Home / Suncorp Group / Determination 933890

Determination 933890

Storm damage claim for shed, slab, tools and roof repairs, and claim handling delay

FirmSuncorp Group
Decided2023-07-28
ProductGeneral Insurance · Home building and contents
OutcomeFor the firm
Amount awarded—
Non-financial loss—
Amount claimed—
SourceAFCA PDF

Summary

The complainant claimed for hail/storm damage to his shed, slab, tools and roof repairs after two storms. AFCA found for the insurer, upholding its offers (shed replacement if slab relaid, $2,600 for tools, $1,000 already paid for non-financial loss) and ordering nothing further.

The slab was not damaged by the storm and the insurer's offers and prior non-financial loss payment were fair, so no further payment was required.

Issues

Subjects and remedies

home or building damagenatural disasterno remedy

Related

All Suncorp Group determinations · Find similar determinations

Text of the determination

Determination Case number 933890 Financial firm AAI Limited Determination | Case number: 933890 Page 1 of 6 Case number: 933890 28 July 2023 1 Determination overview 1.1 Complaint The complainant holds a home and contents insurance policy which is underwritten by the financial firm (insurer). He lodged a claim for hail damage to his home in November 2020, for which the insurer conducted repairs. He later lodged a second claim on 26 February 2022 for further damage after another hailstorm, including to his shed. The insurer agreed to replace the shed, however it cited concerns with the concrete slab and said this must be replaced before any work can be done. The complainant is dissatisfied with the insurer’s handling of the claim and the quality of repairs conducted after the 2020 event. The complainant says the insurer took too long to attend and ongoing rain ingress caused issues with his shed. This included damaging the concrete slab floor, electrics and numerous tools and other items stored within it. He also says the roof of his home was not repaired properly. The complainant seeks cover for this damage under the terms of the policy. He also seeks compensation for non-financial loss compensation. 1.1 Issues and key findings Has the insurer handled the matter appropriately? Yes. The insurer agreed to rectify damage where necessary and to cover the replacement of the shed if the complainant lays a new slab. There is no persuasive evidence the slab was damaged by the 2022 storm. If the complainant does not replace the slab, the insurer may cash settle him for the damage, with appropriate consideration for a contingency uplift. Is the insurer required to pay compensation? No. The insurer is not required to pay any further non-financial loss compensation. Why is the outcome fair? The insurer sought to address the complainant’s concerns and has done so effectively. If the complainant does not replace the slab within three months, it is fair that the insurer provides a cash settlement for the damage, as outlined in section 2. The insurer has already adequately compensated the complainant and paid non-financial loss compensation. 1.2 Determination This determination is in favour of the insurer. The insurer is not required to undertake any further work, except for the replacement of the shed. This only needs to be done if the complainant replaces the slab within three months of accepting this decision. If the complainant accepts the decision and does not replace the slab in this time, the insurer must cash settle the complainant as outlined in section 2 of this determination. The insurer is not required to pay compensation, beyond what it has already agreed. Determination | Case number: 933890 Page 2 of 6 2 Reasons for determination 2.1 Has the insurer handled the matter appropriately? Yes. The insurer agreed to rectify damage where necessary and to cover the replacement of the shed if the complainant lays a new slab. There is no persuasive evidence the slab was damaged by the 2022 storm. If the complainant does not replace the slab, the insurer may cash settle him for the damage, with appropriate consideration for a contingency uplift . Complainant seeks cover for storm damage to shed and other items The complainant made two claims for storm damage to the home. One in 2020, after which the insurer conducted extensive repairs and again in 2022. He says some of the 2022 damage related to poor repair work conducted by the insurer after the 2020 event. The insurer replaced the s hed on the complainant’s property through builder HR after the 2020 event. The complainant says he used this as a workshop, but it was extensively water damaged by the storm. He considers this was due to HR’s poor construction. The complainant also notes the insurer did not have someone attend his property for more than three months after the 2022 event to attend to make safe work. During this period, he says the items in his shed were exposed to the elements. This meant many of his tools were damaged and rusted. He provided photos of the rusted tools. To prevent further damage, the complainant says he purchased a temporary shed to house the tools. He also raised other issues of concern in relation to the home. Policy covers listed events including storm, subject to terms and conditions The complainant ’s policy is made up of the Insurance Certificate and the Product Disclosure Statement (PDS). There is no dispute the insurer sent these documents to the complainant. The policy covers damage caused by one of the listed events. It does not provide cover for all damage. Amongst these events is cover for loss or damage caused by a storm. This cover is subject to terms, conditions and exclusions under the policy. The PDS also confirms: We guarantee the standard of the workmanship to be free of defects. If a defect arises in the lifetime of the home as a result of poor quality workmanship, then we will rectify the problem. It is a condition of the guarantee that we reserve the right to decide who will undertake the rectification work. The insurer says this guarantee does not apply (amongst other things): to wear and tear consistent with normal gradual deterioration of the home Insurer is not required to replace the slab in the shed The complainant says water entered the shed at numerous points during the 2022 storm. This included water coming into the installed light fittings. HR reviewed the damage to the shed, agreeing it sustained water damage: Determination | Case number: 933890 Page 3 of 6 the cause of the water ingress via the ridge capping was due the amount rainwater that fell in that short period of time with wind driving the rain in and under the ridge capping The insurer agreed to replace the shed. However, it had concerns with the state of the concrete slab. The complainant says the slab was damaged in the 2022 event. Numerous experts inspected it. All agreed it was not damaged in the storm event. The slab is estimated to be about 20 years old, Engineer CR found it had multiple hairline cracks and these were due to ‘a lack of regularly spaced saw cut crack control joints’. Such joints are used to control where cracking occurs due to concrete shrinkage. Given the width of the slab (6m) is much longer than the length (3m), CR accepted shrinkage cracks are expected and represent no structural concern for the shed. However, CR said the slab was not raised from the ground, which contravenes the manufacturer’s requirements. I am satisfied there is no persuasive evidence the storm damaged the concrete slab. This alone means the insurer is not liable to replace it. The issues with the concrete slab are consistent with its age, how it was constructed and general deterioration. The policy does not cover: any part of the home, unit or contents that has wear, tear, rust, fading, rising damp, corrosion, rot, action of light, atmospheric or climatic conditions or gradual deterioration I accept the insurer is not required to replace the slab in the shed. Insurer must replace or cover the costs to replace the shed itself The insurer acknowledges HR’s construction of the new shed after the 2020 event was not to an acceptable level. Therefore, it agreed to cover the costs to replace it. The complainant paid for a temporary replacement shed and electrics at a cost of $695. The insurer agreed to reimburse these costs. It also agrees to construct a new shed on the original space, however it says it cannot do this until the complainant replaces the slab. I am satisfied it is fair that the insurer replaces the original shed, only if the complainant lays a new (and structurally compliant) slab. If this is not done within three months of acceptance of this determination, I am satisfied the insurer should not have to comply with the repair guarantee and replace the shed. The insurer remains liable for the costs, though. If the complainant does not replace the slab within the specified time, the insurer may attend to a cash settlement of the claim. This cash settlement must include:  a firm and viable estimate from a builder to replace the shed like-for-like, including construction/installation costs  the costs to obtain and install electrics as they were before and to ensure they are compliant  a 20% contingency uplift to account for the transfer of risk and as a contingency for possible unseen damage. Determination | Case number: 933890 Page 4 of 6 Insurer’s offer to pay $2,600 for replacement of t ools is fair The complainant provided photos of numerous tools he says were damaged in the 2022 storm events and due to the insurer’s delay in arranging make safe work. The storm occurred on 26 February 2022, however make safe work was not done until 4 June 2022. I acknowledge the complainant provided numerous photos of rusted tools. He also claims for a damaged stereo. The exchanged material is not persuasive in showing the storm (or the delay) was exclusively to blame for the observed rust to the tools. Even so, the insurer agreed to reimburse the complainant $2,600 for these items. Whilst the complainant says they are worth $5,200, I am not satisfied this would be a fair outcome. These costs are based on what the complainant says he paid to replace the tools. It is not clear as to the extent the tools were affected by the storm. Given this, I consider the insurer’s offer is fair. The exchanged material does not persuasively show this damage was solely (or even substantively) caused by the 2022 storm or by the insurer’s delays . Insurer’s repair of the home r oof is satisfactory HR also conducted repairs to the main part of the home in or about 2021. This included the replacement of the main roof due to hail damage. The complainant was dissatisfied with some of the repairs conducted at the time and HR was required to conduct some rectification work. The insurer says this was done, although the complainant remained unhappy with the quality of this work at the time of the 2022 claim. The complainant reported to the insurer he had concerns with:  the main roof gable  a gap between the ridge cap and roof sheet ends at the transitional flashing location. The insurer’s assessor reviewed this damage and reports these items were ‘correctly installed’ and would prevent wind driven rain from entering the home. The assessor’s report says this was discussed with the complainant and he was satisfied with this response. Whilst the complainant submits he now is not satisfied, he provided no expert evidence to show the work was deficient or otherwise not completed to an acceptable standard. On balance, I am satisfied the complainant has not shown there are outstanding issues with the roof repair that require further attention. 2.2 Is an award of compensation payable? No. The insurer is not required to pay any further non-financial loss compensation. Complainant dissatisfied with insurer’s hand ling of the claim The complainant says the insurer:  took too long (more than three months) to attend the site  some of the damage was due to poor work conducted by HR in the first place  ongoing delays and ingress problems meant he had to purchase a replacem ent shed to house his items  the overall handling of the matter was poor. Determination | Case number: 933890 Page 5 of 6 AFCA can award compensation for non-financial loss Under our Rules, AFCA can award up to $5,400 compensation for non-financial loss. This must relate to poor claims handling or other actions of the insurer which cause an unusual degree of stress, delay, or inconvenience. We expect complainants to be moderately robust, and we will not award compensation for the ordinary degree of inconvenience involved in making a claim. Insurer is not required to further compensate the complainant The insurer acknowledges the original repair work to the shed conducted by HR was not to an acceptable standard. It agreed to attend to rectification work (if the slab is replaced) and it covered the purchase of a temporary shed for the complainant. I am satisfied this was an acceptable handling of the complainant’s concerns. I accept the insurer took too long in its initial response and there was an unreasonable delay in attending to make safe repairs. I acknowledge this frustrated the complainant and led him to believe this caused further damage. The insurer offered to compensate him $2,600 for the damage caused to his tools. This was a fair outcome. The evidence that the tools were exclusively damaged by either the 2022 storm event, or the delay, is not strong. I acknowledge these issues may have been a factor or contributed to the damage. In further consideration of the overall claims experience, the insurer offered $1,000 to the complainant for non-financial loss compensation on 10 March 2023. The complainant accepted this payment. Given this, I consider there is no need for a further payment. I acknowledge there was inconven ience for the complainant and issues with some of HR’s work. I accept the insurer has attempted to address the issues with its settlement offers for the respective issues and prior payment of compensation. This represents a fair outcome in the circumstances. There is no need for the insurer to pay further compensation to the complainant. Determination | Case number: 933890 Page 6 of 6 3 Supporting information 3.1 The AFCA process AFCA’s approach is based on fairness AFCA has determined this complaint based on what is fair in all the circumstances, having regard to:  the legal principles  applicable industry codes or guidance  good industry practice  previous decisions of AFCA or its predecessor schemes (which are not binding). The respective parties have completed a full exchange of the relevant information, and each party has had the opportunity to address any issues raised. We have reviewed and considered all the information the parties have provided. While the parties have raised a number of issues in their submissions, we have restricted this determination to the issues that are relevant to the outcome. We assess complaints on available information and circumstances AFCA is not a court of law. We do not have the power to take or test evidence on oath, or to require third parties to give evidence. When we assess complaints, we consider:  available documents  the recollections of the parties  all relevant circumstances. We give more weight to documents created at the time the events occurred. If there are no relevant documents, we will decide what most likely occurred based on the available information. If there are conflicting recollections and these are evenly weighted, we may find that a claim cannot be established.

Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.