Determination 933890
Storm damage claim for shed, slab, tools and roof repairs, and claim handling delay
Summary
The complainant claimed for hail/storm damage to his shed, slab, tools and roof repairs after two storms. AFCA found for the insurer, upholding its offers (shed replacement if slab relaid, $2,600 for tools, $1,000 already paid for non-financial loss) and ordering nothing further.
The slab was not damaged by the storm and the insurer's offers and prior non-financial loss payment were fair, so no further payment was required.
Issues
- Claim denial primary · not upheld“no persuasive evidence the storm damaged the concrete slab. This alone means the insurer is not liable to replace it.”
- Claim amount dispute secondary · not upheld“Whilst the complainant says they are worth $5,200... I consider the insurer's offer [of $2,600] is fair.”
- Delay secondary · upheld“I accept the insurer took too long in its initial response and there was an unreasonable delay in attending to make safe repairs.”
- Repairs or contractors secondary · not upheld“complainant has not shown there are outstanding issues with the roof repair that require further attention.”
Subjects and remedies
home or building damagenatural disasterno remedy
Related
All Suncorp Group determinations · Find similar determinations
Text of the determination
Determination
Case number 933890
Financial firm AAI Limited
Determination | Case number: 933890 Page 1 of 6
Case number: 933890 28 July 2023
1 Determination overview
1.1 Complaint
The complainant holds a home and contents insurance policy which is underwritten by the
financial firm (insurer). He lodged a claim for hail damage to his home in November 2020, for
which the insurer conducted repairs. He later lodged a second claim on 26 February 2022 for
further damage after another hailstorm, including to his shed.
The insurer agreed to replace the shed, however it cited concerns with the concrete slab and
said this must be replaced before any work can be done. The complainant is dissatisfied with
the insurer’s handling of the claim and the quality of repairs conducted after the 2020 event.
The complainant says the insurer took too long to attend and ongoing rain ingress caused
issues with his shed. This included damaging the concrete slab floor, electrics and numerous
tools and other items stored within it. He also says the roof of his home was not repaired
properly. The complainant seeks cover for this damage under the terms of the policy. He also
seeks compensation for non-financial loss compensation.
1.1 Issues and key findings
Has the insurer handled the matter appropriately?
Yes. The insurer agreed to rectify damage where necessary and to cover the replacement of
the shed if the complainant lays a new slab. There is no persuasive evidence the slab was
damaged by the 2022 storm. If the complainant does not replace the slab, the insurer may
cash settle him for the damage, with appropriate consideration for a contingency uplift.
Is the insurer required to pay compensation?
No. The insurer is not required to pay any further non-financial loss compensation.
Why is the outcome fair?
The insurer sought to address the complainant’s concerns and has done so effectively. If the
complainant does not replace the slab within three months, it is fair that the insurer provides a
cash settlement for the damage, as outlined in section 2. The insurer has already adequately
compensated the complainant and paid non-financial loss compensation.
1.2 Determination
This determination is in favour of the insurer.
The insurer is not required to undertake any further work, except for the replacement of the
shed. This only needs to be done if the complainant replaces the slab within three months of
accepting this decision. If the complainant accepts the decision and does not replace the slab
in this time, the insurer must cash settle the complainant as outlined in section 2 of this
determination.
The insurer is not required to pay compensation, beyond what it has already agreed.
Determination | Case number: 933890 Page 2 of 6
2 Reasons for determination
2.1 Has the insurer handled the matter appropriately?
Yes. The insurer agreed to rectify damage where necessary and to cover the replacement of
the shed if the complainant lays a new slab. There is no persuasive evidence the slab was
damaged by the 2022 storm. If the complainant does not replace the slab, the insurer may
cash settle him for the damage, with appropriate consideration for a contingency uplift .
Complainant seeks cover for storm damage to shed and other items
The complainant made two claims for storm damage to the home. One in 2020, after which
the insurer conducted extensive repairs and again in 2022. He says some of the 2022
damage related to poor repair work conducted by the insurer after the 2020 event.
The insurer replaced the s hed on the complainant’s property through builder HR after the
2020 event. The complainant says he used this as a workshop, but it was extensively water
damaged by the storm. He considers this was due to HR’s poor construction. The
complainant also notes the insurer did not have someone attend his property for more than
three months after the 2022 event to attend to make safe work.
During this period, he says the items in his shed were exposed to the elements. This meant
many of his tools were damaged and rusted. He provided photos of the rusted tools.
To prevent further damage, the complainant says he purchased a temporary shed to house
the tools. He also raised other issues of concern in relation to the home.
Policy covers listed events including storm, subject to terms and conditions
The complainant ’s policy is made up of the Insurance Certificate and the Product Disclosure
Statement (PDS). There is no dispute the insurer sent these documents to the complainant.
The policy covers damage caused by one of the listed events. It does not provide cover for all
damage. Amongst these events is cover for loss or damage caused by a storm.
This cover is subject to terms, conditions and exclusions under the policy.
The PDS also confirms:
We guarantee the standard of the workmanship to be free of defects. If a defect
arises in the lifetime of the home as a result of poor quality workmanship, then we
will rectify the problem. It is a condition of the guarantee that we reserve the right
to decide who will undertake the rectification work.
The insurer says this guarantee does not apply (amongst other things):
to wear and tear consistent with normal gradual deterioration of the home
Insurer is not required to replace the slab in the shed
The complainant says water entered the shed at numerous points during the 2022 storm. This
included water coming into the installed light fittings. HR reviewed the damage to the shed,
agreeing it sustained water damage:
Determination | Case number: 933890 Page 3 of 6
the cause of the water ingress via the ridge capping was due the amount
rainwater that fell in that short period of time with wind driving the rain in and
under the ridge capping
The insurer agreed to replace the shed. However, it had concerns with the state of the
concrete slab.
The complainant says the slab was damaged in the 2022 event. Numerous experts inspected
it. All agreed it was not damaged in the storm event. The slab is estimated to be about 20
years old, Engineer CR found it had multiple hairline cracks and these were due to ‘a lack of
regularly spaced saw cut crack control joints’. Such joints are used to control where cracking
occurs due to concrete shrinkage.
Given the width of the slab (6m) is much longer than the length (3m), CR accepted shrinkage
cracks are expected and represent no structural concern for the shed. However, CR said the
slab was not raised from the ground, which contravenes the manufacturer’s requirements.
I am satisfied there is no persuasive evidence the storm damaged the concrete slab. This
alone means the insurer is not liable to replace it. The issues with the concrete slab are
consistent with its age, how it was constructed and general deterioration.
The policy does not cover:
any part of the home, unit or contents that has wear, tear, rust, fading, rising
damp, corrosion, rot, action of light, atmospheric or climatic conditions or gradual
deterioration
I accept the insurer is not required to replace the slab in the shed.
Insurer must replace or cover the costs to replace the shed itself
The insurer acknowledges HR’s construction of the new shed after the 2020 event was not to
an acceptable level. Therefore, it agreed to cover the costs to replace it.
The complainant paid for a temporary replacement shed and electrics at a cost of $695. The
insurer agreed to reimburse these costs. It also agrees to construct a new shed on the
original space, however it says it cannot do this until the complainant replaces the slab.
I am satisfied it is fair that the insurer replaces the original shed, only if the complainant lays a
new (and structurally compliant) slab.
If this is not done within three months of acceptance of this determination, I am satisfied the
insurer should not have to comply with the repair guarantee and replace the shed. The
insurer remains liable for the costs, though. If the complainant does not replace the slab
within the specified time, the insurer may attend to a cash settlement of the claim.
This cash settlement must include:
a firm and viable estimate from a builder to replace the shed like-for-like, including
construction/installation costs
the costs to obtain and install electrics as they were before and to ensure they are
compliant
a 20% contingency uplift to account for the transfer of risk and as a contingency for
possible unseen damage.
Determination | Case number: 933890 Page 4 of 6
Insurer’s offer to pay $2,600 for replacement of t ools is fair
The complainant provided photos of numerous tools he says were damaged in the 2022
storm events and due to the insurer’s delay in arranging make safe work. The storm occurred
on 26 February 2022, however make safe work was not done until 4 June 2022.
I acknowledge the complainant provided numerous photos of rusted tools. He also claims for
a damaged stereo.
The exchanged material is not persuasive in showing the storm (or the delay) was exclusively
to blame for the observed rust to the tools. Even so, the insurer agreed to reimburse the
complainant $2,600 for these items.
Whilst the complainant says they are worth $5,200, I am not satisfied this would be a fair
outcome. These costs are based on what the complainant says he paid to replace the tools. It
is not clear as to the extent the tools were affected by the storm.
Given this, I consider the insurer’s offer is fair. The exchanged material does not persuasively
show this damage was solely (or even substantively) caused by the 2022 storm or by the
insurer’s delays .
Insurer’s repair of the home r oof is satisfactory
HR also conducted repairs to the main part of the home in or about 2021. This included the
replacement of the main roof due to hail damage.
The complainant was dissatisfied with some of the repairs conducted at the time and HR was
required to conduct some rectification work. The insurer says this was done, although the
complainant remained unhappy with the quality of this work at the time of the 2022 claim.
The complainant reported to the insurer he had concerns with:
the main roof gable
a gap between the ridge cap and roof sheet ends at the transitional flashing location.
The insurer’s assessor reviewed this damage and reports these items were ‘correctly
installed’ and would prevent wind driven rain from entering the home. The assessor’s report
says this was discussed with the complainant and he was satisfied with this response.
Whilst the complainant submits he now is not satisfied, he provided no expert evidence to
show the work was deficient or otherwise not completed to an acceptable standard.
On balance, I am satisfied the complainant has not shown there are outstanding issues with
the roof repair that require further attention.
2.2 Is an award of compensation payable?
No. The insurer is not required to pay any further non-financial loss compensation.
Complainant dissatisfied with insurer’s hand ling of the claim
The complainant says the insurer:
took too long (more than three months) to attend the site
some of the damage was due to poor work conducted by HR in the first place
ongoing delays and ingress problems meant he had to purchase a replacem ent shed to
house his items
the overall handling of the matter was poor.
Determination | Case number: 933890 Page 5 of 6
AFCA can award compensation for non-financial loss
Under our Rules, AFCA can award up to $5,400 compensation for non-financial loss. This
must relate to poor claims handling or other actions of the insurer which cause an unusual
degree of stress, delay, or inconvenience.
We expect complainants to be moderately robust, and we will not award compensation for the
ordinary degree of inconvenience involved in making a claim.
Insurer is not required to further compensate the complainant
The insurer acknowledges the original repair work to the shed conducted by HR was not to an
acceptable standard. It agreed to attend to rectification work (if the slab is replaced) and it
covered the purchase of a temporary shed for the complainant.
I am satisfied this was an acceptable handling of the complainant’s concerns.
I accept the insurer took too long in its initial response and there was an unreasonable delay
in attending to make safe repairs. I acknowledge this frustrated the complainant and led him
to believe this caused further damage. The insurer offered to compensate him $2,600 for the
damage caused to his tools.
This was a fair outcome. The evidence that the tools were exclusively damaged by either the
2022 storm event, or the delay, is not strong. I acknowledge these issues may have been a
factor or contributed to the damage.
In further consideration of the overall claims experience, the insurer offered $1,000 to the
complainant for non-financial loss compensation on 10 March 2023. The complainant
accepted this payment.
Given this, I consider there is no need for a further payment. I acknowledge there was
inconven ience for the complainant and issues with some of HR’s work. I accept the insurer
has attempted to address the issues with its settlement offers for the respective issues and
prior payment of compensation. This represents a fair outcome in the circumstances.
There is no need for the insurer to pay further compensation to the complainant.
Determination | Case number: 933890 Page 6 of 6
3 Supporting information
3.1 The AFCA process
AFCA’s approach is based on fairness
AFCA has determined this complaint based on what is fair in all the circumstances, having
regard to:
the legal principles
applicable industry codes or guidance
good industry practice
previous decisions of AFCA or its predecessor schemes (which are not binding).
The respective parties have completed a full exchange of the relevant information, and each
party has had the opportunity to address any issues raised. We have reviewed and
considered all the information the parties have provided.
While the parties have raised a number of issues in their submissions, we have restricted this
determination to the issues that are relevant to the outcome.
We assess complaints on available information and circumstances
AFCA is not a court of law. We do not have the power to take or test evidence on oath, or to
require third parties to give evidence.
When we assess complaints, we consider:
available documents
the recollections of the parties
all relevant circumstances.
We give more weight to documents created at the time the events occurred. If there are no
relevant documents, we will decide what most likely occurred based on the available
information.
If there are conflicting recollections and these are evenly weighted, we may find that a claim
cannot be established.