Home / Suncorp Group / Determination 934360

Determination 934360

Decline of storm damage claim for subfloor and foundations; compensation for claim handling delays

FirmSuncorp Group
Decided2023-12-05
ProductGeneral Insurance · Home building and contents
OutcomeFor the complainant in part
Amount awarded—
Non-financial loss$1,000
Amount claimed$137,136
SourceAFCA PDF

Summary

The complainant claimed for storm damage to the subfloor and piers of his home, which the insurer declined as gradual damage from poor drainage and repeated rainfall. AFCA upheld the decline but ordered $1,000 compensation for non-financial loss due to claim handling errors and delays.

The proximate cause of the damage was ongoing water inundation from poor drainage, council pavement fall and repeated rain rather than a single storm, so it fell outside cover and within the wear, tear and gradual deterioration exclusion, but poor claims handling warranted compensation.

Issues

Subjects and remedies

home or building damagenatural disasterpay non financial loss

Related

All Suncorp Group determinations · Find similar determinations

Text of the determination

Determination Case number 934360 Financial firm AAI Limited Determination | Case number: 934360 Page 1 of 7 Case number: 934360 24 November 2023 1 Determination overview 1.1 Complaint The complainant holds a home building and contents insurance policy underwritten by the financial firm (insurer). He lodged a claim for storm damage to the insured home, which he says occurred on 2 March 2022. The insurer declined the claim. It says the damage was not due to a single storm event but rather faulty design, wear, tear, rising damp, and gradual deterioration at the property over an extended period. It says this damage is excluded under the terms of its policy. The complainant disagrees and seeks cover for the damage caused to his home. 1.2 Issues and key findings is the insurer required to cover the claimed loss? No. The inundation of the subfloor of the home was an ongoing issue, due to a combination of recent increased rainfall, poor drainage and council work conducted in the area. These factors meant water pooled under the home and caused damage over time. This is not something the policy provides cover for and the insurer is not required to indemnify the complainant for the damage caused. Is an award of compensation appropriate? Yes. The insurer made errors which delayed the resolution of the claim, causing an unusual degree of stress, delay and inconvenience for the complainant. It is appropriate that the insurer pays additional compensation of $1,000. Why is the outcome fair? The policy provides cover for listed insured events, subject to terms and conditions. The cause of the damage was not due to any of these events. Although regular rain contributed to the water pooling in the subfloor, it would not be fair to require the insurer to cover the claimed damage. Given the poor handling of some aspects of the claim, it is fair the insurer pays compensation. 1.3 Determination The determination is in favour of the insurer. The insurer is required to pay $1,000 compensation for non-financial loss. This amount must be paid within 14 days of the complainant’s acceptance of the determination. The insurer is not required to take any further action in relation to this claim or the complaint. Determination | Case number: 934360 Page 2 of 7 2 Reasons for determination 2.1 Is the insurer required to cover the claimed loss? No. The inundation of the subfloor of the home was an ongoing issue, due to a combination of recent increased rainfall, poor drainage and council work conducted in the area. These factors meant water pooled under the home and caused damage over time. This is not something the policy provides cover for and the insurer is not required to indemnify the complainant for the damage caused. Complainant lodged claim for storm damage to the insured home The complainant and his wife purchased the insured home in August 2021 and moved into it in or about October that same year. The home is a sandstone cottage, built in or about 1888. Some alterations and a second storey were added during renovations in 1996 by prior owners. The complainant seeks cover for water damage to the flooring and the subfloor he says was caused by a storm on 2 March 2022. There is no dispute a storm occurred or that it caused damage. The insurer covered the complainant for damage to the walls, carpet, furniture, a glass ceiling and some contents. It did not cover the damage to the roof, the subfloor or the home’s foundations. It says this damage is not covered by the policy as it was not incurred due to the storm. Whilst the complainant does not dispute the decision in relation to the roof, he disagrees with the refusal to cover the subfloor or the foundations. This decision is therefore limited to consideration of these issues. The parties agree water washed under the foundations of the home and settled in the subfloor. However, they disagree as to the cause of this and the responsibility for it. Onus on complainant to establish a claimable loss The complainant has the onus of establishing he suffered a loss from an event covered by the policy. If a claimable loss is established, the insurer then has the onus of establishing the application of any exclusion or condition it relies on to deny or reduce its liability. For both the complainant and the insurer, the onus of proof is the balance of probabilities (that is, it is more likely than not). If the complainant can establish he suffered a claimable loss, the onus shifts to the insurer to show, on balance:  it is entitled to rely on an exclusion under the policy, or  it is otherwise entitled to decline the claim. Policy covers storm damage subject to terms, conditions and exclusions The terms of the policy include the Certificate of Insurance and the Product Disclosure Statement (PDS). There is no dispute the insurer sent these documents to the complainant. The policy covers damage caused by an ‘incident’. An ‘incident’ is defined as a: single event, accident or occurrence which you did not intend or expect to happen. A series of incidents attributable to one source of originating cause is deemed to be the one incident. Determination | Case number: 934360 Page 3 of 7 The ‘incidents’ covered by the policy are called ‘ insured events ’ . Amongst these insured events is cover for loss or damage caused by a ‘ storm ’ . A storm is defined in the PDS as: a single weather event being, a cyclone or severe atmospheric disturbance. It can be accompanied by strong winds, rain, lightning, hail, snow or dust. The policy specifically excludes certain damage, including that caused by wear, tear, gradual deterioration or poor workmanship. Complainant says stormwater was trapped in the subfloor and caused damage The complainant discovered 400mm of water in the subfloor on 9 April 2023 (38 days after the storm event). He says the prolonged presence of this water, caused by the storm event, damaged the flooring and piers. The flooring sunk about 50mm, causing sloping of the floorboards and gaps in skirting boards. The complainant investigated how and why water was flowing under the home, finding: the stormwater pipe leading from the house out to the footpath had been broken in the middle of the footpath and that the footpath running along the [street] side of the house had an incorrect fall – sloping towards the house and sending water into rather than away from it. He considers the incorrect fall on the concrete diverted water under the home. He seeks cover for the damage caused by the water trapped under the home between the storm date and the extraction of this water, about six weeks later. Engineer says inundation under home was gradual, not due to the storm event Engineer CR for the insurer reviewed the subfloor damage and found:  the complainant confirmed the local council agreed to rectify the concrete pavement as the fall from this directs stormwater into the home  there were high moisture readings in the internal walls along the western part of the home  timber floorboards and the skirting were affected, with the complainant confirming he had to clean mould spores regularly  soil in the subfloor was ‘saturated’ and there was water ponding in the northwest corner  there were no signs of drainage in the subfloor and water marks indicating water had been up to 300mm deep  subsided piers were below the north-western part of the home, causing loss of contact and support for the floor joists (20-30mm)  timber bearers in the subfloor were deteriorated and decayed  a 10-15mm gap was observed between the floorboards and the skirting  the infiltration of water and ponding in the subfloor was ‘a n ongoing issue and not related to a single weather event’  the extent of subsidence from the piers (20-30mm) would not occur in a short period of time or due to the storm event, it generally happens over years. CR accepted the storm likely hastened the damage to the floorboards, but the storm was not the cause. Further, CR noted the changes in 1996 did not comply with the Building Code of Australia 1996 (BCA), which operated at the time. It says the construction changes did not accord with 3.1.2.2 (Drainage requirements) and 3.1.2.4 (Subsoil drainage) of the BCA. Determination | Case number: 934360 Page 4 of 7 Section 3.1.2.2 outlines drainage requirements and how it must be installed. Specifically, where necessary, drainage must serve to divert water away from footings and basements. Section 3.1.2.4 outlines how subsoil drainage must be installed to avoid ‘excessive moisture or water pressure on footings’. Council repair work meant subfloor was no longer inundated The complainant says after the storm event, the subfloor had significant water in it. He acknowledged ‘ this could have been going for 100 years, we don't know ’ . He said the home was ‘smelly’ after periods of rain and had mould growing in it. The complainant purchased fans to operate in the subfloor to fry out the area. The complainant says the storm on 2 March 2022 was so severe as to create a ‘river of water’ in the subfloor. He also became concerned about the recent work undertaken by the local council. In a letter to this council, the complainant wrote: the pipe connected to our downpipe, intended to transport overflow water to the drain on [local street] was cut during the footpath repair in 2020, resulting in a large volume of water that should be diverting away from the house, instead flowing directly under the house. This has obviously caused serious mould and smell issues as a by-product of the constant dampness under the house. The complainant noted further the concrete footpath had been ‘incorrectly laid’, with the fall ‘tilting towards the property’ and not away from it . This meant water seeped under the home and eroded the side wall. After moving into the property, he noticed wet weather created damp areas in the home. Heavy rains made water flow under the home. In response, the local council informed the complainant on 15 June 2022 that the footpath levels met the required standards and do not require reinstatement. However, it agreed to undertake remedial work and relocate the stormwater pipe. Since this work has been done, the complainant says there has been no further water inundation issues. To address the floor, subfloor and other unrepaired damage at the home, the complainant seeks up to $137,136. The council later blamed the inundation of the subfloor on the ‘extreme rainfall event’, noting the volume of rain ‘simply exceeded the capacity of the drainage system’. The complainant believes the insurer should be liable for the damage. Three significant and uninsured factors permitted water ingress to property Since the complainant purchased a pump to remove the water under the home and had the council attend to the other issues, he reports the subfloor is now ‘bone dry’. He considers this is evidence the severity of the storm was the cause of the water ingress problems. I acknowledge the storm on 2 March 2022 resulted in water inundating the subfloor area. I do not, however, consider this was the main cause of water inundation under the home. Damage can have more than one cause. The proximate cause is not necessarily the first or last or the sole cause of the loss. It is the effective, dominant or operative cause of the loss. Significant rainfall occurred in February/March 2022. This exposed or exacerbated a problem under the home which had been present for some time. I accept rainwater ingress was Determination | Case number: 934360 Page 5 of 7 ongoing into the subfloor during periods of heavy rain. This was exacerbated by the combination of:  a lack of suitable subfloor drainage due to the 1996 renovations, meaning significant rainfall run-off could not effectively or efficiently disperse from the subfloor, and  the fall from the external council’s pavement directing water into the subfloor area. The significant overall rainfall in early 2022 likely exacerbated the extent of the damage at the home. I accept rainfall before this period also likely contributed to the overall damage. None of the above issues are insured events under the terms of the policy. Insurer is not required to cover the claimed damage On balance, I am not satisfied the observed damage is limited to the several weeks following the storm event. I accept it occurred over time due to the poor drainage and exacerbated by the pavement work and the higher level of recent rainfall. It is difficult to accept any one event was more predominant than the other, I accept all contributed to the damage. However as none are covered events under the terms of the policy, I accept the loss is not covered. Rainfall through February and March 2022 was significant. However, the local rainfall station recorded 60mm in the 24 hours to 9.00am on 3 March 2022. Only 19mm fell the day before. This contrasts with 128mm recorded on 23 February 2022, 44mm on 26 February 2022, 88mm on 8 March 2022 and 66 on 9 March 2022. In context, the rainfall recorded on the date of the loss was not extreme or necessarily significant compared to other dates around this time. The complainant confirms water had been entering the subfloor every time it rained heavily. On balance, I am satisfied it was the regular inundation of water during this period that was more significant than any one event. Water draining into the subfloor caused the damage (including to the piers) due to it not being able to effectively drain away. This is not something the policy covers. I am not satisfied the proximate cause of the damage was any singular storm event. Rather, it was the constant inundation of the subfloor and saturation of the area, owing to the factors cited above. This type of damage is not covered by the policy. This means the insurer is not liable for the claimed loss to the subfloor or the piers or its effect on the rest of the home. 2.2 Is an award of compensation appropriate? Yes. The insurer made errors which delayed the resolution of the claim, causing an unusual degree of stress, delay and inconvenience for the complainant. It is appropriate that the insurer pays additional compensation of $1,000. AFCA can award compensation for non-financial loss Under our Rules, AFCA can award up to $5,400 compensation for non-financial loss. This must relate to poor claims handling or other actions of the insurer which cause an unusual degree of stress, delay, or inconvenience. We expect complainants to be moderately robust, and we will not award compensation for the ordinary degree of inconvenience involved in making a claim. Determination | Case number: 934360 Page 6 of 7 Insurer is to pay $1,000 compensation for non-financial loss I acknowledge the complainant raises various concerns relating to the insurer’s management, of his claim for other areas of the house which have now been resolved. The complainant says while the insurer subsequently settled the his claim for carpet damage, he had to escalate his complaint three times before the insurer correctly assessed the carpet as unsalvageable and paid for the damage. I accept the poor communication and delays left the complainant confused regarding the claims assessment process. The insurer acknowledged and paid the complainant $300 for delays in assessing the damage to the roof. However, in the circumstances, I am not satisfied the insurer’s compensation is adequate. I consider it is fair that the insurer pays the complainant a further $1,000 in non-financial loss compensation, given his poor experience and the impact it had on him. 2.3 Why is the outcome fair? The policy provides cover for listed insured events, subject to terms and conditions. The cause of the damage was not due to any of these events. Although regular rain contributed to the water pooling in the subfloor, it would not be fair to require the insurer to cover the claimed damage. Given the poor handling of some aspects of the claim, it is fair the insurer pays compensation. Determination | Case number: 934360 Page 7 of 7 3 Supporting information 3.1 The AFCA process AFCA’s approach is based on fairness AFCA has determined this complaint based on what is fair in all the circumstances, having regard to:  the legal principles  applicable industry codes or guidance  good industry practice  previous decisions of AFCA or its predecessor schemes (which are not binding). The respective parties have completed a full exchange of the relevant information, and each party has had the opportunity to address any issues raised. We have reviewed and considered all of the information the parties have provided. While the parties have raised a number of issues in their submissions, we have restricted this determination to the issues that are relevant to the outcome. We assess complaints on available information and circumstances AFCA is not a court of law. We do not have the power to take or test evidence on oath, or to require third parties to give evidence. When we assess complaints, we consider:  available documents  the recollections of the parties  all relevant circumstances. We give more weight to documents created at the time the events occurred. If there are no relevant documents, we will decide what most likely occurred based on the available information. If there are conflicting recollections and these are evenly weighted, we may find that a claim cannot be established.