acknowledged its handling of the claim was inadequate.”
- Inadequate claim investigation secondary · upheld“the engineer did not conduct any invasive investigations... reports were based on a visual inspection only.”
Subjects and remedies
home or building damagenatural disasterpay claimpay non financial loss
Related
Text of the determination
Determination
Case number 934518
Financial firm Insurance Australia Limited
Determination | Case number: 934518 Page 2 of 8
Case number: 934518 16 October 2023
1 Determination overview
1.1 Complaint
On 22 March 2022, the complainant made a claim under a home and contents insurance
policy held with the financial firm (the insurer) for storm damage to his swimming pool that
occurred on or about 5 March 2022.
The insurer initially partially accepted the claim on 5 October 2022 where it accepted liability
for damage caused to the pool and surrounds and made an offer to cash settle the claim for
$41,903.37. The insurer subsequently declined the claim based on an engineer’s report. It
says the damage was caused by hydrostatic pressure, poor workmanship or design and a
structural failure of an item, all of which are exclusions under the policy.
The complainant disputes the insurer’s decision to deny his claim and seeks compensation
for non-financial loss.
1.2 Issues and key findings
Was the insurer entitled to deny the claim?
No. The insurer has not proved the policy exclusions it relied on the deny the claim applied.
The proximate cause of the damage to the pool and its surrounds was the storm events
between 22 and 28 February 2022.
Why is the outcome fair?
The outcome is fair because the available evidence shows the damage was caused by an
insured event, and the insurer has not established exclusions apply or that it is otherwise
entitled to decline the claim.
1.3 Determination
This determination is in favour of the complainant.
The complainant has 30 days to accept the determination. If he accepts the determination,
the insurer must, within 28 days of being informed of his acceptance:
cash settle the claim based on the complainant’s quotes provided in his 27 March 2023
complaint response with a 15% uplift,
pay $2,000 to the complainant as compensation for his non-financial loss.
Determination | Case number: 934518 Page 3 of 8
2 Reasons for determination
2.1 Was the insurer entitled to deny the claim?
No. The insurer has not proved the policy exclusions it relied on the deny the claim applied.
The proximate cause of the damage to the pool and its surrounds was the storm events
between 22 and 28 February 2022.
The insurer says policy exclusions apply
The insurer accepts the complainant has established a valid claim. This means the insurer
has the onus of proving, on the balance of probabilities, a policy exclusion applies or the
policy otherwise does not cover the loss or damage.
The insurer’s reasons for declining the claim was identified in its external dispute resolution
response to AFCA dated 20 December 2022 as follows:
… we have denied the claim on the basis that the damage arises from the
structural failure of the pool, poor workmanship and hydrostatic pressure, which
are exclusions in the policy.
The relevant policy exclusions the insurer relies to deny the claim are set out in Section 3.2
below.
The insurer engaged an engineer to report on the cause of the damage
The insurer partially accepted the claim on or about 5 October 2022 for damage caused to
the pool and surrounds and made a cash settlement offer of $41,903.37. That partial
acceptance appears to have been made based on a report from a builder appointed by the
insurer (Company O) dated 13 April 2022. That report concluded the damage to the pool was
caused by rainwater runoff during storm events between 22 and 28 February 2022 (515 mm
of rain fell during that period).
However, the insurer sent an email to the complainant on 16 November 2022 which relevantly
stated:
Please be advised that on review of the file, the correct process for “storm
damage to pools” has not been undertaken. As a result, we will require an
Engineer to attend to provide a qualified report before we can further proceed with
the claim as our builders are not specialists in the pool field.
The engineer attended the complainant’s residence on 24 November 2022 to inspect the
damage to the pool and its surrounds.
Th e engineer’s report was relied on to deny the claim
The engineer provided their report on 6 December 2022.
The report:
observed the following damage:
Determination | Case number: 934518 Page 4 of 8
noted over 500mm of rain fell during February 2022
made the following conclusions:
relevantly recommended:
Determination | Case number: 934518 Page 5 of 8
The insurer denied the claim based on the engineer’s report. In its final decision letter, the
insurer summarised its reasons for denying the claim as follows:
… [the engineer] find (sic) that the damages to the pool has arisen from a storm in
that:
the waters has (sic) flowed down the hill,
mixed with clay and created a slurry between the concrete and the pool wall,
the slurry been (sic) heavier or more dense than the water in the pool,
which caused hydrostatic pressure on the pool wall which has bent in.
The engineer provides their opinion that the above ground pool is not designed to
be backfilled and that even with the stablished (sic) crusher rock, hydrostatic
pressure will still bring pressure on the pool wall, which is a thin metal and not
designed to deal with these forces.
The complainant disputed the engineer’ s findings
The complainant has not provided an expert report that contradicts the engineer’s findings.
However, he provided information from the pool’s manufacturer that shows the pool could be
installed in the ground so long as certain specifications are met. He also says:
a French drain wa s installed in accordance with the manufacturer’s recommendations and
this alleviates hydrostatic pressure
there was a spoon drain adjacent to the pool and this means the drainage around the pool
is adequate
the backfill was not higher than the water level
the backfill sloped away from the pool and this meant the drainage was adequate.
He has also provided:
photographs and measurements to show the backfill was below the water level in the pool
photographs and measurements showing the drainage immediately adjacent to the pool
was installed.
The engineer reviewed and responded to the complainant’s information
The engineer responded to the complainant’s information in a further report dated 3 April
2023. In summary, that report says:
the discharge pipe was designed to capture ground water permeation and not the
collection from the land
although the ground around the immediate perimeter of the pool is below the pool’s water
level, the ground beyond the perimeter is higher
this meant the backfill was sloping towards the pool
the spoon drain wa s inefficient in the complainant’s pool arrangement because despite its
presence surface water has flown towards the pool.
Determination | Case number: 934518 Page 6 of 8
The insurer was not entitled to deny the claim
The insurer has not proved the structural failure exclusion applies as there is no information
to support a conclusion that the pool had a defect that led to the damage.
The engineer’s conclusion that the damage to the pool was caused by hydrostatic pressure
was qualified by the amount of rain that fell between 22 and 28 February 2022 (over 500mm
compared to a monthly average for February of 130mm). I am therefore satisfied the
proximate cause of the damage to the pool and its surrounds was from rainwater runoff and
subsidence that happened immediately as a direct result of the storm.
I am also concerned the engineer did not conduct any invasive investigations, which I
consider as necessary to properly determine the extent and adequacy of the underground
drainage. I note the engineer’s reports were based on a visual inspection only. This means
it has not been established on the balance of probabilities poor drainage design was a cause
of the damage.
Finally, I am satisfied the pool was installed in line with the manu facturer’s specifications
(provided by the complainant) as evidenced by the complainant’s photographs and
measurements.
The insurer is liable for damage to the pool and its surrounds
Based on the above, I consider the insurer is liable for the damage to the pool and its
surrounds.
However, it is not required to compensate the complainant for his costs incurred to improve
drainage as these were incurred to mitigate future risk.
Given the passage of time since the most recent repair quotes were obtained (being those
provided by the complainant in his 27 March 2023 complaint response), it is reasonable for
the insurer to cash settle the claim based on the complaina nt’s quotes with a 15 % uplift.
The insurer’s offer of compensation for non -financial loss is reasonable
The insurer has acknowledged its handling of the claim was inadequate. It has made a
$2,000 offer for the undeniable stress this has caused the complainant. I think that offer is a
reasonable one in the circumstances.
2.2 Why is the outcome fair?
The outcome is fair
The outcome is fair because the available evidence shows the damage was caused by an
insured event, and the insurer has not established exclusions apply or that it is otherwise
entitled to decline the claim.
Determination | Case number: 934518 Page 7 of 8
3 Supporting information
3.1 The AFCA process
AFCA’s approach is based on fairness
AFCA has determined this complaint based on what is fair in all the circumstances, having
regard to:
the legal principles
applicable industry codes or guidance
good industry practice
previous decisions of AFCA or its predecessor schemes (which are not binding).
There has been a full exchange of the relevant information, and each party has had the
opportunity to address any issues raised. We have reviewed and considered all of the
information the parties have provided.
While the parties have raised a number of issues in their submissions, we have restricted this
determination to the issues that are relevant to the outcome.
3.2 Relevant policy exclusions
Page 27 of the PDS – Flood and rainwater run-off
Not covered
…
loss of damage caused by:
- erosion, deterioration, collapse, shrinkage or any other earth movement …
Page 65 of the PDS – General exclusions for all covers and benefits
What we don’t cover
Loss, damage … arising from:
rust, corrosion, gradual deterioration, depreciation, wear or tear
erosion, deterioration, collapse, shrinkage or any other earth movement
landslide or subsidence unless it happens immediately as a direct result of:
- flood
- rainwater run-off
Determination | Case number: 934518 Page 8 of 8
- storm …
…
hydrostatic pressure including loss or damage to swimming pools or similar
structures
Page 66 of the PDS – General exclusions for all covers and benefits (cont.)
We do not cover:
…
mechanical, structural or electrical failure of an item
…
the settling, shrinkage or expansion in buildings, foundations, walls or
pavement
…
Page 66 of the PDS – Maintaining and occupying your home
We don’t cover loss, damage … arising from:
faulty design or workmanship …