Determination 934084
Insurer limited liability for storm damage claim, rejecting higher scope of repairs, mould remediation, loss of income, medical expenses and non-financial loss
Summary
The complainant disputed the insurer's settlement of her storm damage claim and sought a larger scope of repairs, mould remediation, lost income, medical expenses and non-financial loss. AFCA found the determination in favour of the insurer, as most damage was pre-existing or related to failed prior repairs.
Most damage pre-existed the policy or related to the previous insurer's failed roof repairs and excluded rising damp, and consequential loss is excluded, so the insurer's limited liability and settlement offer were fair.
Issues
- Claim amount dispute primary · not upheld
“I find the insurer's cash settlement offer fair in the circumstances.”
- Claim denial secondary · not upheld
“Pre-existing roof ingress, rising damp and mould not covered; insurer entitled to limit liability.”
- Poor claim handling secondary · not upheld
“The insurer's management of the claim and assessment of its liability has been fair and consistent with its obligations.”
- Delay secondary · not upheld
“Insurer provided a claim outcome within a reasonable timeframe; any delays arise from complainant's decision not to accept assessment.”
- Product terms interpretation secondary · not upheld
“The policy excludes consequential loss, which includes loss of income and medical expenses.”
Subjects and remedies
health or medicalhome or building damagenatural disasterno remedy
Text of the determination
Determination
Case number 934084
Financial firm AAI Limited
Determination | Case number: 934084 Page 1 of 8
Case number: 934084 23 August 2023
1 Determination overview
1.1 Complaint
The complainant incepted a home building and contents policy (policy) with the financial firm
(insurer) commencing 26 October 2021. On 14 March 2022, a claim was lodged for storm
damage to insured property during an event on 27 February 2022. The complainant says
further storm damage occurred on 28 March 2022.
The insurer has accepted the claim and paid the complainant the full contents sum insured
amount of $5,000 and has offered to pay $22,690.00 towards building repairs arranged by the
complainant. The complainant is seeking a significantly higher scope of building repairs
including mould remediation works. She is also seeking cover for loss of income, medical
expenses and non-financial loss compensation (NFL).
1.2 Issues and key findings
Is the insurer’s a ssessment of its liability under the policy fair?
Yes. The insurer’s assessment and associated decision to limit its liability is fair and
consistent with the policy. The insurer is not required to cover loss or damage which existed
prior to inception of t he policy or that relates to a failure by the complainant’s previous
financial firm ‘insurer 2’ to complete adequate repairs.
Is the complainant entitled to compensation?
No. The insurer’s management of the claim and assessment of its liability has been f air and
consistent with its policy obligations. The policy does not cover consequential loss which
includes loss of income and medical expenses. It would be unfair to require the insurer to pay
the complainant NFL in the circumstances.
Why is the outcome fair?
The determination is fair as most of damage and maintenance works needing rectification
existed prior to inception of the policy and/or are related to failed repairs to the roof arranged
by insurer 2. Further, the insurer’s overall management of the claim has not been so poor as
to require it’s to pay NFL. Loss of income and medical expenses are excluded under the
policy.
1.3 Determination
This determination is in favour of the insurer.
The insurer’s decision to limit its liability under the claim is fair and consistent with the policy
provisions. The insurer is not required to pay the complainant compensation or cover the
claimed loss of income and medical expenses.
Determination | Case number: 934084 Page 2 of 8
2 Reasons for determination
2.1 Is the insurer’s assessment of its liability fair ?
Yes. The insurer’s assessment and associated decision to limit its liability under the claim is
fair and consistent with the policy provisions.
The policy is an insured events contract of insurance
The insurer provided the complainant with the relevant policy documentation including the
product disclosure statement (PDS) and certificate of insurance (COI). I accept the insurer is
entitled to rely on the policy provisions to assess its liability under the claim.
The policy covers the insured property against loss or damage caused by one or more of the
listed insured events, including ‘ Storm ’. Cover under the policy is subject to the conditions,
limitations and exclusions specified in the PDS.
The complainant bears the onus to show damage covered under the policy
The complainant is first required to show, it is more likely than not, that the loss or damage
claimed triggers cover under the policy. Only if the complainant can do this, will the duty shift
to the insurer to show, on balance, it is entitled to decline cover in line with the policy wording
or otherwise.
The insurer says the complainant has not shown all the damage claimed is due to one or
more of the listed insured events. Rather, it says that a majority of the damage is pre-existing
and relates to ongoing and long-term issues which are excluded under the policy. The insurer
says it has acted with the utmost good faith in accepting to cover some of the damage and
providing the complainant with temporary accommodation on an ex-gratia basis for an
extended period.
The complainant says the insurer failed to arrange make safe works and is refusing to cover
damage to the insured building caused by the said storms and subsequent mould developing
in the home. The complainant says the insurer should repair all the storm damage as well as
arrange investigation of the extent of mould infestation within the home and associated
remediation works.
I accept the available information shows it is more likely than not that the insured property has
suffered some storm damage because of the events on 27 February 2022 and 28 March
2022. However, that this damage is not to the extent claimed and it is fair that the insurer be
permitted to limit its liability to only such damage that is covered under the policy.
Background information relevant to the consideration of this complaint
the complainant ’s home was covered under an insurance policy held with insurer 2 which
was allowed to lapse after which she incepted the policy with the insurer on 26 October
2021
the available information shows the insured building suffered storm damage in March 2020
and March 2021. The complainant had lodged a claim after the March 2020 event which
was accepted by insurer 2 and later repairs were authorised under insurer 2’s lifetime
repair guarantee in March 2021
insurer 2 failed on several occasions to complete adequate repairs to the external roof i.e.
did not bring it back to a water tight and fit for purpose condition. This resulted in
subsequent instances of stormwater ingress and mould developing within the home. These
Determination | Case number: 934084 Page 3 of 8
rectification attempts by insurer 2 continued even after the complainant incepted the policy
with the insurer
the complainant, dissatisfied with insurer 2, sought to lodge a claim under the policy on 10
March 2022. However, this was subsequently withdrawn given the damage and concerns
related to a claim under the policy held with insurer 2
on 14 March 2022, the complainant lodged a claim for storm damage to the insured
property said to have occurred on 27 February 2022
a few days later, on 16 March 2022 the complainant receives a cash settlement of around
$75,000 from insurer 2 through a complaint determined by AFCA
the complainant then arranges internal repairs though consultants ‘CH’ as well as some
electrical works. However, these repairs were again damaged due to water ingress via the
ceilings and downlights on or about 28 March 2022
the complainant also arranged for the external tile roof to be replaced with a new
Colorbond r oof by ‘MR’ in early April 2022
the complainant is seeking cover for the stormwater ingress damage to newly replaced
walls and ceilings as well as mould damage she says has reappeared due to the insurer ’s
poor management and delays
the insurer has paid the full contents sum insured ($5,000) and is offering $22,690 towards
some of the building repair expenses incurred by the complainant, these being:
- $6,490 towards make safe works completed by CH
- $11,600 towards replacement of the claimed plasterboard linings, soffit linings,
cornices, skirtings and shelving by CH
- $1,900 towards electrical make safe carried out by ‘EC’
- $2,640 for additional works to the bathroom ceiling and associated items by CH
the insurer says it is prepared to re-assess and consider some further repairs as per the
scope of works prepared by its appointed consultants ‘W’
the insurer, despite the complainant’s entitlement to temporary accommodation having
been exhausted has agreed to continue paying for temporary accommodation until this
AFCA determination is provided to the parties.
Information from the various consultants appointed to the claim
The insurer appointed W to investigate the cause and extent of damage to the insured
building. In its report dated 19 March 2022 W notes the garage area had been converted into
a granny flat. This area presented with water ingress along the edges of the concrete slab
causing the walls to soak up water. This also resulted in water damage to the timber door,
bathroom door, walls, skirtings, architraves and flooring.
W says it could not access the roof as it had a tarp on it. However, on inspecting inside the
ceiling it noted damaged tiles and tiles that appeared loose and not in line. W recommended
appointment of a roof specialist and engineering consultants to report on the moisture noted
to be coming through the home’s concrete slab.
Mould remediation experts ‘Z’ attended the property and have provided a report dated 9 June
2022. Z notes lots of rising damp and that the yard was water logged, with moisture coming
through the slab. Z formed the view the home would not be liveable while mould remediation
works are completed. Z set up an exclusion zone, placed PPE, completed mould make safe
works, cleaned affected areas, sanitised and left the area safe.
Restoration consultants ‘J’ have provided a report dated 4 August 2022 after completing
moisture readings and a site inspection. J confirmed water run-off entered the property from
the back door affecting two areas. This was due to these areas being lower than the rest of
Determination | Case number: 934084 Page 4 of 8
the home. J noted dark spots over the concrete slab with visual efflorescence and high
moisture readings. J formed the view the property may have long term rising damp/seepage
issues. The external of the home showed wet brickwork with efflorescence salts to the height
equal to five rows of bricks.
‘E’ has provided a mould assessment report dated 18 August 2022. E collected surface
samples, moisture measurements, air samples and completed a visual inspection. E says the
complainant confirmed the granny flat area was flooded in February/March 2022, but water
did not flood the main section of the home. However, that the main section was experiencing
its own moisture ingress issues. E confirmed mould contamination to contents and throughout
the property.
E says significant strip out and mould remediation work is required to return the property to a
standard considered suitable for reoccupation. E found it is unlikely that the mould
proliferation observed within the main house is because of the flooding event within the
granny flat. E says it is more likely because of the moisture issues affecting the external walls,
and favourable environmental conditions.
The insurer appointed eng ineering consultants ‘K’ who attended the site on 10 August 2022
to report on the rising damp to the slab, external brickworks and suitability of the granny flat
construction. In its report K concludes:
the large amount of rainfall over consecutive days and the lack of surface drainage would
have caused water to pond across the property
the granny flat is a previous garage with the slab set down at a lower level than the house
slab. There is no difference in level between the driveway slab and the floor slab
this will have allowed water to enter the granny flat during the flooding event. Industry
building practice is to have the internal floor slab at a higher level than the external slabs
and ground to prevent water ingress occurring
the water staining/efflorescence to the base of the external brickwork walls and the living
room slab can be attributed to rising damp. Rising damp occurs as moisture from the soil
rises through the slab and the brickwork walls, which leads to efflorescence as the salts
come to the surface
there is likely inadequate waterproofing at the base of the external brickwork walls which
would normally prevent rising damp from occurring in the wall cavity
historical imagery from previous realestate.com.au listings indicate that the rising damp
has been an ongoing issue over the life of the building. The rising damp may have been
exacerbated by the February 2022 flooding event as the soils became saturated.
In its report dated 25 September 2022, W says the granny flat construction does not meet the
relevant building codes and standards, these have been provided in the report. The garage
which is a Class 10b structure has been converted into a Class 1 building (bedroom). W
reiterates the outside concrete area at the rear door where the water came in is almost at
internal concrete slab level and even slightly slopes towards the door.
The insurer has provided reports from its internal assessor who agrees with the findings of
the building, restoration and engineering consultants and adds that due to the pre-existing
rising damp issues, no additional drying or mould remediation will be effective. The
complainant must have the rising damp issue and all associated items permanently rectified
first to prevent further moisture and mould issues. The assessor rejects the scope of works
proposed by W and says it includes repairs not covered under the policy.
The complainant has provided a letter from CH confirming it was employed by the
complainant on 21 March 2022 to strip out water damaged and mouldy plasterboard ceiling
Determination | Case number: 934084 Page 5 of 8
and walls. CH confirms the failed attempts by consultants appointed by insurer 2 to rectify the
issues with the roof. Also, that the insurer and the SES failed to arrange necessary make safe
works to the roof, which CH later arranged and charged the complainant for the works.
CH confirms on removing the internal ceiling, it was evident there were still broken tiles and
sunlight shining through the roof tiles. It says on inspecting the paster boards on 29 March
2022, it was evident water ingress had occurred through around 30 locations (across the
roof).
Information supports the insurer’s position to limit its liability under the claim
I have carefully considered the information including the various expert reports, the policy
provisions and the positions of the parties. I find the information, including photographic
evidence and video clips, supports the insurer’s position. I am satisfied it is reasonable to
accept the insured property was experiencing the below issues from before the complainant
incepted the policy with the insurer as well as the 27 February 2022 storm event:
stormwater ingress issues through the roof
rising damp; and
the presence of mould.
I acknowledge the complainant’s op inion that the storm events of 27 February 2022 and 28
March 2022 caused new damage to the roof allowing stormwater ingress. However, I am not
satisfied this has been shown to be the case. Rather, it is more likely the ongoing water
ingress and associated damage relates to the pre-existing issues with the roof and
inadequate repairs completed by insurer 2 before inception of the policy with the insurer.
Further, that it is more likely the insured property was experiencing mould infestation issues
before the policy was arranged with the insurer. I accept the significant internal works
completed by CH will have removed most of the mould damaged ceilings and walls. However,
there is no information to show this completely removed or remediated all mould from the
property.
In addition to this, I am satisfied the insurer has been successful in establishing there exists a
rising damp issue with the insured building’s slab. This is causing or at the very least is a
significant contributing factor for the repeated reappearance of mould within the home. This
rising damp issue has not been shown to be due to an event covered under the policy, rather,
it is excluded from cover under the policy.
I find the insurer’s cash settlement offer fair in the circumstances . This is especially given
there is persuasive information indicating the construction of the granny flat does not meet the
required building standards and that this has allowed and/or contributed to the water entering
the home. It would not be unreasonable for the insurer to seek to decline cover for this
damage, however, it has chosen to allow cover under the claim.
I accept the complainant’s position that insurer 2 did not identify or rely on these issues when
accepting her claim under the previous policy. However, the decisions, assessments and/or
failures on the part of insure r 2 do not impact on the insurer’s entitlement to rely on the
information from its appointed consultants and the terms of its insurance product, when
assessing its liability.
Given this and in the absence of compelling information to the contrary, I am satisfied the
insurer’s assessment of its liability and associated final claim settlement offer is fair in the
circumstances. Any increase in mould within the home arising from the delay in bring this
Determination | Case number: 934084 Page 6 of 8
claim to conclusion does not rest with the insurer. Rather, it is reasonable to accept this is
due to the complainant’s decision to dispute the insurer’s position under the claim.
2.2 Is the complainant entitled to compensation?
No. The insurer’s management of the claim and assessment of its liability has been fa ir and
consistent with its obligations under the policy. The policy does not cover consequential loss
which includes loss of income and medical expenses.
AFCA Rules allow for an award of NFL
The Rules (Rule D 3.3) allow for an award of up to $5,400 for non-financial loss
compensation, if the insurer caused the complainant to suffer an unusual degree or extent of
inconvenience, delay or interference. AFCA takes a conservative approach when considering
any award of compensation.
Insurer not required to pay the complainant NFL
In this instance and considering the matters discussed above, I am not satisfied it would be
fair to require the insurer to pay the complainant NFL. I empathise with the complainant’s
position and accept she has had to deal with difficult circumstances, especially given all the
other personal issues she has been experiencing. However, I am not satisfied it would
reasonable to require the insurer to pay NFL where its management of the claim and
decisions have been fair and consistent with the policy.
The complainant has chosen to dispute the insurer’s assessment of its liability but has not
provided any persuasive information to show any error or poor management on the part of the
insurer. The insurer arranged the necessary investigations and provided the complainant with
a claim outcome within a reasonable timeframe in line with its policy obligations. Any delays,
damage or loss following this arise from the complainant’s decision not to accept the insurer’s
assessment of its liability.
I note the insurer has continued to provide the complainant temporary accommodation over
an extended period despite this exceeding her entitlement under the policy. I accept this was
provided on an ex-gratia basis and taking into consideration the complainant’s vulnerable
situation.
Policy excludes cover for consequential loss
The complainant has referred to having lost income because of time spent dealing with the
claim and that there are medical expenses incurred in the treatment of the complainant and
her daughter due to exposure to mould. The policy excludes consequential loss, which
includes things such as loss of income and medical expenses.
In line with the matters considered above, I am not satisfied these expenses or loss arise
from failure on the part of the insurer. Accordingly, I accept the insurer is entitled to decline
cover for the claimed loss of income and medical expenses.
2.3 Why is the outcome fair?
The determination is fair as it accepts the available information shows most of damage and
maintenance works needing rectification existed prior to inception of the policy and/or related
to failed repairs to the roof arranged b y insurer 2. Further, the insurer’s overall management
Determination | Case number: 934084 Page 7 of 8
of the claim has not been so poor that it would be fair to require it’s to pay NFL. Loss of
income and medical expenses are excluded under the policy.
Determination | Case number: 934084 Page 8 of 8
3 Supporting information
3.1 The AFCA process
AFCA’s approach is based on fairness
AFCA has determined this complaint based on what is fair in all the circumstances, having
regard to:
the legal principles
applicable industry codes or guidance
good industry practice
previous decisions of AFCA or its predecessor schemes (which are not binding).
The respective parties have completed a full exchange of the relevant information, and each
party has had the opportunity to address any issues raised. We have reviewed and
considered all the information the parties have provided.
While the parties have raised several issues in their submissions, we have restricted this
determination to the issues that are relevant to the outcome.
We assess complaints on available information and circumstances
AFCA is not a court of law. We do not have the power to take or test evidence on oath, or to
require third parties to give evidence.
When we assess complaints, we consider:
available documents
the recollections of the parties
all relevant circumstances.
We give more weight to documents created at the time the events occurred. If there are no
relevant documents, we will decide what most likely occurred based on the available
information.
If there are conflicting recollections and these are evenly weighted, we may find that a claim
cannot be established.